DRAFT 8/1/07
United States Environmental Protection Agency
EPA
August 2007
Office of Air Quality Planning and Standards
Air Quality Policy Division
New Source Review Group
August, 2003
INFORMATION COLLECTION REQUEST FOR CHANGES TO 40 CFR PARTS 51 AND 52:
Prevention of Significant Deterioration (PSD) for Particulate Matter Less Than 2.5 Micrometers (PM2.5) – Increments, Significant Impact Levels (SILs) and Significant Monitoring Concentration (SMC)
E
EPA # 2267.01
Executive Summary
The PSD program is a preconstruction review and permitting program for new major sources of air pollutants and major modifications at existing major sources, which applies to sources located in areas that meet the NAAQS for one or more regulated NSR pollutants (called “attainment areas”) and in areas where there is insufficient information to determine whether they meet the NAAQS (“unclassifiable areas”). The types of information collection activities associated with the PSD program are those necessary for the preparation and submittal of construction permit applications and the issuance of final permits. The PSD rule changes addressed in this ICR add increments, SILs, and an SMC for PM2.5 and its precursors, but do not otherwise change the requirements of the program. For convenience, we refer to this rulemaking as the “PM2.5 Increments Rule” hereafter.
This purpose of this Information Collection Request (ICR) (OMB Control Number 2060-NEW; EPA ICR Number 2276.01) is to show the burden and cost associated with the PSD rule changes for PM2.5. Table E-1 summarizes the overall burden and cost for respondents – sources who must obtain PSD permits and State and local agencies who issue the permits (called “reviewing authorities”).
TABLE E-1 BURDEN FOR RESPONDENTS RESULTING FROM PM2.5 INCREMENTS RULE |
||||
Type of Respondent |
Average Annual Burden (Hours) |
Average Annual Burden per Respondent (Hours) |
Average Annual Costc ($ 2004) |
Average Annual Cost per Respondent ($ 2004) |
Sourcesa Reviewing Authoritiesb |
14,045 4,143 |
53 37 |
$919,948 $180,359 |
$3,472 $1,610 |
Total |
18,188 |
N/A |
$1,100,307 |
N/A |
a We estimate 265 PSD permits per year.
b We assume that there are 112 State and local reviewing authorities.
c All costs are labor costs associated with increased burden; there is no increase in capital, start-up, or O&M costs.
The EPA is the only Federal entity that will experience burden and cost as a result of the PM2.5 Increments Rule. We estimate that the average annual burden for EPA will be 452 hours, at a cost of $16,355 annually.
CAVEAT: This analysis overstates the impact of the rulemaking over the 3 years following promulgation because it has been prepared as if the rule revisions would be fully implemented upon the effective date of the rule. In actuality, the full effect of the PSD rule changes for PM2.5 will lag the promulgation of this rulemaking due to the time needed for reviewing authorities with approved PSD programs to modify their Implementation Plans.
T
EPA
TRACKING NUMBER:
2276.01 OMB
CONTROL NUMBER:
2060-NEW
1 Identification of the
Information Collection 1.1 Title
TRACKING NUMBER: 1230.19 formation
Collection 1.1 Title
EPA
TRACKING NUMBER:
1713.05 OMB
TRACKING NUMBER:
2060-0336 formation
Collection 1.1 Title
EPA
TRACKING NUMBER:
1713.05 OMB
TRACKING NUMBER:
2060-0336 formation
Collection 1.1 Title
EPA
TRACKING NUMBER:
1713.05 OMB
TRACKING NUMBER:
2060-0336
OMD1.2 Description
OMD1.2 Description
OMD1.2 Description
2
1.1 Title
1.2 Description
In 1997, EPA promulgated NAAQS for PM2.5 to address fine particle pollution, while retaining the NAAQS for particulate matter with an aerodynamic diameter less than or equal to a nominal 10 micrometers (PM10) to address coarse particle pollution. In 2006, we revised the PM2.5 and PM10 NAAQS. After delays associated with litigation over the NAAQS and with building up technical capacity to address PM2.5, we are proceeding with implementation of the PM2.5 program, including implementation of the NSR program for PM2.5. In a related rulemaking action we are adding PM2.5 and its precursors to both the PSD program and the NA NSR program as regulated NSR pollutants.
