Impep Questionnaire

IMPEP questionnaire.wpd

Policy Statements, Criteria for Guidance of States and NRC in Discontinuance of NRC Regulatory Authority and Assumption thereof by states through agreement and IMPEP Questionnaire.

IMPEP QUESTIONNAIRE

OMB: 3150-0183

Document [pdf]
Download: pdf | pdf

Approved by OMB1

No. 3150-0183

Expires XX/XX/XX


INTEGRATED MATERIALS PERFORMANCE EVALUATION PROGRAM


QUESTIONNAIRE


Name of State/Regional Program

Reporting Period: Month XX, [YEAR], to Month XX, [YEAR]


Note: If there has been no change in the response to a specific question since the last IMPEP questionnaire, the State or Region may copy the previous answer, if appropriate.


A. GENERAL


1. Please prepare a summary of the status of the State's or Region's actions taken in response to the comments and recommendations following the last review.


AB. COMMON PERFORMANCE INDICATORS


I. Technical Staffing and Training


12. Please provide the following organization charts, including names and positions:


(a) A chart showing positions from Governor down to Radiation Control Program Director;


(b) A chart showing positions of current radiation control program including management; and


(c) Equivalent charts for sealed source and device evaluation, low-level radioactive waste and uranium recovery programs, if applicable


23. Please provide a staffing plan, or complete a listing using the suggested format below, of the professional (technical) person-yearsfull-time equivalents (FTE) of effort applied to the agreement or radioactive materials program by individual. Include the name, position, and, for Agreement States, the fraction of time spent in the following areas: administration, materials licensing & compliance, emergency response, low-level radioactive waste, uranium recovery, other. If these regulatory responsibilities are divided between offices, the table should be consolidated to include all personnel contributing to the radioactive materials program. Include all vacancies and identify all senior personnel assigned to monitor work of junior personnel. If consultants were used to carry out the program's radioactive materials responsibilities, include their efforts. The table heading should be:


Name Position Area of Effort FTE%



34. Please provide a listing of all new professional personnel hired since the last review, indicate the degree(s) they received, if applicable, and additional training and years of experience in health physics, or other disciplines, ifas appropriate.


45. Please list all professional staff who have not yet met the qualification requirements offor a license reviewer/ or materials inspectionor staff (for NRC, Inspection Manual Chapter (IMC) 1246; for Agreement States, please enclose a copy of your qualification and training procedure. If you do not have a written procedure please describe your qualifications requirements for materials license reviewers and inspectors). For each, list the courses or equivalent training/experience they need to attend and a tentative schedule for completion of these requirements.


6. Identify any changes to your qualification and training procedure that occurred during the review period.


57. Please identify the technical staff whothat left the Agreement State/Regional DNMS your program during thise review period.


68. List theany vacant positions in eachyour program, the length of time each position has been vacant, and a brief summary of efforts to fill the vacancy.


79. For Agreement States, Ddoes the Agreement State your program have an oversight board or committee which provides direction to the program and is composed of licensees and/or other members of the public? If so, please describe the procedures used to avoid any potential conflict of interest.


II. Status of Materials Inspection Program


810. Please identify individual licensees or categories of licensees the State/Region is inspecting more or less frequently than called for in NRC’s Inspection Manual Chapter (IMC) 2800 and stateexplain the reason for the difference. The list only needs to include the following information: licensee name, license number, your inspection interval, and rationale for the difference.


911. Please provide for the review period, the number of routine inspections of Priority 1, 2, and 3 inspectionslicensees, as identifieddefined in IMC 2800; that were completed and the number of initial inspections; and the number of increased controls inspections that were completed during the review period.


