Appendices to Supporting Statement Part B

Part B - Appendices.xls

Information Collection Effort for Facilities with Combustion Units

Appendices to Supporting Statement Part B

OMB: 2060-0616

Document [xlsx]
Download: xlsx | pdf

Overview

Appendix 1
Appendix 2 formatted0209


Sheet 1: Appendix 1

Test ID Subcategory Facility Name FacilityID UnitID Combustor Design Control Devices Test Monitor and Fuel Analysis Requirements Small Entity
(bolded)
Test Costs Monitoring Costs Fuel Analysis Costs Total Costs Cost Note
1 Biomass-Large Boise White Paper, LLC - I Falls MNBoisePaper1212 EU 430 Boiler #2 Stoker Over-fire Air Control System CO, HC, Formaldehyde, and Hg stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
2 Biomass-Large Bowater Coated Paper Division SCBowaterCoatedPaper Combination Boiler No. 1 Stoker Electrostatic Precipitator CO, HC, Formaldehyde, and Hg stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
3 Biomass-Large Bowater Newsprint - Calhoun Operations TNBowaterNewsprint Bubbling Fluidized Bed Boiler Fluidized Bed Selective Non-Catalytic Reduction (NH3 Or Urea Injection) (SNCR) CO, HC, Formaldehyde, and Hg stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
4 Biomass-Large Domtar Paper Company, LLC - Rothschild WIDomtar2814 B11, S11 Stoker Electrostatic Precipitator Testing for CO, HC, Formaldehyde, PM, metals; PM/Metals fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
5 Biomass-Large Domtar Paper Company, LLC.- Hawesville Mill KYDomtarHawesville Biofuel Boiler B-900 Fluidized Bed No Equipment CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
6 Biomass-Large Georgia-Pacific - Crossett Plywood/Studmill ARGeorgiaPacificCrossett93 SN-WB1 Wood Boiler Stoker Electrostatic Precipitator CO, HC, Formaldehyde, and HCl stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
7 Biomass-Large Georgia-Pacific - Skippers OSB VAGPSkippers 3000 - Wellons Wood Fuel Burner
Thermal Oxidizer CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
8 Biomass-Large Georgia-Pacific Port Hudson Mill LAGPPortHudson EQT0109 - No. 6 CFB Boiler Fluidized Bed Selective Non-Catalytic Reduction (NH3 Or Urea Injection) (SNCR) Testing for CO, HC, Formaldehyde, PM, metals; PM/Metals fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
9 Biomass-Large Hood Industries, Inc. (Waynesboro Sawmill) MSHoodWaynesboro AA-001 (Wood-Fired Boiler) Stoker Cyclone: Multiple (Multiclone) CO, HC, Formaldehyde, and HCl stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
10 Biomass-Large International Paper - Courtland Mill ALIPCourtland No. 3 Combination Boier / 11CU301 Fluidized Bed Collectors, Settling Chambers, Separators - General CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
11 Biomass-Large Leola Lumber Mill ARLeolaLumberMill SN-01A Stoker Wet Electrostatic Precipitator, General Testing for CO, HC, Formaldehyde, PM, metals; PM/Metals fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
12 Biomass-Large Masonite Corporation, Laurel Mill MSMasoniteLaurel BB-004 Stoker Electrostatic Precipitator CO, HC, Formaldehyde, and HCl stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
13 Biomass-Large Potlatch Forest Products Corporation IDPotlatch PB-2 Riley Stoker Electrostatic Precipitator Testing for CO, HC, Formaldehyde, PM, metals; PM/Metals fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
14 Biomass-Large Riley Creek - Chilco Lake Sawmill IDChilcoLakeSawmill HFB1 Stoker Dry Electrostatic Granular Filter CO/HC variability testing True
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
15 Biomass-Large S.D. Warren Company - Somerset Operations MESDWarrenSomerset No2 Power Boiler Stoker Sodium Carbonate Scrubbing CO, HC, Formaldehyde, and HCl stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
16 Biomass-Large Simpson Tacoma Kraft Company, LLC WASimpsonTacoma2784 #7 PB Stoker Electrostatic Precipitator Comparative CO/HC testing False
$60,000
$60,000 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days
17 Biomass-Large Smurfit Stone Container Enterprises, Fernandina Beach Mill FLSmurfit-Stone 5PB Stoker Electrostatic Precipitator Testing for CO, HC, Formaldehyde, PM, metals; PM/Metals fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
18 Biomass-Large Temple-Inland TXDibollTemple-Inland PB-44 Suspension Burner Electrostatic Precipitator CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
19 Biomass-Large Temple-Inland ( Rome Linerboard Mill) GATempleInlandRome WF Fluidized Bed Electrostatic Precipitator Comparative CO/HC testing False
$60,000
$60,000 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days
20 Biomass-Large West Fraser, Inc. - Huttig Mill ARWestFraserHuttig SN-24 Sloped Grate Cyclone: Multiple (Multiclone) CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
21 Biomass-Large Wickliffe Mill KYNewPage-Wickliffe B09 Stoker Electrostatic Precipitator CO, HC, Formaldehyde, and Hg stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
22 Biomass-Limited Use CraftMaster Manufacturing, Inc., Towanda Mill PACraftMaster No2 Boiler Source ID 032 Suspension Burner Electrostatic Precipitator Testing for PM, HCl, Hg, CO, HC, Formaldehyde, fuel variability for ash and metals Unknown $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
23 Biomass-Limited Use Smurfit-Stone Container Enterprises, Inc. SCSmurfitStone Unit 15: Boiler #1 Stoker Cyclone: Multiple (Multiclone) Testing for PM, HCl, Hg, CO, HC, Formaldehyde, fuel variability for ash and metals False $20,000
$200 $20,200 Fuel analysis, 200 per sample, assume 1 sample
24 Biomass-Limited Use Weyerhaeuser Company - Dierks Mill ARWeyerhaeuserDierksMill SN-32 Stoker Electrostatic Precipitator Testing for PM, HCl, Hg, CO, HC, Formaldehyde, fuel and and CO/HC variability testing False $20,000 $175,000 $200 $195,200 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days. Fuel analysis, 200 per sample, assume 1 sample
25 Biomass-Small Anthony Forest Products Co. Atlanta Sawmill TXAnthonyForestProd-ATL EP 10.1 Superior Stoker Cyclone: Multiple (Multiclone) Testing for PM, metals, CO/HC variability testing, fuel variability for ash and metal content True $10,000 $175,000 $2,000 $187,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days. Fuel variability $200 per sample, assume 10 samples
26 Biomass-Small Milliken Chemical - Dewey Plant SCMilliken-Dewey D30
No Equipment Testing for Hg, HCl, CO, HC, Formaldehyde, fuel False $20,000
$200 $20,200 Fuel analysis, 200 per sample, assume 1 sample
