SUPPORTING STATEMENT


NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR CHEMICAL MANUFACTURING AREA SOURCES


Part A of the Supporting Statement


1. Identification of the Information Collection


(a) Title and Number of the Information Collection.


“NESHAP for Chemical Manufacturing Area Sources.” This is a new information collection request (ICR) and the EPA tracking number is 2323.01.


(b) Short Characterization.

This ICR covers information collection requirements in the proposed area source rule for chemical manufacturing (40 CFR part 63, Subpart VVVVVV). There are nine area source categories in the chemical manufacturing sector: Agricultural Chemicals and Pesticides Manufacturing, Cyclic Crude and Intermediate Production, Industrial Inorganic Chemical Manufacturing, Industrial Organic Chemical Manufacturing, Inorganic Pigments Manufacturing, Miscellaneous Organic Chemical Manufacturing, Plastic Materials and Resins Manufacturing, Pharmaceutical Production, and Synthetic Rubber Manufacturing. The proposed requirements apply to process vents, storage tanks, equipment leaks, wastewater systems, transfer operations, and cooling tower systems at affected sources in each area source category and are combined in one subpart. The proposed standards are based on EPA’s determination regarding the generally available control technology or management practices for each area source category. This information is being collected to assure compliance with 40 CFR part 63, subpart VVVVVV.


Each existing and new affected source would be required to submit an initial notification of applicability and a notification of compliance status in accordance with requirements in the General Provisions (40 CFR Part 63, Subpart A). New sources would also be required to notify the Administrator of intended construction or reconstruction. Each affected source must prepare a startup, shutdown, and malfunction (SSM) plan, keep records of the occurrence and duration of each SSM event and actions taken during each SSM event, and report actions taken that are inconsistent with the plan. Other plans that must be prepared and maintained onsite include a metal process vent monitoring plan if uncontrolled metal HAP emissions from process vents at a new source exceed 100 lb/yr and either a cooling tower maintenance plan or monitoring plan depending on the water recirculation rate. An owner or operator with batch process vents must estimate and keep records of either uncontrolled organic HAP emissions or, if applicable, the organic HAP usage. An owner or operator with metal process vents must estimate and keep records of the uncontrolled metal HAP emissions. An owner or operator must estimate and keep records of the total resource effectiveness index value for each continuous process vent. To demonstrate compliance with management practice requirements for process vents and storage tanks, affected sources would be required to keep records of the findings during quarterly inspections and actions taken in response to those findings. Sources subject to emission standards for process vents must conduct performance tests to demonstrate initial compliance, and they must conduct monitoring and keep records of the monitoring data to demonstrate continuous compliance. Sources using floating roofs to comply with standards for storage tanks must conduct and keep records of inspections for defects in the seals and roof. Sources must keep records identifying wastewater streams that must be separated into an organic phase and water phase before discharge of the water phase to treatment, and they must keep records of the disposition of the organic phase. Semiannual compliance reports would be required only to document deviations from any requirements in the rule that occurred during the reporting period, to provide information related to any delay of repair, or to describe process changes and provide updated certification that the facility complies with applicable requirements after the process change. These notifications, reports, and records are needed to determine compliance.


Any owner or operator subject to the provisions of 40 CFR Part 63 shall maintain required records for at least five years. All reports are sent to the delegated state or local authority. In the event that there is no such delegated authority, the reports are sent directly to the United States Environmental Protection Agency (EPA) regional office.


Approximately 452 chemical manufacturing area source facilities are currently subject to the regulation, and it is estimated that an additional 27 new sources will become subject to the regulation in the next three years.


It is estimated that the information collection will involve 11,488 hours from 1,468 annual responses and respondent labor costs of $874,038/yr. Total annualized capital costs will be $102,825/yr, and total O&M costs will be $11,856/yr. The total Agency burden is estimated to be 1,602 hours per year at a cost of $84,560.


2. Need for and Use of the Collection


(a) Need/Authority for the Collection.


Section 112(k)(3)(B) of the Clean Air Act (CAA) requires EPA to identify at least 30 hazardous air pollutants (HAP), which, as the result of emissions of area sources, that pose the greatest potential health threat in urban areas, and section 112(c)(3) requires EPA to regulate the area source categories that represent 90 percent of the emissions of the 30 “listed” HAP (“urban HAP”). We implement these listing requirements through the Integrated Urban Air Toxics Strategy (64 FR 38715, July 19, 1999). Sierra Club sued EPA, alleging a failure to complete standards for the source categories listed pursuant to CAA section 112(c)(3) within the timeframe specified by the statute. See Sierra Club v. Johnson, No. 01-1537, (D.D.C.). On March 31, 2006, the court issued an order requiring EPA to promulgate standards under CAA section 112(d) for those area source categories listed pursuant to CAA section 112(c)(3). We listed the nine source categories identified above on July 19, 1999, June 26, 2002, and November 22, 2002 (64 FR 38721, 67 FR 43112, and 67 FR 70427).