This ICR addresses rule changes to add increments, SILs, and an SMC for PM2.5 to the PSD rules. For some sources, this will add to the burden of obtaining a PSD permit because it will add to the number of air quality analyses that must be carried out in the application process. Similarly, State and local reviewing authorities will incur increased burden to review such permit applications and issue the permits.1 In addition, reviewing authorities will incur a one-time burden to revise their Implementation Plans to incorporate the PSD rule changes.
T
2.1 Need / Authority for the
Collection
2 Need For and Use of
Collection
2.2 Practical Utility / Users of
the Data
2.3 Caveats and Considerations
In fact, this ICR clearly overstates the impact of the PM2.5 Increments rulemaking over the 3 years following promulgation because it has been prepared as if the rule revisions would be fully implemented upon the effective date of the rule. In actuality, the full effect of these PSD rule changes for PM2.5 will lag the promulgation of this rule due to the time needed for State and local agencies with approved PSD programs to modify their Implementation Plans. We believe that this approach provides a more realistic assessment of the long-term impact of the rulemaking.
Throughout this ICR, the reader will observe estimated values that show accuracy to the single hour or dollar. However, reporting values at the single unit level can be misleading. In most situations, the proper way to present estimated data would be to determine an appropriate level of accuracy and truncate values accordingly, usually in terms of thousands or millions of units. For instance, a spreadsheet-generated estimation of $5,456,295 could be presented in the text as $5.5 (millions) or $5,456 (thousands). One problem with such an approach is the loss of data richness when the report contains a mixture of very large and very small numbers, which is the case with this ICR. Consequently, to avoid the loss of information through rounding, this ICR reports all values to the single unit, and we remind the reader that there is no implied precision inherent in this style of reporting.
For approval of a proposed ICR, the Agency must ensure that it has taken every reasonable step to avoid duplication in its paperwork requirements in accordance with 5 CFR 1320.9. Although the reviewing authorities may be required to revise their Implementation Plans, this action imposes no new paperwork requirements.
3 Non-Duplication, Consultation,
and Other Collection Criteria
3.1 Non-Duplication
3.2 Public Notice Requirements
3.3 Consultations
3.4 Less Frequent Collection
The Act defines the rate of reporting by sources, States, and local entities. Consequently, less frequent collection is not possible.
3.5 General Guidelines
The OMB’s general guidelines for information collections must be adhered to by all Federal Agencies for approval of any rulemaking’s collection methodology. In accordance with the requirements of 5 CFR 1320.5, the Agency believes:
1. The PM2.5 Increments Rule does not require periodic reporting more frequently than semi-annually.
2. The PM2.5 Increments Rule does not require respondents to participate in any statistical survey.
3. Written responses to Agency inquiries are not required to be submitted in less than 30 days.
4. Special consideration has been given in the design of the PM2.5 Increments Rule to ensure that the requirements are, to the greatest extent possible, the same for Federal requirements and those reviewing authorities who already have PSD programs in place.
5. Confidential, proprietary, and trade secret information necessary for the completeness of the respondent’s permit are protected from disclosure under the requirements of section 114(c) of the Act.
6. The PM2.5 Increments Rule does not require more that one original and two copies of the permit application, update, or revision to be submitted to the Agency.
7. Respondents do not receive remuneration for the preparation of reports required by the Act or 40 CFR parts 51 or 52.
8. To the greatest extent possible, the Agency has taken advantage of automated methods of reporting.
9. The Agency believes the impact of the PM2.5 Increments Rule on small entities to be insignificant and not disproportionate.
The recordkeeping and reporting requirements contained in the PM2.5 Increments Rule do not exceed any of the Paperwork Reduction Act guidelines contained in 5 CFR 1320.5, except for the guideline which limits retention of records by respondents to 3 years. The Act requires both respondents and State or local agencies to retain records for a period of 5 years. The justification for this exception is found in 28 U.S.C. 2462, which specifies 5 years as the general statute of limitations for Federal claims in response to violations by regulated entities. The decision in U.S. v. Conoco, Inc., No. 83-1916-E (W.D. Okla., January 23, 1984) found that the 5-year general statute of limitations applies to the Clean Air Act.
