EIA-923 Power Plant Operations Report

Electric Power Surveys

Electricity 2008 EIA-923 Form 12-21-2007

Electric Power Surveys

OMB: 1905-0129

Document [pdf]
Download: pdf | pdf
U.S. Department of Energy
Energy Information Administration
Form EIA-923 (2008)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires:

NOTICE: This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to
comply may result in criminal fines, civil penalties and other sanctions as provided by law. For further information
concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of
information in the instructions. Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly
to make to any Agency or Department of the United States any false, fictitious, or fraudulent statements as to any
matter within its jurisdiction.

SCHEDULE 1. IDENTIFICATION
(Instructions for SCHEDULE 1 are on page 2.)

Survey Contact
Last Name:_________________

First Name:________________
Title:______________________________
Telephone (include extension):______________
E-mail:_______________________________

Fax:__________________

Address:

City:

State:

Zip:

Supervisor of Contact Person for Survey
First Name:____________________
Last Name:_____________________
Title:___________________________
Telephone (include extension):______________
Fax:__________________
E-mail:________________________________
Address:

City:

State:

Zip:
Report For
Company Name: ______________________________________________
Plant Name:_________________________________________________
Plant ID:_________________
Plant County:_______________
Address:______________________________________________________
City:____________________
State:_______________
Zip Code:_____________
Reporting Month/Year:________________
For questions or additional information about the Form EIA-923, contact the Survey Manager:
Name: TBD
Telephone: (202) 586-XXXX
FAX: (202) 287-XXXX
E-mail: [email protected]

1

U.S. Department of Energy
Energy Information Administration
Form EIA-923 (2008)

Form Approval
OMB No. 1905-0129
Approval Expires:

POWER PLANT OPERATIONS REPORT

Plant Name:_________________________________________
Plant ID:_______
State:______
Reporting Month/Year:________________
SCHEDULE 2. COST AND QUALITY OF FUEL RECEIPTS – PLANT-LEVEL
For Fossil-fueled Plants 50 megawatts and above
(Instructions for SCHEDULE 2 are on pages 2 through 7.)

No Receipts (If applicable, please check.)
Contract Information
Complete for All Fossil
Fuels
Fuel
Supplier
Name

1

Contract
Contract
Expiration
Type
Date

2

3

Receipts

Is there a fuel tolling agreement in place for this plant? (If applicable, please check.)
Cost of Fuel

Quality of Fuel as Received

Coal,
Coal and
All Fossil
All Fossil Pet
Natural
All Fossil Fuels
Fuels
Fuels
Coke,
Gas
Oil
Energy
Source

4

Quantity
Received

Total
Commodity
Delivered
Cost
Cost

Average
Heat
Content
(as
received)

Sulfur
Content

Percent
Million
Cents per Cents per
Solids:
weight
Btus
MMBtu, to MMBtu, to
Tons
to
Liquids: the nearest the nearest (MMBtus)
0.1 cents per Unit to nearest
0.1 cents
Barrels
the nearest 0.01%
Gases: Mcf
0.001
MMBtu
5
6
7
8
9

Coal
Only

Coal
Only

Ash
Mercury
Content Content

Percent
weight
to
nearest
0.1%

10

2

Parts
per
Million
or enter
999 if
not
available
11

Fuel Transportation

Coal Mine and Type

Natural
Gas

Coal, Petroleum
Coke and Oil

Firm or
Interruptible

Predomi- Secondary
nant Mode
Mode
See
See
instructions instructions

12

13

14

If you have provided the Mine Safety
and Health Administration (MSHA) ID
number, leave the other coal columns
blank.
State or
MSHA Name of
Mine
Country
Mine or
ID
Type
of Origin
Number Tipple

Leave
blank if
MSHA
ID is not
known.

15

16

17

County

Twoletter
code

For
imported
coal, IMP
should be
entered.