27 Biomass-Small Sanderson Plumbing Products, Inc. MSSandersonPlumbing AD-001 Stoker Cyclone: Single Testing for Hg, HCl, fuel and CO/HC variability testing True $10,000 $175,000 $200 $185,200 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days. Fuel analysis, 200 per sample, assume 1 sample
28 Biomass-Small West Fraser Inc. Seaboard Lumber NCSeaboardLumber ES-NB Stoker Cyclone: Multiple (Multiclone) Testing for Hg, HCl, CO, HC, Formaldehyde, fuel False $20,000
$200 $20,200 Fuel analysis, 200 per sample, assume 1 sample
29 Biomass-Small Yorktowne Inc. PAYorktowneMifflinburg 033 #3 or 033 #=2 033 #3: Stoker/Fluidized Bed
033 #2: Stoker/Fluidized Bed
033 #3: Centrifuge Collector
033 #2: Centrifuge Collector
Testing for Hg, HCl, CO, HC, Formaldehyde, fuel False $20,000
$200 $20,200 Fuel analysis, 200 per sample, assume 1 sample
30 Coal-Large Alcoa Inc. - Warrick Operations INAlcoaWarrick Unit #2 Pulverized Coal No Equipment HC, Formaldehyde, CO and HCl stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
31 Coal-Large Anheuser-Busch, Inc. St. Louis Brewery MOAnheuserBusch Boiler 1 Pulverized Coal Electrostatic Precipitator Comparative CO/HC testing False
$60,000
$60,000 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days
32 Coal-Large Archer Daniels Midland Co. - Des Moines IAArchersDanielsMidlandDesMoines Asea Boiler #1 Fluidized Bed Fabric Filter Comparative CO/HC testing False
$60,000
$60,000 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days
33 Coal-Large Blue Ridge Paper Products Inc. dba Evergreen Packaging NCBlueRidgePaper G11040 Pulverized Coal Selective Non-Catalytic Reduction (NH3 Or Urea Injection) (SNCR) CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
34 Coal-Large Bowater Newsprint - Calhoun Operations TNBowaterNewsprint Power Boiler No. 1 Pulverized Coal Electrostatic Precipitator HC, Formaldehyde, CO and Hg stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
35 Coal-Large DuPont Washington Works WVDuPontWashingtonWorks P05 Stoker Fabric Filter CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
36 Coal-Large Georgia-Pacific - Muskogee Mill OKGPMuskogeeMill B-3 or B-4 B-3: Pulverized Coal
B-4: Pulverized Coal
B-3:
B-4:
CO/HC Variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
37 Coal-Large Green Bay Packaging Inc.- Green Bay Mill Division WIGreenBayPackagingMillDivision Boiler B26- Coal Fired Boiler Stoker Fabric Filter HC, Formaldehyde, CO, PM, metals stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
38 Coal-Large International Paper - Courtland Mill ALIPCourtland No.2 Combination Boiler / 11CU201 Stoker Sodium Carbonate Scrubbing HC, Formaldehyde, CO and HCl stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
39 Coal-Large Iowa State University Power Plant IAIAStateUnivPowerPlant B2 Fluidized Bed Limestone Injection, General HC, Formaldehyde, CO, PM, metals stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
40 Coal-Large Nissan North America, Inc. TNNissanSmyrna Boiler 2 Stoker Fabric Filter HC, Formaldehyde, CO and Hg stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
41 Coal-Large Nissan North America, Inc. TNNissanSmyrna Boiler 3 Stoker Fabric Filter HC, Formaldehyde, CO and Hg stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
42 Coal-Large Philip Morris USA Inc. - Park 500 VAPhilipMorrisPark500 B2 Pulverized Coal Electrostatic Precipitator CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
43 Coal-Large PPG Industries, Inc., Natrium Plant WVPPGMartinsville R072-Boiler 5 Pulverized Coal Electrostatic Precipitator Comparative CO/HC testing False
$60,000
$60,000 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days
44 Coal-Large Prairie Power ILPrairiePowerPearl B1 Pulverized Coal Wet Scrubber CO/HC Variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
45 Coal-Large SABIC Innovative Plastics Mt. Vernon, LLC VASABICInnovativePlastics 01-001 BW2 Boiler Pulverized Coal Fabric Filter HC, Formaldehyde, CO, PM, metals stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
46 Coal-Large TES Filer City Station MITESFilerCity EUBOILER02 Stoker Fabric Filter Comparative CO/HC testing Unknown
$60,000
$60,000 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days
47 Coal-Large The Amalgamated Sugar Company LLC IDTASCONampa Babcock and Wilcox (B&W) #1 or Power Boiler #2 Coal Boiler #1: Pulverized Coal
Boiler #2: Pulverized Coal
Boiler #1: Fabric Filter
Boiler #2: Fabric Filter
CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
48 Coal-Large The Amalgamated Sugar Company LLC IDAmalgamatedSugarCoTwinFalls S-B1 Stoker Fabric Filter HC, Formaldehyde, CO and Hg stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
49 Coal-Large The University of Iowa IAUofIowa EP6 Boiler 10 Stoker Electrostatic Precipitator HC, Formaldehyde, CO, PM, metals stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
50 Coal-Large Tyson Foods, Inc. NCTysonHarmony TYS-ES-21 Stoker Fabric Filter HC, Formaldehyde, CO and Hg stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
51 Coal-Large University of Virginia VAUniversityofVirginia 7103-1-01R Stoker Spray Dryer, General HC, Formaldehyde, CO, PM, metals stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
52 Coal-Large Verso Paper Quinnesec Mill MIVersoPaperQuinnesec Waste Fuel Boiler Stoker Electrostatic Precipitator HC, Formaldehyde, CO and Hg stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
53 Coal-Large Wisconsin Rapids Mill WINewPage-WisconsinRapids Power Boiler 1 - B21 Stoker Electrostatic Precipitator HC, Formaldehyde, CO and HCl stack/fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
54 Coal-Limited Use Crawfordsville Electric Light & Power INCrawfordsvilleElectric Boiler #5
Cyclone: Multiple (Multiclone) Testing for Hg, CO, HC, Formaldehyde, fuel True $17,000
$200 $17,200 Fuel analysis, 200 per sample, assume 1 sample
55 Coal-Limited Use GM Orion Assembly Center MIGMOrion1138 EG-Boiler 3 Stoker Gravity Collection Testing for HCl, Hg, CO, HC, Formaldehyde, fuel False $20,000
$200 $20,200 Fuel analysis, 200 per sample, assume 1 sample
56 Coal-Limited Use Iowa State University Power Plant IAIAStateUnivPowerPlant B5 Stoker Cyclone: Multiple (Multiclone) Testing for Hg, CO, HC, Formaldehyde, fuel False $17,000
$200 $17,200 Fuel analysis, 200 per sample, assume 1 sample
57 Coal-Limited Use Rock Island Arsenal ILRockIslandArsenal NBN 12602 (Boiler #1) Stoker Fabric Filter Testing for CO, HC, Formaldehyde False $15,000