3.6 Confidentiality
Confidentiality is not an issue for this rulemaking. To the extent that the information required in a PSD permit under the PM2.5 Increments Rule is proprietary, confidential, or of a nature that could impair the ability of the source to maintain its market position, that information is collected and handled subject to the requirements of section 114(c) of the Act. Information received and identified by owners or operators as confidential business information (CBI) and approved as CBI by EPA, in accordance with Title 40, Chapter 1, Part 2, Subpart B, shall be maintained appropriately (see 40 CFR 2; 41 FR 36902, September 1, 1976; amended by 43 FR 39999, September 8, 1978; 43 FR 42251, September 28, 1978; 44 FR 17674, March 23, 1979).
3.7 Sensitive
Questions
3.8 Environmental Justice
Considerations
4 The Respondents and the
Information Requested
4.1 Respondents/SIC and NAICS
Codes
Table 4-1. Most Numerous Industrial Respondents by Industrial Group
Industry Group |
SIC |
NAICS |
Electric Services |
491 |
221111, 221112, 221113, 221119, 221121, 221122 |
Petroleum Refining |
291 |
32411 |
Industrial Inorganic Chemicals |
281 |
325181, 32512, 325131, 325182, 211112, 325998, 331311, 325188 |
Industrial Organic Chemicals |
286 |
32511, 325132, 325192, 325188, 325193, 32512, 325199 |
Miscellaneous Chemical Products |
289 |
32552, 32592, 32591, 325182, 32551 |
Natural Gas Liquids |
132 |
211112 |
Natural Gas Transport |
492 |
48621, 22121 |
Pulp Mills |
261 |
32211, 322121, 322122, 32213 |
Paper Mills |
262 |
322121, 322122 |
Automobile Manufacturing |
371 |
336111, 336112, 336712, 336211, 336992, 336322, 336312, 33633, 33634, 33635, 336399, 336212, 336213 |
Pharmaceuticals |
283 |
325411, 325412, 325413, 325414 |
The respondents also include State and local air regulatory agencies. Because of the national scope of the PSD program, these governmental respondents are in all 50 States.
4.2 Information Requested
This section discusses the data items that must be collected and reported and the activities that respondents must carry out under the PM2.5 Increments Rule.
4.2.1 Data items, including
recordkeeping requirements
http://www.epa.gov/epacfr40/chapt-I.info/chi-toc.htm
Respondent data and information requirements for PSD permits can be found in the Supporting Statement for the 2005 ICR renewal for the entire major NSR program (ICR #1230.17), including appropriate references in 40 CFR part 51 for the data and information requirements that govern the way States implement NSR programs.3
The data requirements associated with the PM2.5 Increments Rule are a small subset of the total data required for PSD permits. Specifically, this rule enables the air quality impact analyses that already must be carried out for other significant pollutants to be implemented for PM2.5. Thus, when the rule is implemented, the modeling analyses required by 40 CFR 51.166(k) and (l) or 52.21(k) and (l), whichever is applicable, will have to be conducted by sources for PM2.5 and submitted for review by reviewing authorities.
4.2.2 Respondent activities
The Supporting Statement for the 2005 ICR renewal for the entire major NSR program (ICR #1230.17) identifies the activities for PSD permitting for source and reviewing authority respondents.4 For source respondents, the activities are divided into three broad categories: (1) preparation and planning, (2) data collection and analysis, and (3) permit application. The PM2.5 Increments Rule will add new burden for the data collection and analysis category as sources will have to conduct these activities for PM2.5.
Reviewing authority respondents’ activities involve interacting with the source during its preparation of an application, reviewing the application and making a determination, implementing the public notice and comment process, issuing the permit, and transmitting information to EPA. The PM2.5 Increments Rule will add new burden for attending pre-application meetings, answering sources’ questions, and logging in and reviewing data submissions, as reviewing authorities will have to conduct these activities for PM2.5.
In addition to the activities associated with reviewing and issuing major NSR permits under the revised regulations, reviewing authority respondents may have to revise their Implementation Plans to add increments, SILs, and an SMC for PM2.5 to their PSD programs.
5 The Information Collected -
Agency
Activities, Collection Methodologies, and Information Management
The
Supporting Statement for the 2005 ICR renewal for the entire major
NSR program (ICR #1230.17) identifies EPA’s activities
associated with PSD permitting.5
5.1 Agency Activities
5.2 Collection
Methodology and Management
The reviewing authority reviews the PM2.5 air quality analyses and checks the quality of data submitted by the applicant on a case-by-case basis. The applicant will be required to submit information on how the data were obtained and how the calculations and modeling were performed. The reviewing authority personnel will check data quality by reviewing the modeling documentation and checking engineering calculations. Confidential information submitted by the applicant (if any) will be handled by the reviewing authority’s confidential information handling procedures. The public will be provided the opportunity to review a permit application and other materials relevant to the reviewing authority’s decision on issuing the permit, including FLM findings, by obtaining a copy from the permit reviewing authority or by attending the public hearing. The PM2.5 Increments Rule will not require information through any type of survey.
