Small Entity |
FacilityID |
UnitID |
Classification |
Combustor Category |
Fuel (specific) |
FuelCategory |
Design Capacity (mmBtu/hr) |
Control |
TestType |
Test Costs |
False |
ALIPCourtland |
No. 3 Combination Boiler / 11Cu301 |
Boiler |
FB |
Biomass, TDF, Ind. Sludge |
Biomass |
|
ESP |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
ALMeadwestvacoCottonton46 |
No.1 Wood Residue Boiler |
Boiler |
Stoker |
Biomass, Ind. Sludge |
Biomass |
|
Wet Scrubber |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
True |
ARAnthonyForestProducts |
SN-12 |
Boiler |
Fuel Cell |
Wood: Bark and Wood: Unadulterated Lumber and Wood: Unadulterated Timber |
Biomass (wet) |
29.56 |
Cyclone: Multiple (Multiclone) |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
ARDomtarIndustries |
PB1 |
Boiler |
Stoker |
Fuel cubes (paper diaper clippings/refuse)Natural gasTire Derived Fuel (TDF)Wood: Bark |
Biomass (wet) |
580 |
Wet Electrostatic Precipitator, General |
CO/HC/Formaldehyde Stack Test CEMS Monitoring |
$190,000 |
False |
ARGPChemCrossett89 |
SN-05 |
Process Heater |
none selected |
Natural gasTall oil, tall oil derivatives |
NF Liquid |
94.1 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
True |
ARGreenvilleTube |
Annealing Furnaces & Dryer (SN-04-09, 13) |
Process Heater |
unknown |
Gas |
gas |
<= 10 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
ARWeyerhaeuserDierksMill |
SN-45 |
Boiler |
Fuel Cell |
Hog Fuel |
Biomass (dry) |
249 |
Cyclone: Multiple (Multiclone)Electrostatic Precipitator |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
AZCatalystPaperSnowflake |
Power Boiler #3 Natural Gas |
Boiler |
none selected |
Diesel fuelNatural gas |
Liquid (light) |
337 |
Low NOx Burners |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
CAConocoPhilipsLosAng |
D44 BC-601 U152 |
Process Heater |
none selected |
Natural gas and Refinery GasNo. 2 Distillate |
Liquid (light) |
87 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
CASierraPine-Rocklin |
SPRKBL01 |
Boiler |
SuspensionBurner |
/Natural gas and Wood: Plywood, Particleboard (containing glues or resins) / |
Biomass (dry) |
71.7 |
Venturi ScrubberWet Electrostatic Precipitator, General |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
CATesoro |
S-974 Furance 55 |
Process Heater |
none selected |
Refinery Gas |
Gas |
110 |
Selective Catalytic Reduction (SCR) |
CO/HC/Formaldehyde Stack Test CEMS Monitoring |
$190,000 |
False |
CORockyMtnSteel212 |
VTD Degasser Boiler SMDBON5 |
Boiler |
none selected |
Natural gas |
Gas |
37 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
CORockyMtnSteel212 |
EAF #5 95OPPB097 S035 |
Process Heater |
none selected |
/Natural gas/ |
Gas |
31.75 |
Fabric Filter |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
CORockyMtnSteel212 |
Rod/Bar Mill Furnace 95OPPB088 |
Process Heater |
none selected |
Natural gas |
Gas |
225 |
Low NOx Burners |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
CTCytecWallingford |
150 Furnace |
Process Heater |
none selected |
Natural gasNo. 2 Distillate |
Liquid (light) |
11 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
CTElectric Boat |
EMU 17 |
Boiler |
none selected |
Natural gasNo. 4 Fuel oil |
Liquid (light) |
7 |
Activated Carbon AdsorptionNo Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
DEINVISTA |
EU 016 - Vaporizer No. 8 |
Process Heater |
none selected |
No. 2 Distillate |
Liquid (light) |
24 |
Electrostatic Precipitator |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
FLOsceolaFarms |
Boiler No. 4 |
Boiler |
Fuel Cell |
Bagasse |
Bagasse |
280 |
Wet Scrubber |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
FLPepperidgeFarm |
HOT WAT GAS FIRED |
Process Heater |
unknown |
Gas |
gas |
<= 10 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
FLRayonierPerformance |
PB06 |
Boiler |
FB |
Tire Derived Fuel (TDF)Wood: Bark |
Biomass (wet) |
525 |
Electrostatic PrecipitatorWet Scrubber |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
GAGPCedarSprings |
U500 - Power Boiler No. 1 |
Boiler |
PC |
Coal, TDF |
Coal |
|
Wet Scrubber |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
GAGPCelluloseBrunswick |
U700 - No. 4 Power Boiler |
Boiler |
|
Biomass, TDF |
Biomass |
|
ESP |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
GAGPMadisonPly |
800 Wood Waste Boiler |
Boiler |
SuspensionBurner |
Wood: BarkWood: Plywood, Particleboard (containing glues or resins)Wood: Unadulterated Lumber |
Biomass (wet) |
355 |
Cyclone: Multiple (Multiclone)Electrostatic Precipitator |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
GALangboardWillacoochee |
EU24 |
Boiler |
FB |
Wood: Bark |
Biomass (wet) |
185 |
Electrostatic PrecipitatorSelective Non-Catalytic Reduction (NH3 Or Urea Injection) (SNCR) |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
GARayonierBaxley |
PB02 |
Boiler |
Fuel Cell |
/Wood: Unadulterated Lumber/ |
Biomass (dry) |
61.54 |
Cyclone: Multiple (Multiclone)Electrostatic Precipitator |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
GASPNewsprint |
PB2 |
Boiler |
FB |
Coal, TDF, Ind. Sludge |
Coal |
|
ESP |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