Under CAA section 112(d)(5), the Administrator may, in lieu of standards requiring maximum achievable control technology (MACT) under section 112(d)(2), elect to promulgate standards or requirements for area sources "which provide for the use of generally available control technologies or management practices by such sources to reduce emissions of hazardous air pollutants." Under section 112(d)(5), the Administrator has the discretion to use generally available control technology or management practices (GACT) in lieu of MACT. Pursuant to section 112(d)(5), we have decided not to issue MACT standards and concluded that GACT is appropriate for chemical manufacturing area sources.


Legislative history describes GACT as standards or requirements reflecting application of generally available control technology or management practices, that is, “methods, practices and techniques which are commercially available and appropriate for application by the sources in the category considering economic impacts and the technical capabilities of the firms to operate and maintain the emissions control systems” (Senate Report Number 101-228, December 20, 1989). Consistent with the legislative history, in addition to considering technical capabilities of the facilities and the availability of control measures, we may consider costs and economic impacts in determining GACT.


Certain records and reports are necessary for the Administrator to confirm the compliance status of area sources, identify any new or reconstructed sources subject to the standards, and confirm that the GACT standards are being achieved on a continuous basis. These recordkeeping and reporting requirements are specifically authorized by section 114 of the Clean Air Act (42 U.S.C. 7414) and set out in the part 63 NESHAP General Provisions.


(b) Use/Users of the Data.


The information will be used by the delegated authority (State agency or Regional Administrator if there is no delegated State agency) to ensure that the emissions limits and other requirements are being achieved. Based on review of the recorded information at the site and the reported information, the delegated permitting authority can identify facilities that may not be in compliance and decide which plants, records, or processes may need inspection.


3. Nonduplication, Consultations, and Other Collection Criteria


(a) Nonduplication.


Some of the affected facilities under this NESHAP will also be subject to requirements under 40 CFR part 60 new source performance standards in subparts Kb, VV, DDD, III, NNN, and/or RRR. Some chemical manufacturing area sources also may be subject to 40 CFR parts 260 through 270. In all such cases, the area source NESHAP identifies the rule that takes precedence or specifies that the owner or operator must identify and comply with the more stringent requirements. These provisions eliminate duplication.


Some of the affected facilities under this NESHAP also may be subject to requirements under 40 CFR part 60 NSPS in subparts G, H, T, U, V, W, X, and/or PP. There is no duplication of effort in these cases, however, because the standards and associated information collection requirements are for different pollutants that are not regulated under the area source NESHAP (e.g., acid gases or fluorides).


Certain reports required by State or local agencies may duplicate information required by these area source source standards. In such cases, a copy of the report submitted to the State or local agency may be sent to the Administrator in lieu of the report required by the standards.


(b) Public Notice Required Prior to ICR Submission to OMB.


Notice of the submission of this ICR to OMB will be published in the proposed rule.


(c) Consultations.


No consultations were held during development of the proposed area source standards. However, all interested parties will have an opportunity to comment on the recordkeeping and reporting requirements and associated burden during the public comment period for the proposed rule.


(d) Effects of Less Frequent Collection.


If the relevant information were collected less frequently, the delegated permitting authority (State or EPA) would not be reasonably assured that an affected facility is in compliance with the standards.


(e) General Guidelines.


This section is not applicable because none of the OMB guidelines in 5 CFR 1320.5 are being exceeded by the proposed area source standards.


(f) Confidentiality.


The required information has been determined not to be confidential. However, any information submitted to the Agency for which a claim of confidentiality is made is safeguarded according to CAA section 114(c) and the Agency’s implementing regulations in Title 40, chapter 1, part 2, subpart B - Confidentiality of Business Information (CBI) (see 40 CFR 2; 41 FR 36902, September 1, 1976; amended by 43 FR 40000, September 8, 1978; 43 FR 42251, September 20, 1978; 44 FR 17674, March 23, 1979).


(g) Sensitive Questions.


None of the reporting or recordkeeping requirements contain sensitive questions.


4. The Respondents and the Information Requested


(a) Respondents/NAICS Codes.


Respondents are owners and operators of chemical manufacturing facilities that are located at area sources of HAP emissions and process, use, produce, or generate any of the 15 urban HAP that must be regulated to achieve the section 112(c)(3) requirement to regulate 90 percent of urban HAP. The applicable North American Industry Classification System (NAICS) code for respondents affected by the NESHAP is 325, with certain exceptions. The chemical manufacturing area source category excludes: (1) production operations classified in NAICS 325222, 325314, or 323413; (2) facilities subject to standards for other listed area source categories (Acrylic Fibers/Modacrylic Fibers Production, Chemical Preparation, Carbon Black, Chemical Manufacturing: chromium compounds, Polyvinyl Chloride and Copolymers Production, Paint and Allied Coatings, and Mercury Cell Chlor-Alkali Manufacturing) in NAICS 325; (3) certain fabricating operations; (4) manufacture of photographic film, paper, and plate where material is coated or contains chemicals (only the manufacture of the photographic chemicals would be regulated); and (5) manufacture of radioactive elements or isotopes, radium chloride, radium luminous compounds, strontium, and uranium.