5.3 Small Entity Flexibility
A Regulatory Flexibility Act Screening Analysis (RFASA) developed as part of a 1994 draft Regulatory Impact Analysis (RIA) and incorporated into the September 1995 ICR renewal analysis reported an initial regulatory flexibility screening analysis showed that the changes to the NSR program due to the 1990 Clean Air Act amendments would not have an adverse impact on small entities.6 This analysis encompassed the entire universe of applicable major sources that were likely to also be small businesses. The Agency estimates there are approximately 50 “small business” major sources.7 Because the administrative burden of the NSR program are the primary source of the NSR program’s regulatory costs, the analysis estimated a negligible “cost to sales” (regulatory cost divided by the business category mean revenue) ratio for this source group. The new burden resulting from the PM2.5 Increments Rule is small compared to the overall burden of the PSD program. Thus, there is no economic basis for a different conclusion regarding the PM2.5 Increments Rule.
5.3.1 Measures to avert impacts
on small entities
Even
though the PSD program does not have an adverse impact on a
significant number of small businesses, EPA takes measures to assist
sources in affected small entities through the implementation of
small business stationary source technical and environmental
compliance assistance programs, as called for in section 507 of the
Act. These programs reduce the reporting burden of small entities
that are subject to PSD and may significantly alleviate the economic
burden on small sources by (1) establishing programs to assist small
businesses with determining what Act requirements apply to their
sources and when they apply, and (2) providing guidance on
alternative control technology and pollution prevention for small
businesses.
5.3.2 Measures to mitigate
impacts on small entities
5.4 Collection Schedule
6 Estimating the Burden and Cost
of the Collection
Burden means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements; train personnel to be able to respond to a collection of information; and transmit or otherwise disclose the information. In addition to the labor hours expended by the respondents, the burden estimate should include: (1) total capital and start-up costs annualized over the useful life of the purchased equipment, and (2) total costs for operation, maintenance, and purchases of services. Each component should be divided into burden borne directly by the respondent and any services that are contracted out.
This section discusses the development of burden estimates and their conversion into costs, which are separated into burden costs and capital and operating and maintenance (O&M) costs. According to the latest guidance for ICRs (EPA 2005), capital and O&M costs display the cost of any new capital equipment the source or reviewing authority may have to purchase solely for information collection, assimilation, and storage purposes. For example, if a source had to purchase a new mini-computer to store and manipulate data, that computer would be a cost of administration subject to reporting in the ICR. In addition, the latest guidance instructs the Agency to differentiate the burden associated with a source’s labor and that which it hires through outside contractors. To the extent a source contracts out for administrative purposes (e.g., employing consultants to perform modeling functions), the burden associated with those contracted tasks are not a burden to the source - but they still remain a cost. The reader should read this section with the following considerations in mind:
• The Agency believes the time necessary to perform a task is independent of the origins of its labor. In other words, if a source would employ 20 hours of burden to fully perform a function, then a contractor hired by the source would also take 20 hours to perform that same task. Furthermore, the Agency assumes no economies or diseconomies of scale. The linear combination of any amount of contractor and source effort will also sum to 20. Therefore, the burden estimates in this ICR act as an assessment of the total burden to affected sources and reviewing authorities, given the affected entity does not employ contracted labor.
• For some burden categories, the Agency believes the hours assigned to them will be divided between the source and outside contractors. For these categories, the Agency established a composite cost per hour by developing a weighted average of the source and contractor wages, with the weight defined by the percentage of total effort each burden source applied. Consequently, the cost developed in this ICR should be interpreted as an upper bound on the actual cost of administration by the source or reviewing authority. The methodology for determining cost per hour can be found in greater detail in section 6.2, below.
6.1 Estimating Respondent Burden
The PM2.5 Increments Rule adds increments, SILs, and an SMC for PM2.5 to the PSD program. When the rule is implemented, sources will be required to conduct the air quality impact analyses for PM2.5 that they are already required to conduct for other pollutants. Thus, the rule will add new burden as sources and reviewing authorities carry out the activities associated with such analyses for PM2.5.