$15,000
58 Coal-Limited Use S. D. Warren Company - Muskegon MISDWarrenMuskegon1182 EU Boiler 3 Pulverized Coal Electrostatic Precipitator Testing for CO, HC, Formaldehyde False $15,000

$15,000
59 Coal-Limited Use The Amalgamated Sugar Company LLC ORAmalgamatedSugarCoNyssa Babcock and Wilcox (B&W) #2 Stoker Wet Scrubber Testing for Hg, HCl, fuel, and CO/HC variability testing False $10,000 $175,000 $200 $185,200 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days. Fuel analysis, 200 per sample, assume 1 sample
60 Coal-Small Bernhardt Furniture Company (Plant 3) NCBernhardtFurn3 320
Cyclone: Multiple (Multiclone) Testing for Hg, HCl, PM/metals, CO, HC, Formaldehyde True $20,000

$20,000
61 Coal-Small Jofco Inc. INBlackBeautyCoal752 B-1 Stoker Collectors, Settling Chambers, Separators - General Testing for Hg, HCl, PM/metals, CO, HC, Formaldehyde True $20,000

$20,000
62 Coal-Small Kimball Office - Salem INKimballOfficeSalem Boiler 1 or Boiler 2 Boiler 1: Stoker
Boiler 2: Stoker
Boilers 1 and 2: Breslove Regenerative Fly Ash Cyclonic Collector Testing for Hg, HCl, PM/metals, CO, HC, Formaldehyde True $20,000

$20,000
63 Coal-Small Vaughan-Bassett Furniture Company, Inc. VAVaughanBassettGalax B-1 or B-2 B-1:Stoker
B-2:Stoker
B-1: multiclone
B-2: multiclone
Testing for Hg, HCl, PM/metals, CO, HC, Formaldehyde False $20,000

