Justification for Change

JUSTIFICATION FOR CHANGE.doc

Application for a Department of Army Permit

Justification for Change

OMB: 0710-0003

Document [doc]
Download: doc | pdf

JUSTIFICATION FOR CHANGE


The United States Army Corps of Engineers is adding six new nationwide permits that will increase the number of permittees who are required to submit a pre-construction notification. The content of the pre-construction notification and the process for submission will not change; however, the paperwork burden will increase because of the increased number of pre-construction notifications submitted. In addition, for existing aquaculture activities using nationwide permit 48, a short report indicating basic information about the existing shellfish production operation will be filed where a pre-construction notification is not required. The information provided on the short report is a subset of what would normally be required for a pre-construction notification, so there is no new information being collected. A sample report is attached.


File Typeapplication/msword
File TitleJUSTIFICATION FOR CHANGE
Authorpltoppings
Last Modified Bypltoppings
File Modified2007-03-16
File Created2007-03-16

© 2024 OMB.report | Privacy Policy