(b) Information Requested.


(i) Data Items, Including Recordkeeping Requirements. Table 1 summarizes the proposed data items, including recordkeeping and reporting requirements.


Types of reports that may be required are listed below:


Reports for 40 CFR part 63, subpart VVVVVV

Notification of intended construction/reconstruction (new sources)

63.5(b)(4) and 63.9(b)(5)

Initial notification (all sources)

63.9(b)

Notification of performance test (sources subject to emission limits for process vents and storage tanks)

63.7(b) and 63.9(e)

Performance test results (same as for notification of performance tests)

63.7(g) and 63.10(d)(2)

Notification of compliance status (all sources)

63.9(h), 63.11501(b)

Semiannual compliance reports (all sources when criteria for reporting are met)

63.11501(d)


A source must maintain the following records:


Recordkeeping for 40 CFR part 63, subpart VVVVVV

Emission estimates and TRE index calculations for process vents

63.11496(a), (b), and (f)

Records are required to be retained for five (5) years

63.10(b)(2), 63.11501(c)

Cooling tower maintenance plan or monitoring plan

63.104, 63.11.495(g), 63.11500(b), and Table 2 to Subpart VVVVVV

Metal process vent monitoring plan

63.11410(g)(2) and (h), 63.11496(f)(3)

Records of wastewater streams, type of treatment, and if applicable, disposition of separated organic phases

Table 2 to subpart VVVVVV

Inspections and monitoring results.

60.115b, 60.116b, 63.104(f), 63.998, 63.11410(d) and (g)(4), 63.11495, 63.11496, 63.11498.

(ii) Respondent Activities. The respondent activities required by the proposed rules are identified in Table 1 and introduced in section 6(a).


The respondent activities required by subpart VVVVVV are listed in the following table.


Respondent Activities

Read instructions.

Write plans for cooling tower monitoring and metal process vent monitoring.

Perform initial performance test using appropriate Reference Method, and repeat performance tests if necessary.

Write the notifications and reports listed above.

Enter information required to be recorded above.

Submit the required reports developing, acquiring, installing, and utilizing technology and systems for the purpose of collecting, validating, and verifying information.

Develop, acquire, install, and utilize technology and systems for the purpose of processing and maintaining information.

Develop, acquire, install, and utilize technology and systems for the purpose of disclosing and providing information.

Adjust the existing ways to comply with any previously applicable instructions and requirements.

Train personnel to be able to respond to a collection of information.

Transmit, or otherwise disclose the information.



5. The Information Collected: Agency Activities, Collection Methodology, and Information Management


(a) Agency Activities.


EPA conducts the following activities in connection with the acquisition, analysis, storage, and distribution of the required information.


Agency Activities

Observe initial performance tests and repeat performance tests if necessary.

Review notifications and reports, including initial notification, notification of compliance status, performance test reports, SSM reports, and periodic compliance reports, required to be submitted by industry.

Input, analyze, and maintain data in the AIRS Facility Subsystem (AFS) database.


(b) Collection Methodology and Management.


Data and records maintained by the respondents are tabulated and published for use in compliance and enforcement programs of the delegated permitting authority. The monitoring reports submitted to the permitting authority are used for problem identification, as a check on source operation and maintenance, and for compliance determinations. EPA is the permitting authority until the State agency is delegated authority to implement the final rule. Therefore, information contained in the reports submitted to the Regional Administrator will be entered into the Air Facility System (AFS), which is operated and maintained by EPA's Office of Compliance. AFS is EPA’s database for the collection, maintenance, and retrieval of compliance data for approximately 125,000 industrial and government-owned facilities. EPA uses the AFS for tracking air pollution compliance and enforcement by local and state regulatory agencies, EPA regional offices and EPA headquarters. EPA and its delegated authorities can edit, store, retrieve and analyze the data.


(c) Small Entity Flexibility.


Few of the affected facilities are estimated to be small entities. The classification of a small entity is defined as having less than a specified number of employees. The specific number varies based on the NAICS code. For this overall source category, a small entity is defined as having less than 1,000 employees, less than 750 employees, or less than 500 employees, depending on the NAICS code. The impact on small entities was taken into consideration during the development of the regulation by mandating minimal notification and reporting requirements for all sources. The Agency considers these requirements the minimum needed to ensure compliance and, therefore, cannot reduce them further for small entities. To minimize recordkeeping and reporting for all facilities, only brief documentation of quarterly inspections is required, and compliance reports are required only if certain conditions are met during the reporting period.