$20,000
64 Gas-Large Cascade Pacific Pulp, LLC. ORCascadePacificPulp PB2EU
No Equipment CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
65 Gas-Large Diamond Shamrock Refining Company LP-Three Rivers Refinery TXDiamondShamrockThreeRivers H-203
No Equipment CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
66 Gas-Large Equistar Chemicals LP Corpus Christi TXEquistarCorpusChristi 4D
No Equipment CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
67 Gas-Large Georgia-Pacific Consumer Products (Camas) LLC WAGPCamas No. 5 Power Boiler
Wet Scrubber CO/HC comparative testing False
$60,000
$60,000 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days
68 Gas-Large Lyondell Chemical Company TXLyondellPasadena B-901
No Equipment CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
69 Gas-Large Rayonier Performance Fibers--Jesup Mill GARayonierJesupMill PB31
No Equipment CO/HC comparative testing False
$60,000
$60,000 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days
70 Gas-Large Rohm and Haas Texas, Inc, Deer Park TX TXRohmHaasDeerPark BH-2-3
Steam Or Water Injection CO/HC comparative testing False
$60,000
$60,000 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days
71 Gas-Large Valero Refining Texas LP - Corpus Christi East Plant TXValeroCorpusChristi 108-H-6
No Equipment CO/HC comparative testing False
$60,000
$60,000 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days
72 Gas-Large Western Refining Company, L.P. TXWesternRefining F-4150
No Equipment CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
73 Gas-Large WRB Refining LLC - Wood River Refinery ILWoodRiverRefinery HTR-DU1-F302
No Equipment CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
74 Gas-Limited Use Grays Harbor Paper, L. P. WAGraysHarborPaper No. 9 Boiler (EU3)
Low NOx Burners CO/HC variability testing True
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
75 Gas-Small Evraz Oregon Steel OREvrazOregonSteel EU-5 Vacuum Degasser Boiler
No Equipment CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
76 Liquid-Large BFGoodrich Tire Manufacturing ALBFGoodrich-Opelika Boiler 2
No Equipment Testing for HCl, Hg, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg False $20,000
$200 $20,200 Fuel analysis, 200 per sample, assume 1 sample
77 Liquid-Large Cherokee Pharmaceuticals, L.L.C. PACherokeePharm SG-C, Title V Source ID 037
No Equipment Testing for CO, HC, Formaldehyde, PM, metals; PM/Metals fuel variability testing False $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
78 Liquid-Large DSM, Inc. NCDSM Boiler #4
Sodium Carbonate Scrubbing Testing for HCl, Hg, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg False $20,000
$200 $20,200 Fuel analysis, 200 per sample, assume 1 sample
79 Liquid-Large DuPont Experimental Station DEEIDupontWilmington Boiler #6
No Equipment Comparative CO/HC testing False
$60,000
$60,000 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days
80 Liquid-Large International Waxes, Inc. PAInternationalWaxes Boiler #4
Electrostatic Precipitator Testing for HCl, Hg, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg True $20,000
$200 $20,200 Fuel analysis, 200 per sample, assume 1 sample
81 Liquid-Large Newark America MANewarkAmerica Boiler #2
No Equipment Testing for HCl, CO, HC, Formaldehyde, PM, metals; fuel variability testing for ash and metal content Unknown $20,000
$2,000 $22,000 Fuel variability $200 per sample, assume 10 samples
82 Liquid-Large Rumford Mill MENewPage-Rumford PB#3
Venturi Scrubber Testing for HCl, Hg, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg False $20,000
$200 $20,200 Fuel analysis, 200 per sample, assume 1 sample
83 Liquid-Large The Ohio State University OHOSUColumbus B143
No Equipment CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
84 Liquid-Large UNC-CH Cogeneration Facility NCUNCCogen ES-003
Low NOx Burners Comparative CO/HC testing False
$60,000
$60,000 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days
85 Liquid-Large UNITED REFINING COMPANY PAUnitedRefiningWarrant 56
No Equipment Comparative CO/HC testing False
$60,000
$60,000 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days
86 Liquid-Large University of Notre Dame INNotreDame B-6
No Equipment Comparative CO/HC testing True
$60,000
$60,000 1-week of comparitive monitoring; 25000 to bring equipment and 5000 per day for 7 days
87 Liquid-Large Weyerhaeuser Company Cellulose Fibers NCWeyerhaeuser-Vanceboro ES 161-001
Sodium-Alkali Scrubbing System Testing for HCl, Hg, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg False $20,000
$200 $20,200 Fuel analysis, 200 per sample, assume 1 sample
88 Liquid-Limited Use City of Dover - McKee Run Generating Station DEDoverMcKeeRun Electric Generating Unit # 1 or #2
Cyclone: Multiple (Multiclone) Testing for CO, HC, Formaldehyde, fuel analysis HCl and Hg True $15,000
200 $15,200 Fuel analysis, 200 per sample, assume 1 sample
89 Liquid-Limited Use Cogen South L.L.C. SCCogenSouth B002 - Auxiliary Boiler #1
Low NOx Burners Testing for CO, HC, Formaldehyde, fuel analysis HCl and Hg False $15,000
$200 $15,200 Fuel analysis, 200 per sample, assume 1 sample
90 Liquid-Limited Use Dept. of the Navy/ Naval Support Facilty MDDeptofNavySupportFacilityIndianHead FBE - 712 - E1 (4-0081) (Aux. Boiler 1)
Cyclone: Multiple (Multiclone) Testing for CO, HC, Formaldehyde, fuel analysis HCl and Hg False $15,000
200 $15,200 Fuel analysis, 200 per sample, assume 1 sample
91 Liquid-Limited Use Keystone Power Plant PAKeystonePowerPlantShelocta Aux Boiler A
No Equipment CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
92 Liquid-Limited Use Kohler Co., dba Baker Furniture NCKohler ESBL1
Cyclone: Multiple (Multiclone) Testing for CO, HC, Formaldehyde, fuel analysis HCl and Hg False $15,000
200 $15,200 Fuel analysis, 200 per sample, assume 1 sample
93 Liquid-Limited Use Philip Morris USA Inc. - Park 500 VAPhilipMorrisPark500 B1
Cyclone: Multiple (Multiclone) Testing for CO, HC, Formaldehyde, fuel analysis HCl and Hg False $15,000
200 $15,200 Fuel analysis, 200 per sample, assume 1 sample
94 Liquid-Limited Use Pioneer Plastics Corporation MEPioneerPlastics Boiler #4
No Equipment CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
95 Liquid-Limited Use Rumford Mill MENewPage-Rumford PB#5 
Venturi Scrubber Testing for HCl, Hg, PM/Metals, CO/HC, Formaldehyde, fuel analysis Cl and Hg False $20,000
200 $20,200 Fuel analysis, 200 per sample, assume 1 sample
96 Liquid-Small Anniston Army Depot ALAnnistonArmyDepot Any liquid fuel boiler on-site less than 10 mmBtu/hr
Note: Please update this field to include any add-on control devices that exist on the unit to be tested. Testing for PM, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg Unknown $20,000
$200 $20,200 Fuel analysis, 200 per sample, assume 1 sample
97 Liquid-Small Anniston Army Depot ALAnnistonArmyDepot B503-1
No Equipment Testing for PM, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg False $20,000
$200 $20,200 Fuel analysis, 200 per sample, assume 1 sample
98 Liquid-Small Bath Iron Works Corporation MEBathIronWorks Boiler #10
No Equipment Testing for PM, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg False $20,000
$200 $20,200 Fuel analysis, 200 per sample, assume 1 sample
99 Liquid-Small Delta Air Lines, Inc. Technical Operations Center GADeltaAir 634
No Equipment Testing for PM, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg False $20,000
$200 $20,200 Fuel analysis, 200 per sample, assume 1 sample
100 Liquid-Small Irving Tanning Co. MEIrvingTanning Boiler #3A
No Equipment Testing for PM, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg Unknown $20,000
$200 $20,200 Fuel analysis, 200 per sample, assume 1 sample
101 Liquid-Small Milliken and Company - New Holland Plant GAMillikenNewHolland BLR1
No Equipment Testing for PM, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg False $20,000
$200 $20,200 Fuel analysis, 200 per sample, assume 1 sample
102 Liquid-Small Northern Sun - ADM NDADMNorthernSun EU21
No Equipment CO/HC variability testing False
$175,000
$175,000 1-month of variability monitoring; 25000 to bring equipment and 5000 per day for 30 days
103 Liquid-Small Providence Metallizing Co., Inc. RIProvMetalCoPawtucket B002
No Equipment Testing for PM, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg True $20,000
$200 $20,200 Fuel analysis, 200 per sample, assume 1 sample
104 Liquid-Small Quality Rolling & Deburring CO. CTQualityRolling Boiler#2 75BHP Bigelow
No Equipment Testing for PM, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg Unknown $20,000
$200 $20,200 Fuel analysis, 200 per sample, assume 1 sample
105 Liquid-Small Quality Rolling & Deburring CO. CTQualityRolling Boiler#3 210BHP Bigelow
No Equipment Testing for PM, CO, HC, Formaldehyde, Fuel Analysis for HCl, Hg Unknown $20,000
$200 $20,200 Fuel analysis, 200 per sample, assume 1 sample








