News Release on NOPR in Docket RM16-8

RM16-8_News Release20160317-3071.pdf

FERC-516A, (NOPR in RM16-8) Standardization of Small Generator Interconnection Agreements and Procedures,

News Release on NOPR in Docket RM16-8

OMB: 1902-0203

Document [pdf]
Download: pdf | pdf
March 17, 2016
News Media Contact
Mary O’Driscoll | 202-502-8680
Docket Nos. RM16-8-000
Item No. E-1

FERC Proposes Changes Requiring Small Generators to ‘Ride Through’ System Disturbances
The Federal Energy Regulatory Commission (FERC) is proposing revisions to its small generator interconnection policy to
reflect the need for those generators to “ride through” and stay connected during abnormal frequency and voltage
events.
Under the proposal, FERC would revise the pro forma Small Generator Interconnection Agreement (SGIA) adopted in
Order No. 2006 and amended in Order No. 792 to require generators smaller than 20 megawatts signing new SGIAs to
ride through abnormal frequency and voltage events, and not disconnect during those events.
The Commission says that changing industry conditions and the increasing presence and the impact of distributed
energy resources on the electric system now require the extension of that capability to small generators similar to the
requirements for generators larger than 20 megawatts. FERC also notes that the proposed changes would apply only to
small generator interconnections subject to its jurisdiction.
Comments on the proposal are due 60 days after publication in the Federal Register.