18

19

U.S. Department of Energy
Energy Information Administration
Form EIA-923 (2008)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires:

Plant Name:_________________________________________
Reporting
Plant ID:_______
State:______
Month/Year:________________
SCHEDULE 3. PART A. BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED
PLANTS – FUEL CONSUMPTION
(Instructions for SCHEDULE 3 are on pages 7 through 9.)

This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and
above that burn organic fuels. Report only fuels consumed in the boilers, or for HRSGs in duct
burners. Report consumption in combustion turbines or IC engines on SCHEDULE 3. PART B.
If this does not apply, go to SCHEDULE 3. PART B.
Complete a separate row for each Boiler ID (see page seven of the instructions).
Did any boiler produce steam for purposes other than electric power generation during this
reporting period? (If applicable, please check.)

Prime
Mover
Code

Boiler
ID

Boiler
Status

Energy Source
(See Table 3 on
pages 17 through
19 in the
Instructions.)

Quantity
Consumed (Enter
zero when a fuel
has no
consumption for
this reporting
period)

Type of
Physical
Units
(tons,
barrels, or
Mcf)

Average Heat
Content (as
burned)
(MMBtu per
ton, barrel, or
Mcf)

Sulfur Content
(petroleum and
coal only, to
nearest 0.01%)

Ash
Content
(coal only,
to nearest
0.1%)

If Energy Source reported is OTH, OBS, OBG, OBL, or OG, please specify: _____________________________

3

U.S. Department of Energy
Energy Information Administration
Form EIA-923 (2008)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires:

Plant Name:_________________________________________
Plant ID:_______
State:______
Reporting Month/Year:________________
SCHEDULE 3. PART B. FUEL CONSUMPTION – PRIME MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,
combustion turbines, IC engines, and pumped storage hydroelectric units.

Aggregate quantity consumed for prime movers of a single type. In other words, all natural gas
consumed by all combustion gas turbines should be reported as one number.

Complete a separate row for each Prime Mover Type (see page eight of the instructions).
Was steam produced for purposes other than electric power generation during this reporting
period? (If applicable, please check.)

Prime Mover Type

Energy Source
(See Table 3 on
pages 17 through 19
in the Instructions.)

Quantity Consumed
(Enter zero when a
fuel has no
consumption for this
reporting period.)

Type of Physical Units
(tons, barrels, or Mcf)

Average Heat Content
(MMBtu per ton,
barrel, or Mcf)

If Energy Source reported is OTH, OBS, OBG, OBL or OG, please specify: _____________________________

4

U.S. Department of Energy
Energy Information Administration
Form EIA-923 (2008)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires:

Plant Name:_________________________________________
Plant ID:_______
State:______
Reporting Month/Year:________________
SCHEDULE 4. FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND DATA
BALANCE
(Instructions for SCHEDULE 4 are on pages 9 through 10.)

Report stocks for the following fuels:
•
Coal (tons)
•
Residual oil (No. 5 and No. 6 fuel oils) (barrels)
•
Distillate-type oils (including diesel oil, No. 2 oil, jet fuel and kerosene) (barrels)
•
Petroleum coke (tons)
•
Include back-up fuels.
•

Include start-up and flame-stabilization fuels.

•

Do not report stocks for waste coal, natural gas, or wood waste. Do enter a comment if the natural
gas balance does not equal zero.

•

Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held
at a central storage site. Each central storage site must be reported separately. New sites should
be indicated in the Comment Section, located in SCHEDULE 9 on page 16 of this form.

•

Enter zero if the plant has no stocks. Do not leave blank.

•

Enter adjustments to stocks. An adjustment can be positive or negative. See instructions for
additional information. Provide a comment on SCHEDULE 9 to explain adjustments.

•

Enter a comment if the balance does not equal zero.

Energy Source (See
Table 1 on page 5 in
the Instructions.)