Emission Contractor Total: $1,269,000 $5,740,000 $68,000 $7,077,000

Sheet 2: Appendix 2 formatted0209

FacilityID UnitID Facility Name Address City State Zip Cadmium (Cd) CO Dioxin/Furans Hydrogen Chloride (HCl) Lead (Pb) Mercury (Hg) NOX Particulate Matter (front half) Particulate Matter (total, including condensibles) SO2 Estimated Cost of Emissions Tests
AKAgriumKenai B-600A
Mile 21 Kenai Spur Highway Kenai AK 99611









$51,000
AKAlyeskaPumpStation1 31-IN-1 Alyeska Pipeline Service Company Pump Station 1 Sections 32 and 33, T11N, R14E, Umiat Meridian North Slope AK










$51,000
AKAlyeskaPumpStation6 PS6 Smart Ash Alyeska Pipeline Service Company Pump Station 6 Sections 19 and 20, T12N, R10W, Fairbanks Meridian Near the Yukon River Bridge AK










$51,000
AKBelugaRiverProduction Mech Shop Used Oil Burner
P.O. Box 66 Kenai AK 99611









$51,000
AKBelugaRiverProduction P&S Yard Incinerator
P.O. Box 66 Kenai AK 99611









$51,000
AKChugachElectricBeluga EU No. 9
5601 Electron Drive Anchorage AK 99518









$51,000
AKCoeur Incinerator
3031 Clinton Drive, Suite 202 Juneau AK 99801









$51,000
AKCookInletPipeline-DriftRiver Drift River Terminal Incinerator
2000 W. International Airport Road, Suite D-6 Anchorage AK 99502









$51,000
AKEntechAlaska Incin # 1
440 E. 100th Avenue Anchorage AK 999515









$51,000
AKFairbanksMaintenance FMF Smart Ash
3311 Lathrop Street Fairbanks AK 99701









$51,000
AKGlenallenResponseBase GRB Smart Ash
MP 188 Glenn Highway Glennallen AK 99588









$51,000
AKHeclaGreensCreekJuneau Consumat Incinerator
Mile 8.5 B-Road - Northern Admiralty Island Juneau AK 99803









$51,000
AKIcicleSeafoods EU #7
Seasonally Moored, Udagak Bay (54deg 44min N, 166deg 18min W)
(mailing address: 4019 21st Avenue W, Seattle WA 98199)
Unalaska Island AK N/A









$51,000
AKKuparukCentral Production H-250 (EU 35)
Section 9, Township 11N, Range 10E, Umiat Meridian (Production Pad) Achorage AK 99501









$51,000
AKOITMooseCreek INC1
2355 Old Richardson Hwy. Moose Creek AK 99705









$51,000
AKPeakOilfield CB 5000 1
2525 C Street, Suite 201 Anchorage AK 99503









$51,000
AKPeakOilfield SA Incinerator-1
2525 C Street, Suite 201 Anchorage AK 99503









$51,000
AKPioneerNR I-5 incinerator
700 G Street, Suite 600 Anchorage AK 99501









$51,000
AKTeckComincoAlaskaIncRedDogMine MI-2
68 deg 4' North; 162 deg 50" West Anchorage AK 99517









$51,000
AKUnisea37 EU ID 10
88 Salmon Way, Amaknak Island Dutch Harbor AK 99692









$51,000
AKWestMacArthurRiverUnit I-1
310 K Street, Suite 700 Anchorage AK 99501









$51,000
AKXTOEnergy INCINERATOR
52260 WIK ROAD KENAI AK 99611









$51,000
ALIPRiverdale No. 2 Bark Boiler / BK02
601 County Road 78 Selma AL 36703







X
$45,000
ALSABIC I-5
1 Plastics Dr. Burkville AL 36752









$51,000
ALSonyElectronics Battery Inc. Sony Electronics Inc. 4275 West Main Street Dothan AL 36305






X

$42,000
AREvergreenPackaging BB
5201 Fairfield Road Pine Bluff AR 71601
X





X
$48,000
ARFutureFuels 6M03-05
2800 Gap Rd. Batesville AR 72501









$51,000
ARGPGurdonPlyLumber SN-01 No. 1 Wood Residue Fired Boiler Georgia-Pacific-Gurdon Plywood and Lumber Complex #1 GP Lane Gurdon AR 71743









$48,000
CAArmtecDefense Scrap Incinerator 1
85-901 Ave. 53 Coachella CA 92236
X



X X
X $35,000
CABokan 1
4101 Franklin Blvd. Sacramento CA 95820









$51,000
CACEMEXVictorville Kiln 3
16888 North E Street Victorville CA 92394

X





X $15,000
CAConocoPhilipsLosAng C1735 - Soil Vapor Extraction
1660 W. Anaheim St Wilmington CA 90744









$51,000
CAD&D Incinerator
4105 Bandini Blvd Vernon CA 90023-4680









$51,000
CAWheelabratorShasta Boiler#1
20811 Industry Road Anderson CA 96007
X
X
X X X X
$35,000
COChevronRangely Smart Ash 3
100 Chevron Road Rangely CO 81648









$51,000
CORoundupStation Smart Ash
3064 Road I Wiggins CO 80654









$51,000
FLCemexMiami Cement Kiln
1200 NW 137th Avenue Miami FL 33182
X X
X X X
X X $7,000
FLCemexMiami Soil Thermal Treatment Facility
1200 NW 137th Avenue Miami FL 33182
X





X
$44,000
FLFloridaRock Kiln Line 1
4000 NW County Road 235 Newberry FL 32669
X X


X
X X $15,000
FLSolutiaIncPensacola CP-L
3000 Old Chemstrand Rd. Cantonment FL 32533-8926









$51,000
GAADMLocation551 630- Wellons
1841 Clay Road Valdosta GA 31603
X




X

$44,000
GAAmericasStyrenics H2200
17401 State Route 7 South Marietta OH 45750
X







$44,000
GAOwensCorningRoofingandAsphaltAtlanta IB01 Owens Corning Roofing and Asphalt, LLC. - Atlanta Roofing and Asphalt 4795 Frederick Drive Atlanta GA 30306









$51,000
IACNHAmerica INC-1 CNH America LLC, Burlington, IA 1930 Des Moines Avenue Burlington IA 52601









