SURVEY OF COMMUNITY WATER SYSTEMS







OMB No. XXXX-XXXX

Expiration date: MM/DD/YY

Sheet 2: I

Paper version:

Spreadsheet version:
Web site version:



When you complete the survey, please visit our website at

Please return this questionnaire in the enclosed pre-paid Federal Express envelope.

www.UploadCWSSurvey.gov




Follow instructions to upload your completed questionnaire. Please have your Response ID available
(There will be a cover sheet that welcomes the system to the web site, verifying its name and PWSID. It will include instructions for when
or mail to:



the system finishes the survey (e.g., click "done" and follow instructions to save a version of the completed questionnaire.



If you prefer, you may return this questionnaire by emailing it as an attachment to:
it will also include the following text:)
EPA Community Water System Survey

[email protected]

c/o The Cadmus Group, Inc.




57 Water Street

You also may print a copy of the completed questionnaire and send it to us in the pre-paid Federal Express envelope provided.
Participation in the survey is voluntary. However, as a matter of policy, EPA will not disclose the identity of any respondent to this questionnaire, nor the
Watertown, MA 02472

(Please call XXX-XXX-XXXX if you need a Federal Express envelope.)
identity of any participating water system. While no respondent has ever claimed that the information asked for in this survey contains confidential business





information (CBI), EPA will offer you the opportunity of claiming CBI in the event that we receive a Freedom of Information Act request for any data that
Participation in the survey is voluntary. However, as a matter of policy, EPA will not disclose the identity of any respondent to this questionnaire, nor the

Or you may mail your printed copy of the completed questionnaire to:
would identify you or your system. It should be noted, however, that EPA has never received a Freedom of Information Act request for such information
identity of any participating water system. While no respondent has ever claimed that the information asked for in this survey contains confidential business

EPA Community Water System Survey
in prior surveys.
information (CBI), EPA will offer you the opportunity of claiming CBI in the event that we receive a Freedom of Information Act request for any data that

c/o The Cadmus Group, Inc.

would identify you or your system. It should be noted, however, that EPA has never received a Freedom of Information Act request for such information

57 Water Street
The public reporting and record keeping burden for this collection of information is estimated to average 3.58 hours per response or to range from 1 hour to
in prior surveys.

Watertown, MA 02472
5 hours per respondent annually. Burden means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or





provide information to or for a Federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and
The public reporting and record keeping burden for this collection of information is estimated to average 3.58 hours per response or to range from 1 hour to

Participation in the survey is voluntary. However, as a matter of policy, EPA will not disclose the identity of any respondent to this questionnaire, nor the
systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing
5 hours per respondent annually. Burden means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or

identity of any participating water system. While no respondent has ever claimed that the information asked for in this survey contains confidential business
information; adjust the existing ways to comply with any previously applicable instructions and requirements; train personnel to be able to respond to a
provide information to or for a Federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and

information (CBI), EPA will offer you the opportunity of claiming CBI in the event that we receive a Freedom of Information Act request for any data that
collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information. An
systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing

would identify you or your system. It should be noted, however, that EPA has never received a Freedom of Information Act request for such information
agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control
information; adjust the existing ways to comply with any previously applicable instructions and requirements; train personnel to be able to respond to a

in prior surveys.
number. The OMB control numbers for EPA's regulations are listed in 40 CFR Part 9 and 48 CFR Chapter 15.
collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information. An




agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control

The public reporting and record keeping burden for this collection of information is estimated to average 3.58 hours per response or to range from 1 hour to
If you wish, you may send comments on the Agency's need for this information, the accuracy of the provided burden estimates, and any suggested methods
number. The OMB control numbers for EPA's regulations are listed in 40 CFR Part 9 and 48 CFR Chapter 15.

5 hours per respondent annually. Burden means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or
for minimizing respondent burden, including through the use of automated collection techniques to the Director, Collection Strategies Division, U.S.



provide information to or for a Federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and
Environmental Protection Agency (2822), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460; and to the Office of Information and Regulatory Affairs,
If you wish, you may send comments on the Agency's need for this information, the accuracy of the provided burden estimates, and any suggested methods

systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing
Office of Management and Budget, 725 17th Street, NW, Washington, DC 20503, Attention: Desk Officer for EPA. Include the EPA ICR number and OMB
for minimizing respondent burden, including through the use of automated collection techniques to the Director, Collection Strategies Division, U.S.

information; adjust the existing ways to comply with any previously applicable instructions and requirements; train personnel to be able to respond to a
control number in any correspondence. Do not send the completed survey to this address.
Environmental Protection Agency (2822), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460; and to the Office of Information and Regulatory Affairs,

collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information. An

Office of Management and Budget, 725 17th Street, NW, Washington, DC 20503, Attention: Desk Officer for EPA. Include the EPA ICR number and OMB

agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control

control number in any correspondence. Do not send the completed survey to this address.

number. The OMB control numbers for EPA's regulations are listed in 40 CFR Part 9 and 48 CFR Chapter 15.