102. Please submit a table, or a computer printout, that identifies inspections of Priority 1, 2, and 3 licensees, increased controls, and initial inspections that are presently overdue or which were conducted overdue per the applicable guidance at intervals that exceed the IMC 2800 frequencies over the course of the entire review period. (See STP Procedure SA-101, Reviewing the Common Performance Indicator, Status of Materials Inspection Program, for detailed guidance in preparing this information). Priority 1, 2, and 3 licensees and initial inspections must be conducted at least as frequently as the inspection intervals established in IMC 2800. Increased controls inspections should be conducted at the intervals established in the Staff Requirements Memorandum for COMSECY-05-0028.


At a minimum, the list should include the following information for each inspection that is overdue or was conducted overdue during the review period:


(1) Licensee Name

(2) License Number

(3) Priority (IMC 2800)

(4) Last inspection date or license issuedance date, if initial inspection

(5) Date Due

(6) Date Performed

(7) Amount of Time Overdue

(8) Date inspection findings issued


13. Please submit a table or computer printout that identifies any Priority 1, 2, and 3 licensees, increased controls, and initial inspections that are currently overdue, per the applicable guidance. At a minimum, the list should include the same information for each overdue inspection provided for Question 12 plus your action plan for completing the inspection.


11. If you have any overdue inspections, do you have an action plan for completing them? If so, please describe the plan or provide a written copy with your response to this questionnaire.


124. Please provide the number of reciprocity licensees that were candidates for inspection per year as described in NRC IMC 1220 and the number of candidate licensee reciprocity inspections that were completed each year during the review period.


III. Technical Quality of Inspections


135. What, if any, changes were made to your written inspection procedures during the reporting period?


146. Prepare a table showing the number and types of supervisory accompaniments made during the review period. Include:



Inspector Supervisor License Category Date



15. Describe internal procedures for conducting supervisory accompaniments of inspectors in the field.


167. Describe or provide an update on your instrumentation, methods of calibration and laboratory capabilities. Are all instruments properly calibrated at the present time? Were there sufficient calibrated instruments available throughout the review period?


IV. Technical Quality of Licensing Actions


178. How many specific radioactive material licenses does the Program regulate at this time?


189. Please identify any major, unusual, or complex licenses which were issued, received a major amendment, were terminated, decommissioned, submitted a bankruptcy notification or renewed in this period. Also identify any new or amended licenses that now require emergency plans.


20. Identify any licensees or groups of licensees that were issued increased controls during the review period. Those licensees that were initially identified during the initial implementation of increased controls need not be listed.


1921. Discuss any variances in licensing policies and procedures or exemptions from the regulations granted during the review period.


202. What, if any, changes were made in your written licensing procedures (new procedures, updates, policy memoranda, etc.) during the reporting period?


213. Identify by licensee name, and license number and type, any renewal applications that have been pending for one year or more. Please indicate why these reviews have been delayed and describe your action plan to reduce the backlog.


V. Responses to Technical Quality of Incidents and Allegations Activities


224. For Agreement States, please provide a list of any reportable incidents not previously submitted to NRC (See STP Procedure SA-300, Reporting Material Events, for additional guidance, OMB clearance number 3150-0178). The list should be in the following format:



Licensee Name License # Date of Incident/Report Type of Incident



235. During this review period, did any incidents occur that involved equipment or source failure or approved operating procedures that were deficient? If so, how and when were other State/NRC licensees who might be affected notified? For States, was timely notification made to NRC? For Regions, was an appropriate and timely PN generated? For Agreement States, was information on the incident provided to the agency responsible for evaluation of the device for an assessment of possible generic design deficiency? Please provide details for each case.


246. Identify any changes to your procedures for responding to incidents and handling allegations that occurred during the period of this review.


VI. General


25. Please prepare a summary of the status of the State's or Region's actions taken in response to the comments and recommendations following the last review. Provide the results of any program audits (including self-audits) completed during the review period.


26. Provide a brief description of your program's strengths and weaknesses. These strengths and weaknesses should be supported by examples of successes, new initiatives, problems or difficulties which occurred during this review period.