$51,000
IALafargeBuffalo Kiln 1
301 E. Front Street Buffalo IA 52728
X X


X X
X $15,000
IALehighCementMasonCity 302.203
700 25th Street NW Mason City IA 50401-9403
X X X

X X X X $10,000
IAPellaCorp EP-CO Pella Corporation - Pella 102 Main Street Pella IA 50219









$51,000
ILDixline Paint Stripping Furnace Dixline Corporation 26 SW Fourth Avenue, P.O. Box 166 Galva IL 61434









$51,000
ILElastec Smart Ash
1309 West Main Carmi IL 62821









$51,000
ILF&MStateBank Incinerator Farmers and Merchants State Bank of Bushnell 484 E. Main Bushnell IL 61422









$51,000
ILFlintHillsResources HB-2301 Flint Hills Resources, LP- Joliet Facility 23425 Amoco R Joliet IL 60434
X
X

X X

$12,000
ILFlintHillsResources MB-1012 Flint Hills Resources, LP- Joliet Facility 23425 Amoco R Joliet IL 60434









$51,000
ILFlintHillsResources NB-800 Flint Hills Resources, LP- Joliet Facility 23425 Amoco R Joliet IL 60434









$51,000
ILHiltonLisle Incinerator Hilton Lisle/Naperville 3003 Corporate West Drive Lisle IL 60532









$51,000
ILInterlakeMaterial AN Interlake Material Handling, Inc. 701 Interlake Drive Pontiac IL 61764









$51,000
ILJacksonvilleDevelopmentalCenter Incinerator Jacksonville Developmental Center 1201 S. Main st. Jacksonville IL 62650









$51,000
ILPolyOne CE4 PolyOne Corporation 1546 County Road 1450N Henry IL 61537









$51,000
INBlufftonMotorWorks 6645, E6 Bluffton Motor Works, LLC 410 East Spring Street Bluffton IN 46714









$51,000
INBungeDecatur Murray (3SP1)
1200 North 2nd Street Decatur IN 46733









$51,000
INCovanceLabsGreenfield 241-1A Covance Laboratories, Inc. (SWI-115) Formerly Eli Lilly Greenfield Labs. 671 S. Meridian Greenfield IN 46140-5006









$51,000
INLehighCementMitchell EU15 Lehigh Cement Company, Mitchell Plant 180 N. Meridian Road Mitchell IN 47446
X X
X

X X
$12,000
INLehighCementMitchell EU17 Lehigh Cement Company, Mitchell Plant 180 N. Meridian Road Mitchell IN 47446

X



X

$15,000
INSupremeCorp M-Building Supreme Corporation 2581 E. Kercher Rd. Goshen IN 46526









$51,000
INSyndicateSales incinerator Syndicate Sales Inc. 945 S. Lindsay Street Kokomo IN 46901









$51,000
INWabashNational855 BO Wabash National 1000 Sagamore Parkway South Lafayette IN 47905









$51,000
INWhirlpool Pyrolytic Oven #1 Whirlpool Corporation 5401 U.S Highway 41 North Evansville IN 47727









$51,000
KSFCIndustries EP-01 FC Industries, Inc. 13508 Oak St. Kansas City MO 64145









$51,000
KYCooperStandard SN-17 Cooper Standard Automotive 250 Oak Grove Drive Mount Sterling KY 40353









$51,000
KYFauntleroy D-900 Fauntleroy Supply Inc. 820 North Main Street Greenville KY 42345









$51,000
LABASFDiolsComplex Q02
PO Box 457 Geismar LA 70734-0457
X



X X

$40,000
LAConocoPhillipsUnit891 T1
15551 Hwy 23 S Belle Chasse LA 70037 X


X X
X

$15,000
LADeltech HB-507 Deltech Corporation 11911 Scenic Highway Baton Rouge LA 70807









$51,000
LAInternationalPaper-Pineville Power Boiler / 0601 International Paper-Pineville Mill 300 Williams Lake Rd Pineville LA 71360 X X
X X X
X

$30,000
LAInternationalPaperRedRiverMill EQT011 Hogged Fuel Boiler No. 2 International Paper - Red River Mill 4537 Highway 480 Campti LA 71411






X

$45,000
MDSeverstalSparrows 1BLR
1430 Sparrows Point Boulevard Sparrows Point MD 21219









$51,000
MEBoralex Boiler #1 Boralex- Livermore Falls 267 Diamond Rd. Livermore Falls ME 4254 X X X X X X X X X
$7,000
MEBoralexStratton Boiler #1 Boralex Stratton Energy LP PO Box 140 27 Fox Farm Rd Stratton ME 4982 X X X X X X X
X
$7,000
MEHuberEngineeredWoodLLC Boiler No.1
333 Station Road Easton ME _04740









$51,000
MEHuberEngineeredWoodLLC Dryer Furnace
333 Station Road Easton ME _04740









$51,000
MEPioneerPlastics Boiler #5/Thermal Oxidizer Pioneer Plastics Corporation 1 Pionite Road Auburn ME 04210






X

$45,000
MIDTEGreenwood GRN-EASTAUX Detroit Edison, Greenwood Energy Center 7000 Kilgore Road Avoca MI 48006









$51,000
MNNorthshoreMiningCo Shop Boiler 2 (EU 002) Northshore Mining Company 7 Miles East of Babbitt on County Road 70 Babbitt MN 55706









$51,000
NCGlaxoSmithKline MWI-2 GlaxoSmithKline 5 Moore Drive and 3030 Cornwallis Road Research Triangle Park NC 27709 X X X X X X
X X
$7,000
NDADMNorthernSun EU17 Northern Sun - ADM 5525 136th Ave. SE Enderlin ND 58027 X X
X X X
X X X $22,000
NDCNHAmerica INC-1 CNH America LLC, Fargo ND 3401 1st Avenue North Fargo ND 58102









$51,000
NECNHAmericaGrandIsland 7996 CNH America LLC Grand Island Operation 3445 Stolley Park Rd Grand Island NE 68802









$51,000
NJBASFCatalysts EN002 BASF Catalysts, LLC 1 West Central Avenue East Newark NJ 07029









$51,000
NJNovartis ID to be assigned
59 Route 10 East Hanover NJ 07936
X



X X
X $35,000
NYKodakParkDivision ID to be assigned
1669 Lake Avenue Rochester NY 14652
X
X