Type of Physical
Units (tons or
barrels)

Previous
Month’s Ending
Stocks
(1)

Current
Month’s
Receipts
(2)

Current Month’s
Consumption
(3)

Ending Stocks
(4)

Adjustment to
Stocks (5)

Balance (6)
4=(1+2-3+5)

Previous Month’s Stocks plus Receipts minus Consumption plus (or minus) Adjustment should equal
Ending Stocks. The balance will appear in column (6). If the balance is not zero, provide a comment
below. Identify the fuel code in the comment.
Comment (if
balance does
not equal zero)

5

U.S. Department of Energy
Energy Information Administration
Form EIA-923 (2008)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires:

Plant Name:_________________________________________
Plant ID:_______
State:______
Reporting Month/Year:________________
SCHEDULE 5. PART A. GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANICFUELED PLANTS
(Instructions for SCHEDULE 5 are on pages 10 through 11.)

This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a
total steam turbine capacity of 10 megawatts and above. Report generation for all other types of prime
movers (combustion turbines, IC engines, wind, or hydroelectric turbines), and steam turbine plants
with less than 10 megawatts total capacity or fueled by nuclear, solar, geothermal, or other energy
sources on SCHEDULE 5. PART B.
Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition of net generation).
Complete a separate row for each Generator ID (see page ten of the instructions).
Prime
Mover
Code

Generator
ID

Generator
Status

Gross Generation
(MWh)

6

Net Generation
(MWh)

U.S. Department of Energy
Energy Information Administration
Form EIA-923 (2008)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires:

Plant Name:_________________________________________
Plant ID:_______
State:______
Reporting Month/Year:________________
SCHEDULE 5. PART B. PRIME MOVER-LEVEL GENERATION
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine
capacity less than 10 megawatts and all steam plants fueled by solar, nuclear, geothermal, or other
sources, as well as combustion turbines, IC engines, wind and hydroelectric turbines, and other prime
mover types.
In the applicable Gross Generation or Net Generation cell, enter the aggregate generation for prime
movers of a single type. For example, enter the total generation from all combustion turbines.
Industrial or Commercial CHPPlants may report ONLY gross generation if net generation is not
measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see page 11 of the instructions).
Prime Mover Type

Gross Generation
(MWh)

7

Net Generation
(MWh)

U.S. Department of Energy
Energy Information Administration
Form EIA-923 (2008)

Form Approval
OMB No. 1905-0129
Approval Expires:

POWER PLANT OPERATIONS
REPORT

Plant Name:_________________________________________
Plant ID:_______
State:______
Reporting Year:________________
SCHEDULE 6. NONUTILITY ANNUAL SOURCE AND DISPOSITION OF ELECTRICITY
(Instructions for SCHEDULE 6 are on pages 11 through 12.)

SCHEDULE 6 collects calendar year data (no monthly detail).
Annual data are due by March 30 following the reporting year.
Report all generation in megawatthours (MWh) rounded to a whole number.
Source of Electricity

Disposition of Electricity

(1) Gross Generation (Annual)

(4) Station Use

(2) Other Incoming Electricity

(5) Direct Use (For CHPs only)
(6) Total Facility Use (4 + 5)
(7) Retail Sales to Ultimate Customers
(8) Sales for Resale
(9) Other Outgoing Electricity

(3) Total Sources (1 + 2)

(10) Total Disposition (6 + 7 + 8 + 9)

Total Sources must equal Total Disposition (3 = 10)

8

U.S. Department of Energy
Energy Information Administration
Form EIA-923 (2008)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires:

Plant Name:_________________________________________
Plant ID:_______
State:______
Reporting Year:________________
SCHEDULE 7. ANNUAL REVENUES FROM SALES FOR RESALE
(Instructions for SCHEDULE 7 are on page 12 through 13.)