If you wish, you may send comments on the Agency's need for this information, the accuracy of the provided burden estimates, and any suggested methods




for minimizing respondent burden, including through the use of automated collection techniques to the Director, Collection Strategies Division, U.S.




Environmental Protection Agency (2822), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460; and to the Office of Information and Regulatory Affairs,




Office of Management and Budget, 725 17th Street, NW, Washington, DC 20503, Attention: Desk Officer for EPA. Include the EPA ICR number and OMB




control number in any correspondence. Do not send the completed survey to this address.


Sheet 3: II

Dear Owners and Operators of Community Water Systems:

The United States Environmental Protection Agency (EPA) is conducting a national survey of drinking water systems using the attached questionnaire.
About 1,700 water systems have been randomly selected to participate in this survey, and yours was one such system. This survey is conducted
approximately every five years, the last one being in 2000. We are sending you this questionnaire because you were identified in your state's database (State
Drinking Water Information System) as the most appropriate person to provide information about your water system. Participation in the survey is voluntary.
This survey attempts to identify key characteristics of many aspects of a water system to determine a national picture of operations, treatment schemes,
and finances. The questions asked in the questionnaire reflect myriad issues and topics including: current technology at the water system, sources of
drinking water, treatment techniques and objectives, storage, the distribution system, security questions, and system finance.

Once the questionnaires have been returned, the information collected will be reviewed and statistical inferences about water systems country will be made.
With this information, EPA will then determine the best policies and procedures for production of safe drinking water throughout the country.

This will accomplish a number of important objectives. First, it will give us current data that will allow us to better consider the costs and benefits to
water systems when we develop new national drinking water regulations. It will also allow us to measure the impact of drinking water regulations that have
been put in place since the last survey. This, in turn, will help us determine more affordable approaches to drinking water treatment. Furthermore, the answers
you provide in this questionnaire will help us in developing more effective programs to safeguard our nation's drinking water, provide guidance to the states
and measure the effectiveness of federal programs already in existence, such as the Drinking Water State Revolving Fund.

As we have done in the past, EPA will only make use of the information you provide when it has been aggregated with the responses of many other water
systems in the same size category as yours. We will never disclose your name or the name of your water system in any public documents. Please see the
inside cover of the questionnaire if you'd like more details on how your privacy will be protected.

Answers to this questionnaire will help EPA to understand your circumstances better than any other single tool we have. If you have ever wanted to have a
larger say in the development of national rules that could directly effect you and your water system, providing answers to this questionnaire is an important
contribution. Because only 1,700 of you are being asked to speak for over 50,000 other systems, your voice is that much more important and will carry that
much more weight. If you have ever felt that Federal regulators don't understand your situation, then please take this opportunity to tell us, in detail, just
what your situation is. It will make a difference.

Sincerely,

Brian C. Rourke
Program Analyst
Standards and Risk Management Division

Sheet 4: III


GENERAL INSTRUCTIONS

This questionnaire asks about your system's operational and financial characteristics.

Questions 1-4 ask for general information about your system.
Questions 5 through 20 ask about your systems operational characteristics, including its water sources, treatment practices, storage and distribution system.
Question 20 through 28 ask about your systems financial characteristics, including number of connections, revenue, expenses, and capital investment.

Please complete the questionnaire.

Paper version
Please make a copy of your completed questionnaire. Return the completed questionnaire, along with any supporting documentation, in the pre-paid FedEx
envelop provided.

Your are encouraged to enclose schematics, diagrams, financial reports, or other information that will help provide a complete picture of your water system. If
you have a map of your service area, please send it with your questionnaire. If schematics, diagrams, financial or other reports contain the information
requested by a question, you may enclose and refer to the documentation rather than fill out the question. If you are responding electronically, you may
upload any of these files at www.CWSSQuestionnaire.com.

Spreadsheet version:
You may send the completed questionnaire to us electronically via e-mail, or you may upload it to our website. You also may print a copy and send it to us by
FedEx or US mail.

Your are encouraged to enclose schematics, diagrams, financial reports, or other information that will help provide a complete picture of your water system. If
you have a map of your service area, please send it with your questionnaire. If schematics, diagrams, financial or other reports contain the information
requested by a question, you may enclose and refer to the documentation rather than fill out the question. If have electronic copies of the documents, you
may upload any of these files at www.CWSSQuestionnaire.com. Please have your Responder ID available to upload files. You also may request a pre-paid
FedEx envelope at our web site, by e-mailing us at [email protected], or by calling toll-free XXX-XXX-XXXX

Web-version
As with the paper and spreadsheet version of the questionnaire, you do not need to complete the questionnaire in one session. Your data will be saved as
you enter it. When you are finished, click on the "Done" button. Follow the instructions to save a copy of the completed questionnaire on your computer.