X

X $37,000
OHTateLyleDayton B002 Tate & Lyle, Dayton 5600 Brentlinger Drive Dayton OH 45414
X







$47,000
OHWhirlpoolClyde ID to be assigned
119 Birdseye St. Clyde OH 43410






X

$42,000
OKPioneerTelephone MS200
208 E. Harvey Ave. Kingfisher OK 73750









$51,000
OKVRCOklahoma HI-501 Valero Refining Company -Oklahoma Highway 142 E and Cameron Road Ardmore OK 73401









$51,000
ORGPToledo EU11 - Hog Fuel Boiler #4
1400 SE Butler Bridge Road Toledo OR 97391
X
X


X

$47,000
PAcambria Cambria 031/032 Cambria Cogen Company 243 Rubisch Road Ebensburg PA 15931









$51,000
PACNHAmericaNewHolland INC-1 CNH America LLC, New Holland, PA 300 Diller Avenue New Holland PA 17557









$51,000
PAKimberlyClarkChester Boiler #10 (ID 035)
One Avenue of the States Chester PA 19013
X X X
X X
X X $10,000
PALehighCementYork 200 Lehigh Cement Company, York Plant 200 Hokes Mill Road York PA 17403 X X X X
X X X
X $5,000
PAWardMfg C10 Afterburners Ward Manufacturing LLC 115 Gulick St Blossburg PA 16912









$51,000
PED Oil Corporation
PORTABLE FILTER INCIN
INCIN #1

Midland TX 79701 X X
X X X X X

$15,000
SCBASFSeneca 5
554 Engelhard Drive Seneca SC 29678 X X
X X

X

$17,000
SCCryovac FB01
803 North Maple Street Simpsonville SC 29681


X


X

$37,000
SCDixieNarco 47 Dixie-Narco/Crane 3330 Dixie Narco Blvd Williston SC 29583









$51,000
SCINVISTACamdenPlant Unit ID 19 - Lindberg INVISTA S.à r.l.-Camden Plant 643 Highway 1 South Lugoff SC 29078









$51,000
SCINVISTASpartanburg EU39a - Polyester Burn Off Oven #1 INVISTA S.à r.l. 1550 Dewberry Road Spartanburg SC 29307









$51,000
SCLafargeHarleyville 2 Lafarge Harleyville 463 Judge Street Harleyville SC 29448 X X X X X X
X X
$8,000
TNStateIndustries Waste Incinerator/Boiler State Industries, Inc. 500 Tennessee Waltz Parkway Ashland City TN 37015









$51,000
TNTeknorApex Boiler # 5 Teknor Apex - Haywood Company 751 Dupree Brownsville TN 38012









$51,000
TNTempleInland2426 5000F Temple-Inland, Inc 2877 Sceptor Road Waverly TN 37185






X
X $43,000
TNVolvoPenta Pyrolysis Oven 1 Volvo Penta Marine Products, LLC 200 Robert Wallace Drive Lexington TN 38351









$51,000
TXBASFFreeport IN-4702 BASF Corporation Freeport 602 COPPER RD FREEPORT TX 77541 X X

X X X

X $15,000
TXChemtrade PRO-001 Chemtrade Refinery Services Inc. 1400 Olin Road Beaumont TX 77705 X X
X


X X X $37,000
TXDrugEmporium 01 Drug Emporium 2321 West Loop 281 Longview TX 75608









$51,000
TXLehighCementCompanyWaco KILN1 Lehigh Cement Company, Waco Plant 100 South Wickson Road Waco TX 76712 X X X X
X
X X X $7,000
TXLuciteNederland Acrylo Incinerator Lucite International, Inc. 6350 North Twin City Highway Nederland TX 77627





X


$42,000
TXReichhold Thermal Oxidizer Reichhold, Inc. 1503 Haden Road Houston TX 77213









$51,000
TXSterlingChemTexasCity 53H3 Sterling Chemicals, Inc. 201 Baystreet South Texas City TX 77590









$51,000
VABAENorfolk 003
750 West West Berkley Avenue Norfolk VA 23523









$51,000
VAHapcoAbingdon RGF TO-30 Hapco, Inc 26252 Hillman Hwy Abingdon VA 24210









$51,000
VARadfordArmyAmmunitionPlant Decontamination Oven
Route 114 Radford VA 24143-0100 X X X X X

X

$7,000
VASmurfitStoneHopewell Lime Kiln
910 Industrial Street Hopewell VA 23860






X

$45,000
VATransInd 50825 Trans Ind Corporation - Coxendale Incinerator 1711 Coxendale Road Chester VA 23831









$51,000
WAEmeraldKalama U-2 Emerald Kalama Chemical 2801 E 7th St Kalama WA 98625-9799
X







$47,000
WALongviewFPP #12 Power Boiler Longview Fibre Paper & Packaging, Inc. 300 Fibre Way Longview WA 98632 X X
X X X
X

$23,000
WAPortTownsendPaper #10 Power Boiler Port Townsend Paper Corp. 100 Mill Road Port Townsend WA 98368 X X
X X X X


$22,000
WINSPWAshland B20
122 N. 14th Avenue West Ashland WI 54806 X


X X
X X
$23,000
WIRichardsonBrosYacht B-38 Richardson Brothers Yacht Interiors 635 Cty. Rd. PP Sheboygan Falls WI 53085









$51,000
WYSinclairWyoming Pt 67 Catalytic Oxidizer Unit Sinclair Wyoming Refining Company 100 East Lincoln Highway Sinclair WY 82334









$51,000
AKAlyeskaPumpStation3 33-PK-1 Alyeska Pipeline Service Company Pump Station 3 Sections 8, 9, 16, & 17, T7S, R14E, Umiat Meridian, 112 miles South of Prudhoe Bay
AK










$51,000
AKAlyeskaPumpStation4 34-PK-11 Alyeska Pipeline Service Company Pump Station 4 Sections 5 and 8, T12S, R12E, Umiat Meridian, 155 miles South of Prudhoe Bay
AK










$12,000
AKPeakOilfield CY 2000 Peak Oilfield Service Company - North Slope 2525 C Street, Suite 201 Anchorage AK 99503









