Download:
pdf |
pdfDATE:
SEPARATE STORAGE INSTALLATIONS
APPROVED BY OMB: NO. 3150-0056
EXPIRES: 06/30/2008
CONFIDENTIAL
WHEN COMPLETED
INTERNATIONAL ATOMIC ENERGY AGENCY
DEPARTMENT OF SAFEGUARDS AND INSPECTION
DESIGN INFORMATION
QUESTIONNAIRE *
(CONTINUED)
The "Confidential" marking on this form is for IAEA
purposes only. It indicates that the IAEA considers
the information in the completed form to be
'safeguards confidential' and is not to be confused
with any U.S. security classification.
IAEA USE ONLY
* Questions which are not applicable may be left
unanswered.
SEPARATE STORAGE INSTALLATIONS
GENERAL STORAGE DATA
13. FACILITY DESCRIPTION
(for each storage area)
N-94 (6-2005)
GENERAL DIAGRAM(S) ATTACHED UNDER REFERENCE NUMBERS:
CONFIDENTIAL
3
SEPARATE STORAGE INSTALLATIONS
DATE:
GENERAL STORAGE DATA
14. DESIGN CAPACITY
15. ANTICIPATED ANNUAL THROUGHPUT
AND INVENTORY
(in the form of forward programme
indicating the proportion of various
receipts and shipments)
NUCLEAR MATERIAL DESCRIPTION AND FLOW
16. TYPES OF UNITS HANDLED
AT THE FACILITY
IF NECESSARY, ATTACH DRAWING(S)
17. MAIN MATERIAL DESCRIPTION
(in general)
DRAWING(S) ATTACHED UNDER REFERENCE NUMBER(S)
i)
Physical (Mechanical) Form
and Dimensions
(for fuel element/assembly stored,
attach drawings)
N-94 (6-2005)
CONFIDENTIAL
4
SEPARATE STORAGE INSTALLATIONS
DATE:
NUCLEAR MATERIAL DESCRIPTION AND FLOW
17. MAIN MATERIAL DESCRIPTION
(in general) (Continued)
ii)
Chemical Form
(indicate chemical composition or
main alloy constituents)
iii)
Enrichment Range and Pu Content
iv)
Range of Weight of Nuclear Material
v)
Cladding Materials
vi)
Means of Nuclear Material
Identification
N-94 (6-2005)
CONFIDENTIAL
5
SEPARATE STORAGE INSTALLATIONS
DATE:
NUCLEAR MATERIAL DESCRIPTION AND FLOW
17. MAIN MATERIAL DESCRIPTION
(in general) (Continued)
vii)
DRAWING(S) ATTACHED UNDER REFERENCE NUMBERS:
Types of Containers, Packaging
viii) Radiation Level at Nuclear
Material Location
ix)
Other Nuclear Material in the Facility
Not Already Specified
(quantity, form and location of inventory)
18. SCHEMATIC FLOW SHEET FOR
NUCLEAR MATERIAL
(identifying measurement points.
accountability areas, inventory locations,
etc., for operator purposes)
N-94 (6-2005)
DRAWING(S) ATTACHED UNDER REFERENCE NUMBERS:
CONFIDENTIAL
6
SEPARATE STORAGE INSTALLATIONS
DATE:
HANDLING OF NUCLEAR MATERIAL
19. DESCRIPTION OF EACH NUCLEAR
MATERIAL STORAGE AREA
(inventory location)
DRAWING(S) ATTACHED UNDER REFERENCE NUMBERS:
20. DESIGN RANGE OF INVENTORIES
OF NUCLEAR MATERIAL IN EACH
STORAGE AREA
21. METHOD OF POSITIONING OF NUCLEAR
MATERIAL IN STORAGE
IF NECESSARY, ATTACHED DRAWING(S)
22. ROUTES AND EQUIPMENT USED FOR
MOVEMENT OF NUCLEAR MATERIAL
(if applicable)
DRAWING(S) ATTACHED UNDER REFERENCE NUMBERS:
23. FREQUENCY OF RECEIPT
AND SHIPMENT
N-94 (6-2005)
CONFIDENTIAL
7
SEPARATE STORAGE INSTALLATIONS
DATE:
HANDLING OF NUCLEAR MATERIAL
24. SHIELDING
(for storage and transfer)
PROTECTION AND SAFETY MEASURES
25. BASIC MEASURES FOR PHYSICAL
PROTECTION OF NUCLEAR MATERIAL
26. SPECIFIC HEALTH AND SAFETY RULES
FOR INSPECTOR COMPLIANCE
(if extensive, attach separately)
N-94 (6-2005)
CONFIDENTIAL
8
SEPARATE STORAGE INSTALLATIONS
DATE:
NUCLEAR MATERIAL ACCOUNTANCY AND CONTROL
27. SYSTEM DESCRIPTION
Give description of:
SPECIMEN FORMS USED IN ALL PROCEDURES ATTACHED
UNDER REFERENCE NUMBERS:
-- the nuclear material accountancy system;
-- the method of recording and reporting
accountancy data and establishing
material balances;
-- the procedures for account adjustment