(d) Collection Schedule.


The specific frequency for each information collection activity within this request is shown in Table 1.


6. Estimating the Burden and Cost of the Collection


Table 1 documents the computation of individual burdens for the recordkeeping and reporting requirements applicable to the industry for the subpart included in this ICR. The individual burdens are expressed under standardized headings believed to be consistent with the concept of burden under the Paperwork Reduction Act. Where appropriate, specific tasks required and major assumptions made have been identified. Responses to this information collection are mandatory.


The Agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB Control Number.


(a) Estimating Respondent Burden.


The average annual burden to industry over the next three years from these recordkeeping and reporting requirements is estimated to be 11,488 hours per year (Total Labor Hours from Table 1: Annual Burden of Reporting and Recordkeeping Requirements, NESHAP for Chemical Manufacturing Area Sources (40 CFR part 63, subpart VVVVVV).


(b) Estimating Respondent Costs.


(i) Estimating Labor Costs. Labor rates and associated costs are based on Bureau of Labor Statistics (BLS) data. Technical, management, and clerical average hourly rates for private industry workers were taken from the United States Department of Labor, Bureau of Labor Statistics, May 2007 for NAICS Code 325 at “May 2007 National Industry-Specific Occupational Employment and Wage Estimates,” available at http://stats.bls.gov/oes/current/oessrci.htm. Wages for occupational groups are used as the basis for the labor rates with a total compensation of $36.78 per hour for technical, $62.20 per hour for managerial, and $17.75 per hour for clerical. These rates represent salaries plus fringe benefits and do not include the cost of overhead. An overhead rate of 110 percent is used to account for these costs. The fully-burdened hourly wage rates used to represent respondent labor costs are: technical at $77.24, management at $130.62, and clerical at $37.28.


(ii) Estimating Capital and Operations and Maintenance (O&M) Costs. The proposed NESHAP requires capital costs associated with performance tests, monitoring equipment, and water sampling and analyses. The total cost for these capital expenditures is $936,479 for existing and new sources.


Operation and maintenance (O&M) costs for existing and new sources are associated with the cost of materials for temperature monitoring systems and bag leak detection systems, labor costs for updating maintenance plans and conducting inspections, and the cost of operating monitoring equipment. The total estimated cost is $11,856/yr.


(iii) Annualizing Capital Costs. Annualized costs are calculated by multiplying the capital recovery factor by the annual capital cost. The capital recovery factor is 0.1098 based on an interest rate of 7 percent and an assumed equipment life of 15 years. The total annualized capital cost is $102,825.


(c) Estimating Agency Burden and Cost.


Because the information collection requirements were developed as an incidental part of standards development, no costs can be attributed to the development of the information collection requirements. Because reporting and recordkeeping requirements on the part of the respondents are required under the operating permits rules in 40 CFR part 70 or part 71 and the part 63 NESHAP General Provisions, no operational costs would be incurred by the Federal Government. Publication and distribution of the information are part of the Compliance Data System, with the result that no Federal costs can be directly attributed to the ICR. Examination of records to be maintained by the respondents will occur incidentally as part of the periodic inspection of sources that is part of EPA's overall compliance and enforcement program, and, therefore, is not attributable to the ICR. The only costs that the Federal government would incur are user costs associated with the analysis of the reported information, as presented in Table 2.


The Agency labor rates are from the Office of Personnel Management (OPM) 2007 General Schedule which excludes locality rates of pay. These rates can be obtained from Salary Table 2007-GS, available on the OPM website at www.opm.gov/oca/07tables/html/gs_h.asp. The government employee labor rates are $14.60 per hour for clerical (GS-6, Step 3), $26.98 for technical (GS-12, Step 1), and $36.36 for managerial (GS-13, Step 5). These rates were increased by 60 percent to include fringe benefits and overhead. The fully-burdened wage rates used to represent Agency labor costs are: clerical at $23.36, technical at $43.17, and managerial at $58.18.


(d) Estimating the Respondent Universe and Total Burden and Costs.


Approximately 452 chemical manufacturing area sources are currently subject to the regulation. Twenty seven new sources are estimated during the next 3 years.


The total annual number of responses for the monitoring, recordkeeping, and reporting requirements in subpart VVVVVV is 1,468. This number is calculated by summing the product of columns B and D for each of the activities listed in Table 1.


The total annual labor costs are $874,038. Details upon which this estimate is based appear in Table 1.


(e) Bottom Line Burden Hours Burden Hours and Cost Tables.


(i) Respondent Tally. The bottom line respondent burden hours and costs, presented in Table 1 are calculated by adding person-hours per year down each column for technical, managerial, and clerical staff, and by adding down the cost column.


The average annual burden for the monitoring, recordkeeping, and reporting requirements in subpart VVVVVV is 11,488 hours, with annual labor costs of $874,038, annualized capital costs of $102,825, and annualized O&M costs of $11,856.


(ii) The Agency Tally. The average annual Federal Government cost for labor and travel costs is $84,560 for 1,602 hours for subpart VVVVVV. The bottom line Agency burden hours and costs presented in Table 2 are calculated by adding person-hours per year down each column for technical, managerial, and clerical staff, and by adding down the cost column.


(iii) Variations in the Annual Bottom Line. This section does not apply since no significant variation is anticipated.


(f) Reasons for Change in Burden.


The burden in this ICR results from the information collection requirements in the proposed area source rule for chemical manufacturing (40 CFR part 63, Subpart VVVVVV). The proposed standards are based on EPA’s determination regarding the generally available control technology or management practices for each area source category.


(g) Burden Statement.


The annual public reporting and recordkeeping burden for this collection of information is estimated to average 7.8 hours per response. Burden means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements; train personnel to be able to respond to a collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information.


An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a valid OMB Control Number. The OMB Control Numbers for EPA’s regulations are listed at 40 CFR part 9 and 48 CFR chapter 15.


To comment on the Agency's need for this information, the accuracy of the provided burden estimates, and any suggested methods for minimizing respondent burden, including the use of automated collection techniques, EPA has established a public docket for this ICR under Docket ID Number EPA-HQ-OAR-2008-0334. An electronic version of the public docket is available at www.regulations.gov which may be used to obtain a copy of the draft collection of information, submit or view public comments, access the index listing of the contents of the docket, and to access those documents in the public docket that are available electronically. When in the system, select “search,” then key in Docket ID Number EPA-HQ-OAR-2008-0334. The documents are also available for public viewing at the EPA Docket Center, EPA West, Room 3334, 1301 Constitution Avenue, NW, Washington, DC. The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Reading Room is (202) 566-1744, and the telephone number for the docket center is (202) 566-1742. Send comments to the Office of Information and Regulatory Affairs, Office of Management and Budget (OMB), Attn: Desk Officer for EPA, 725 17th St., NW, Washington, DC 20503. Please include the EPA Docket ID Number EPA-HQ-OAR-2008-0334 and OMB Control Number 2060-NEW in any correspondence.


Part B of the Supporting Statement


This part is not applicable because statistical methods are not used in data collection associated with the rule.



Table 1. Annual Respondent Burden and Cost— NESHAP for Chemical Manufacturing Area Sources


 

Technical hours per occurrence

Occurrences/ respondent/year

Technical hours/ respondent/ year

Respondents per yeara

Total technical hours per year

Management hours per year

Clerical hours per year

Cost per yearb

 

(A)

(B)

(C = A * B)

(D)

(E = C * D)

(F = 0.05 * E)

(G = 0.1 * E)

(H)

1. APPLICATIONS

N/A

 

 

 

 

 

 

 

2. SURVEY AND STUDIES

 

 

 

 

 

 

 

 

Cooling tower monitoring planc

40

1

40

0

0

0

0

$0

Metal process vent monitoring pland

30

1

30

28.3

849

42.5

84.9

$74,285

3. REPORTING REQUIREMENTS

 

 

 

 

 

 

 

 

A. Read Instructionse

4

1

4

160

640

32.0

64.0

$55,998

B. Required Activities

 

 

 

 

 

 

 

 

Initial Performance testf

24

1

24

21.9

525.6

26.3

52.6

$45,988

Repeat Performance testg

24

1

24

4.4

105.6

5.3

10.6

$9,240

C. Create Information

Included in 3B

 

 

 

 

 

 

 

D. Gather Existing Information

Included in 3E

 

 

 

 

 

 

 

E. Write Report

 

 

 

 

 

 

 

 

Notification of construction/reconstructionh

2

1

2

9

18

0.9

1.8

$1,575

Initial notificationi

2

1

2

160

320

16.0

32.0

$27,999

Notification of compliance statusj

8

1

8

160

1,280

64.0

128.0

$111,996

Notification of initial performance testk

2

1

2

21.9

43.8

2.2

4.4

$3,832

Report of performance test

Included in 3B

 

 

 

 

 

 

 

Semiannual compliance reportsl

8

1

8

3.6

28.8

1.4

2.9

$2,520

4. RECORDKEEPING REQUIREMENTS

 

 

 

 

 

 

 

 

A. Read Instructionse

4

1

4

160

640

32.0

64.0

$55,998

B. Plan Activities

Included in 3B

 

 

 

 

 

 

 

C. Implement Activities

 

 

 

 

 

 

 

 

Initial calculations and demonstrations

 

 

 

 

 

 

 

 

- TRE calculation for continuous process ventsm

2

1

2

24.2

48.4

2.4

4.8

$4,235

- calculation of batch process vent emissionsn

4

1

4

4.1

16.4

0.8

1.6

$1,435

- calculation of metal HAP emissionso

2

1

2

4.5

9

0.5

0.9

$787

- capacity and MTVP calculations for storage tanksp

1

2

2

96.8

193.6

9.7

19.4

$16,939

- inspection or seal gap measurement for storage tanksq

2

3.3 

6.6 

 0.3

 0.7

$577 

- determination of HAP concentrations in wastewater streamsr

20

1

20

96.8

1,936

96.8

193.6

$169,393

Recurring calculations and tracking requirements

 

 

 

 

 

 

 

 

- number of batches per month (or HAP usage) to maintain less than 19,000 lb/yr of organic HAP emissionss

0.5

12

6

8.1

48.6

2.4

4.9

$4,252

- metal PV emissionst

0.5

12

6

5.8

34.8

1.7

3.5

$3,045

- quarterly inspections for process vents and storage tanksu

1

4

4

0

0

0

0

$0

D. Develop Record System

20

1

20

160

3200

160.0

320.0

$279,989

E. Time to Enter Information

 

 

 

 

 

 

 

 

Operating parameters for control devicesv

0.25

52

13

0

0

0.0

0.0

$0

Records of quarterly inspections for process vents and storage tanks

0.25

4

1

18

18

0.9

1.8

$1,575

Records of equipment leak inspections

Included in emission control option costs

 

 

 

 

 

 

 

Records of cooling tower system monitoring

Included in emission control option costs

 

 

 

 

 

 

 

Information related to bag leak detection systems

2

 8

 3.4

27.2 

 1.4

 2.7

$2,380 

Records of inspections or seal gap measurements for storage tanks equipped with floating roofsw


 

 

 

 

 

 

F. Train Personnel

 

 

 

 

 

 

 

 

Initial

N/A

 

 

 

 

 

 

 

Refresher and new personnel

N/A

 

 

 

 

 

 

 

G. Audits

N/A

 

 

 

 

 

 

 

5. TOTAL LABOR BURDEN AND COST

 

 

 

 

9,989

499

999

$874,038

 

 

 

 

 

 

11,488

hours

 

6. CAPITAL/O&M COSTS

 

 

 

 

 


 

 

Annual capital costs

 

 

 

 

 

 

 

 

Metal process vent performance testsx

 

 

 

 

 

 

 

$174,280

Monitoring equipment for metal process ventsy

 

 

 

 

 

 

 

$495,725

Batch process vent and continuous process vent performance testsz

 

 

 

 

 

 

 

$48,840

Monitoring equipment for batch process vent and continuous process vent control devicesaa

 

 

 

 

 

 

 

$7,240

Initial wastewater sampling and analysisbb

 

 

 

 

 

 

 

$210,395

Cooling tower water sampling and analysiscc

 

 

 

 

 

 

 

$0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Annualized Capital Costdd

 

 

 

 

 

 

 

$102,825

Annual O&M Costee

 

 

 

 

 

 

 

$11,856

Total Annual Capital and O&M Cost

 

 

 

 

 

 

 

$114,682

 








 

aAssume 452 existing facilities are subject to the NESHAP (228 have only organic HAP emissions, 178 have only metal HAP emissions, and 46 have both types of emissions). Thus, on average, 452/3 =151 existing sources/yr will be subject. Assume 2 percent growth in new facilities each year (0.02 x 452 = 9 new facilities per year; 9 x 274/452 = 5.4 with organic HAP emissions and 9 x 224/452 = 4.5 with metal HAP emissions).

bUnited States Department of Labor, Bureau of Labor Statistics, May 2007 National Industry-Specific Occupational Employment and Wage Estimates, NAICS 325000 Chemical Manufacturing. The wages are for Environmental Engineers, General and Operations Managers, and Office and Administrative Support Occupations. The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry. Technical - $77.24/hr; Managerial - $130.62/hr; Clerical - $37.28/hr.

cAssume 80 percent of facilities with organic HAP emissions have cooling towers and will need to prepare a cooling tower monitoring plan (274/3 x 0.8 = 73.1 existing sources/yr plus 5.4 x 0.8 = 4.3 new sources/yr). However, this cost was included as part of the cooling tower monitoring program cost.

d All sources with metal HAP emissions greater than 100 lb/yr must prepare a metal process vent monitoring plan. This includes sources that are controlling such emissions (55/3 = 18.3 existing uncontrolled sources/yr plus 25/3 = 8.3 existing controlled sources/yr plus 4.5 x 80/224 = 1.6 new sources/yr). The plan is not submitted but must be maintained onsite and made available upon request.

e Assume an average of 8 hours/facility to read and understand the monitoring, recordkeeping, and reporting requirements. This time is split evenly between items 3A and 4A in this table.

f Assume 24 hours for facility technical staff to arrange for a performance test, provide support to test crew during the test, review final report, and submit report.

g Assume 20 percent of performance tests must be repeated.

h All new sources must submit notification of construction/reconstruction.

i All existing and new sources must submit initial notification. On average, 151 existing sources per year submit the initial notification during the 3 years of this ICR (452/3 = 151).

j All existing and new sources must submit notification of compliance status. Assume that all existing sources submit the notification prior to the compliance date (i.e., within the 3 years of this ICR).

k Assume 61 existing facilities have to conduct a performance test (55 with metal process vents, 2 with continuous process vents, and 4 with batch process vents). On average, this is 20.3/yr. Assume existing sources that are already controlled can use a previous test to demonstrate compliance. Assume 1.6 new facilities with metal HAP emissions have to conduct a performance test each year (4.5 x 80/224 = 1.6/yr). Although a small percentage of new sources is expected to meet the conditions under which control of batch process vents and continuous process vents is required, this analysis assumes that none are constructed in the 3 years of this ICR.

l For each semiannual reporting period, assume 10 percent of facilities meet conditions requiring submittal of a compliance report. In the 3 years of this ICR, these reports would be submitted only by new sources (average of 18 new facilities in the 2nd year operating x 2 semiannual reporting periods/yr x 0.1 = 3.6 compliance reports/yr).


m Assume 25 percent of facilities with organic HAP emissions have continuous process vents, and each of these facilities must calculate the TRE (274/3 x 0.25 = 22.8 existing sources/yr plus 9 x 274/452 x 0.25 = 1.4 new sources/yr).

n Assume 75 percent of facilities with organic HAP emissions have batch process vents, and each of these facilities must calculate the total emissions from batch process vents. However, also assume that existing sources already have historical records of emissions developed for emissions inventories or other purposes that can be used. Only new sources would need to project emissions from scratch (5.4 x 0.75 = 4.1 new sources/yr).

o Assume all facilities with metal HAP emissions must calculate the total metal HAP emissions from process vents. However, also assume that existing sources already have historical records of emissions developed for emissions inventories or other purposes that can be used. Only new sources would need to project emissions from scratch (4.5 new sources/yr).

p Assume each facility with organic HAP emissions has two storage tanks, and records of the dimensions, capacity, and MTVP are required for each (274/3 = 91.3 existing sources/yr plus 5.4 new sources/yr).

q Assume 10 storage tanks at existing sources meet the thresholds for control and that all are equipped with either an internal floating roof or external floating roof. Assume no storage tanks at new sources meet the thresholds for control (10/3 = 3.3 per year).

r Assume each facility with organic HAP emissions has process wastewater and must determine the HAP concentrations in each stream (274/3 = 91.3 existing sources/yr plus 5.4 new sources/yr).

s All facilities with batch process vents, except those using control devices, must track emissions from batch process vents. However, only new sources must comply during the 3 years of this ICR. Assume an average number of new sources in 2nd year (2 x 5.4 x 0.75 = 8.1 new sources/yr; assume no new sources use control devices during 3 years of this ICR).

t All facilities with metal process vents that are not required to use control devices must track metal HAP emissions from metal process vents. However, only new sources must comply during the 3 years of this ICR. Use estimated number of new sources in the 2nd year as average per year (2 x (4.5 - 1.6) = 5.8 new sources/yr).

u Only new sources would be subject in the 3 years of this ICR. Assume all facilities are already performing the required inspections.

v No existing sources are required to monitor operating parameters on control devices during the 3 years of this ICR. Although a small percentage of sources is expected to meet the conditions under which control devices are required for batch process vents and continuous process vents, this analysis assumes no new sources will meet these conditions during the 3 years of this ICR. When operating parameters must be monitored, it is assumed that the data will be collected automatically so that the only burden will be 0.25 hr/week to review results and verify that the system is operating properly.

w Only new sources have to comply in the 3 years of this ICR. Assume none of the new sources has a subject storage tank.

x All facilities with control devices for metal process vents must conduct an initial performance test (55/3 = 18.3 existing sources/yr plus 4.5 x 80/224 = 1.6 new sources/yr). Assumes average cost for a performance test using Method 5 is $8,740 per test.

y Assumes each source with a control device for metal process vents uses a fabric filter. Includes 80/3 =26.7 existing sources/yr plus 1.6 new sources/yr. Assumes total purchase and installation costs for a bag leak detection system is $17,533.

z All facilities with control devices for batch process vents and continuous process vents must conduct an initial performance test. Assumes 2 existing sources have control devices for continuous process vents, 4 existing sources have control devices for batch process vents, and no new sources have control devices. Assumes average cost for a performance test using Method 18 is $24,420.

aa Assumes a temperature monitoring system is needed for each control device used to control batch process vents or continuous process vents. Assumes the monitoring equipment cost is $3,620 per system.

bb Assumes all facilities with organic HAP emissions have wastewater streams for which concentrations must be determined (274 existing sources and 5.4 new sources/yr). Assumes 50 percent of the facilities conduct sampling and analysis for an average of 10 streams per facility. Assumes cost of sampling and analysis is $435/sample. (Assumes other 50 percent of facilities determine concentrations based on knowledge of the wastewater; no capital cost.)

cc Assumes cost of sampling and analysis is part of the monitoring program.

dd Annualized costs are calculated by multiplying the capital recovery factor by the annual capital cost. The capital recovery factor is 0.1098 based on an interest rate of 7 percent and an assumed equipment life of 15 years.

ee Includes each of the following assumptions: (1) average annual cost of materials for temperature monitoring systems (4 existing facilities with batch process vents and 2 existing facilities with continuous process vents) and bag leak detection systems (1.6 new facilities with metal process vents) are $200/yr and $1,219/yr, respectively; (2) 5 percent of cooling tower and metal process vent monitoring plans must be updated each year (5 technical hr/update); (3) the average amount of time to operate, maintain, and repair monitoring equipment is 3 hr month for the 1.6 new facilities with metal process vents; (4) 5 percent of new sources with wastewater will make process changes each year that require a new determination or analysis of the organic HAP concentration (2 x 5.4 x 0.05 = 0.54 new sources/yr). Also assumes cost of periodic equipment leak inspections is part of the inspection program cost, and cost of quarterly cooling tower water monitoring is part of the monitoring program cost. Note that in years after the 3 years of this ICR all sources that are required to use control devices for batch process vents, continuous process vents, and/or metal process vents will need to operate and maintain monitoring equipment (10 hr/yr for temperature monitor).















Table 2. Annual Burden and Cost to the Agency—NESHAP for Chemical Manufacturing Area Sources

Activity

(A) EPA Hours/ Occurrence

(B) Occurrences/ Plant/Year

(C) EPA Hours/ Plant/Yeara

(D) Plants/Year

(E) EPA Technical Hours/ Yearb

(F) EPA Managerial Hours/Year

(G) EPA Clerical Hours/Year

(H) Cost, $

Attendance of Initial Performance Test

24

1

24

21.9

526.40

26.32

52.64

$25,484

Attendance of Repeat Performance Testsc

24

1

24

4.4

105.28

5.26

10.53

$5,097

Report Review

 

 

 

 

 

 

 

 

Notification of construction/reconstruction commencement

2

1

2

9.00

18.00

0.90

1.80

$871

Initial Notificationd

0.5

1

0.5

160

79.85

3.99

7.99

$3,866

Notification of compliance statuse

2.5

1

2.5

160

399.27

19.96

39.93

$19,330

Notification of initial testf

0.5

1

0.5

30.3

15.13

0.76

1.51

$733

Review test resultsf

8

1

8

30.3

242.13

12.11

24.21

$11,722

Semiannual compliance reportsg

2

1

2

3.6

7.20

0.36

0.72

$349

Total Annual Hours

 

 

 

 

1,708

85.42

170.84

$82,708

 

 

 

 

 

 

1,602

hours

 

Travel Expensesh

 

 

 

 

 

 

 

$17,108

 








$84,560

a C = A x B

b E = C x D

c Assume 20% of initial performance tests must be repeated due to failure

dAll existing and new sources must submit initial notification. On average, 151 existing sources per year submit the initial notification during the 3 years of this ICR (453/3 = 151).

eAll existing and new sources must submit notification of compliance status. Assume that all existing sources submit the notification prior to the compliance date (i.e., within the 3 years of this ICR).

fAssume 61 existing facilities have to conduct a performance test (55 with metal process vents, 2 with continuous process vents, and 4 with batch process vents). On average, this is 20.3/yr. Assume 25 existing sources already control metal HAP emissions and can submit an existing test report to demonstrate compliance (25/3 = 8.3/yr). Assume 1.6 new facilities with metal HAP emissions have to conduct a performance test each year (4.5 x 80/224 = 1.7/yr). Although a small percentage of new sources is expected to meet the conditions under which control of batch process vents and continuous process vents is required, this analysis assumes that none are constructed in the 3 years of this ICR.

gFor each semiannual reporting period, assume 10 percent of facilities meet conditions requiring submittal of a compliance report. In the 3 years of this ICR, these reports would be submitted only by new sources (average of 18 new facilities operating/yr x 2 semiannual reporting periods x 0.1 = 3.6 compliance reports/yr) .

h Travel Expenses = (1 person x 21.9 plants/year x 3 days/plant x $50 per diem) + ($500 round trip/plant x 21.9 plants/year) + (1 person x 4.4 plants/year x 3 days/plant x $50 per diem) + ($500 round trip/plant x 4.4 plants/year)= $17,108/year.