Under PSD, sources are generally required to conduct dispersion modeling to determine the air quality impacts of the criteria pollutants that they emit in significant quantities.8 Up until now, the lack of PM2.5 increments, SILs, and SMCs have prevented sources from carrying out the full range of air quality impact analyses that would otherwise have been required for significant sources of PM2.5. Instead, in accordance with our stated policy, sources and reviewing authorities have used PM10 analyses as a surrogate for PM2.5. As a result of the PM2.5 Increments Rule, we expect most PM2.5 sources to be required to carry out modeling analyses for both PM2.5 and PM10 (as well as any other criteria pollutants that they emit), resulting in a new burden to obtain a PSD permit. In addition, a corresponding new burden will result for reviewing authority respondents to review permit applications and issue permits.
To estimate the magnitude of the permitting burden that will result from the PM2.5 Increments Rule, we considered two factors: (1) which permitting activities are likely to be affected by an increase in the number of air quality impact modeling analyses, and (2) the new burden for carrying out the affected activities for PM2.5. These factors are discussed further below.
As noted previously, there is currently an approved ICR for the overall NSR program (2005 ICR renewal; ICR #1230.17), which includes the PSD program. This approved ICR indicates that the average burden to a source to obtain a PSD permit is 839 hours. Of these, 350 hours are associated with data collection and analysis activities, which we believe are the activities that will be most affected by an increase in the number air quality modeling analyses. The approved ICR also indicates that the average burden to a reviewing authority for issuing a PSD permit is 272 hours, of which 72 hours are associated with attending pre-application meetings, answering sources’ questions, and logging in and reviewing data submissions (the activities most related to air quality modeling analyses).
To determine the new burden per PSD permit for carrying out the affected activities for PM2.5, we assumed that PSD permit applicants who would be subject to the requirements for PM2.5 currently conduct an average of four modeling impact analyses.9 After implementation of the PM2.5 Increments Rule, we believe that this number will increase by one (i.e., by 25 percent) to an average of five such analyses.10 Thus, for sources subject to PSD permitting for PM2.5, the new, additional burden associated with the affected activities will be 25 percent of the currently approved burden. We assumed the same percent increase for reviewing authorities where PSD permits must address PM2.5.
However, not all sources that must obtain a PSD permit will be subject to PSD for PM2.5. To estimate the percentage of permits that will have to address PM2.5, we consulted the RBLC to determine what percentage has historically been subject to major NSR for particulate matter.11 We found that over the last 10 years, approximately 60 percent of facilities that obtained control technology determinations obtained a determination for particulate matter. We used this percentage as a weighting factor to determine the weighted average increase in burden for the affected activities across all PSD permits (i.e., those that address PM2.5 and those that do not). This weighted average is 15 percent (0.60 x 0.25 = 0.15). We applied this weighted average burden increase to the affected PSD activities for both source respondents and reviewing authority respondents to determine the average new burden per PSD permit associated with the PM2.5 Increments Rule.
Table 6-1 shows the average new burden per PSD permit for source and reviewing authority respondents. As the table shows, we estimate an average burden for sources of 53 hours per PSD permit. Based on the current approved total burden for a PSD permit (839 hours), this represents an increase of about 6 percent. For reviewing authorities, we estimate an average burden of 10 hours per permit, or about 4 percent of the current approved total burden of 272 hours.
Table 6-1. Burden for Source and Reviewing Authority Respondents, Hours per PSD Permit
Type of Respondent |
Activities Affected |
Approved Burden Absent PM2.5 Increments Rule (hours) |
Additional Burden Resulting from PM2.5 Increments Rule (hours) |
Sources |
Data collection and analysis |
350 |
53 |
Reviewing authorities |
Attending pre-application meetings Answering sources’ questions Logging in and reviewing data submissions Total |
36 20 16 72 |
5 3 2 10 |
In addition to issuing permits, the reviewing authorities must ensure that their PSD programs meet the requirements that EPA specifies for such programs pursuant to part C. The PM2.5 Increments Rule revises these requirements. Therefore, each reviewing authority must submit changes to its existing Implementation Plan program or demonstrate that its existing program is no less stringent than EPA’s new requirements. Because the changes needed for updating Implementation Plans are small and the requirements for Implementation Plan development differ from State to State, the EPA assumed it would take no more than 40 hours for each reviewing authority to fully incorporate this rulemaking into its plan. This assumption includes legislative review, public comment, and all legal and legislative processes necessary for all of the above components. This is a one-time burden that will occur during the 3-year period covered by this ICR.