Your are encouraged to enclose schematics, diagrams, financial reports, or other information that will help provide a complete picture of your water system. If
you have a map of your service area, please send it with your questionnaire. If schematics, diagrams, financial or other reports contain the information
requested by a question, you may enclose and refer to the documentation rather than fill out the question. If have electronic copies of the documents, you
may upload any of these files at www.CWSSQuestionnaire.com. Please have your Responder ID available to upload files. You also may request a pre-paid
FedEx envelope at our web site, by e-mailing us at [email protected], or by calling toll-free XX


If you require more space to answer an question than is provided, please record the information on a copy of the question or use a blank
sheet of your own.

If you have any questions, please call us toll-free at XXX-XXX-XXXX


Sheet 5: 1-2

1 Please provide the name, title, and telephone number of the most knowledgeable person to contact for








information. Also, please provide the name of the responder if it does not match the label:




















A. Part I – Operating Characteristics

B. Part II – Financial Characteristics








(Write “SAME” if same as A)



Name:








Title:








Tel. No.








Fax No.








E-mail:







2 This survey will ask you to provide operating and financial information for your public water system for








the most recent 12-month period for which data are available. Please specify below the end dates for which








data are provided.


















A Operating information (end date):










mm dd yy











B Financial information (end date):










mm dd yy

Sheet 6: 3-4

3 Please classify your water system using the following criteria. (Please check one only)





Owned and operated by a government or public agency (not including government-owned systems that hire a private company to operate the system)


Owned by a government or public agency and operated by a private contractor


Owned privately and operated for profit primarily as a water business (e.g., American Water Company)


Owned privately and not operated for profit (e.g., a homeowners association or a non-profit cooperative)


Owned privately and operated as a necessary part of another business (e.g., a mobile home park)
4 A Do you have regular access to a computer for sending and receiving information?







(Skip to question 5)

B Do any of your computers have the following features? (Please check all that apply)





Microsoft Excel




Microsoft Access




CD drive




DVD player


C What access do you have to the internet? (Please check one only)





High speed internet access (e.g., cable, DSL, wireless, or T1)




Dial-up modem access




No access


Sheet 7: Fig 1

The following definitions of the components of a water system are used in this survey. Figure 1 is an example of a schematic of a water system showing water sources, treatment plants, transmission lines, and the distribution system.


Please refer to these definitions and the schematic for an explanation of the terms used in questions 6 through 11. Please submit diagrams or schematics, using figure 1 as a guide.


Please note that the identifier numbers used in the questions do not refer to specific items in figure 1. For example, use ‘S1' to refer to your first surface water source, regardless of whether it is a flowing stream, as depicted in the schematic, or another surface water source.








Term Example Code Definition Figure 1: Sample diagram of intakes, treatment plants, and entry points
Surface water intake S1, S2 A surface water intake refers to the structure at the surface water source (flowing stream, lake, reservoir, or ground water under the direct influence of surface water) that permits the withdrawal of the water from that source.
Ground water source G1, G2, G3 A ground water source refers to the connection of untreated water from one or more wells to a water treatment plant or directly into the distribution system. Where the water from multiple wells flows through a common pipe prior to entry into the treatment plant or distribution system, the combined flow is considered one ground water source.
Purchased water connection P1, P2 A purchased water connection refers to the transmission of water from the seller's water system to a water treatment plant or directly into the distribution system of the purchaser's water system.
Water treatment plant WTP 1, WTP 2 A water treatment plant is any facility where water is filtered, disinfected, and/or otherwise treated prior to its transmission into the distribution system (or its conveyance to another purchasing water system). For the purposes of this survey, simple disinfection only or pH adjustment prior to entry into the distribution system are considered to be a water treatment plant. Other examples include large scale filtration plants and chemical feed on wells for disinfection. It does not include facilities within the distribution system that boost disinfection.
Buyer B1, B2, B3 A buyer refers to any system to whom water is sold.
Entry point E1, E2, E3 An entry point is where treated or untreated potable water enters into the water system's distribution system.

Sheet 8: 5

5 Please draw your schematic here or submit a schematic on a separate sheet of paper. Figure 1 is an example of the type

of schematic requested.




















































































































r

Sheet 9: 6A

6 Provide the following information for the ground water sources, surface water intakes, or purchased water connections for this water system.








MG is millions of gallons of water.








MGD is millions of gallons per day.








If the source is used on a seasonal or emergency basis, the average daily amount is for the days the source is used.

















A Ground water sources grouped by entry point to the distribution system.








Please list each well or group of wells feeding into a single ground water entry point separately by line.


