HIPuuneneSugarMill |
Boiler 3 |
Boiler |
Stoker |
yellow grease (used cooking oil) |
Liquid (heavy) |
568 |
Cyclone: Multiple (Multiclone)Venturi Scrubber |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
IAADMCornProcessingCR |
EU-501A |
Boiler |
FB |
/Coal: Bituminous and Coal: Sub-bituminous/ |
Coal: Bituminous |
551.5 |
Fabric FilterFurnace Sorbent Injection (Dry) |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
IAArchersDanielsMidlandDesMoines |
Asea Boiler #1 |
Boiler |
FB |
/Coal: Sub-bituminous/ |
Coal: Sub-bituminous |
192 |
Fabric Filter |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
IAMonsantoMuscatine |
Boiler #8 (EP-195) |
Boiler |
Stoker |
Coal, Ind. Sludge, Agr. Residue |
Coal |
|
Fabric Filter |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
IARoquetteAmerica |
Circulating Fluidized Bed Boiler (121) |
Boiler |
FB |
Coal: Bituminous |
Coal: Bituminous |
996 |
Dry Scrubbing, GeneralFabric FilterLimestone Injection, GeneralSelective Non-Catalytic Reduction (NH3 Or Urea Injection) (SNCR) |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
IAUofIowa |
EP7 Boiler 11 |
Boiler |
FB |
BiomassCoal: Bituminous |
Coal: Bituminous |
223 |
Dry Limestone InjectionFabric Filter |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
1 |
IDChilcoLakeSawmill |
HFB1 |
Boiler |
Stoker |
Wood: Unadulterated Lumber |
Biomass (dry) |
125 |
Electrified Filter Bed (EFB) |
CO/HC/Formaldehyde Stack Test CEMS Monitoring |
$190,000 |
False |
IDPotlatch |
PB-1 CE |
Boiler |
Fuel Cell |
Hog Fuel |
Biomass (dry) |
27.6 |
Cyclone: Multiple (Multiclone)Electrostatic Precipitator |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
ILAbbottAbbottPark |
Unit 5AP |
Boiler |
Stoker |
Coal: Bituminous |
Coal: Bituminous |
83 |
Cyclone: Multiple (Multiclone)Dry Limestone InjectionFabric Filter |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
ILAkzoNobelMorris |
B-1 Nebraska Boiler |
Boiler |
none selected |
Natural gasNitrile Pitch Residue |
NF Solid |
41 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
ILBungeDanville |
CFB Boiler |
Boiler |
FB |
/Coal: Bituminous/ |
Coal: Bituminous |
322.5 |
Fabric FilterLimestone Injection, GeneralTemperature Control |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
True |
ILCityofSpringfield |
Dallman Unit 31 |
Boiler |
Cyclone |
Coal: BituminousNo. 2 DistillatePlant-based Agricultural Residue |
Coal: Bituminous |
882 |
Electrostatic PrecipitatorFlue Gas Desulfurization, GeneralSelective Catalytic Reduction (SCR) |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
True |
ILCityofSpringfield |
Lakeside Unit 7 |
Boiler |
Cyclone |
Coal: BituminousNo. 2 DistillatePlant-based Agricultural Residue |
Coal: Bituminous |
415 |
Electrostatic Precipitator |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
ILKeystoneSteel&Wire |
B1 |
Boiler |
none selected |
No. 2 Distillate |
Liquid (light) |
143 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
ILLafargeJoppaPlant |
Vehicle Maintenance Shop Heater |
Process Heater |
none selected |
On site generated used oil (assume on-spec) |
Liquid (heavy) |
0.235 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
Unknown |
ILPolyOne |
B1 |
Boiler |
FB |
/Coal: Bituminous/ |
Coal: Bituminous |
143.75 |
Cyclone: SingleDry Limestone InjectionFabric Filter |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
True |
ILPrairiePowerPearl |
B1 |
Boiler |
PC |
/Coal: Bituminous/ |
Coal: Bituminous |
278 |
Wet Scrubber |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
ILUSSGraniteCity |
No. 8 Galvanizing Line Furnace |
Process Heater |
none selected |
Natural gas |
Gas |
54.6 |
Selective Non-Catalytic Reduction (NH3 Or Urea Injection) (SNCR) |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
INAlcoaWarrick |
Annealing Furnace #17 |
Process Heater |
none selected |
Natural gas |
Gas |
48 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
INAlcoaWarrick |
Unit #3 |
Boiler |
PC |
Coal: Bituminous |
Coal: Bituminous |
1589 |
Electrostatic Precipitator Wet Scrubber |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
INArcelorMittalBurnsHarbor |
Hot Dip Coating Line Annealing Furnace |
Process Heater |
none selected |
Natural gas |
Gas |
95 |
Selective Catalytic Reduction (SCR) |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
INArcelorMittalIndianaHarbor |
Eleven Four-Stack Batch Annealing Furnaces |
Process Heater |
none selected |
Natural gas |
Gas |
176 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
INArcelorMittalIndianaHarbor |
No. 7 Boiler |
Boiler |
none selected |
Blast Furnace GasNatural gasNo. 6 Residual oil |
Liquid (heavy) |
454 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
INCargill-Lafayette |
Boiler #1 |
Boiler |
none selected |
Animal Fat/Oils/TallowNatural gasNo. 2 DistillateNo. 4 Fuel oilNo. 5 Fuel oilNo. 6 Residual oilVegetable Oil |
Liquid (heavy) |
60 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
True |
INCountrymarkCoop |
C-II (Crude Heater) |
Process Heater |
none selected |
No. 6 Residual oilRefinery gas |
Liquid (heavy) |
131 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