after inventory and correction of mistakes,
etc., under the following headings:
under the following headings:
i)
General
N-94 (6-2005)
CONFIDENTIAL
9
SEPARATE STORAGE INSTALLATIONS
DATE:
NUCLEAR MATERIAL ACCOUNTANCY AND CONTROL
27. SYSTEM DESCRIPTION
(Continued)
ii)
Receipts
(including method of dealing with
shipper/receiver differences and
subsequent account corrections)
iii)
Shipments
(including wastes)
N-94 (6-2005)
CONFIDENTIAL
10
SEPARATE STORAGE INSTALLATIONS
DATE:
NUCLEAR MATERIAL ACCOUNTANCY AND CONTROL
27. SYSTEM DESCRIPTION
(Continued)
iv)
LIST OF MAJOR ITEMS OF EQUIPMENT REGARDED AS NUCLEAR
MATERIAL CONTAINERS ATTACHED UNDER REFERENCE NUMBERS:
Physical Inventory
Frequency, procedures, established
distribution of nuclear material, methods
of operator's inventory taking (both for
item and/or bulk accountancy, including
relevant assay methods),
ACCESSABILITY,and possible
verification method for irradiated nuclear
material, expected accuracy, access to
nuclear material
v)
Operational Records and
Accounting Records
(including method adjustment or
correction and place of preservation
and language)
28. FEATURES RELATED TO CONTAINMENT
AND SURVEILLANCE MEASURES
(general description of applied or possible
measures)
N-94 (6-2005)
CONFIDENTIAL
11
SEPARATE STORAGE INSTALLATIONS
DATE:
NUCLEAR MATERIAL ACCOUNTANCY AND CONTROL
29. FOR EACH MEASUREMENT POINT OF
ACCOUNTABILITY AREAS, IDENTIFIED
UNDER QS. 18, GIVE THE FOLLOWING
(if applicable)
i)
SEPARATE SHEET(S) CAN BE ATTACHED FOR EACH
MEASUREMENT POINT
IF NECESSARY, ATTACH DRAWING(S)
Description of Location, Type,
Identification
ii)
Anticipated Types of Inventory
Change and Possibilities to
Use This Measurement Point for
Physical Inventory Taking
iii)
Physical and Chemical Form of
Nuclear Material
(with cladding materials description)
iv)
Nuclear Material Containers,
Packaging
N-94 (6-2005)
CONFIDENTIAL
12
SEPARATE STORAGE INSTALLATIONS
DATE:
NUCLEAR MATERIAL ACCOUNTANCY AND CONTROL
29. FOR EACH MEASUREMENT POINT OF
ACCOUNTABILITY AREAS, IDENTIFIED
UNDER QS. 18, GIVE THE FOLLOWING
(if applicable) (Continued)
v) Sampling Procedure and
Equipment Used
vi)
Measurement Method(s) and
Equipment Used
vii)
Source and Level of Random and
Systematic Errors
(weight, volume, sampling, NDA)
viii) Technique and Frequency of
Calibration of Equipment Used
ix)
Method of Converting Source Data
to Batch Data
x)
Means of Batch Identification
N-94 (6-2005)
CONFIDENTIAL
13
SEPARATE STORAGE INSTALLATIONS
DATE:
NUCLEAR MATERIAL ACCOUNTANCY AND CONTROL
29. FOR EACH MEASUREMENT POINT OF
ACCOUNTABILITY AREAS, IDENTIFIED
UNDER QS. 18, GIVE THE FOLLOWING
(if applicable) (Continued)
xi)
Anticipated Batch Flow Rate Per Year
xii)
Anticipated Number of Inventory Batches
xiii) Anticipated Number of Items Per Flow
and Inventory Batches
xiv) Type, Composition and Quantity of
Nuclear Material Per Batch
(with indication of batch data, total
weight of each element of nuclear
material and the isotopic ocmposition
(for uranium) and Pu content, when
appropriate; form of nuclear material)
xv)
Features Related to ContainmentSurveillance Measures
N-94 (6-2005)
CONFIDENTIAL
14
SEPARATE STORAGE INSTALLATIONS
DATE:
OPTIONAL INFORMATION
30. OPTIONAL INFORMATION
(that the operator considers relevant
to safeguarding the facility)
Signature of Responsible Officer:
Date:
N-94 (6-2005)
CONFIDENTIAL
15
File Type | application/pdf |
File Title | o:\informs\fixforms\ia_n94_1.wpf |
Author | BAM1 |
File Modified | 2005-10-13 |
File Created | 2005-10-13 |