Ground water sources grouped by entry point to the distribution system How many individual wells supply this ground water entry point? Is this a seasonal source?
(Yes or No)
Is this an emergency source?
(Yes or No)
If this is a seasonal or emergency source, how many months was it used in the 12-month period reported in question 2A? Is the water from this source treated by your system?1
(Yes or No)
What is the total amount of water drawn from this source in the 12-month period reported in question 2A?
(MG)
On average, how much water is drawn from this source on a typical day that they were used during the reporting period in question 2A?
(MGD)
Estimate the maximum daily amount of water that can be drawn from this source that supplies each ground water entry point.2
(MGD)

G1








G2








G3








G4








G5








G6








G7








G8








G9








G10


















1. Treatment includes any process that alone or in combination with other processes has an objective of producing or maintaining potable water.








2. If there is no limit on the amount of water that can be withdrawn, enter "no limit" here.








Limits on the availability of water include source capacity, water quality requirements, state and local water resource plans, local economic development and growth








projections, contractual obligations, permits, water rights, and legal constraints. Limits also include current equipment constraints imposed by system components,








pumps, and water treatment plant capacity.








Sheet 10: 6B

B Surface water intake identifiers.








Please list each surface water intake separately by line.


















Surface water intake identifiers What is the source for this surface water intake?
(Please select one)
Is this a seasonal source?
(Yes or No)
Is this an emergency source?
(Yes or No)
If this is a seasonal or emergency source, how many months was it used in the 12-month period reported in question 2A? Is the water from this intake treated by your system?2
(Yes or No)
What is the total amount of water drawn from this source in the 12-month period reported in question 2A? (MG) On average, how much water is drawn from this source on a typical day that it was used during the reporting period in question 2A?
(MGD)
Estimate the maximum daily amount of water that can be drawn from each surface water intake.3

1) Flowing stream,
2) Reservoir or lake,
3) GWUDI1

S1








S2








S3








S4








S5








S6








S7








S8








S9








S10


















1. GWUDI is ground water under the direct influence of surface water.








2. Treatment includes any process that alone or in combination with other processes has an objective of producing or maintaining potable water.








3. If there is no limit on the amount of water that can be withdrawn, enter "no limit" here.








Limits on the availability of water include source capacity, water quality requirements, state and local water resource plans, local economic development








and growth projections, contractual obligations, permits, water rights, and legal constraints. Limits also include current equipment constraints imposed by








system components, pumps, and water treatment plant capacity.








Sheet 11: 6C

C Purchased water connections.















If your system purchases water from one source but has multiple connections or turnouts, please list each connection or turnout separately by line.
































Purchased water con-nections Provide the PWSIDs or name of the sellers for each connection. A seller can appear more than once. Is this a seasonal source?
(Yes or No)
Is this an emergency source?
(Yes or No)
If this is a seasonal or emergency source, how many months was it used in the 12-month period reported in question 2A? When you purchase this water, is it one of the following? (Please select one) What is the source of the purchased water?
(Please select one)
Do you boost disinfection of water from this source after it enters the distribution system? (Yes or No) Do you provide any other treatment1 to this water? (Yes or No) What is the total amount of water drawn from this source in the 12-month period reported in question 2A?
(MG)
On average, how much water is drawn from this connection on a typical day that it was used during the reporting period in question 2A?
(MGD)
Estimate the maximum daily amount of water that can be drawn from each purchased water connection.3




1) Finished,
2) Partially
treated1,
3) Untreated,
4) Unknown
1) Ground,
2) Surface,
3) GWUDI,2
4) Unknown





P1















P2















P3















P4















P5















P6















P7















P8















P9















P10

































1. Treatment includes any process that alone or in combination with other processes has an objective of producing or maintaining potable water.















2. GWUDI is ground water under the direct influence of surface water.















3. If there is no limit on the amount of water that can be withdrawn, enter "no limit" here.















Limits on the availability of water include source capacity, water quality issues, state and local water resource plans, local economic development and growth















projections, contractual obligations, permits, water rights, and legal constraints. Limits also include constraints imposed by system components, pipeline carrying















capacity, and water treatment plant capacity.















Sheet 12: 7

7 Provide the following information for each water treatment plant in this water system. A water treatment plant is any facility that treats or otherwise improves




the quality of the water. It includes large scale filtration plants, chemical feeds on wells for disinfection, and facilities that adjust pH prior to entry to the




distribution system. It does not include facilities within the distribution system that boost disinfection.










Average daily production is the total amount of water produced by the plant divided by the number of days the plant was in use in the 12-month reporting




period in question 2A. Mathematically, it is the sum of all the daily flows divided by the number of daily flows. Design capacity refers to the maximum




amount of water the plant can produce in a single 24-hour period with all treatment trains operating at capacity. Peak daily production refers to the maximum




amount produced in a single day over the 12-month reporting period in question 2A.










Water treatment plant identifier List all of the surface, ground, and purchased water sources from question 6 that feed into each water treatment plant. What was the average daily production of each water treatment plant for the 12-month period reported in question 2A? What was the design capacity for each water treatment plant? What was the peak daily production for each water treatment plant for the 12-month period reported in question 2A?

WTP1




WTP2




WTP3




WTP4




WTP5




WTP6




WTP7




WTP8




WTP9




WTP10




Sheet 13: T1 & T2

Use the treatment processes in table 1 and the objectives in table 2 to describe the treatment processes used by each plant in question 8.












Table 1: Treatment Processes Codes
Table 2: Treatment Objectives Codes
Treatment Code Treatment Code
Treatment Code
Disinfection
Filtration (continued)

Algae control O1
Chlorine T1 Rapid sand filter T21
Corrosion control O2
Chlorine dioxide T2 Deep bed mono-media T22
Primary disinfection O3
Chloramines only T3 Dual/multi media T23
Secondary disinfection O4
Chloramine with a free chlorine T4


Disinfectant byproduct control O5
period (based on need in the
Membranes

Dechlorination O6
distribution system and not
Reverse osmosis T24
Oxidation O7
routinely done)
Microfiltration T25
Iron removal O8
Chloramine with seasonal T5 Ultrafiltration T26
Manganese removal O9
(routine) free chlorine use
Nanofiltration T27
Taste/odor control O10
Ozone T6


TOC removal O11
Ultraviolet light T7 Other

Particulate/turbidity removal O12
Mixed oxidant T8 Aeration T28
Softening (hardness removal) O13


Potassium permanganate T29
Recarbonation O14
Filtration Processes
Corrosion control T30
Organic chemical contaminant removal (e.g., VOCs, pesticides) O15
Coagulant addition/rapid mix T9 Ion exchange T31
Inorganic chemical contaminant removal (e.g., arsenic) O16
Polymer addition T10 Activated alumina T32
Radionuclides contaminant removal O17
Flocculation T11 Iron-based adsorptive media T33
Security O18
Settling/sedimentation T12 Sequestration T34
Mussel control O19
Lime/soda ash softening T13 Fluoride addition T35
Disinfection byproduct control O20
Recarbonation T14 Dissolved air flotation T36
Fluoridation O21


Granular activated carbon T37
Other (1) see question 8 O22
Filtration
Centrally managed POU/POE T38
Other (2) see question 8 O23
Micro strainer T15 Clearwell and/or contact vessel T39
Other (3) see question 8 O24
Slow sand filter T16 (e.g., basin, pipeline)



Bag or cartridge T17 Other (1) see question 8 T40


Diatomaceous earth T18 Other (2) see question 8 T41


Pressure filtration T19 Other (3) see question 8 T42


Green sand T20





Sheet 14: 8




















































8 Using the water treatment plant identifiers from question 7, characterize the treatment practices used in each of your system's treatment plants.















































- Please enter the treatment process and objective for each step of the treatment practice. Use the codes from tables 1 and 2 above.














































- There are a total of 15 steps available to select these processes and objectives. Each step may have up to three processes and six objectives. Copy this page if you















































have more than 10 plants or use more than 15 steps in a single plant. If you have more than six objectives for a treatment step, please provide the six most important objectives.














































- Do not include disinfection booster stations that are within the distribution system.































































































Two examples are provided. The first is example is conventional filtration. The second is iron/manganese removal.
































































































WTP
Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 Step 11 Step 12 Step 13 Step 14 Step 15


Ex. 1 Process T10

T11

T12

T24

T1

T40






























Objective O12

O12

O12

O12

O3

O3













































































Ex. 2 Process T8

T22

T1







































Objective O6 O8
O7 O8
O3







































O7













































WTP 1 Process














































Objective





























































































WTP 2 Process














































Objective





























































































WTP 3 Process














































Objective





























































































WTP 4 Process














































Objective





























































































WTP 5 Process














































Objective





























































































WTP 6 Process














































Objective





























































































WTP 7 Process














































Objective





























































































WTP 8 Process














































Objective





























































































WTP 9 Process














































Objective





























































































WTP 10 Process














































Objective















































































































































Use treatment codes T40, T41, and T42 for any treatment process you use that is not listed in Table 1 on page 9.




















Use treatment codes O21, O22, and O23 for any objective that is not listed in Table 2 on page 9.

























Please specify what each process is:




















Please specify what each objective is:
































T40: Other (1)






















O21: Other (1)























T41: Other (2)






















O22: Other (2)























T42: Other (3)






















O23: Other (3)




































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































































Sheet 15: 9

9 Using the water treatment plant identifiers from question 7, indicate if the specified residuals management practices are used and provide the















requested information regarding potential discharge. (Yes or No for each category)

































Do you use the following residual management process in the following water treatment plants?
(Use the water treatment plant numbers from Question 8)


Dewatering Disposal



Mechanical dewatering (e.g., belt presses, centrifuges, pressure filters, and vacuum filters) Non-mechanical dewatering (e.g., lagoons, drying beds, and freeze assisted drying beds) Land ap-plication (e.g.,
bene-
ficial
use)

Deep
well injection
Waste landfill Waterway Septic system Sanitary sewer


Water treatment plant identifier On-Site Storage Hazar-
dous
waste landfill
Non-hazard-ous
waste landfill
Can you discharge
to a
water-
way (surface water)?
If yes,
do you
discharge
to a
water-
way?
Can you discharge to a
septic system?
If yes, do you discharge to a
septic system?
Can you discharge to a sanitary sewer? If yes, do you discharge to a sanitary sewer? Recycle filter
back-
wash
Other (specify)

WTP 1















WTP 2















WTP 3















WTP 4















WTP 5















WTP 6















WTP 7















WTP 8















WTP 9















WTP 10
































Sheet 16: 10

[QUESTION 10 ASKED OF VERY LARGE SYSTEMS ONLY]







10 A Is your system currently treating (directly or indirectly) for any contaminants not regulated by the federal government? (Directly means that the treatment







in place is due to the presence of the unregulated contaminant. Indirectly means that the unregulated contaminant is being addressed because of current







treatment practices for a regulated contaminant.)







Yes







No (Skip to question 11)






B Please provide the following information about unregulated contaminants addressed by your treatment plants.







(If you have more than 10 unregulated contaminants, please make a copy of this table.)
















What are the unregulated contaminants that are being addressed by your treatment plants? If known, please provide the concentration of the unregulated contaminant in the raw and finished water as it leaves the plant. Enter N/A if unknown. Enter ND if the contaminant was not detected. Please provide the units as well (e.g., mg/L). What water treatment plant treats for the unregulated contaminant (use plant identifiers from questions 8)? Is the plant treating directly for this contaminant, i.e., is it in place to treat specifically for this contaminant?


Raw water Finished Water


Concentration Units Concentration Units




























































































Sheet 17: 11

11 A What is the total capacity of storage located past




D Please provide the following information about the practices you use to maintain water





the first residential customer?





quality in storage vessels.





(in millions of gallons)





















1
2

B Please indicate the number of each type of storage facility that you









Check below if


have in your utility that are located past the first residential









you believe you


customer.







Do you use any
have adequate











of the following
information on


1 Fully or partially buried






practices to
how to use each











maintain water
strategy to


2 Ground level






quality in
address water











storage vessels
quality


3 Elevated






in your system?
degradation in











(Please check all
your storage


4 Hydropneumatic






that apply)
facilities
















5 a. Standpipes




a Modeling or other detention time evaluations 















b. How many standpipes are operated




b Longer fill/draw cycles to increase mixing



as surge tanks?
















c Inlet/outlet modifications


6 Other
















d Mechanical mixing

C
Indicate the typical number of years between










cleaning an individual storage vessel:




e Increase or switch disinfectant residual





















f Operational modifications to maintain












disinfectant residual





















g Other (please specify)



























Sheet 18: 12

12 Estimate the length of the transmission lines and distribution mains in your system, and length of pipe replaced in the last five years.




















A transmission line is defined as a pipeline that transports raw or partially treated water to a water treatment plant or finished water to a




















distribution grid.




















A distribution main is defined as part of the pipeline network that distributes water to the consumers.




















Replaced pipe is pipe that has either been physically removed from the ground or has been subject to major rehabilitation efforts.




















New pipe installed is new transmission lines or distribution mains that do not replace existing pipe.

































Distribution Mains




























Water Treatment
Plant

















Source Transmission Line

Transmission Line








































































Pipe Type and Diameter
Existing (or Current) Length of Pipe
(In Miles)
Length of Pipe Replaced in the Last 5 Years1
(In Miles)
Length of New Pipe Installed in the Last 5 Years1
(In Miles)


Transmission lines





Mains Less than 6"





6-10"






Greater than 10" and Less than 24"







24" or greater






1. Ending on the date shown in your answer to question 2A.



















Sheet 19: 13-17

13 A Please provide the following information about each pressure zone in your distribution system.







1 How many pressure zones do you have in your distribution system?






2 How many pressure zones have booster disinfection stations?






3 How many booster disinfection stations do you have throughout your distribution system?





B If your system has experienced a loss of pressure during the past operating year below 20 psi,







please tell us the number of pressure losses that occurred for each of the following reasons:







1 Power outage






2 Fire






3 Main pipeline burst






4 Other (such as maintenance, flushing; please specify)













14 Do you flush your distribution system on a regular basis?








Yes
No (If No, skip to question 17)


15 What percentage of the distribution system is flushed each year on a regular basis?





%
16 What approach is used when you flush your system on a regular basis?







A (Uni-) Directional (Restricting water flow to one direction using closed valves to maximize velocity,







generally from source/plant to the lowest elevation in the system)





B Random or non-directional (Opening hydrants on lines without closing valves or restricting the direction of water flow)






C Dead end (opening a hydrant or flush valve on the dead-end line)






D Other (Please specify)





17 A If you do not flush your system on a regular basis, have you ever flushed your system?








Yes
No (If No, skip to question 18)


B 1 What was the last year you flushed your system?






2 What year did you flush the system before that?







(Enter "NA" if you only flushed the system once.)