6.2 Estimating Respondent Costs
6.2.1 Estimating labor costs
Similarly, the labor rate used in this analysis for reviewing authority respondents is $43.53 per hour. This rate was derived for the 2005 ICR renewal by inserting 2004 Federal government pay schedule wage rates for clerical, technical, and managerial staff into the weighting system developed in the 1997 renewal ICR and described in the November 2002 ICR update.12
6.2.2 Estimating
capital/start-up and O&M costs, including purchase of services
Even if an applicant is a brand new company and the prospective source is a “greenfield” source (the EPA estimates less than 1 percent of source respondents fit that description) most, and perhaps all, of the equipment needed to prepare permit applications (for example, the computers and basic software) will be part of the source’s business operation inventory. Furthermore, the models for performing ambient air impact analyses are available in electronic form from several different EPA web sites for just the Internet access charges, which are typically absorbed in routine business overhead expenses. Thus, the PM2.5 Increments Rule will not cause any new capital costs to be incurred by any respondents.
Since the purchase of capital equipment is believed to be an insignificant factor in permit application preparation, we assume that the O&M and services for same are negligible. Further, once a permit is issued, there is no O&M cost associated with it. It remains unaltered unless the source or the reviewing authority discovers specific reasons to reexamine it and change any conditions or specifications. If purely administrative, the changes are handled exclusively by the reviewing authority. If changes have the potential for environmental consequences, the action may be significant enough to be counted as a separate and new application, to which a new burden and cost may be ascribed.
6.2.3 Annualized
capital costs
6.3 Estimating Agency Burden and
Cost
To facilitate cost comparisons between this ICR update and the 2005 ICR renewal, we have used the Federal labor rate from the 2005 ICR of $36.21 per hour.13 The rate reflects the assumption, made in the July 10, 1997 renewal ICR and the February 2001 renewal ICR, that the staff reviewing permits are classified as Grade 11 Step 3. The corresponding salary is loaded with benefits at the rate of 60%.
In addition, there will be Agency burden to review the revised Implementation Plans submitted by the reviewing authorities to verify that the revisions fully meet the requirements of the PSD program, as changed by the PM2.5 Increments Rule. Due to the nature of the Implementation Plan revisions needed, the Agency expects that each Implementation Plan revision will require about 5 hours of review. We expect this one-time burden to occur during the period covered by this ICR.
6.4 Estimating the Respondent
Universe and Total Burden and Cost
6.4.1 Estimating the number of
respondents
For the number of respondent reviewing authorities associated with major NSR permitting and Implementation Plan revisions, we used the 112 reviewing authority count used by other permitting ICRs. Again, we carried out this “worst-case” analysis as if all reviewing authorities would begin issuing PSD permits for PM2.5 immediately, with no lag time for Implementation Plan revisions. We also included the reviewing authorities’ burden for revising the Implementation Plans in this ICR.
6.4.2 Estimating total respondent
burden and cost
Table 6-2. Annual Burden and Costs for Source Respondents
Activity |
Number of Permits per Year |
Burden per Permit (Hours) |
Annual Burden (Hours) |
Labor Rate |
Annual Cost ($ 2004) |
PSD Permitting |
265 |
53 |
14,045 |
$65.50/hr |
$919,948 |
Table 6-3. Annual Burden and Costs for Reviewing Authority Respondents
Major NSR Permitting |
|||||
Activity |
Number of Permits per Year |
Burden per Permit (Hours) |
Annual Burden (Hours) |
Labor Rate |
Annual Cost ($ 2004) |
PSD Permitting |
265 |
10 |
2,650 |
$43.53/hr |
$115,354 |
Implementation Plan Revisions |
|||||
Activity |
Number of Plan Revisions per Yeara |
Burden per Revision (Hours) |
Average Annual Burdenb (Hours) |
Labor Rate |
Average Annual Costc ($ 2004) |
Revision of Implementation Plan |
37.33 |
40 |
1,493 |
$43.53/hr |
$65,005 |
Reviewing Authority Totals |
|||||
TOTAL |
|
|
4,143 |
|
$180,359 |
a Each of the 112 reviewing authorities may submit one Implementation Plan revision to conform their PSD programs to the revised rules over the 3-year period covered by this ICR. Thus, the average annual number of such revisions is 112 / 3 = 37.33 per year.
b Each reviewing authority will revise its Implementation Plan once for a 3-year total burden of 4,480 hours. Average annual burden is 4,480 / 3 = 1,493 hours.
c Total 3-year cost is 4,480 hours x $43.53 = $195,014. Average annual cost is $195,014 / 3 = $65,005.
