Coalbed Methane Extraction Sector Questionnaire (New)

Coalbed Methane Extraction Sector Survey (New)

2291supp01 - EPA CBM Screener Questionnaire (Version 2.2)

Coalbed Methane Extraction Sector Questionnaire (New)

OMB: 2040-0279

Document [doc]
Download: doc | pdf

U.S. ENVIRONMENTAL PROTECTION AGENCY

2007 COALBED METHANE INDUSTRY SCREENER

Source: EIA, November 2007

Form Approved

OMB Control No. 2040-NEW

Approval Expires: XXX



OMB 2040-NEW

(approval expiration date):


DUE DATE:



YOUR RESPONSE IS REQUIRED BY LAW. Title 33, United States Code, requires businesses and other organizations that receive this questionnaire to answer the questions and return the report to the U.S. Environmental Protection Agency.


By the same law, you may claim confidentiality. See Instruction Guide.

2007 COALBED METHANE INDUSTRY SCREENER







[ADDRESS LABEL]








INSTRUCTIONS:

  • Please refer to the accompanying Instruction Guide for help in answering specific questions.

  • More information is available from EPA’s contractor support at [email protected] or XXX-XXX-XXXX

Item A ESTABLISHMENT NAME


Is the establishment name shown above in the mailing address correct?


 Yes



 No – Enter establishment name


Item B CONTACT INFORMATION


If we have any questions about your response, who may we contact?


Name: _____________________________________________________

Street Address: _______________________________________________

City, State, ZIP: _______________________________________________

Phone: __________________________

email: ___________________________

Item C OPERATING STATUS IN 2007 IN THIS BASIN


In 2007, did your establishment own or operate any wells that produce coalbed methane in [basin] in [state – if Powder River]? Please respond only for this location.


 Yes → Go to Item D


 No → Check the box, and return the survey to the address in the Instruction Guide.


Item D BUSINESS SIZE


In 2007, was your highest level of corporate ownership a small business? (See common size standards below)


Yes


No



NAICS

Name of Industry

SBA Size Standard

211xxx

Oil and Gas Extraction

500 employees

21211x

Coal Mining

500 employees

213111

Drilling Oil and Gas Wells

500 employees

213112

Support Activities for Oil and Gas Operations

$6.5 million annual revenues

213113

Support Activities for Coal Mining

$6.5 million annual revenues

22111x

Electric Power Generation

<4 million megawatt-hours/year

221112

Fossil Fuels Electric Power Generation

<4 million megawatt-hours/year

22112x

Electric Power, Transmission, Control and Distribution

<4 million megawatt-hours/year

22121x

Natural Gas Distribution

500 employees

32411x

Petroleum Refineries

1,500 employees

486110

Pipeline Transportation of Crude Oil

1,500 employees

486210

Pipeline Transportation of Natural Gas

$6.5 million annual revenues


Item E NUMBER OF PROJECTS


A project in this survey is defined as a well, group of wells, lease, group of leases, or some other recognized unit that your establishment operates as an economic unit when making production decisions.


In 2007, how many projects did your establishment own or operate in [basin] in [state if Powder River]?

____ Projects


Item F PROJECT INFORMATION


For each project in [basin] in [state if Powder River], provide the following information.

  • Additional copies of this page are available at www.epa.gov/xxxxxxx.

  • If you have many projects, you may prefer to report this information in a tabular format. A spreadsheet version of this page is available at www.epa.gov/xxxxxxx and may be used instead of providing one page per project.



1. What is the name or identifier that you use for this project?




2. How many wells were in this project in 2007?



3. What was the combined gas production from the wells in 2007?






4

Thousands of Cubic Feet (Mcf)

Other – Enter other reporting units → ____________________

.
In 2007, how did you manage your produced water? Check all that apply.

[This question will only be included on screeners for the Powder River Basin in WY & the Appalachian Basin.]


 Subsurface injection

 Hauled or trucked off-site

 Land applied (for example, irrigation, dust suppression)

 Disposed or discharged by some other method

 No water produced by the project

5. In order to avoid asking you for detailed information about all of your projects, EPA intends to statistically select a limited number to receive a second questionnaire. If this project is selected, where should we send the second questionnaire?


 To the same contact person identified in Item B.

 To the same contact person identified in the previous project.

 To the following contact person:

Name: _____________________________________________________

Street Address: _______________________________________________

City, State, ZIP: _______________________________________________

Phone: __________________________

email: ___________________________


REMARKS Please use this space to clarify your responses, if appropriate.










Please keep a copy and return the original to:


U.S. Environmental Protection Agency

CBM Industry Screener

c/o/ PG Environmental, LLC

447B Carlisle Drive

Herndon, VA 20170



THANK YOU.



The public reporting and recordkeeping burden for this collection of information is estimated to average 5 hours per response. Send comments on the Agency's need for this information, the accuracy of the provided burden estimates, and any suggested methods for minimizing respondent burden, including through the use of automated collection techniques to the Director, Collection Strategies Division, U.S. Environmental Protection Agency (2822T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number in any correspondence. Do not send the completed survey to this address.

File Typeapplication/msword
File TitleEPA CBM Screener Survey
AuthorMarla Smith
Last Modified BySpencer W. Clark
File Modified2008-07-11
File Created2008-07-08

© 2024 OMB.report | Privacy Policy