Sheet 20: 18-19

18 Please provide the following data on disinfection residuals for one summer month (June, July, August, September) and one winter month











(December, January, February).


























Average Entry Point Disinfectant Residual for the Treatment Plant with the Highest Average Daily Flow (mg/L) Distribution system



Surface water entry point1 Ground water entry point Average distribution disinfectant residual Percentage of Distribution System Samples <0.2 mg/L, including non-detects



(mg/L as Cl2) (mg/L as Cl2) (mg/L as Cl2)

Season Month Total Cl2 Free Cl2 Total Cl2 Free Cl2 Total Cl2 Free Cl2 Total Cl2

Summer






%

Winter






%














1. Surface water entry points includes ground water under the direct influence of surface water. If the plant treats both surface and ground water,











report the results in the surface water entry points columns.























[QUESTIONS 19 ASKED OF SMALL AND MEDIUM SYSTEMS ONLY]











19 Please list the 5-digit ZIP codes included in your service area. This information will be used to identify the unique demographic characteristics











of your service area so that EPA can better assess the financial and operating characteristics of the system



















































































Sheet 21: 20

20 Please answer the following questions about water security.


Enter Yes or No

A 1
Has your water system attended any EPA-sponsored water security training?










2
Have you used EPA's web-based water security technology product guides?










3
Have you heard of EPA's Response Protocol Toolbox?










4
Have you heard of the 14 features of an “active and effective” water security program?










5
What, if any, information do you need that would help you protect your system against security threats? (Please write a brief answer below)




















B 1
Have you heard of mutual aid and assistance agreements and/or compacts? (If No, skip to section C)










2
Would you be interested in joining such an agreement and/or contract?










3
If not, please explain why not ______________________________________________________________________________________
















C What are the two largest barriers to enhancing security at your system? (Please select only 2)





1
Lack of interest at the system, public, or rate board level


2
Competing priorities (regulatory compliance, aging infrastructure, etc.)


3
Lack of funding


4
Lack of knowledge / guidance / training materials


5
Other (Please specify)








D Who do you prefer to get Water Security Information / Products from? (Please select only one)





1
Department of Homeland Security



2
EPA


3
Water Associations


4
No preference


5
Other (Please specify)








Sheet 22: 21

21 A Please complete the table below for the most recently completed fiscal year (the











B Please indicate your water system's revenue during the last





12-month period indicated in question 2B). Financial information is needed to assess












year from other water-related revenue sources.





the financial condition of the water system, to assess possible future expenditures, and



















to see how costs are distributed among customers. No financial information provided












1 Connection and development fees

$


will affect any EPA or other Federal financial assistance program.












2 Revenue from the Government (e.g. General



















fund of Municipal Government, public




Column A: What was the amount of water produced and delivered to each of the following













systems only)

$


customer categories? Report the amount in millions of gallons per year (MGY).












3 Other water-related revenue not reported




Unaccounted for water includes system losses and uncompensated uses (e.g., fire flow).













above (e.g., fines, penalties, other fees;

$

















please specify)




Columns B and C: How many connections and people did your drinking water



















system serve year-round? Please indicate the number of connections and number of



















people served by your water system for all customer types that apply. If you do not



















know the connections or people served, please provide your best estimate.











C Provide the PWSID or name of each public water supplier



















included in the response to part A1 above.





Column D: What were your drinking water system's revenues from water sales for



















each of the following customer categories? (Enter “0” if you do not have revenue












1 Finished water




from a source.)










































Column A

Column B
Column C
Column D












Water

Number of
Number of
Water












Quantity

Connections
People
Sales



2 Partially treated or untreated water






Delivered

Served
Served
Revenue































1 Sold to other water suppliers



















a Finished water
MGY




$











b Partially-treated










D Please indicate the revenue you receive from






or untreated water
MGY




$



non-drinking water related business, not



















included above, including rental income and the





2 Residential
MGY




$



sale of other goods and services:


$























3 Non-residential (Commercial, Industrial, Agricultural)










E If you did not report any revenue under parts A, B, and D,






a Finished water
MGY




$



how did you pay for your system's operations?






b Partially-treated or















untreated water
MGY




$






















4 Unaccounted for water and














uncompensated usage
MGY
















































Sheet 23: 22-25

22 Please identify your drinking water system's billing structure.







[QUESTIONS 24 ASKED OF SMALL, MEDIUM, SYSTEMS ONLY]











(Please check all that apply)



Non-


24 A Does your system serve a residential population that changes on a





Does your system serve a residential population that changes on a seasonal basis? The seasonal population is considered the population that fluctuates within a system based on the seasons. For example, the population of a water system serving a winter or summer resort area has an influx during certain periods of the year. (Please check Yes or No)





Residential
residential




seasonal basis? The seasonal population is considered the population









A Metered charges
Customers
Customers




that fluctuates within a system based on the seasons. For example, the










1 Uniform rate







population of a water system serving a winter or summer resort area has










2 Declining block rate






an influx during certain periods of the year. (Please check Yes or No)