6.4.3 Estimating total Federal
burden and cost
Table 6-4. Federal Annual Burden and Costs
Major NSR Permitting |
|||||
Activity |
Number of Permits per Year |
Additional Burden per Permit (Hours) |
Additional Annual Burden (Hours) |
Labor Rate |
Annual Cost ($ 2004) |
PSD Permitting |
265 |
1 |
265 |
$36.21/hr |
$9,596 |
Implementation Plan Review |
|||||
Activity |
Number of Plans to Review per Yeara |
Burden per Plan Review (Hours) |
Average Annual Burdenb (Hours) |
Labor Rate |
Average Annual Costc ($ 2004) |
Review of Implementation Plans |
37.33 |
5 |
187 |
$36.21/hr |
$6,759 |
Federal Totals |
|||||
TOTAL |
|
|
452 |
|
$16,355 |
a The EPA will review one Implementation Plan revision submitted by each of the 112 reviewing authorities over the 3-year period covered by this ICR. Thus, the average annual number of Implementation Plan reviews is 112 / 3 = 37.33 per year.
b The EPA will review a total of 112 Implementation Plan revisions for a 3-year total burden of 560 hours. Average annual burden is 560 / 3 = 187 hours.
b Total 3-year cost is 560 hours x $36.21 = $20,278. Average annual cost is $20,278 / 3 = $6,759.
6.5 Bottom Line Burden and Cost
Table 6-5. Total Estimated Annual Respondent Burden and Costs
Type of Respondent |
Number of Responses |
Total Burden (Hours/Year) |
Total Labor Costs ($/Year) |
Total Capital Costs ($/Year) |
Total Costs ($/Year) |
Sources |
265 |
14,045 |
$919,948 |
$ 0 |
$919,948 |
Reviewing Authoritiesa |
302.33 |
4,143 |
180,359 |
0 |
180,359 |
TOTAL |
567.33 |
18,188 |
$1,100,307 |
$ 0 |
$1,100,307 |
a During the 3-year period of this ICR, the 112 reviewing authorities will review 265 PSD permits each year and submit an average of 37.33 Implementation Plan revisions per year (112 / 3 = 37.33), for a total of 302.33 responses per year.
Table 6-6. Total Estimated Annual Federal Burden and Costs
Type of Entity |
Number of Entities |
Total Incremental Burden (Hours/Year) |
Total Incremental Labor Costs ($/Year) |
Total Incremental Capital Costs ($/Year) |
Total Incremental Costs ($/Year) |
Federal Agency (EPA) |
1 |
452 |
$16,355 |
$0 |
$16,355 |
As
discussed in the previous sections,
6.6 Reasons for Change in Burden
6.7 Burden Statement
Burden means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements; train personnel to be able to respond to a collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The OMB control numbers for EPA’s regulations are listed in 40 CFR Part 9 and 48 CFR Chapter 15.
To comment on the Agency's need for this information, the accuracy of the provided burden estimates, and any suggested methods for minimizing respondent burden, including the use of automated collection techniques, EPA has established a public docket for this ICR under Docket ID Number EPA-HQ-OAR-2007-0628, which is available for online viewing at www.regulations.gov, or in-person viewing at the Air and Radiation Docket and Information Center in the EPA Docket Center (EPA/DC), EPA West, Room 3334, 1301 Constitution Avenue, NW, Washington, D.C. The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Reading Room is (202) 566-1744, and the telephone number for the Air Docket is (202) 566-1742. An electronic version of the public docket is available at www.regulations.gov. This site can be used to submit or view public comments, access the index listing of the contents of the public docket, and to access those documents in the public docket that are available electronically. When in the system, select “search,” then key in the Docket ID Number identified above. Also, you can send comments to the Office of Information and Regulatory Affairs, Office of Management and Budget, 725 17th Street, NW, Washington, D.C. 20503, Attention: Desk Officer for EPA. Please include the EPA Docket ID Number EPA-HQ-OAR-2007-0628 and OMB Control Number 2060-NEW in any correspondence.