SCHEDULE 7 is to be completed by respondents who entered a positive amount on SCHEDULE 6,
Disposition of Electricity, Item 8, Sales for Resale. Annual data are due by March 30 following the
reporting year.
Sales for Resale is energy supplied to other electric utilities, cooperatives, municipalities, Federal and
State electric agencies, or other entities for resale to end-use consumers.
Annual Revenues from Sales for Resale (in thousand dollars):____________________

9

U.S. Department of Energy
Energy Information Administration
Form EIA-923 (2008)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires:

Plant Name:_________________________________________
Plant ID:_______
State:______
Reporting Year:________________
SCHEDULE 8. ANNUAL ENVIRONMENTAL INFORMATION
SCHEDULE 8. PARTS A through F are filed annually and must be reported by steam-electric organicfueled power plants with a total steam turbine capacity of 10 megawatts and above (only plants that
reported boiler-level consumption on SCHEDULE 3. PART A). Annual data are due by March 30
following the reporting year.
SCHEDULE 8. PART A. ANNUAL BYPRODUCT DISPOSITION
(Instructions for SCHEDULE 8. PART A are on page 13.)

Enter the quantity of combustion byproducts for the year by type of disposal (to nearest 0.1 thousand
tons). Report sales of steam in million Btu (MMBtu). If actual data are not available, provide an
estimated value.
NO BYPRODUCTS
Disposal
Byproduct

On-Site
Landfill

On-Site
Ponds

Sale or Beneficial Use
Disposal
Off-site

Fly ash from standard
boiler/PCD units
Fly ash from units with dry FGD
Fly ash from FBC units
Bottom ash from standard boiler
units
Bottom (bed) ash from FBC units
FGD Gypsum
Other FGD byproducts
Ash from coal gasification
(IGCC) units
Other (specify via footnote on
Schedule 9)
Steam Sales (MMBtu)

10

Sold

Used
On-site

Used
Off-site

Storage
Stored
On-site

Stored
Off-site

Total

U.S. Department of Energy
Energy Information Administration
Form EIA-923 (2008)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires:

Plant Name:_________________________________________
Plant ID:_______
State:______
Reporting Year:________________
SCHEDULE 8. PART B. FINANCIAL INFORMATION
(Instructions for SCHEDULE 8. PART B are on pages 13 through 15.)

If actual data are not available, provide an estimated value.
Operation and Maintenance (O&M) Expenditures During Year (Thousand Dollars)
Type

(1)
Fly Ash

(2)
Bottom Ash

(3)
Flue Gas
Desulfurization

(4)
Water Pollution
Abatement

(5)
Other Pollution
Abatement

(6)
Total
(1 + 2 + 3 + 4 + 5)

Collection
Disposal
Other

Capital Expenditures for New Structures and Equipment During Year, Excluding Land and
Interest Expense (Thousand Dollars)
Type

(7)
Air Pollution
Abatement

(8)
Water Pollution
Abatement

(9)
Solid/Contained Waste

(10)
Other Pollution Abatement

Amount

Byproduct Sales Revenue During Year (Thousand Dollars)
Type

(11)
Fly Ash

(12)
Bottom Ash

(13)
Fly and Bottom
Ash Sold
Intermingled

(14)
Flue Gas
Desulfurization
Byproducts

Amount

11

(15)
Other Byproduct
Revenue

(16)
Total
(11+12+13+14+15)

U.S. Department of Energy
Energy Information Administration
Form EIA-923 (2008)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires:

Plant Name:_________________________________________
Plant ID:_______
State:______
Reporting Year:________________
SCHEDULE 8. PART C. BOILER INFORMATION NITROGEN OXIDE EMISSION CONTROLS
(Instructions for SCHEDULE 8. PART C are on page 15.)

Complete a separate row for each boiler.
Note: The Boiler ID must match the Boiler ID as reported on Form EIA-860, "Annual Electric Generator
Report"
Boiler ID

NOx Emission Rate (lbs/MMBtu)
May through
Entire Year
September

NOx Control In-Service
(hours)

12

U.S. Department of Energy
Energy Information Administration
Form EIA-923 (2008)

POWER PLANT OPERATIONS REPORT

Plant Name:_________________________________________
Plant ID:_______
State:______

Form Approval
OMB No. 1905-0129
Approval Expires:

Reporting Year:________________

SCHEDULE 8. PART D. COOLING SYSTEM INFORMATION, ANNUAL OPERATIONS
(Instructions for SCHEDULE 8. PART D are on pages 15 through 16.)