3 Increasing block rate














4 Peak period rate (e.g., seasonal)































B Unmetered charges







B Please indicate the average daily flow during peak season:







5 Separate flat fee for water





C Please indicate the approximate length in days










6 Annual connection fee




of the peak season (e.g. 30, 60, or 90 days):





























7 Combined flat fee for water





25 Please enter the average cumulative number of hours operators, mangers, and












and other services (e.g., rental fees,





administrative staff work in the water system each week. Please include part-












association fees, pad fees):



time and contract employees that operate the system. For staff employed










C Other billing methods (please specify):







directly by the system, enter the average hourly wage or salary of each. Enter








directly by the system, enter the average hourly wage or salary of each. Enter the cost of










the cost of fringe benefits provided as a percentage of wages or salaries.








fringe benefits provided as a percentage of wages or salaries. (Fringe








(Fringe benefits include pension and other retirement contributions, health








benefits include pension and other retirement contributions, health insurance
23 A Does your system have a program that lowers the cost of drinking water







insurance contributions, vacation, and sick leave.) For contract employees








contributions, vacation, and sick leave.) For contract employees that operate


for low- or fixed-income households? (Please check only one)







that operate the system, provide the average hourly cost to the system of the








the system, provide the average hourly cost to the system of the contract











contract employees (including wages, salaries, benefits, and fees).








employees (including wages, salaries, benefits, and fees).



Yes




















No (Skip to question 24)












Contract




















employees




B What are the eligibility requirements for this program?










Hours per

that operate

















week Employees of the system: the system

















employees
Benefits as a


















work in the Average percentage Average

















water hourly of salary or hourly labor













Staff system wage/salary wages cost













A Operators










C How many households qualify






1 Treatment Plant


$ % $





for the program?






2 Distribution System


$ % $













B Managers


$ % $













C Administrative staff


$ % $





Sheet 24: 26-27b











26 This question is intended to account for all of your drinking water expenses




27 A If you have paid for major capital improvements, repairs, or


related to the revenues referred to in question 21 A and B. Please provide






expansions in the last five years ending on the date reported in


finanical data for the latest 12 month period for which they are available. Please






question 2B, please indicate the total amount spent on these capital


do not compile new data specifically for the survey if data already exists. The






expenditures.


categories below are intended to be mutually exclusive. For example, expenses










for purchased water in part B should include the cost of the water only (an






1 a Land: $

operating expense), not the capital required to bring it to the system.



















b How much land was purchased (acres):

A Please attach available summaries of financial statements, including a










balance sheet, income statement, and statement of cash flows. Please





2 Water source: $


attach a depreciation schedule, if one is available (i.e., a program defining










your process for depreciating the value of capital improvements).





3 Transmission and distribution system: $













B Please enter the following routine operating expenses in the last year:





4 Treatment: $














1 Expenses for purchased water: $



5 Storage: $














2 Security related expenses (spending for




6 Security (include security-related



security only, e.g., gates, locks, or guards): $




spending not included in other capital










expenditures): $


3 Other routine operating expenses (including










expenses for labor, chemicals, power, materials




7 All other not included above: $



and supplies, and contractor services): $




















4 Depreciation expenses: $



What percentage of the total capital expenditures identified in part A were









used for the following (must sum to 100 percent)?



5 Income taxes (privately owned systems): $















1 System expansion, regardless of whether


6 Other payments to the general fund, e.g.,





expenditure includes replacement and repair



payment in lieu of taxes (publicly owned



B
of equipment or compliance with regulations %



systems): $















2 Replacement and repair of equipment, regardless

C Please enter the amount of debt service expenditures in the last year:






of whether it includes compliance with regulations










but excluding spending for system expansion %


7 Interest payments: $















3 Compliance with regulations, excluding expendi-


8 Principal payments: $




tures for system expansion and replacement










and repair of equipment %

D Other Expenses






















9 Capital improvements: $




















10 Payments to reserve funds: $







Sheet 25: 27c-28











C How were the major capital improvements, repairs, and expansions of the past five years from question 27A funded?





















Percentage of capital expenses
For borrowed funds, please provide the:






funded from each source (should sum to 100 percent)
Average Interest Rate
Average Length of Loan Period (Years)


1 Current revenue (including payments








from reserve funds):
%





2 Equity or other funds from private investors:
%





3 Department of Homeland Security Grant:
%





4 Other government grants:
%





5 Drinking Water State Revolving Fund








a Principal Repayment Forgiveness:
%






b Loans:
%
%



6 Other borrowing from public sector








sources (e.g., state or regional authorities):
%
%



7 Borrowing from private sector sources








(e.g., banks or the bond market):
%
%



8 Other (please specify):










%
%

28 A Do you have an asset management plan or other formal written strategy addressing








your long-term (e.g., 20 years or more) needs for infrastructure rehabilitation and replacement?








Yes







No