1The term “reviewing authority” is synonymous with the term “permitting authority” used in previous permit-related analyses. The reader should consider these terms interchangeable for comparison purposes.
2 “Proposed Rule to Implement the Fine Particle National Ambient Air Quality Standards,” 70 FR 65984, November 1, 2005.
3 A. Rios and J. Santiago. Information Collection Request for 40 CFR Part 51 and 52 Prevention of Significant Deterioration and Nonattainment New Source Review. U.S. Environmental Protection Agency, Research Triangle Park, NC. October 2004. Appendix A.
4 A. Rios and J. Santiago. Information Collection Request for 40 CFR Part 51 and 52 Prevention of Significant Deterioration and Nonattainment New Source Review. U.S. Environmental Protection Agency, Research Triangle Park, NC. October 2004. Pages 17 and 18.
5 A. Rios and J. Santiago. Information Collection Request for 40 CFR Part 51 and 52 Prevention of Significant Deterioration and Nonattainment New Source Review. U.S. Environmental Protection Agency, Research Triangle Park, NC. October 2004. Page 19.
6“Economic Assessment of the Impacts of Part C and D Regulatory Changes,” June 2, 1994.
7The definition for “small business” employed for all SIC categories in this analysis was any business employing fewer than 500 employees.
8“Criteria pollutants” are those for which NAAQS have been established, i.e., ozone, nitrogen dioxide (NO2), sulfur dioxide (SO2), carbon monoxide (CO), lead, PM10, and PM2.5. Ozone is not emitted directly, but is formed in the atmosphere by complex photochemical reactions involving volatile organic compounds (VOCs) and oxides of nitrogen (NOx). Impact modeling is not required for ozone under PSD because existing models are not capable of accurately predicting the impacts of a single source.
9 Full modeling analyses must be conducted for each criteria pollutant emitted by the source for which PSD increments (i.e., maximum allowable increases above baseline ambient concentrations) have been established. These analyses must be carried out for each averaging period that has been established for the pollutants. Sources subject to PSD for PM2.5 currently must conduct modeling analyses for PM10 for two averaging periods – annual and 24-hour. Some such sources also are subject to PSD for SO2 and/or NOx. Sources subject for SO2 must conduct analyses for three averaging periods (annual, 24-hour, and 3-hour), while NOx sources only need to conduct an analysis for the annual averaging period. To account for overlapping SO2 and NOx applicability, we believe it is a reasonable assumption that PM2.5 sources must conduct an average of two additional modeling analyses, for a total of four (prior to the PM2.5 Increments Rule).
10 Under the PM2.5 Increments Rule, sources subject to PSD for PM2.5 will be required to conduct PM2.5 modeling analyses for two averaging periods – annual and 24-hour. Because most such sources also will be subject to PSD for PM10, they will be required to conduct one PM10 modeling analysis for the 24-hour averaging period (there is no longer an annual NAAQS for PM10 and the annual increment for PM10 is eliminated by the PM2.5 Increments Rule). The rule will not affect the average of two analyses that we assume for SO2/NOx. Thus, the average total number of modeling analyses under the PM2.5 Increments Rule will be five.
11 The Reasonably Available Control Technology (RACT), Best Available Control Technology (BACT), Lowest Achievable Emission Rate (LAER) Clearinghouse, or RBLC, is a database of RACT/BACT/LAER determinations made in site-specific permitting analyses. It is generated and updated using information provided by State and local permitting agencies.
12 U.S., Environmental Protection Agency, Office of Air Quality Planning and Standards, Draft Information Collection Request For Changes To The 40 CFR Part 51 And 52 Prevention Of Significant Deterioration And New Source Review Applicability Requirements For Modifications To Existing Sources, November 2002, p. 29.
13A. Rios and J. Santiago. Information Collection Request for 40 CFR Part 51 and 52 Prevention of Significant Deterioration and Nonattainment New Source Review. U.S. Environmental Protection Agency, Research Triangle Park, NC. October 2004. Page 13.
File Type | application/msword |
File Title | United States Environmental Protection Agency |
Author | Robin Barrows |
Last Modified By | Stephen Edgerton |
File Modified | 2007-08-01 |
File Created | 2007-08-01 |