INEliLillyTippecanoeLab |
BLR001 |
Boiler |
Stoker |
Coal: Bituminous |
Coal: Bituminous |
92 |
Cyclone: Multiple (Multiclone) |
CO/HC/Formaldehyde Stack Test CEMS Monitoring |
$190,000 |
False |
INHarrisonSteel |
Heat Treat |
Process Heater |
unknown |
Gas |
gas |
<= 10 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
INHaynesInternational |
anneal furnaces |
Process Heater |
unknown |
Gas |
gas |
<= 10 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
True |
INNewEnergy |
Riley Boiler |
Boiler |
PC |
Coal: Bituminous |
Coal: Bituminous |
414 |
Fabric FilterLow NOx Burners |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
True |
INNotreDame |
B-4 |
Boiler |
Cyclone |
/Coal: Bituminous and Natural gas and No. 2 Distillate/ |
Coal: Bituminous |
234 |
Fabric Filter |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
INNucorSteel |
Cold Mill Annealing |
Process Heater |
unknown |
Natural gas |
Gas |
<= 10 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
True |
INOutokumpuStainlessPlate |
Heppenstall Annealing Furnace |
Process Heater |
none selected |
Natural gas |
Gas |
10.8 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
INPurdueUniverisity |
Boiler 5 |
Boiler |
FB |
Coal: Bituminous |
Coal: Bituminous |
279 |
Fabric FilterFurnace Sorbent Injection (Dry)Low NOx Burners |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
INSuperiorEssexCoFortWayne |
radiant ovens |
Process Heater |
unknown |
Gas |
gas |
<= 10 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
INTateLyleSagamore |
21B501 |
Process Heater |
none selected |
BiogasNatural gas |
Gas |
60 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
INTateLyleSagamore |
31B1 |
Boiler |
PC |
Coal: Sub-bituminous and Plant-based Agricultural Residue |
Coal: Sub-bituminous |
231 |
Fabric Filter |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
INUSSteelGaryWorks |
CHY00071 |
Process Heater |
none selected |
Coke Oven Gas |
Gas |
25 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
INUSSteelGaryWorks |
O4B10459 |
Boiler |
none selected |
Blast Furnace Gas, Natural Gas, Fuel Oil |
Liquid (light) |
500 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
True |
KSCoffeyvilleRefinery |
EU-39-FH0027 |
Boiler |
Stoker |
Coal: BituminousRefinery gas |
Coal: Bituminous |
291.6 |
Fabric FilterGravity CollectionNo Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
KYAKSteel-Ashland |
No. 1 Boiler |
Boiler |
none selected |
Coke Oven GasNatural gas |
Gas |
130 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
KYAKSteel-WestWorks |
No. 3 Coating Line Annealing Furnace Radiant Tube |
Process Heater |
none selected |
Natural gas |
Gas |
60 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
KYISPChemicals |
0AA (Riley) |
Boiler |
Stoker |
Coal: BituminousVent Gas for Air Pollution Control |
Coal: Bituminous |
139 |
Cyclone: Multiple (Multiclone)Fabric Filter |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
LABoiseNewsprintDeRidder |
69-03 |
Boiler |
Stoker |
Biomass, TDF |
Biomass |
|
Wet Scrubber |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
LACytecIndustries |
K-31 |
Boiler |
none selected |
Natural gasSulfur |
NF Solid |
200 |
Mist Eliminator |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
LAGPPortHudson |
EQT0109 - No. 6 CFB Boiler |
Boiler |
FB |
Coke Oven GasIndustrial SludgeWood: BarkWood: Unadulterated Lumber |
Biomass (wet) |
1205 |
Alkaline Fly Ash ScrubbingElectrostatic PrecipitatorLimestone Injection, GeneralSelective Non-Catalytic Reduction (NH3 Or Urea Injection) (SNCR) |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
LAIPMansfield |
1-78-No.1 Power Boiler / EQT005 |
Boiler |
PC |
Coal, TDF |
Coal |
|
ESP |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
LALakeCharlesChemical |
ALC-BA-802 (Hot Oil Heater) |
Process Heater |
none selected |
GasNF Solid |
NF Solid |
96 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
MDSeverstalSparrows |
4BLR |
Boiler |
none selected |
Blast Furnace GasNatural gasNo. 6 Residual oilUsed Petroleum-based Oils |
Liquid (heavy) |
871 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
MEFPLEnergyWyman |
Unit #5 |
Boiler |
none selected |
/No. 6 Residual oil/ |
Liquid (heavy) |
72 |
Low NOx Burners |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
MENewPage-Rumford |
Cogen#6 |
Boiler |
FB |
Coal, TDF |
Coal |
|
Lime Injection, Fabric Filter |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
MESDWarren |
#21 Boiler |
Boiler |
PC |
Coal, Ind. sludge |
Coal |
|
ESP |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
MESDWarrenSomerset |
No1 Power Boiler |
Boiler |
Stoker |
Biomass, Ind. sludge |
Biomass |
|
ESP |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
MEVersoPaper |
Boiler #8 |
Boiler |
PC |
Coal, TDF |
Coal |
|
ESP |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
True |
MIDecorativePanels |
Boiler #1 |
Boiler |
Stoker |
Coal, Ind. Sludge |
Coal |
|
ESP |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
MIMichiganSugarCo |
Wickes Boiler |
Boiler |
none selected |
Natural gasNo. 6 Residual oil |
Liquid (heavy) |
87 |