BC. NON-COMMON PERFORMANCE INDICATORS


I. Legislation and Program Elements Required for Compatibility Requirements


27. Please list all currently effective legislation that affects the radiation control program. Denote any legislation that was enacted or amended during the review period.


28. Are your regulations subject to a "Sunset" or equivalent law? If so, explain and include the next expiration date for your regulations.


29. Please review and verify that the information in the enclosed State Regulation Status (SRS) sheet is correct. For those regulations that have not been adopted by the State, explain why they were not adopted, and discuss actions being taken to adopt them. If legally binding requirements were used in lieu of regulations, please describe their use.


30. If you have not adopted all amendments within three years from the date of NRC rule promulgation, briefly describe your State's procedures for amending regulations in order to maintain compatibility with the NRC, showing the normal length of time anticipated to complete each step.


II. Sealed Source and Device (SS&D) Evaluation Program


31. Prepare a table listing new and amended (including transfers to inactive status) SS&D registrations of devices issued during the review period. The table heading should be:



SS&D Manufacturer,

Registry Distributor or Product Type Date Type of

Number Custom User or Use Issued Action



32. What guides, standards and procedures are used to evaluate registry applications?


33. Please include information on the following questions in Section A, as they apply to the SS&D Program:


Technical Staffing and Training - Questions 12-79

Technical Quality of Licensing Actions - Questions 178-213

Responses to Technical Quality of Incidents and Allegations Activities - Questions 22-24-26


III. Low-Level Radioactive Waste Disposal Program


343. Please include information on the following questions in Section A, as they apply to the Low-Level Radioactive Waste Disposal Program:


Technical Staffing and Training - Questions 12-79

Status of Materials Inspection Program - Questions 810-114

Technical Quality of Inspections - Questions 135-167

Technical Quality of Licensing Actions - Questions 178-213

Responses to Technical Quality of Incidents and Allegations Activities - Questions 22-24-26


IV. Uranium Recovery Program


354. Please include information on the following questions in Section A, as they apply to the Uranium Recovery Program:


Technical Staffing and Training - Questions 12-79

Status of Materials Inspection Program - Questions 8-113

Technical Quality of Inspections - Questions 134-16

Technical Quality of Licensing Actions - Questions 178-213

Responses to Technical Quality of Incidents and Allegations Activities - Questions 22-24-26

MATERIALS REQUESTED TO BE AVAILABLE FOR

THE ON-SITE PORTION OF AN IMPEP REVIEW


Please have the following information available for use by the IMPEP review team when they arrive at your office:


List of open license cases, with date of original request, and dates of followup actions.

List of licenses terminated during review period.

Copy of current log or other document used to track licensing actions.

List of all licensing actions completed during the review period (sorted by license reviewer, if possible).

Copy of current log or other document used to track inspections.

List of all inspections completed during the review period (sorted by inspector, if possible).

List of inspection frequencyies by license type.

List of all allegations occurring during the review period. Show whether the allegation is open or closed and whether it was referred by NRC.



ALSO, PLEASE HAVE THE FOLLOWING DOCUMENTS AVAILABLE:

All State regulations

Statutes affecting the regulatory authority of the State program

Standard license conditions

Technical procedures for licensing, model licenses, review guides

SS&D review procedures, guides, and standards

Instrument calibration records

Inspection procedures and guides

Inspection report forms

Documented training plan, if applicable

Records of results of supervisory accompaniments of inspectors

Emergency plan and communications list

Procedures for investigating allegations

Procedures for investigating incidents

Enforcement procedures, including procedures for escalated enforcement, severity levels, civil penalties (as applicable)

Job descriptions

1 Estimated burden per response to comply with this voluntary collection request: 53 hours. Forward comments regarding burden estimate to the Records Management Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and to the Paperwork Reduction Project (3150-0183), Office of Management and Budget, Washington, DC 20503. If an information collection does not display a currently valid OMB control number, NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

File Typeapplication/octet-stream
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy