Test ID | Subcategory | Facility Name | FacilityID | UnitID | Combustor Design | Control Devices | Test Monitor and Fuel Analysis Requirements | Small Entity (bolded) |
Test Costs | Monitoring Costs | Fuel Analysis Costs | Total Costs | Cost Note |
1 | Biomass-Large | Boise White Paper, LLC - I Falls | MNBoisePaper1212 | EU 430 Boiler #2 | Stoker | Over-fire Air Control System | CO, HC, Formaldehyde, and Hg stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
2 | Biomass-Large | Bowater Coated Paper Division | SCBowaterCoatedPaper | Combination Boiler No. 1 | Stoker | Electrostatic Precipitator | CO, HC, Formaldehyde, and Hg stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
3 | Biomass-Large | Bowater Newsprint - Calhoun Operations | TNBowaterNewsprint | Bubbling Fluidized Bed Boiler | Fluidized Bed | Selective Non-Catalytic Reduction (NH3 Or Urea Injection) (SNCR) | CO, HC, Formaldehyde, and Hg stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
4 | Biomass-Large | Domtar Paper Company, LLC - Rothschild | WIDomtar2814 | B11, S11 | Stoker | Electrostatic Precipitator | Testing for CO, HC, Formaldehyde, PM, metals; PM/Metals fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
5 | Biomass-Large | Domtar Paper Company, LLC.- Hawesville Mill | KYDomtarHawesville | Biofuel Boiler B-900 | Fluidized Bed | No Equipment | CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | ||
6 | Biomass-Large | Georgia-Pacific - Crossett Plywood/Studmill | ARGeorgiaPacificCrossett93 | SN-WB1 Wood Boiler | Stoker | Electrostatic Precipitator | CO, HC, Formaldehyde, and HCl stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
7 | Biomass-Large | Georgia-Pacific - Skippers OSB | VAGPSkippers | 3000 - Wellons Wood Fuel Burner | Thermal Oxidizer | CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | |||
8 | Biomass-Large | Georgia-Pacific Port Hudson Mill | LAGPPortHudson | EQT0109 - No. 6 CFB Boiler | Fluidized Bed | Selective Non-Catalytic Reduction (NH3 Or Urea Injection) (SNCR) | Testing for CO, HC, Formaldehyde, PM, metals; PM/Metals fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
9 | Biomass-Large | Hood Industries, Inc. (Waynesboro Sawmill) | MSHoodWaynesboro | AA-001 (Wood-Fired Boiler) | Stoker | Cyclone: Multiple (Multiclone) | CO, HC, Formaldehyde, and HCl stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
10 | Biomass-Large | International Paper - Courtland Mill | ALIPCourtland | No. 3 Combination Boier / 11CU301 | Fluidized Bed | Collectors, Settling Chambers, Separators - General | CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | ||
11 | Biomass-Large | Leola Lumber Mill | ARLeolaLumberMill | SN-01A | Stoker | Wet Electrostatic Precipitator, General | Testing for CO, HC, Formaldehyde, PM, metals; PM/Metals fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
12 | Biomass-Large | Masonite Corporation, Laurel Mill | MSMasoniteLaurel | BB-004 | Stoker | Electrostatic Precipitator | CO, HC, Formaldehyde, and HCl stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
13 | Biomass-Large | Potlatch Forest Products Corporation | IDPotlatch | PB-2 Riley | Stoker | Electrostatic Precipitator | Testing for CO, HC, Formaldehyde, PM, metals; PM/Metals fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
14 | Biomass-Large | Riley Creek - Chilco Lake Sawmill | IDChilcoLakeSawmill | HFB1 | Stoker | Dry Electrostatic Granular Filter | CO/HC variability testing | True | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | ||
15 | Biomass-Large | S.D. Warren Company - Somerset Operations | MESDWarrenSomerset | No2 Power Boiler | Stoker | Sodium Carbonate Scrubbing | CO, HC, Formaldehyde, and HCl stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
16 | Biomass-Large | Simpson Tacoma Kraft Company, LLC | WASimpsonTacoma2784 | #7 PB | Stoker | Electrostatic Precipitator | Comparative CO/HC testing | False | $60,000 | $60,000 | 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days | ||
17 | Biomass-Large | Smurfit Stone Container Enterprises, Fernandina Beach Mill | FLSmurfit-Stone | 5PB | Stoker | Electrostatic Precipitator | Testing for CO, HC, Formaldehyde, PM, metals; PM/Metals fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
18 | Biomass-Large | Temple-Inland | TXDibollTemple-Inland | PB-44 | Suspension Burner | Electrostatic Precipitator | CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | ||
19 | Biomass-Large | Temple-Inland ( Rome Linerboard Mill) | GATempleInlandRome | WF | Fluidized Bed | Electrostatic Precipitator | Comparative CO/HC testing | False | $60,000 | $60,000 | 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days | ||
20 | Biomass-Large | West Fraser, Inc. - Huttig Mill | ARWestFraserHuttig | SN-24 | Sloped Grate | Cyclone: Multiple (Multiclone) | CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | ||
21 | Biomass-Large | Wickliffe Mill | KYNewPage-Wickliffe | B09 | Stoker | Electrostatic Precipitator | CO, HC, Formaldehyde, and Hg stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
22 | Biomass-Limited Use | CraftMaster Manufacturing, Inc., Towanda Mill | PACraftMaster | No2 Boiler Source ID 032 | Suspension Burner | Electrostatic Precipitator | Testing for PM, HCl, Hg, CO, HC, Formaldehyde, fuel variability for ash and metals | Unknown | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
23 | Biomass-Limited Use | Smurfit-Stone Container Enterprises, Inc. | SCSmurfitStone | Unit 15: Boiler #1 | Stoker | Cyclone: Multiple (Multiclone) | Testing for PM, HCl, Hg, CO, HC, Formaldehyde, fuel variability for ash and metals | False | $20,000 | $200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | |
24 | Biomass-Limited Use | Weyerhaeuser Company - Dierks Mill | ARWeyerhaeuserDierksMill | SN-32 | Stoker | Electrostatic Precipitator | Testing for PM, HCl, Hg, CO, HC, Formaldehyde, fuel and and CO/HC variability testing | False | $20,000 | $175,000 | $200 | $195,200 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days. Fuel analysis, 200 per sample, assume 1 sample |
25 | Biomass-Small | Anthony Forest Products Co. Atlanta Sawmill | TXAnthonyForestProd-ATL | EP 10.1 Superior | Stoker | Cyclone: Multiple (Multiclone) | Testing for PM, metals, CO/HC variability testing, fuel variability for ash and metal content | True | $10,000 | $175,000 | $2,000 | $187,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days. Fuel variability $200 per sample, assume 10 samples |
26 | Biomass-Small | Milliken Chemical - Dewey Plant | SCMilliken-Dewey | D30 | No Equipment | Testing for Hg, HCl, CO, HC, Formaldehyde, fuel | False | $20,000 | $200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
27 | Biomass-Small | Sanderson Plumbing Products, Inc. | MSSandersonPlumbing | AD-001 | Stoker | Cyclone: Single | Testing for Hg, HCl, fuel and CO/HC variability testing | True | $10,000 | $175,000 | $200 | $185,200 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days. Fuel analysis, 200 per sample, assume 1 sample |
28 | Biomass-Small | West Fraser Inc. Seaboard Lumber | NCSeaboardLumber | ES-NB | Stoker | Cyclone: Multiple (Multiclone) | Testing for Hg, HCl, CO, HC, Formaldehyde, fuel | False | $20,000 | $200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | |
29 | Biomass-Small | Yorktowne Inc. | PAYorktowneMifflinburg | 033 #3 or 033 #=2 | 033 #3: Stoker/Fluidized Bed 033 #2: Stoker/Fluidized Bed |
033 #3: Centrifuge Collector 033 #2: Centrifuge Collector |
Testing for Hg, HCl, CO, HC, Formaldehyde, fuel | False | $20,000 | $200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | |
30 | Coal-Large | Alcoa Inc. - Warrick Operations | INAlcoaWarrick | Unit #2 | Pulverized Coal | No Equipment | HC, Formaldehyde, CO and HCl stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
31 | Coal-Large | Anheuser-Busch, Inc. St. Louis Brewery | MOAnheuserBusch | Boiler 1 | Pulverized Coal | Electrostatic Precipitator | Comparative CO/HC testing | False | $60,000 | $60,000 | 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days | ||
32 | Coal-Large | Archer Daniels Midland Co. - Des Moines | IAArchersDanielsMidlandDesMoines | Asea Boiler #1 | Fluidized Bed | Fabric Filter | Comparative CO/HC testing | False | $60,000 | $60,000 | 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days | ||
33 | Coal-Large | Blue Ridge Paper Products Inc. dba Evergreen Packaging | NCBlueRidgePaper | G11040 | Pulverized Coal | Selective Non-Catalytic Reduction (NH3 Or Urea Injection) (SNCR) | CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | ||
34 | Coal-Large | Bowater Newsprint - Calhoun Operations | TNBowaterNewsprint | Power Boiler No. 1 | Pulverized Coal | Electrostatic Precipitator | HC, Formaldehyde, CO and Hg stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
35 | Coal-Large | DuPont Washington Works | WVDuPontWashingtonWorks | P05 | Stoker | Fabric Filter | CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | ||
36 | Coal-Large | Georgia-Pacific - Muskogee Mill | OKGPMuskogeeMill | B-3 or B-4 | B-3: Pulverized Coal B-4: Pulverized Coal |
B-3: B-4: |
CO/HC Variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | ||
37 | Coal-Large | Green Bay Packaging Inc.- Green Bay Mill Division | WIGreenBayPackagingMillDivision | Boiler B26- Coal Fired Boiler | Stoker | Fabric Filter | HC, Formaldehyde, CO, PM, metals stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
38 | Coal-Large | International Paper - Courtland Mill | ALIPCourtland | No.2 Combination Boiler / 11CU201 | Stoker | Sodium Carbonate Scrubbing | HC, Formaldehyde, CO and HCl stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
39 | Coal-Large | Iowa State University Power Plant | IAIAStateUnivPowerPlant | B2 | Fluidized Bed | Limestone Injection, General | HC, Formaldehyde, CO, PM, metals stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
40 | Coal-Large | Nissan North America, Inc. | TNNissanSmyrna | Boiler 2 | Stoker | Fabric Filter | HC, Formaldehyde, CO and Hg stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
41 | Coal-Large | Nissan North America, Inc. | TNNissanSmyrna | Boiler 3 | Stoker | Fabric Filter | HC, Formaldehyde, CO and Hg stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
42 | Coal-Large | Philip Morris USA Inc. - Park 500 | VAPhilipMorrisPark500 | B2 | Pulverized Coal | Electrostatic Precipitator | CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | ||
43 | Coal-Large | PPG Industries, Inc., Natrium Plant | WVPPGMartinsville | R072-Boiler 5 | Pulverized Coal | Electrostatic Precipitator | Comparative CO/HC testing | False | $60,000 | $60,000 | 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days | ||
44 | Coal-Large | Prairie Power | ILPrairiePowerPearl | B1 | Pulverized Coal | Wet Scrubber | CO/HC Variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | ||
45 | Coal-Large | SABIC Innovative Plastics Mt. Vernon, LLC | VASABICInnovativePlastics | 01-001 BW2 Boiler | Pulverized Coal | Fabric Filter | HC, Formaldehyde, CO, PM, metals stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
46 | Coal-Large | TES Filer City Station | MITESFilerCity | EUBOILER02 | Stoker | Fabric Filter | Comparative CO/HC testing | Unknown | $60,000 | $60,000 | 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days | ||
47 | Coal-Large | The Amalgamated Sugar Company LLC | IDTASCONampa | Babcock and Wilcox (B&W) #1 or Power Boiler #2 Coal | Boiler #1: Pulverized Coal Boiler #2: Pulverized Coal |
Boiler #1: Fabric Filter Boiler #2: Fabric Filter |
CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | ||
48 | Coal-Large | The Amalgamated Sugar Company LLC | IDAmalgamatedSugarCoTwinFalls | S-B1 | Stoker | Fabric Filter | HC, Formaldehyde, CO and Hg stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
49 | Coal-Large | The University of Iowa | IAUofIowa | EP6 Boiler 10 | Stoker | Electrostatic Precipitator | HC, Formaldehyde, CO, PM, metals stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
50 | Coal-Large | Tyson Foods, Inc. | NCTysonHarmony | TYS-ES-21 | Stoker | Fabric Filter | HC, Formaldehyde, CO and Hg stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
51 | Coal-Large | University of Virginia | VAUniversityofVirginia | 7103-1-01R | Stoker | Spray Dryer, General | HC, Formaldehyde, CO, PM, metals stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
52 | Coal-Large | Verso Paper Quinnesec Mill | MIVersoPaperQuinnesec | Waste Fuel Boiler | Stoker | Electrostatic Precipitator | HC, Formaldehyde, CO and Hg stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
53 | Coal-Large | Wisconsin Rapids Mill | WINewPage-WisconsinRapids | Power Boiler 1 - B21 | Stoker | Electrostatic Precipitator | HC, Formaldehyde, CO and HCl stack/fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | |
54 | Coal-Limited Use | Crawfordsville Electric Light & Power | INCrawfordsvilleElectric | Boiler #5 | Cyclone: Multiple (Multiclone) | Testing for Hg, CO, HC, Formaldehyde, fuel | True | $17,000 | $200 | $17,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
55 | Coal-Limited Use | GM Orion Assembly Center | MIGMOrion1138 | EG-Boiler 3 | Stoker | Gravity Collection | Testing for HCl, Hg, CO, HC, Formaldehyde, fuel | False | $20,000 | $200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | |
56 | Coal-Limited Use | Iowa State University Power Plant | IAIAStateUnivPowerPlant | B5 | Stoker | Cyclone: Multiple (Multiclone) | Testing for Hg, CO, HC, Formaldehyde, fuel | False | $17,000 | $200 | $17,200 | Fuel analysis, 200 per sample, assume 1 sample | |
57 | Coal-Limited Use | Rock Island Arsenal | ILRockIslandArsenal | NBN 12602 (Boiler #1) | Stoker | Fabric Filter | Testing for CO, HC, Formaldehyde | False | $15,000 | $15,000 | |||
58 | Coal-Limited Use | S. D. Warren Company - Muskegon | MISDWarrenMuskegon1182 | EU Boiler 3 | Pulverized Coal | Electrostatic Precipitator | Testing for CO, HC, Formaldehyde | False | $15,000 | $15,000 | |||
59 | Coal-Limited Use | The Amalgamated Sugar Company LLC | ORAmalgamatedSugarCoNyssa | Babcock and Wilcox (B&W) #2 | Stoker | Wet Scrubber | Testing for Hg, HCl, fuel, and CO/HC variability testing | False | $10,000 | $175,000 | $200 | $185,200 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days. Fuel analysis, 200 per sample, assume 1 sample |
60 | Coal-Small | Bernhardt Furniture Company (Plant 3) | NCBernhardtFurn3 | 320 | Cyclone: Multiple (Multiclone) | Testing for Hg, HCl, PM/metals, CO, HC, Formaldehyde | True | $20,000 | $20,000 | ||||
61 | Coal-Small | Jofco Inc. | INBlackBeautyCoal752 | B-1 | Stoker | Collectors, Settling Chambers, Separators - General | Testing for Hg, HCl, PM/metals, CO, HC, Formaldehyde | True | $20,000 | $20,000 | |||
62 | Coal-Small | Kimball Office - Salem | INKimballOfficeSalem | Boiler 1 or Boiler 2 | Boiler 1: Stoker Boiler 2: Stoker |
Boilers 1 and 2: Breslove Regenerative Fly Ash Cyclonic Collector | Testing for Hg, HCl, PM/metals, CO, HC, Formaldehyde | True | $20,000 | $20,000 | |||
63 | Coal-Small | Vaughan-Bassett Furniture Company, Inc. | VAVaughanBassettGalax | B-1 or B-2 | B-1:Stoker B-2:Stoker |
B-1: multiclone B-2: multiclone |
Testing for Hg, HCl, PM/metals, CO, HC, Formaldehyde | False | $20,000 | $20,000 | |||
64 | Gas-Large | Cascade Pacific Pulp, LLC. | ORCascadePacificPulp | PB2EU | No Equipment | CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | |||
65 | Gas-Large | Diamond Shamrock Refining Company LP-Three Rivers Refinery | TXDiamondShamrockThreeRivers | H-203 | No Equipment | CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | |||
66 | Gas-Large | Equistar Chemicals LP Corpus Christi | TXEquistarCorpusChristi | 4D | No Equipment | CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | |||
67 | Gas-Large | Georgia-Pacific Consumer Products (Camas) LLC | WAGPCamas | No. 5 Power Boiler | Wet Scrubber | CO/HC comparative testing | False | $60,000 | $60,000 | 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days | |||
68 | Gas-Large | Lyondell Chemical Company | TXLyondellPasadena | B-901 | No Equipment | CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | |||
69 | Gas-Large | Rayonier Performance Fibers--Jesup Mill | GARayonierJesupMill | PB31 | No Equipment | CO/HC comparative testing | False | $60,000 | $60,000 | 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days | |||
70 | Gas-Large | Rohm and Haas Texas, Inc, Deer Park TX | TXRohmHaasDeerPark | BH-2-3 | Steam Or Water Injection | CO/HC comparative testing | False | $60,000 | $60,000 | 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days | |||
71 | Gas-Large | Valero Refining Texas LP - Corpus Christi East Plant | TXValeroCorpusChristi | 108-H-6 | No Equipment | CO/HC comparative testing | False | $60,000 | $60,000 | 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days | |||
72 | Gas-Large | Western Refining Company, L.P. | TXWesternRefining | F-4150 | No Equipment | CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | |||
73 | Gas-Large | WRB Refining LLC - Wood River Refinery | ILWoodRiverRefinery | HTR-DU1-F302 | No Equipment | CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | |||
74 | Gas-Limited Use | Grays Harbor Paper, L. P. | WAGraysHarborPaper | No. 9 Boiler (EU3) | Low NOx Burners | CO/HC variability testing | True | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | |||
75 | Gas-Small | Evraz Oregon Steel | OREvrazOregonSteel | EU-5 Vacuum Degasser Boiler | No Equipment | CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | |||
76 | Liquid-Large | BFGoodrich Tire Manufacturing | ALBFGoodrich-Opelika | Boiler 2 | No Equipment | Testing for HCl, Hg, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg | False | $20,000 | $200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
77 | Liquid-Large | Cherokee Pharmaceuticals, L.L.C. | PACherokeePharm | SG-C, Title V Source ID 037 | No Equipment | Testing for CO, HC, Formaldehyde, PM, metals; PM/Metals fuel variability testing | False | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | ||
78 | Liquid-Large | DSM, Inc. | NCDSM | Boiler #4 | Sodium Carbonate Scrubbing | Testing for HCl, Hg, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg | False | $20,000 | $200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
79 | Liquid-Large | DuPont Experimental Station | DEEIDupontWilmington | Boiler #6 | No Equipment | Comparative CO/HC testing | False | $60,000 | $60,000 | 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days | |||
80 | Liquid-Large | International Waxes, Inc. | PAInternationalWaxes | Boiler #4 | Electrostatic Precipitator | Testing for HCl, Hg, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg | True | $20,000 | $200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
81 | Liquid-Large | Newark America | MANewarkAmerica | Boiler #2 | No Equipment | Testing for HCl, CO, HC, Formaldehyde, PM, metals; fuel variability testing for ash and metal content | Unknown | $20,000 | $2,000 | $22,000 | Fuel variability $200 per sample, assume 10 samples | ||
82 | Liquid-Large | Rumford Mill | MENewPage-Rumford | PB#3 | Venturi Scrubber | Testing for HCl, Hg, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg | False | $20,000 | $200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
83 | Liquid-Large | The Ohio State University | OHOSUColumbus | B143 | No Equipment | CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | |||
84 | Liquid-Large | UNC-CH Cogeneration Facility | NCUNCCogen | ES-003 | Low NOx Burners | Comparative CO/HC testing | False | $60,000 | $60,000 | 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days | |||
85 | Liquid-Large | UNITED REFINING COMPANY | PAUnitedRefiningWarrant | 56 | No Equipment | Comparative CO/HC testing | False | $60,000 | $60,000 | 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days | |||
86 | Liquid-Large | University of Notre Dame | INNotreDame | B-6 | No Equipment | Comparative CO/HC testing | True | $60,000 | $60,000 | 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days | |||
87 | Liquid-Large | Weyerhaeuser Company Cellulose Fibers | NCWeyerhaeuser-Vanceboro | ES 161-001 | Sodium-Alkali Scrubbing System | Testing for HCl, Hg, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg | False | $20,000 | $200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
88 | Liquid-Limited Use | City of Dover - McKee Run Generating Station | DEDoverMcKeeRun | Electric Generating Unit # 1 or #2 | Cyclone: Multiple (Multiclone) | Testing for CO, HC, Formaldehyde, fuel analysis HCl and Hg | True | $15,000 | 200 | $15,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
89 | Liquid-Limited Use | Cogen South L.L.C. | SCCogenSouth | B002 - Auxiliary Boiler #1 | Low NOx Burners | Testing for CO, HC, Formaldehyde, fuel analysis HCl and Hg | False | $15,000 | $200 | $15,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
90 | Liquid-Limited Use | Dept. of the Navy/ Naval Support Facilty | MDDeptofNavySupportFacilityIndianHead | FBE - 712 - E1 (4-0081) (Aux. Boiler 1) | Cyclone: Multiple (Multiclone) | Testing for CO, HC, Formaldehyde, fuel analysis HCl and Hg | False | $15,000 | 200 | $15,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
91 | Liquid-Limited Use | Keystone Power Plant | PAKeystonePowerPlantShelocta | Aux Boiler A | No Equipment | CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | |||
92 | Liquid-Limited Use | Kohler Co., dba Baker Furniture | NCKohler | ESBL1 | Cyclone: Multiple (Multiclone) | Testing for CO, HC, Formaldehyde, fuel analysis HCl and Hg | False | $15,000 | 200 | $15,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
93 | Liquid-Limited Use | Philip Morris USA Inc. - Park 500 | VAPhilipMorrisPark500 | B1 | Cyclone: Multiple (Multiclone) | Testing for CO, HC, Formaldehyde, fuel analysis HCl and Hg | False | $15,000 | 200 | $15,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
94 | Liquid-Limited Use | Pioneer Plastics Corporation | MEPioneerPlastics | Boiler #4 | No Equipment | CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | |||
95 | Liquid-Limited Use | Rumford Mill | MENewPage-Rumford | PB#5 | Venturi Scrubber | Testing for HCl, Hg, PM/Metals, CO/HC, Formaldehyde, fuel analysis Cl and Hg | False | $20,000 | 200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
96 | Liquid-Small | Anniston Army Depot | ALAnnistonArmyDepot | Any liquid fuel boiler on-site less than 10 mmBtu/hr | Note: Please update this field to include any add-on control devices that exist on the unit to be tested. | Testing for PM, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg | Unknown | $20,000 | $200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
97 | Liquid-Small | Anniston Army Depot | ALAnnistonArmyDepot | B503-1 | No Equipment | Testing for PM, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg | False | $20,000 | $200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
98 | Liquid-Small | Bath Iron Works Corporation | MEBathIronWorks | Boiler #10 | No Equipment | Testing for PM, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg | False | $20,000 | $200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
99 | Liquid-Small | Delta Air Lines, Inc. Technical Operations Center | GADeltaAir | 634 | No Equipment | Testing for PM, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg | False | $20,000 | $200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
100 | Liquid-Small | Irving Tanning Co. | MEIrvingTanning | Boiler #3A | No Equipment | Testing for PM, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg | Unknown | $20,000 | $200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
101 | Liquid-Small | Milliken and Company - New Holland Plant | GAMillikenNewHolland | BLR1 | No Equipment | Testing for PM, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg | False | $20,000 | $200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
102 | Liquid-Small | Northern Sun - ADM | NDADMNorthernSun | EU21 | No Equipment | CO/HC variability testing | False | $175,000 | $175,000 | 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days | |||
103 | Liquid-Small | Providence Metallizing Co., Inc. | RIProvMetalCoPawtucket | B002 | No Equipment | Testing for PM, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg | True | $20,000 | $200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
104 | Liquid-Small | Quality Rolling & Deburring CO. | CTQualityRolling | Boiler#2 75BHP Bigelow | No Equipment | Testing for PM, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg | Unknown | $20,000 | $200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
105 | Liquid-Small | Quality Rolling & Deburring CO. | CTQualityRolling | Boiler#3 210BHP Bigelow | No Equipment | Testing for PM, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg | Unknown | $20,000 | $200 | $20,200 | Fuel analysis, 200 per sample, assume 1 sample | ||
Emission Contractor Total: | $1,269,000 | $5,740,000 | $68,000 | $7,077,000 |
FacilityID | UnitID | Facility Name | Address | City | State | Zip | Cadmium (Cd) | CO | Dioxin/Furans | Hydrogen Chloride (HCl) | Lead (Pb) | Mercury (Hg) | NOX | Particulate Matter (front half) | Particulate Matter (total, including condensibles) | SO2 | Estimated Cost of Emissions Tests |
AKAgriumKenai | B-600A | Mile 21 Kenai Spur Highway | Kenai | AK | 99611 | $51,000 | |||||||||||
AKAlyeskaPumpStation1 | 31-IN-1 | Alyeska Pipeline Service Company Pump Station 1 | Sections 32 and 33, T11N, R14E, Umiat Meridian | North Slope | AK | $51,000 | |||||||||||
AKAlyeskaPumpStation6 | PS6 Smart Ash | Alyeska Pipeline Service Company Pump Station 6 | Sections 19 and 20, T12N, R10W, Fairbanks Meridian | Near the Yukon River Bridge | AK | $51,000 | |||||||||||
AKBelugaRiverProduction | Mech Shop Used Oil Burner | P.O. Box 66 | Kenai | AK | 99611 | $51,000 | |||||||||||
AKBelugaRiverProduction | P&S Yard Incinerator | P.O. Box 66 | Kenai | AK | 99611 | $51,000 | |||||||||||
AKChugachElectricBeluga | EU No. 9 | 5601 Electron Drive | Anchorage | AK | 99518 | $51,000 | |||||||||||
AKCoeur | Incinerator | 3031 Clinton Drive, Suite 202 | Juneau | AK | 99801 | $51,000 | |||||||||||
AKCookInletPipeline-DriftRiver | Drift River Terminal Incinerator | 2000 W. International Airport Road, Suite D-6 | Anchorage | AK | 99502 | $51,000 | |||||||||||
AKEntechAlaska | Incin # 1 | 440 E. 100th Avenue | Anchorage | AK | 999515 | $51,000 | |||||||||||
AKFairbanksMaintenance | FMF Smart Ash | 3311 Lathrop Street | Fairbanks | AK | 99701 | $51,000 | |||||||||||
AKGlenallenResponseBase | GRB Smart Ash | MP 188 Glenn Highway | Glennallen | AK | 99588 | $51,000 | |||||||||||
AKHeclaGreensCreekJuneau | Consumat Incinerator | Mile 8.5 B-Road - Northern Admiralty Island | Juneau | AK | 99803 | $51,000 | |||||||||||
AKIcicleSeafoods | EU #7 | Seasonally Moored, Udagak Bay (54deg 44min N, 166deg 18min W) (mailing address: 4019 21st Avenue W, Seattle WA 98199) |
Unalaska Island | AK | N/A | $51,000 | |||||||||||
AKKuparukCentral Production | H-250 (EU 35) | Section 9, Township 11N, Range 10E, Umiat Meridian (Production Pad) | Achorage | AK | 99501 | $51,000 | |||||||||||
AKOITMooseCreek | INC1 | 2355 Old Richardson Hwy. | Moose Creek | AK | 99705 | $51,000 | |||||||||||
AKPeakOilfield | CB 5000 1 | 2525 C Street, Suite 201 | Anchorage | AK | 99503 | $51,000 | |||||||||||
AKPeakOilfield | SA Incinerator-1 | 2525 C Street, Suite 201 | Anchorage | AK | 99503 | $51,000 | |||||||||||
AKPioneerNR | I-5 incinerator | 700 G Street, Suite 600 | Anchorage | AK | 99501 | $51,000 | |||||||||||
AKTeckComincoAlaskaIncRedDogMine | MI-2 | 68 deg 4' North; 162 deg 50" West | Anchorage | AK | 99517 | $51,000 | |||||||||||
AKUnisea37 | EU ID 10 | 88 Salmon Way, Amaknak Island | Dutch Harbor | AK | 99692 | $51,000 | |||||||||||
AKWestMacArthurRiverUnit | I-1 | 310 K Street, Suite 700 | Anchorage | AK | 99501 | $51,000 | |||||||||||
AKXTOEnergy | INCINERATOR | 52260 WIK ROAD | KENAI | AK | 99611 | $51,000 | |||||||||||
ALIPRiverdale | No. 2 Bark Boiler / BK02 | 601 County Road 78 | Selma | AL | 36703 | X | $45,000 | ||||||||||
ALSABIC | I-5 | 1 Plastics Dr. | Burkville | AL | 36752 | $51,000 | |||||||||||
ALSonyElectronics | Battery Inc. | Sony Electronics Inc. | 4275 West Main Street | Dothan | AL | 36305 | X | $42,000 | |||||||||
AREvergreenPackaging | BB | 5201 Fairfield Road | Pine Bluff | AR | 71601 | X | X | $48,000 | |||||||||
ARFutureFuels | 6M03-05 | 2800 Gap Rd. | Batesville | AR | 72501 | $51,000 | |||||||||||
ARGPGurdonPlyLumber | SN-01 No. 1 Wood Residue Fired Boiler | Georgia-Pacific-Gurdon Plywood and Lumber Complex | #1 GP Lane | Gurdon | AR | 71743 | $48,000 | ||||||||||
CAArmtecDefense | Scrap Incinerator 1 | 85-901 Ave. 53 | Coachella | CA | 92236 | X | X | X | X | $35,000 | |||||||
CABokan | 1 | 4101 Franklin Blvd. | Sacramento | CA | 95820 | $51,000 | |||||||||||
CACEMEXVictorville | Kiln 3 | 16888 North E Street | Victorville | CA | 92394 | X | X | $15,000 | |||||||||
CAConocoPhilipsLosAng | C1735 - Soil Vapor Extraction | 1660 W. Anaheim St | Wilmington | CA | 90744 | $51,000 | |||||||||||
CAD&D | Incinerator | 4105 Bandini Blvd | Vernon | CA | 90023-4680 | $51,000 | |||||||||||
CAWheelabratorShasta | Boiler#1 | 20811 Industry Road | Anderson | CA | 96007 | X | X | X | X | X | X | $35,000 | |||||
COChevronRangely | Smart Ash 3 | 100 Chevron Road | Rangely | CO | 81648 | $51,000 | |||||||||||
CORoundupStation | Smart Ash | 3064 Road I | Wiggins | CO | 80654 | $51,000 | |||||||||||
FLCemexMiami | Cement Kiln | 1200 NW 137th Avenue | Miami | FL | 33182 | X | X | X | X | X | X | X | $7,000 | ||||
FLCemexMiami | Soil Thermal Treatment Facility | 1200 NW 137th Avenue | Miami | FL | 33182 | X | X | $44,000 | |||||||||
FLFloridaRock | Kiln Line 1 | 4000 NW County Road 235 | Newberry | FL | 32669 | X | X | X | X | X | $15,000 | ||||||
FLSolutiaIncPensacola | CP-L | 3000 Old Chemstrand Rd. | Cantonment | FL | 32533-8926 | $51,000 | |||||||||||
GAADMLocation551 | 630- Wellons | 1841 Clay Road | Valdosta | GA | 31603 | X | X | $44,000 | |||||||||
GAAmericasStyrenics | H2200 | 17401 State Route 7 South | Marietta | OH | 45750 | X | $44,000 | ||||||||||
GAOwensCorningRoofingandAsphaltAtlanta | IB01 | Owens Corning Roofing and Asphalt, LLC. - Atlanta Roofing and Asphalt | 4795 Frederick Drive | Atlanta | GA | 30306 | $51,000 | ||||||||||
IACNHAmerica | INC-1 | CNH America LLC, Burlington, IA | 1930 Des Moines Avenue | Burlington | IA | 52601 | $51,000 | ||||||||||
IALafargeBuffalo | Kiln 1 | 301 E. Front Street | Buffalo | IA | 52728 | X | X | X | X | X | $15,000 | ||||||
IALehighCementMasonCity | 302.203 | 700 25th Street NW | Mason City | IA | 50401-9403 | X | X | X | X | X | X | X | $10,000 | ||||
IAPellaCorp | EP-CO | Pella Corporation - Pella | 102 Main Street | Pella | IA | 50219 | $51,000 | ||||||||||
ILDixline | Paint Stripping Furnace | Dixline Corporation | 26 SW Fourth Avenue, P.O. Box 166 | Galva | IL | 61434 | $51,000 | ||||||||||
ILElastec | Smart Ash | 1309 West Main | Carmi | IL | 62821 | $51,000 | |||||||||||
ILF&MStateBank | Incinerator | Farmers and Merchants State Bank of Bushnell | 484 E. Main | Bushnell | IL | 61422 | $51,000 | ||||||||||
ILFlintHillsResources | HB-2301 | Flint Hills Resources, LP- Joliet Facility | 23425 Amoco R | Joliet | IL | 60434 | X | X | X | X | $12,000 | ||||||
ILFlintHillsResources | MB-1012 | Flint Hills Resources, LP- Joliet Facility | 23425 Amoco R | Joliet | IL | 60434 | $51,000 | ||||||||||
ILFlintHillsResources | NB-800 | Flint Hills Resources, LP- Joliet Facility | 23425 Amoco R | Joliet | IL | 60434 | $51,000 | ||||||||||
ILHiltonLisle | Incinerator | Hilton Lisle/Naperville | 3003 Corporate West Drive | Lisle | IL | 60532 | $51,000 | ||||||||||
ILInterlakeMaterial | AN | Interlake Material Handling, Inc. | 701 Interlake Drive | Pontiac | IL | 61764 | $51,000 | ||||||||||
ILJacksonvilleDevelopmentalCenter | Incinerator | Jacksonville Developmental Center | 1201 S. Main st. | Jacksonville | IL | 62650 | $51,000 | ||||||||||
ILPolyOne | CE4 | PolyOne Corporation | 1546 County Road 1450N | Henry | IL | 61537 | $51,000 | ||||||||||
INBlufftonMotorWorks | 6645, E6 | Bluffton Motor Works, LLC | 410 East Spring Street | Bluffton | IN | 46714 | $51,000 | ||||||||||
INBungeDecatur | Murray (3SP1) | 1200 North 2nd Street | Decatur | IN | 46733 | $51,000 | |||||||||||
INCovanceLabsGreenfield | 241-1A | Covance Laboratories, Inc. (SWI-115) Formerly Eli Lilly Greenfield Labs. | 671 S. Meridian | Greenfield | IN | 46140-5006 | $51,000 | ||||||||||
INLehighCementMitchell | EU15 | Lehigh Cement Company, Mitchell Plant | 180 N. Meridian Road | Mitchell | IN | 47446 | X | X | X | X | X | $12,000 | |||||
INLehighCementMitchell | EU17 | Lehigh Cement Company, Mitchell Plant | 180 N. Meridian Road | Mitchell | IN | 47446 | X | X | $15,000 | ||||||||
INSupremeCorp | M-Building | Supreme Corporation | 2581 E. Kercher Rd. | Goshen | IN | 46526 | $51,000 | ||||||||||
INSyndicateSales | incinerator | Syndicate Sales Inc. | 945 S. Lindsay Street | Kokomo | IN | 46901 | $51,000 | ||||||||||
INWabashNational855 | BO | Wabash National | 1000 Sagamore Parkway South | Lafayette | IN | 47905 | $51,000 | ||||||||||
INWhirlpool | Pyrolytic Oven #1 | Whirlpool Corporation | 5401 U.S Highway 41 North | Evansville | IN | 47727 | $51,000 | ||||||||||
KSFCIndustries | EP-01 | FC Industries, Inc. | 13508 Oak St. | Kansas City | MO | 64145 | $51,000 | ||||||||||
KYCooperStandard | SN-17 | Cooper Standard Automotive | 250 Oak Grove Drive | Mount Sterling | KY | 40353 | $51,000 | ||||||||||
KYFauntleroy | D-900 | Fauntleroy Supply Inc. | 820 North Main Street | Greenville | KY | 42345 | $51,000 | ||||||||||
LABASFDiolsComplex | Q02 | PO Box 457 | Geismar | LA | 70734-0457 | X | X | X | $40,000 | ||||||||
LAConocoPhillipsUnit891 | T1 | 15551 Hwy 23 S | Belle Chasse | LA | 70037 | X | X | X | X | $15,000 | |||||||
LADeltech | HB-507 | Deltech Corporation | 11911 Scenic Highway | Baton Rouge | LA | 70807 | $51,000 | ||||||||||
LAInternationalPaper-Pineville | Power Boiler / 0601 | International Paper-Pineville Mill | 300 Williams Lake Rd | Pineville | LA | 71360 | X | X | X | X | X | X | $30,000 | ||||
LAInternationalPaperRedRiverMill | EQT011 Hogged Fuel Boiler No. 2 | International Paper - Red River Mill | 4537 Highway 480 | Campti | LA | 71411 | X | $45,000 | |||||||||
MDSeverstalSparrows | 1BLR | 1430 Sparrows Point Boulevard | Sparrows Point | MD | 21219 | $51,000 | |||||||||||
MEBoralex | Boiler #1 | Boralex- Livermore Falls | 267 Diamond Rd. | Livermore Falls | ME | 4254 | X | X | X | X | X | X | X | X | X | $7,000 | |
MEBoralexStratton | Boiler #1 | Boralex Stratton Energy LP | PO Box 140 27 Fox Farm Rd | Stratton | ME | 4982 | X | X | X | X | X | X | X | X | $7,000 | ||
MEHuberEngineeredWoodLLC | Boiler No.1 | 333 Station Road | Easton | ME | _04740 | $51,000 | |||||||||||
MEHuberEngineeredWoodLLC | Dryer Furnace | 333 Station Road | Easton | ME | _04740 | $51,000 | |||||||||||
MEPioneerPlastics | Boiler #5/Thermal Oxidizer | Pioneer Plastics Corporation | 1 Pionite Road | Auburn | ME | 04210 | X | $45,000 | |||||||||
MIDTEGreenwood | GRN-EASTAUX | Detroit Edison, Greenwood Energy Center | 7000 Kilgore Road | Avoca | MI | 48006 | $51,000 | ||||||||||
MNNorthshoreMiningCo | Shop Boiler 2 (EU 002) | Northshore Mining Company | 7 Miles East of Babbitt on County Road 70 | Babbitt | MN | 55706 | $51,000 | ||||||||||
NCGlaxoSmithKline | MWI-2 | GlaxoSmithKline | 5 Moore Drive and 3030 Cornwallis Road | Research Triangle Park | NC | 27709 | X | X | X | X | X | X | X | X | $7,000 | ||
NDADMNorthernSun | EU17 | Northern Sun - ADM | 5525 136th Ave. SE | Enderlin | ND | 58027 | X | X | X | X | X | X | X | X | $22,000 | ||
NDCNHAmerica | INC-1 | CNH America LLC, Fargo ND | 3401 1st Avenue North | Fargo | ND | 58102 | $51,000 | ||||||||||
NECNHAmericaGrandIsland | 7996 | CNH America LLC Grand Island Operation | 3445 Stolley Park Rd | Grand Island | NE | 68802 | $51,000 | ||||||||||
NJBASFCatalysts | EN002 | BASF Catalysts, LLC | 1 West Central Avenue | East Newark | NJ | 07029 | $51,000 | ||||||||||
NJNovartis | ID to be assigned | 59 Route 10 | East Hanover | NJ | 07936 | X | X | X | X | $35,000 | |||||||
NYKodakParkDivision | ID to be assigned | 1669 Lake Avenue | Rochester | NY | 14652 | X | X | X | X | $37,000 | |||||||
OHTateLyleDayton | B002 | Tate & Lyle, Dayton | 5600 Brentlinger Drive | Dayton | OH | 45414 | X | $47,000 | |||||||||
OHWhirlpoolClyde | ID to be assigned | 119 Birdseye St. | Clyde | OH | 43410 | X | $42,000 | ||||||||||
OKPioneerTelephone | MS200 | 208 E. Harvey Ave. | Kingfisher | OK | 73750 | $51,000 | |||||||||||
OKVRCOklahoma | HI-501 | Valero Refining Company -Oklahoma | Highway 142 E and Cameron Road | Ardmore | OK | 73401 | $51,000 | ||||||||||
ORGPToledo | EU11 - Hog Fuel Boiler #4 | 1400 SE Butler Bridge Road | Toledo | OR | 97391 | X | X | X | $47,000 | ||||||||
PAcambria | Cambria 031/032 | Cambria Cogen Company | 243 Rubisch Road | Ebensburg | PA | 15931 | $51,000 | ||||||||||
PACNHAmericaNewHolland | INC-1 | CNH America LLC, New Holland, PA | 300 Diller Avenue | New Holland | PA | 17557 | $51,000 | ||||||||||
PAKimberlyClarkChester | Boiler #10 (ID 035) | One Avenue of the States | Chester | PA | 19013 | X | X | X | X | X | X | X | $10,000 | ||||
PALehighCementYork | 200 | Lehigh Cement Company, York Plant | 200 Hokes Mill Road | York | PA | 17403 | X | X | X | X | X | X | X | X | $5,000 | ||
PAWardMfg | C10 Afterburners | Ward Manufacturing LLC | 115 Gulick St | Blossburg | PA | 16912 | $51,000 | ||||||||||
PED Oil Corporation PORTABLE FILTER INCIN |
INCIN #1 | Midland | TX | 79701 | X | X | X | X | X | X | X | $15,000 | |||||
SCBASFSeneca | 5 | 554 Engelhard Drive | Seneca | SC | 29678 | X | X | X | X | X | $17,000 | ||||||
SCCryovac | FB01 | 803 North Maple Street | Simpsonville | SC | 29681 | X | X | $37,000 | |||||||||
SCDixieNarco | 47 | Dixie-Narco/Crane | 3330 Dixie Narco Blvd | Williston | SC | 29583 | $51,000 | ||||||||||
SCINVISTACamdenPlant | Unit ID 19 - Lindberg | INVISTA S.à r.l.-Camden Plant | 643 Highway 1 South | Lugoff | SC | 29078 | $51,000 | ||||||||||
SCINVISTASpartanburg | EU39a - Polyester Burn Off Oven #1 | INVISTA S.à r.l. | 1550 Dewberry Road | Spartanburg | SC | 29307 | $51,000 | ||||||||||
SCLafargeHarleyville | 2 | Lafarge Harleyville | 463 Judge Street | Harleyville | SC | 29448 | X | X | X | X | X | X | X | X | $8,000 | ||
TNStateIndustries | Waste Incinerator/Boiler | State Industries, Inc. | 500 Tennessee Waltz Parkway | Ashland City | TN | 37015 | $51,000 | ||||||||||
TNTeknorApex | Boiler # 5 | Teknor Apex - Haywood Company | 751 Dupree | Brownsville | TN | 38012 | $51,000 | ||||||||||
TNTempleInland2426 | 5000F | Temple-Inland, Inc | 2877 Sceptor Road | Waverly | TN | 37185 | X | X | $43,000 | ||||||||
TNVolvoPenta | Pyrolysis Oven 1 | Volvo Penta Marine Products, LLC | 200 Robert Wallace Drive | Lexington | TN | 38351 | $51,000 | ||||||||||
TXBASFFreeport | IN-4702 | BASF Corporation Freeport | 602 COPPER RD | FREEPORT | TX | 77541 | X | X | X | X | X | X | $15,000 | ||||
TXChemtrade | PRO-001 | Chemtrade Refinery Services Inc. | 1400 Olin Road | Beaumont | TX | 77705 | X | X | X | X | X | X | $37,000 | ||||
TXDrugEmporium | 01 | Drug Emporium | 2321 West Loop 281 | Longview | TX | 75608 | $51,000 | ||||||||||
TXLehighCementCompanyWaco | KILN1 | Lehigh Cement Company, Waco Plant | 100 South Wickson Road | Waco | TX | 76712 | X | X | X | X | X | X | X | X | $7,000 | ||
TXLuciteNederland | Acrylo Incinerator | Lucite International, Inc. | 6350 North Twin City Highway | Nederland | TX | 77627 | X | $42,000 | |||||||||
TXReichhold | Thermal Oxidizer | Reichhold, Inc. | 1503 Haden Road | Houston | TX | 77213 | $51,000 | ||||||||||
TXSterlingChemTexasCity | 53H3 | Sterling Chemicals, Inc. | 201 Baystreet South | Texas City | TX | 77590 | $51,000 | ||||||||||
VABAENorfolk | 003 | 750 West West Berkley Avenue | Norfolk | VA | 23523 | $51,000 | |||||||||||
VAHapcoAbingdon | RGF TO-30 | Hapco, Inc | 26252 Hillman Hwy | Abingdon | VA | 24210 | $51,000 | ||||||||||
VARadfordArmyAmmunitionPlant | Decontamination Oven | Route 114 | Radford | VA | 24143-0100 | X | X | X | X | X | X | $7,000 | |||||
VASmurfitStoneHopewell | Lime Kiln | 910 Industrial Street | Hopewell | VA | 23860 | X | $45,000 | ||||||||||
VATransInd | 50825 | Trans Ind Corporation - Coxendale Incinerator | 1711 Coxendale Road | Chester | VA | 23831 | $51,000 | ||||||||||
WAEmeraldKalama | U-2 | Emerald Kalama Chemical | 2801 E 7th St | Kalama | WA | 98625-9799 | X | $47,000 | |||||||||
WALongviewFPP | #12 Power Boiler | Longview Fibre Paper & Packaging, Inc. | 300 Fibre Way | Longview | WA | 98632 | X | X | X | X | X | X | $23,000 | ||||
WAPortTownsendPaper | #10 Power Boiler | Port Townsend Paper Corp. | 100 Mill Road | Port Townsend | WA | 98368 | X | X | X | X | X | X | $22,000 | ||||
WINSPWAshland | B20 | 122 N. 14th Avenue West | Ashland | WI | 54806 | X | X | X | X | X | $23,000 | ||||||
WIRichardsonBrosYacht | B-38 | Richardson Brothers Yacht Interiors | 635 Cty. Rd. PP | Sheboygan Falls | WI | 53085 | $51,000 | ||||||||||
WYSinclairWyoming | Pt 67 Catalytic Oxidizer Unit | Sinclair Wyoming Refining Company | 100 East Lincoln Highway | Sinclair | WY | 82334 | $51,000 | ||||||||||
AKAlyeskaPumpStation3 | 33-PK-1 | Alyeska Pipeline Service Company Pump Station 3 | Sections 8, 9, 16, & 17, T7S, R14E, Umiat Meridian, 112 miles South of Prudhoe Bay | AK | $51,000 | ||||||||||||
AKAlyeskaPumpStation4 | 34-PK-11 | Alyeska Pipeline Service Company Pump Station 4 | Sections 5 and 8, T12S, R12E, Umiat Meridian, 155 miles South of Prudhoe Bay | AK | $12,000 | ||||||||||||
AKPeakOilfield | CY 2000 | Peak Oilfield Service Company - North Slope | 2525 C Street, Suite 201 | Anchorage | AK | 99503 | $51,000 | ||||||||||
AKPeakOilfield | Model 200 | Peak Oilfield Service Company - North Slope | 2525 C Street, Suite 201 | Anchorage | AK | 99503 | $51,000 | ||||||||||
AKTeckComincoAlaskaIncRedDogMine | MI-3 | Teck Cominco Alaska, Inc. Red Dog Mine | 68 deg 4' North; 162 deg 50" West | Anchorage | AK | 99517 | $48,000 | ||||||||||
AKUnisea37 | EU ID 18 | UniSea, Inc. Dutch Harbor Plant | 88 Salmon Way, Amaknak Island | Dutch Harbor | AK | 99692 | $51,000 | ||||||||||
AKUnisea37 | EU ID 3 | UniSea, Inc. Dutch Harbor Plant | 88 Salmon Way, Amaknak Island | Dutch Harbor | AK | 99692 | X | X | $47,000 | ||||||||
AKUOCCGranitePoint | P-X-0540 (EU 11) | Granite Point Platform | Cook Inlet, Alaska | AK | $15,000 | ||||||||||||
AKUOCCTradingBay | R-H-0800 | Trading Bay Production Facility | 52300 Nikiski Beach Road | Nikiski | AK | 99635 | $51,000 | ||||||||||
ALBP-Decatur24 | AB-8905 | BP Amoco Chemical Company - Decatur Plant | 1401 Finley Island Road | Decatur | AL | 35609 | $51,000 | ||||||||||
ALWestFraserCitronelle | Boiler-1 | West Fraser Inc Citronelle | 20025 Odom Road | Citronelle | AL | 36522 | $51,000 | ||||||||||
ALWestFraserMaplesville | Boiler-1 | West Fraser Inc Maplesville | 7475 Highway 22 West | Maplesville | AL | 36750 | $51,000 | ||||||||||
ARGPGurdonPlyLumber | SN-02 No. 2 Wood Residue Fired Boiler | Georgia-Pacific-Gurdon Plywood and Lumber Complex | #1 GP Lane | Gurdon | AR | 71743 | $51,000 | ||||||||||
FLSolutiaIncPensacola | CP-S | Solutia Inc. Pensacola Plant | 3000 Old Chemstrand Rd. | Cantonment | FL | 32533-8926 | $10,000 | ||||||||||
FLSolutiaIncPensacola | HE140A | Solutia Inc. Pensacola Plant | 3000 Old Chemstrand Rd. | Cantonment | FL | 32533-8926 | $51,000 | ||||||||||
FLSolutiaIncPensacola | HE171A | Solutia Inc. Pensacola Plant | 3000 Old Chemstrand Rd. | Cantonment | FL | 32533-8926 | $51,000 | ||||||||||
MDMirantChalkPoint | Unit 4 | Mirant Chalk Point Generating Station | 25100 Chalk Point Road | Aquasco | MD | 20608-2600 | $51,000 | ||||||||||
MIGraylingGeneratingStation | Boiler1 | Grayling Generating Station | 4400 W. Four Mile Road | Grayling | MI | 49738 | X | X | X | X | X | X | X | X | $15,000 | ||
MIHermanMiller | EUBBLR | Herman Miller, Inc. | 855 E. Main Ave. | Zeeland | MI | 49464 | X | X | X | X | X | X | $15,000 | ||||
MIVikingEnergyMcBain | 19313 | Viking Energy of McBain | 6751 W. Gerwoude DR | McBain | MI | 49657 | X | X | X | X | X | X | $15,000 | ||||
MNAinsworthEngineeredCook | EU006 Keeler Boiler #1 | Ainsworth Engineered LLC - Cook | 9358 US Highway 53 | Cook | MN | 55723 | X | X | X | $17,000 | |||||||
MNGPDuluth | EU35 Boiler#5 | Georgia-Pacific Duluth Hardboard | 1220 West Railroad Street | Duluth | MN | 55802 | $51,000 | ||||||||||
MNSappiCloquet | EU002 | Sappi Cloquet LLC | 2201 Avenue B | Cloquet | MN | 55720 | X | X | X | X | X | $10,000 | |||||
NCDukeEnergyAllen | ES-6(AuxB) | Duke Energy Carolinas LLC, Allen Steam Station | 253 Plant Allen Road | Belmont | NC | 28012 | $51,000 | ||||||||||
OKVRCOklahoma | LPLT VCU | Valero Refining Company -Oklahoma | Highway 142 E and Cameron Road | Ardmore | OK | 73401 | $51,000 | ||||||||||
ORBBSMMedford | B3 | Boise Building Solutions Manufacturing (BBSM) Medford | 3285 North Pacific Highway | Medford | OR | 97501 | $51,000 | ||||||||||
SCBASFSeneca | 23 | BASF Corporation | 554 Engelhard Drive | Seneca | SC | 29678 | $51,000 | ||||||||||
TNPackagingCorpCounce | Combination Boiler # 1 | Packaging Corporation of America, Counce Mill | 6715 Hwy 57 | Counce | TN | 38326 | X | X | $17,000 | ||||||||
TNPackagingCorpCounce | Combination Boiler # 2 | Packaging Corporation of America, Counce Mill | 6715 Hwy 57 | Counce | TN | 38326 | X | X | X | $17,000 | |||||||
TXBASFFreeport | IN-5500 | BASF Corporation Freeport | 602 Copper Road | Freeport | TX | 77541 | $51,000 | ||||||||||
TXInternationalPaperQueenCity | PB02 | International Paper Texarkana Mill | 9978 FM 3129 | Queen City | TX | 75572 | X | X | X | X | X | X | X | X | X | $5,000 | |
TXMadix | Building C - Burn-off Oven | Madix, Inc. | 500 Airport Rd. | Terrell | TX | 75160 | $51,000 | ||||||||||
VACovance | 100264 | Covance Inc. | 9200 Leesburg Pike | Vienna | VA | 22182 | $51,000 | ||||||||||
WALongviewFPP | #20 Power Boiler | Longview Fibre Paper & Packaging, Inc. | 300 Fibre Way | Longview | WA | 98632 | X | X | X | X | X | X | X | X | $15,000 | ||
WILPHayward | Line 1 Trim Heater | LP Corporation's Hayward Siding Facility | 16571 W US Hwy 63 | Hayward | WI | 54843 | $51,000 | ||||||||||
KYCoxInterior | WB2 | Cox Interior, Inc. | 1751 Old Columbia Road | Campbellsville | KY | 42718 | X | $45,000 | |||||||||
ORSierraPine | SPMDBL01 | SierraPine - Medite Division | 2685 North Pacific Hwy | Medford | OR | 97501 | X | X | X | X | $17,000 | ||||||
VABearIslandPaperCoAshland | Unit Ref #2 (Combo Boiler) | Bear Island Paper Company, L.L.C. | 10026 Old Ridge Road | Ashland | VA | 23005 | X | X | X | X | X | $17,000 | |||||
Electric Motor Repair & Sales Company | 1 Goodson St | Bristol | VA | $51,000 | |||||||||||||
Nautilus Human Performance Systems Incorporated | 709 Powerhouse Rd | Independence | VA | $51,000 | |||||||||||||
Quadrant Engineering Plastics Products | Rte 21 | Wytheville | VA | $51,000 | |||||||||||||
Universal Leaf Tobacco | P.O. Box 25099 | Richmond | VA | 23260 | $51,000 | ||||||||||||
Monsanto Agricultural Co. | Muscatine | IA | 52761 | $51,000 | |||||||||||||
Boeing Military Aircraft (DC) | Seattle | WA | 98108 | $51,000 | |||||||||||||
Total | Emission Contractor Total: | $7,109,000 |