Cyclone: Multiple (Multiclone) |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
MITBSimonPowerPlant |
Unit 2 |
Boiler |
PC |
Coal: Bituminous |
Coal: Bituminous |
287.5 |
Fabric FilterSelective Non-Catalytic Reduction (NH3 Or Urea Injection) (SNCR) |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
MIUSSteelGreatLakes |
Main Plant Boilerhouse, No. 8 Boiler |
Boiler |
none selected |
Coke Oven GasNatural gas |
Gas |
100 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
MIVersoPaperQuinnesec |
Waste Fuel Boiler |
Boiler |
Stoker |
NF Solids, TDF |
NF Solids |
|
ESP |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
MNADMCornDivision |
Gluten Dryer #2 EU127 (Not operational) |
Process Heater |
none selected |
BiogasNatural gas |
Gas |
50.18 |
Sodium Carbonate Scrubbing |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
MNGPDuluth |
EU33 Boiler #3 |
Boiler |
none selected |
Natural gasNo. 6 Residual oil |
Liquid (heavy) |
43 |
Electrostatic Precipitator |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
MNNorthshoreMiningCo |
Shop Boiler 2 (EU 002) |
Boiler |
none selected |
Used Petroleum-based Oils (on-spec) |
Liquid (heavy) |
6 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
MNSouthernMNBeetSugarCoop |
WWTP-BG-1 |
Process Heater |
none selected |
BiogasNo. 6 Residual oil |
Liquid (heavy) |
12.6 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
MNStPaulParkRef |
EU 009 |
Boiler |
none selected |
No. 6 Residual oilRefinery gas |
Liquid (heavy) |
112 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
MNVersoPaper |
EU006 B&W |
Boiler |
Stoker |
BiomassCoal: BituminousIndustrial SludgeTire Derived Fuel (TDF) |
Coal: Bituminous |
368 |
Cyclone: Multiple (Multiclone)Venturi Scrubber |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
MOAnheuserBusch |
Boiler 6 |
Boiler |
none selected |
No. 2 Distillate |
Liquid (light) |
299 |
Electrostatic Precipitator |
CO/HC/Formaldehyde Stack Test CEMS Monitoring |
$190,000 |
False |
MOUofMissouri |
Boiler 7 |
Boiler |
Stoker |
Coal, TDF |
Coal |
|
Lime Injection, Fabric Filter |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
MSWeyerhaeuserBruce |
AA-002 No. 2 Boiler |
Boiler |
Fuel Cell |
Hog Fuel |
Biomass (dry) |
115 |
Electrostatic Precipitator |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
MSWeyerhaeuserColumbus |
AA-012 |
Boiler |
PC |
Biomass, Ind. Sludge |
Biomass |
|
ESP |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
MTSmurfitStone |
Multi-Fuel Boiler |
Boiler |
Stoker |
Biomass, Ind. Sludge |
Biomass |
|
Wet Scrubber |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
Unknown |
NCBRPUS |
G-2 Melt Furnaces |
Process Heater |
unknown |
Gas |
gas |
<= 10 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
NCCertainTeedOxford |
ES-PH1 |
Process Heater |
none selected |
Natural gasNo. 6 Residual oil |
Liquid (heavy) |
11.3 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
NCDomtar |
65-25-0310 (No. 2 Hog Fuel Boiler) |
Boiler |
Stoker |
Coal, Ind. sludge |
Coal |
|
Fabric Filter |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
NCEIDuPontKinston |
ES6009 |
Process Heater |
none selected |
Natural gasNo. 4 Fuel oilNo. 6 Residual oil |
Liquid (heavy) |
15.7 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
True |
NCEPCORRoxboro |
1-A |
Boiler |
Stoker |
Coal, TDF |
Coal |
|
Fabric Filter |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
NCInternationalPaperRiegelwood |
PB5 |
Boiler |
Stoker |
Coal: BituminousNo. 6 Residual oilWood: Bark |
Coal: Bituminous |
600 |
Cyclone: Multiple (Multiclone)Venturi Scrubber |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
NCInvistaHwy421 |
B7600 |
Process Heater |
none selected |
Natural gasNo. 6 Residual oil |
Liquid (heavy) |
22 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
NCSeaboardLumber |
ES-3 |
Boiler |
FB |
Wood: Unadulterated Timber |
Biomass (wet) |
55.82 |
Electrostatic Precipitator |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
NCUNCCogen |
ES-001 |
Boiler |
FB |
Coal: Bituminous |
Coal: Bituminous |
323.17 |
Dry Limestone InjectionFabric Filter |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
NDCargillWestFargo |
Foster Wheeler Boiler (EU43) |
Boiler |
FB |
/Natural gas and Plant-based Agricultural Residue/ |
Biomass (dry) |
50.3 |
Electrostatic Precipitator |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
NJColoriteSpecialty |
NB17940 |
Boiler |
none selected |
No. 6 Residual oil |
Liquid (heavy) |
24 |
No Equipment |
CO/HC/Formaldehyde Stack Test CEMS Monitoring |
$190,000 |
False |
NJJohnsonMatthey |
E29004 |
Boiler |
none selected |
Natural gas |
Gas |
26.4 |
Catalytic Oxidizer (For CO & VOC)Selective Catalytic Reduction (SCR) |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
NJJohnsonMatthey |
E29002 |
Boiler |
none selected |
Natural gasNo. 2 Distillate |
Liquid (light) |
48.6 |
Low NOx Burners and Flue Gas Recirculation |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
NJSunocoWestville |
Boiler #7 |
Boiler |
none selected |
/Jet Fuel/ |
Liquid (light) |
399.05 |
Ammonia InjectionSelective Catalytic Reduction (SCR)Wet Electrostatic Precipitator, General |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
NJSunocoWestville |
Boiler #8 |
Boiler |
none selected |
/Jet Fuel/ |
Liquid (light) |
399.05 |
Ammonia InjectionSelective Catalytic Reduction (SCR)Wet Electrostatic Precipitator, General |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
NJVinelandMuniElectric-HowardDown |
Unit 9 |
Boiler |
none selected |
No. 6 Residual oil |
Liquid (heavy) |
207 |
Cyclone: Multiple (Multiclone) |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
NYArcelorMittal |
Hot Dip Galvanizing Despatch Furnace |
Process Heater |
none selected |
/Natural gas/ |
Gas |
21 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
True |
NYBlackRiverGen |
E00001 |
Boiler |
FB |
Coal: BituminousTire Derived Fuel (TDF) |
Coal: Bituminous |
201.25 |
Cyclone: Multiple (Multiclone)Dry Limestone InjectionFabric Filter |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
NYConEd59thStStationNewYork |
Boiler 118 |
Boiler |
none selected |
Natural gasNo. 6 Residual oil |
Liquid (heavy) |
180 |
Flue Gas Recirculation |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
Unknown |
OHAkronThermalEnergy |
Unit #3 (B005) |
Boiler |
none selected |
Natural gasUsed Petroleum-based Oils |
Liquid (heavy) |
180 |
Electrostatic Precipitator |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
OHArcelorMittalCleveland |
Boiler 3 |
Boiler |
PC |
Coal: Bituminous |
Coal: Bituminous |
388 |
Electrostatic Precipitator |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
True |
OHCognisOleochem |
Boiler #2 (B028) |
Boiler |
Stoker |
Coal: Bituminous Landfill Gas No. 4 Fuel oil |
Coal: Bituminous |
38.2 |
Fabric Filter |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
OHMortonSaltRittman |
B002 - Coal-Fired Boiler #2 |
Boiler |
Stoker |
Coal: Bituminous |
Coal: Bituminous |
140 |
Activated Carbon InjectionFabric FilterWet Lime Injection |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
OKSunocoTulsa |
#2 Plat PH-6 |
Process Heater |
none selected |
Hydrogen |
Gas |
34.8 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
OREvrazOregonSteel |
EU-5 Vacuum Degasser Boiler |
Boiler |
none selected |
Natural gas |
Gas |
37.8 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
ORFlakeboardEugene |
Boiler-2 |
Boiler |
SuspensionBurner |
Natural gasWood: Plywood, Particleboard (containing glues or resins) |
Biomass (dry) |
51 |
Fabric Filter |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
ORGeorgiaPacificWaunaMill |
EU35 - Fluidized Bed Boiler |
Boiler |
FB |
Hog FuelIndustrial SludgeNatural gas |
Biomass (dry) |
179 |
Dry Limestone InjectionFabric FilterSelective Non-Catalytic Reduction (NH3 Or Urea Injection) (SNCR) |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
|
ORGeorgiaPacificWaunaMill |
EU35 - Fluidized Bed Boiler |
Boiler |
FB |
Biomass, Ind. sludge |
Biomass |
|
Fabric Filter |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
Unknown |
ORInterforPacificGilchrist |
B-1 |
Boiler |
Dutch Oven |
Wood: Unadulterated Lumber |
Biomass (dry) |
170 |
Cyclone: Multiple (Multiclone) |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
True |
ORRosboroSpringfield |
DV 01.1 |
Boiler |
Dutch Oven |
Hog Fuel |
Biomass (dry) |
50 |
Cyclone: Multiple (Multiclone) |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
ORRoseburgRiddle2 |
Boiler #1 |
Boiler |
FB |
/Hog Fuel and Wood: Unadulterated Lumber/ |
Biomass (dry) |
126.5 |
Cyclone: Multiple (Multiclone)Electrostatic Precipitator |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
ORSierraPine |
SPMDBL01 |
Boiler |
SuspensionBurner |
Wood: Plywood, Particleboard (containing glues or resins) |
Biomass (dry) |
103.5 |
Wet Electrostatic Precipitator, GeneralWet Scrubber |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
ORWahChang |
6633-78 (SEP-AS-502B, Boiler #2) |
Boiler |
none selected |
No. 6 Residual oil |
Liquid (heavy) |
29 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
ORWeyerhaeuserCoWarrentonLumberMill |
3-HFB |
Boiler |
Fuel Cell |
Hog Fuel |
Biomass (dry) |
60 |
Cyclone: Multiple (Multiclone) |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
PAAKSteelButler |
148 - CRNO Line Anneal Furnace |
Process Heater |
none selected |
Natural gas |
Gas |
31 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
PAAppletonPapers |
#036 |
Boiler |
Stoker |
Coal: BituminousIndustrial SludgeWood: Bark |
Coal: Bituminous |
180 |
Cyclone: Multiple (Multiclone)Venturi Scrubber |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
True |
PAARGBradford |
37 |
Boiler |
Stoker |
Coal: Bituminous |
Coal: Bituminous |
169 |
Cyclone: Multiple (Multiclone)Fabric Filter |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
True |
PAARGBradford |
41 |
Process Heater |
none selected |
No. 4 Fuel oilPetrochemical process gas |
Liquid (light) |
33.4 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
PACabotSupermetals |
Kolene |
Process Heater |
unknown |
Gas |
gas |
<= 10 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
PACarpenterTechnology |
F-658 |
Boiler |
none selected |
Natural gas |
Gas |
12.5 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
PAFlexsysAmericaMonogahela |
103 |
Process Heater |
none selected |
Natural gasNo. 2 Distillate |
Liquid (light) |
11.4 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
PAHorseheadCorpMonaco |
32 |
Boiler |
none selected |
CO gasNatural gas |
Gas |
25.1 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
True |
PAInternationalWaxes |
Boiler #1 |
Boiler |
PC |
Coal: Bituminous and Oil |
Coal: Bituminous |
108 |
Electrostatic Precipitator |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
True |
PAInternationalWaxes |
Boiler #4 |
Boiler |
none selected |
No. 2, 5, and 6 Oil |
Liquid (heavy) |
59 |
Electrostatic Precipitator |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
PAMIMetals |
1 |
Process Heater |
unknown |
Gas |
gas |
<= 10 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
PAPHGlatfelter |
PB5 |
Boiler |
FB |
Coal, Ind. sludge |
Coal |
|
ESP |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
PAProctorGambleMehoopanyPA |
Boiler #3 (033A) |
Boiler |
Stoker |
/Natural gas and Paper and Paper Residues/ |
NF Solid |
156 |
Cyclone: Multiple (Multiclone)Venturi Scrubber |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
PASeverstalWheeling2236 |
Boiler 1 |
Boiler |
none selected |
Natural gasNo. 2 Distillate |
Liquid (light) |
60.5 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
PASunocoPhiladelphia |
CU-021 |
Boiler |
none selected |
No. 6 Residual oilRefinery gas |
Liquid (heavy) |
660 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
PAUnitedRefiningWarrant |
50 |
Process Heater |
none selected |
No. 5 Fuel oilRefinery gas |
Liquid (heavy) |
125 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
PAUSSFairlessHills |
GE Furnace |
Process Heater |
none selected |
Natural gas |
Gas |
69 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
PAUSSMonValleyIrvin |
CA Line |
Process Heater |
none selected |
Coke Oven GasNatural gas |
Gas |
45 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
PAYorktowneMifflinburg |
033 #2 |
Boiler |
FB |
Wood: Plywood, Particleboard (containing glues or resins) |
Biomass (dry) |
5 |
Centrifuge Collection |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
SCBMWManufacturingCo |
HB03 |
Boiler |
none selected |
Landfill GasNatural gas |
Gas |
61 |
Flue Gas Recirculation |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
SCCogenSouth |
B004 - Auxiliary Boiler #3 |
Boiler |
none selected |
No. 2 Distillate |
Liquid (light) |
313 |
Low NOx Burners |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
SCCogenSouth |
B001 - Main Boiler |
Boiler |
PC |
Coal, Ind. sludge |
Coal |
|
Fabric Filter |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
SCDuPontTeijinFlorence |
Boiler #3 |
Boiler |
none selected |
Natural gasNo. 6 Residual oil |
Liquid (heavy) |
99.1 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
SCEastmanColombia |
HTM Heater #3 (Equip ID 1101) |
Process Heater |
none selected |
Natural gasNo. 6 Residual oil |
Liquid (heavy) |
88.2 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
True |
SCHartsvilleOilMill |
CB-600 h.p. primary boiler |
Boiler |
none selected |
Natural gasNo. 6 Residual oilVegetable Oil |
Liquid (heavy) |
25.106 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
SCInternationalPaperEastover |
No. 2 Power Boiler |
Boiler |
Stoker |
Biomass, TDF |
Biomass |
|
ESP |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
SCIPGeorgetown |
PB01 |
Boiler |
PC |
Coal, TDF, Ind. sludge |
Coal |
|
|
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
SCMarlboroPaper |
Hogged Fuel Boiler |
Boiler |
Stoker |
Biomass, Ind. sludge |
Biomass |
|
ESP |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
SCMichelinSandySprings |
B:02:01 |
Boiler |
none selected |
Natural gasNo. 6 Residual oil |
Liquid (heavy) |
51.75 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
SCMilliken-Dewey |
D30 |
Boiler |
|
NF Liquid, Ind. Sludge |
NF Liquid |
|
None |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
SCMitsubishiPolyesterFilm |
Dowtherm Heater 4 (4FPDDOWHSA) |
Process Heater |
none selected |
Natural gasNo. 2 DistillateVent Gas for Air Pollution Control |
Liquid (light) |
49 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
SCWeylChem |
CHR-2 |
Process Heater |
none selected |
thermal oil |
Liquid (heavy) |
1 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
True |
TNArborCraft |
B-1 |
Boiler |
FB |
Natural gasWood: Plywood, Particleboard (containing glues or resins) |
Biomass (dry) |
17.14 |
Cyclone: Multiple (Multiclone) |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
TNBowaterNewsprint |
Bubbling Fluidized Bed Boiler |
Boiler |
FB |
Biomass, TDF, Ind. sludge |
Biomass |
|
ESP |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
TNBungeChattanooga |
EU003 (Vaporizer #1) |
Process Heater |
none selected |
Natural gas |
Gas |
11.5 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
TNCargillMemphis |
Pulverized Coal Boiler (8301) |
Boiler |
PC |
Coal: Bituminous |
Coal: Bituminous |
247 |
Fabric FilterLow NOx Burners |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
TNDuPontOldHickoryPlant |
Dow Vaporizer No. 3 |
Process Heater |
none selected |
Natural gasNo. 2 Distillate |
Liquid (light) |
12.8 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
TNEastman_NO_CBIDATA |
Boiler 30 |
Boiler |
PC |
Coal: Bituminous |
Coal: Bituminous |
780 |
Dry Scrubbing, GeneralElectrostatic Precipitator |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
TNInvistaChattanooga |
EU003 - Vaporizer #1 |
Process Heater |
none selected |
Natural gasNo. 2 Distillate |
Liquid (light) |
22 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
TXCelanesePampa |
Boiler 11 |
Boiler |
none selected |
Methane and CO gas and CO2Natural gas |
Gas |
0.18 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
UTHunterPowerPlantCastleDale |
3 |
Boiler |
PC |
/Coal: Bituminous/ |
Coal: Bituminous |
1704.864 |
Fabric FilterFlue Gas Desulfurization, General |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
UTWestinghouse |
306 |
Process Heater |
unknown |
Gas |
gas |
<= 10 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
VAIntermetArcherCreek |
PROCESS 1 |
Process Heater |
none selected |
Natural gas |
Gas |
30 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
VAINVISTAWaynesboro |
2-205 (B#1) Boiler #1 |
Boiler |
PC |
Coal: Bituminous |
Coal: Bituminous |
196 |
Cyclone: Multiple (Multiclone)Fabric Filter |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
VAPhilipMorrisPark500 |
B2 |
Boiler |
PC |
Coal: Bituminous |
Coal: Bituminous |
237 |
Electrostatic Precipitator |
CO/HC/Formaldehyde Stack Test CEMS Monitoring |
$190,000 |
False |
VAVCUMCVCampusSteamPlant |
BOE002 |
Boiler |
none selected |
Natural gasNo. 2 DistillateNo. 6 Residual oilUsed Petroleum-based Oils (on-spec) |
Liquid (heavy) |
150.6 |
Flue Gas RecirculationLow NOx Burners |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
WABoeingRenton |
BOIL04 |
Boiler |
none selected |
Natural gas |
Gas |
64 |
No Equipment |
CO/HC/Formaldehyde Stack Test CEMS Monitoring |
$190,000 |
False |
WAGPCamas |
No. 5 Power Boiler |
Boiler |
none selected |
Natural gasNo. 6 Residual oil |
Liquid (heavy) |
318 |
Venturi ScrubberWet Scrubber |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
WAKimberlyClarkEverett |
No. 14 Cogeneration Boiler |
Boiler |
Stoker |
Biomass, Ind. sludge |
Biomass |
|
Fabric Filter |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
WANipponPaper |
#8 Hog Fuel Boiler |
Boiler |
Stoker |
Biomass, Ind. sludge |
Biomass |
|
Wet Scrubber |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
False |
WAWeyerhaeuser_Raymond |
Hog Fuel Boiler EU1 |
Boiler |
Fuel Cell |
Hog Fuel |
Biomass (dry) |
115 |
Electrostatic Precipitator |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
WICharterSteel |
P31 |
Process Heater |
none selected |
Natural gas |
Gas |
10.2 |
No Equipment |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
WIGPGreenBay2818 |
B10 - Wastepaper Sludge-Fired Boiler 10 |
Boiler |
FB |
Deinking Residuals |
NF Liquid |
95 |
Fabric FilterSelective Non-Catalytic Reduction (NH3 Or Urea Injection) (SNCR) |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
WIGPHardboardPhillips |
B22 Fluidized Bed |
Boiler |
FB |
Hog Fuel |
Biomass (dry) |
36 |
Cyclone: Multiple (Multiclone) |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
|
WIThilmanyLLC |
B09 |
Boiler |
cyclone |
Coal, TDF |
Coal |
|
ESP |
Stack tests for CO/HC/PM/Metals/Hg/NOx/SO2/dioxins/HCl; Opacity test; 10-sample fuel variability |
$53,000 |
True |
WIWRREnvironmental |
B#3 |
Boiler |
none selected |
Natural gasNo. 6 Residual oil |
Liquid (heavy) |
16.7 |
Automatic Flame Control |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
WVPPGMartinsville |
R097-Boiler 6 |
Boiler |
none selected |
Hydrogen |
Gas |
181 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
False |
WYSinclairWyoming |
Pt 74 #2 H2 Plant Heater |
Process Heater |
none selected |
CO gasNatural gas |
Gas |
288 |
No EquipmentSelective Catalytic Reduction (SCR) |
CO/HC/Formaldehyde/NOx Stack Test |
$16,000 |
False |
WYSinclairWyoming |
Pt 41 #9 HPB |
Boiler |
none selected |
No. 6 Residual oilRefinery gas |
Liquid (heavy) |
100 |
No Equipment |
CO/HC/PM/HCl/Hg/metals+NOx/SO2 Stack Test and 10-sample Fuel Variability |
$28,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL COST = |
$6,859,000 |
FacilityID |
UnitID |
Facility Name |
Address |
City |
State |
Zip |
Cadmium (Cd) |
CO |
Dioxin/Furans |
Hydrogen Chloride (HCl) |
Lead (Pb) |
Mercury (Hg) |
NOX |
Particulate Matter (front half) |
Particulate Matter (total, including condensibles) |
SO2 |
Estimated Cost of Emissions Tests |
AKAlyeskaPumpStation1 |
31-IN-1 |
Alyeska Pipeline Service Company Pump Station 1 |
Sections 32 and 33, T11N, R14E, Umiat Meridian |
North Slope |
AK |
|
|
|
|
|
|
|
|
|
|
|
$51,000 |
AKAlyeskaPumpStation3 |
33-PK-1 |
Alyeska Pipeline Service Company Pump Station 3 |
Sections 8, 9, 16, & 17, T7S, R14E, Umiat Meridian, 112 miles South of Prudhoe Bay |
|
AK |
|
|
|
|
|
|
|
|
|
|
|
$51,000 |
AKAlyeskaPumpStation4 |
34-PK-11 |
Alyeska Pipeline Service Company Pump Station 4 |
Sections 5 and 8, T12S, R12E, Umiat Meridian, 155 miles South of Prudhoe Bay |
|
AK |
|
|
|
|
|
|
|
|
|
|
|
