30 CFR Part 829: Special Permanent Program Performance Standards - Abandoned Coal Refuse Remining Operations

ICR 200608-1029-002

OMB: 1029-0126

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2006-12-07
Supplementary Document
2006-12-07
Supporting Statement A
2006-12-07
ICR Details
1029-0126 200608-1029-002
Historical Inactive
DOI/OSMRE Remining/829
30 CFR Part 829: Special Permanent Program Performance Standards - Abandoned Coal Refuse Remining Operations
New collection (Request for a new OMB Control Number)   No
Regular
Preapproved 02/27/2007
Retrieve Notice of Action (NOA) 01/17/2007
  Inventory as of this Action Requested Previously Approved
02/28/2010 36 Months From Approved
504 0 0
4,372 0 0
4,400 0 0

30 CFR Part 829 sets forth the minimum environemental protection performance standards to which coal refuse remining operators must adhere. These regulations implement primarily § 515 (environmental protection performance standards) and § 517 (inspections and monitoring) of the Surface Mining Control and Reclamation Act of 1977 (SMCRA or the Act), as amended by the Energy Policy Act of 1992.

US Code: 30 USC 1201 Name of Law: Surface Mining Control and Reclamation Act of 1977
  
PL: Pub.L. 102 - 486 2503 Name of Law: Energy Policy Act of 1992

1029-AB70 Proposed rulemaking 72 FR 2136 01/17/2007

No

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 504 0 504 0 0 0
Annual Time Burden (Hours) 4,372 0 4,372 0 0 0
Annual Cost Burden (Dollars) 4,400 0 4,400 0 0 0
No
No
OSM is proposing to amend our regulations to comply with the Energy Policy Act of 1992 (EPAct). The EPAct requires OSM to develop regulations establishing environmental performance and reclamation standards for abandoned coal refuse remining operations. These standards must distinguish between refuse removal operations and on-site refuse reprocessing operations and must be premised on the distinct differences between removal operations, on-site reprocessing operations, and other types of surface coal mining operations. OSM is devising different performance standards than any of those set forth in sections 515 and 516 of the Surface Mining Control and Reclamation Act of 1977, 30 U.S.C. § 1201 et seq. (SMCRA), and separate permit systems to facilitate refuse removal and on-site refuse reprocessing operations in a manner that would provide the same level of environmental protection as under sections 515 and 516. We are proposing changes to our rules that respond to the EPAct's requirements. Although we are creating new permitting requirements, OSM anticipates a greater reduction in the standard permitting requirements.

$10,920
No
No
Uncollected
Uncollected
Uncollected
Uncollected
John Trelease 202 208-2783 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
01/17/2007


© 2024 OMB.report | Privacy Policy