$51,000
AKPeakOilfield Model 200 Peak Oilfield Service Company - North Slope 2525 C Street, Suite 201 Anchorage AK 99503









$51,000
AKTeckComincoAlaskaIncRedDogMine MI-3 Teck Cominco Alaska, Inc. Red Dog Mine 68 deg 4' North; 162 deg 50" West Anchorage AK 99517









$48,000
AKUnisea37 EU ID 18 UniSea, Inc. Dutch Harbor Plant 88 Salmon Way, Amaknak Island Dutch Harbor AK 99692









$51,000
AKUnisea37 EU ID 3 UniSea, Inc. Dutch Harbor Plant 88 Salmon Way, Amaknak Island Dutch Harbor AK 99692
X





X
$47,000
AKUOCCGranitePoint P-X-0540 (EU 11) Granite Point Platform Cook Inlet, Alaska
AK










$15,000
AKUOCCTradingBay R-H-0800 Trading Bay Production Facility 52300 Nikiski Beach Road Nikiski AK 99635









$51,000
ALBP-Decatur24 AB-8905 BP Amoco Chemical Company - Decatur Plant 1401 Finley Island Road Decatur AL 35609









$51,000
ALWestFraserCitronelle Boiler-1 West Fraser Inc Citronelle 20025 Odom Road Citronelle AL 36522









$51,000
ALWestFraserMaplesville Boiler-1 West Fraser Inc Maplesville 7475 Highway 22 West Maplesville AL 36750









$51,000
ARGPGurdonPlyLumber SN-02 No. 2 Wood Residue Fired Boiler Georgia-Pacific-Gurdon Plywood and Lumber Complex #1 GP Lane Gurdon AR 71743









$51,000
FLSolutiaIncPensacola CP-S Solutia Inc. Pensacola Plant 3000 Old Chemstrand Rd. Cantonment FL 32533-8926









$10,000
FLSolutiaIncPensacola HE140A Solutia Inc. Pensacola Plant 3000 Old Chemstrand Rd. Cantonment FL 32533-8926









$51,000
FLSolutiaIncPensacola HE171A Solutia Inc. Pensacola Plant 3000 Old Chemstrand Rd. Cantonment FL 32533-8926









$51,000
MDMirantChalkPoint Unit 4 Mirant Chalk Point Generating Station 25100 Chalk Point Road Aquasco MD 20608-2600









$51,000
MIGraylingGeneratingStation Boiler1 Grayling Generating Station 4400 W. Four Mile Road Grayling MI 49738 X X
X X X X
X X $15,000
MIHermanMiller EUBBLR Herman Miller, Inc. 855 E. Main Ave. Zeeland MI 49464 X X
X X X

X
$15,000
MIVikingEnergyMcBain 19313 Viking Energy of McBain 6751 W. Gerwoude DR McBain MI 49657
X

X X X
X X $15,000
MNAinsworthEngineeredCook EU006 Keeler Boiler #1 Ainsworth Engineered LLC - Cook 9358 US Highway 53 Cook MN 55723
X




X X
$17,000
MNGPDuluth EU35 Boiler#5 Georgia-Pacific Duluth Hardboard 1220 West Railroad Street Duluth MN 55802









$51,000
MNSappiCloquet EU002 Sappi Cloquet LLC 2201 Avenue B Cloquet MN 55720
X X

X

X X $10,000
NCDukeEnergyAllen ES-6(AuxB) Duke Energy Carolinas LLC, Allen Steam Station 253 Plant Allen Road Belmont NC 28012









$51,000
OKVRCOklahoma LPLT VCU Valero Refining Company -Oklahoma Highway 142 E and Cameron Road Ardmore OK 73401









$51,000
ORBBSMMedford B3 Boise Building Solutions Manufacturing (BBSM) Medford 3285 North Pacific Highway Medford OR 97501









$51,000
SCBASFSeneca 23 BASF Corporation 554 Engelhard Drive Seneca SC 29678









$51,000
TNPackagingCorpCounce Combination Boiler # 1 Packaging Corporation of America, Counce Mill 6715 Hwy 57 Counce TN 38326


X

X


$17,000
TNPackagingCorpCounce Combination Boiler # 2 Packaging Corporation of America, Counce Mill 6715 Hwy 57 Counce TN 38326


X

X X

$17,000
TXBASFFreeport IN-5500 BASF Corporation Freeport 602 Copper Road Freeport TX 77541









$51,000
TXInternationalPaperQueenCity PB02 International Paper Texarkana Mill 9978 FM 3129 Queen City TX 75572 X X X
X X X X X X $5,000
TXMadix Building C - Burn-off Oven Madix, Inc. 500 Airport Rd. Terrell TX 75160









$51,000
VACovance 100264 Covance Inc. 9200 Leesburg Pike Vienna VA 22182









$51,000
WALongviewFPP #20 Power Boiler Longview Fibre Paper & Packaging, Inc. 300 Fibre Way Longview WA 98632 X X
X X X X X
X $15,000
WILPHayward Line 1 Trim Heater LP Corporation's Hayward Siding Facility 16571 W US Hwy 63 Hayward WI 54843









$51,000
KYCoxInterior WB2 Cox Interior, Inc. 1751 Old Columbia Road Campbellsville KY 42718
X







$45,000
ORSierraPine SPMDBL01 SierraPine - Medite Division 2685 North Pacific Hwy Medford OR 97501
X



X X
X $17,000
VABearIslandPaperCoAshland Unit Ref #2 (Combo Boiler) Bear Island Paper Company, L.L.C. 10026 Old Ridge Road Ashland VA 23005 X

X X X


X $17,000


Electric Motor Repair & Sales Company 1 Goodson St Bristol VA










$51,000


Nautilus Human Performance Systems Incorporated 709 Powerhouse Rd Independence VA










$51,000


Quadrant Engineering Plastics Products Rte 21 Wytheville VA










$51,000


Universal Leaf Tobacco P.O. Box 25099 Richmond VA 23260









$51,000


Monsanto Agricultural Co.
Muscatine IA 52761









$51,000


Boeing Military Aircraft (DC)
Seattle WA 98108









$51,000
Total














Emission Contractor Total: $7,109,000
File Typeapplication/vnd.ms-excel
File Modified2009-02-13
File Created2009-01-27

© 2024 OMB.report | Privacy Policy