Download:
pdf |
pdf§ 1792.104
7 CFR Ch. XVII (1–1–04 Edition)
and Natural Hazards, Federal Emergency Management Agency, 500 C
Street, SW., Washington, DC 20472.
[65 FR 76916, Dec. 8, 2000]
§ 1792.104
1794.24 Proposals normally requiring an EA
with scoping.
1794.25 Proposals normally requiring an
EIS.
1794.26–1794.29 [Reserved]
Subpart D—Procedure for Categorical
Exclusions
Seismic acknowledgments.
For each applicable building, borrowers and grant recipients must provide RUS a written acknowledgment
from a registered architect or engineer
responsible for the design stating that
seismic
provisions
pursuant
to
§ 1792.103(b) will be used in the design of
the building. This acknowledgement
will include the identification and date
of the model code or standard that is
used for the seismic design of the seismic design of the building project and
the seismic factor for the building location.
1794.30 General.
1794.31 Classification.
1794.32 Environmental report.
1794.33 Agency action.
1794.34–1794.39 [Reserved]
Subpart E—Procedure for Environmental
Assessments
1794.40 General.
1794.41 Document requirements.
1794.42 Notice of availability.
1794.43 Agency finding.
1794.44 Timing of agency action.
1794.45–1794.49 [Reserved]
[65 FR 76916, Dec. 8, 2000]
Subpart F—Procedure for Environmental
Assessments With Scoping
PART 1794—ENVIRONMENTAL
POLICIES AND PROCEDURES
Subpart A—General
Sec.
1794.1 Purpose.
1794.2 Authority.
1794.3 Actions requiring environmental review.
1794.4 Metric units.
1794.5 Responsible officials.
1794.6 Definitions.
1794.7 Guidance.
1794.8–1794.9 [Reserved]
Subpart B—Implementation of the National
Environmental Policy Act
1794.10 Applicant responsibilities.
1794.11 Apply NEPA early in the planning
process.
1794.12 Consideration of alternatives.
1794.13 Public involvement.
1794.14 Interagency involvement and coordination.
1794.15 Limitations on actions during the
NEPA process.
1794.16 Tiering.
1794.17 Mitigation.
1794.18–1794.19 [Reserved]
Subpart C—Classification of Proposals
1794.20 Control.
1794.21 Categorically excluded proposals
without an ER.
1794.22 Categorically excluded proposals requiring an ER.
1794.23 Proposals normally requiring an EA.
1794.50 Normal sequence.
1794.51 Preparation for scoping.
1794.52 Scoping meetings.
1794.53 Environmental analysis.
1794.54 Agency determination.
1794.55–1794.59 [Reserved]
Subpart G—Procedure for Environmental
Impact Statements
1794.60 Normal sequence.
1794.61 Environmental impact statement.
1794.62 Supplemental EIS.
1794.63 Record of decision.
1794.64 Timing of agency action.
1794.65–1794.69 [Reserved]
Subpart H—Adoption of Environmental
Documents
1794.70 General.
1794.71 Adoption of an EA.
1794.72 Adoption of an EIS.
1794.73 Timing of agency action.
1794.74 Incorporation of environmental materials.
1794.75–1794.79 [Reserved]
AUTHORITY: 7 U.S.C. 6941 et seq., 42 U.S.C.
4321 et seq.; 40 CFR Parts 1500–1508.
SOURCE: 63 FR 68655, Dec. 11, 1998, unless
otherwise noted.
Subpart A—General
§ 1794.1 Purpose.
(a) This part contains the policies
and procedures of the Rural Utilities
1140
VerDate jul<14>2003
02:36 Jan 18, 2004
Jkt 203021
PO 00000
Frm 01140
Fmt 8010
Sfmt 8010
Y:\SGML\203021T.XXX
203021T
File Type | application/pdf |
File Title | Document |
Subject | Extracted Pages |
Author | U.S. Government Printing Office |
File Modified | 2004-04-01 |
File Created | 2004-04-01 |