Note: Cooling System ID must match the ID as reported on Form EIA-860, "Annual Electric Generator Report.”
Complete a separate row for each cooling system.
Cooling
System
ID

Cooling
System
Status

Annual Amount of
Chlorine added to
Cooling Water
(1000 lbs)

3

Average Annual Rate of Cooling Water (0.1 ft /sec)

Withdrawal

Discharge

Consumption

13

Maximum Cooling Water Temperature at
Intake (F)
Winter Peak Month

Summer Peak
Month

Maximum Cooling Water Temperature at
Discharge Outlet (F)
Winter Peak Month

Summer Peak Month

U.S. Department of Energy
Energy Information Administration
Form EIA-923 (2008)

POWER PLANT OPERATIONS REPORT

Plant Name:_________________________________________
Plant ID:_______
State:______

Form Approval
OMB No. 1905-0129
Approval Expires:

Reporting Year:________________

SCHEDULE 8. PART E. FLUE GAS PARTICULATE COLLECTION INFORMATION
(Instructions for SCHEDULE 8. PART E are on page 16.)

Complete a separate row for each flue gas particulate collector.
Flue Gas
Particulate
Collector
ID

FGP
Collector
Status

Hours In-Service

Typical Particulate
Emissions Rate (nearest
0.01 lb/MMBtu)

14

Removal Efficiency of Particulate Matter (nearest 0.1% by weight)
At Annual Operating
Factor

At 100% Load or Tested
Efficiency

Date of Most Recent
Efficiency Test (e.g., 122005)

U.S. Department of Energy
Energy Information Administration
Form EIA-923 (2008)

POWER PLANT OPERATIONS REPORT

Plant Name:_________________________________________
Plant ID:_______
State:______

Form Approval
OMB No. 1905-0129
Approval Expires:

Reporting Year:________________

SCHEDULE 8. PART F. FLUE GAS DESULFURIZATION UNIT INFORMATION, ANNUAL OPERATIONS
(Instructions for SCHEDULE 8. PART F are on pages 16 through 17.)

Note: Flue Gas Desulfurization ID must match the ID as reported on Form EIA-860, "Annual Electric Generator Report.”
Complete a separate row for each Flue Gas Desulfurization Unit.
ANNUAL OPERATIONS
Flue Gas
Desulfurization
Unit ID

FGD Unit Status

Hours In-Service

Quantity of FGD
Sorbent Used (to
the nearest 0.1
thousand tons)

Electrical Energy
Consumption
(MWh)

Removal Efficiency of Sulfur Dioxide (nearest 0.1% by wt)
Date of Most
At Annual
At 100% Load or
Recent Efficiency
Test (e.g., 12Operating Factor
Tested Efficiency
2005)

OPERATION AND MAINTENANCE EXPENDITURES DURING YEAR, EXCLUDING ELECTRICITY (THOUSAND DOLLARS)
Flue Gas Desulfurization
Unit ID

Feed Materials and
Chemicals

Labor and Supervision

Waste Disposal

15

Maintenance, Materials,
and All Other Costs

Total

U.S. Department of Energy
Energy Information Administration
Form EIA-923 (2008)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires:

Plant Name:_________________________________________
Plant ID:_______
State:______
Reporting Month/Year:________________
SCHEDULE 9. COMMENTS
Comment Section: Explain any unusual values, occurrences, or changes in ownership.
Schedule

Part

Item

Comment

Changes in Ownership
(Provide name of purchaser and date sold.)

16


File Typeapplication/pdf
AuthorKNO
File Modified2007-12-21
File Created2007-12-21

© 2024 OMB.report | Privacy Policy