$51,000 |
AKBelugaRiverProduction |
Mech Shop Used Oil Burner |
|
P.O. Box 66 |
Kenai |
AK |
99611 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
AKChugachElectricBeluga |
EU No. 9 |
|
5601 Electron Drive |
Anchorage |
AK |
99518 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
AKCoeur |
Incinerator |
|
3031 Clinton Drive, Suite 202 |
Juneau |
AK |
99801 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
AKCookInletPipeline-DriftRiver |
Drift River Terminal Incinerator |
|
2000 W. International Airport Road, Suite D-6 |
Anchorage |
AK |
99502 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
AKEntechAlaska |
Incin # 1 |
|
440 E. 100th Avenue |
Anchorage |
AK |
999515 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
AKHeclaGreensCreekJuneau |
Consumat Incinerator |
|
Mile 8.5 B-Road - Northern Admiralty Island |
Juneau |
AK |
99803 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
AKIcicleSeafoods |
EU #7 |
|
Seasonally Moored, Udagak Bay (54deg 44min N, 166deg 18min W) (mailing address: 4019 21st Avenue W, Seattle WA 98199) |
Unalaska Island |
AK |
N/A |
|
|
|
|
|
|
|
|
|
|
$51,000 |
AKKuparukCentral Production |
H-250 (EU 35) |
|
Section 9, Township 11N, Range 10E, Umiat Meridian (Production Pad) |
Achorage |
AK |
99501 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
AKOITMooseCreek |
INC1 |
|
2355 Old Richardson Hwy. |
Moose Creek |
AK |
99705 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
AKPeakOilfield |
CY 2000 |
Peak Oilfield Service Company - North Slope |
2525 C Street, Suite 201 |
Anchorage |
AK |
99503 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
AKPioneerNR |
I-5 incinerator |
|
700 G Street, Suite 600 |
Anchorage |
AK |
99501 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
AKTeckComincoAlaskaIncRedDogMine |
MI-2 |
|
68 deg 4' North; 162 deg 50" West |
Anchorage |
AK |
99517 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
AKTeckComincoAlaskaIncRedDogMine |
MI-3 |
Teck Cominco Alaska, Inc. Red Dog Mine |
68 deg 4' North; 162 deg 50" West |
Anchorage |
AK |
99517 |
|
|
|
|
|
|
|
|
|
|
$48,000 |
AKUnisea37 |
EU ID 18 |
UniSea, Inc. Dutch Harbor Plant |
88 Salmon Way, Amaknak Island |
Dutch Harbor |
AK |
99692 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
AKUOCCGranitePoint |
P-X-0540 (EU 11) |
Granite Point Platform |
Cook Inlet, Alaska |
|
AK |
|
|
|
|
|
|
|
|
|
|
|
$51,000 |
AKUOCCTradingBay |
R-H-0800 |
Trading Bay Production Facility |
52300 Nikiski Beach Road |
Nikiski |
AK |
99635 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
AKWestMacArthurRiverUnit |
I-1 |
|
310 K Street, Suite 700 |
Anchorage |
AK |
99501 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
AKXTOEnergy |
INCINERATOR |
|
52260 WIK ROAD |
KENAI |
AK |
99611 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
ALIPRiverdale |
No. 2 Bark Boiler / BK02 |
|
601 County Road 78 |
Selma |
AL |
36703 |
|
|
|
|
|
|
|
X |
X |
|
$45,000 |
ALSonyElectronics |
Battery Inc. |
Sony Electronics Inc. |
4275 West Main Street |
Dothan |
AL |
36305 |
|
|
|
|
|
|
|
X |
|
|
$45,000 |
AREvergreenPackaging |
BB |
|
5201 Fairfield Road |
Pine Bluff |
AR |
71601 |
|
X |
|
|
|
|
|
X |
X |
|
$44,000 |
ARFutureFuels |
6M03-05 |
|
2800 Gap Rd. |
Batesville |
AR |
72501 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
CAArmtecDefense |
Scrap Incinerator 1 |
|
85-901 Ave. 53 |
Coachella |
CA |
92236 |
|
X |
|
|
|
|
X |
X |
|
X |
$35,000 |
CABokan |
1 |
|
4101 Franklin Blvd. |
Sacramento |
CA |
95820 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
CACEMEXVictorville |
Kiln 3 |
|
16888 North E Street |
Victorville |
CA |
92394 |
|
|
X |
|
|
|
|
|
|
X |
$15,000 |
CAD&D |
Incinerator |
|
4105 Bandini Blvd |
Vernon |
CA |
90023-4680 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
CAWheelabratorShasta |
Boiler#1 |
|
20811 Industry Road |
Anderson |
CA |
96007 |
|
X |
|
X |
|
X |
X |
X |
X |
|
$35,000 |
FLCemexMiami |
Cement Kiln |
|
1200 NW 137th Avenue |
Miami |
FL |
33182 |
|
X |
X |
|
X |
X |
X |
X |
X |
X |
$7,000 |
FLCemexMiami |
Soil Thermal Treatment Facility |
|
1200 NW 137th Avenue |
Miami |
FL |
33182 |
|
X |
|
|
|
|
|
X |
X |
|
$44,000 |
FLFloridaRock |
Kiln Line 1 |
|
4000 NW County Road 235 |
Newberry |
FL |
32669 |
|
X |
X |
|
|
|
X |
X |
X |
X |
$15,000 |
FLSolutiaIncPensacola |
CP-L |
|
3000 Old Chemstrand Rd. |
Cantonment |
FL |
32533-8926 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
GAADMLocation551 |
630- Wellons |
|
1841 Clay Road |
Valdosta |
GA |
31603 |
|
X |
|
|
|
|
|
X |
|
|
$44,000 |
GAAmericasStyrenics |
H2200 |
|
17401 State Route 7 South |
Marietta |
OH |
45750 |
|
X |
|
|
|
|
|
|
|
|
$47,000 |
GAOwensCorningRoofingandAsphaltAtlanta |
IB01 |
Owens Corning Roofing and Asphalt, LLC. - Atlanta Roofing and Asphalt |
4795 Frederick Drive |
Atlanta |
GA |
30306 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
IACNHAmerica |
INC-1 |
CNH America LLC, Burlington, IA |
1930 Des Moines Avenue |
Burlington |
IA |
52601 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
IALafargeBuffalo |
Kiln 1 |
|
301 E. Front Street |
Buffalo |
IA |
52728 |
|
X |
X |
|
|
|
X |
X |
|
X |
$15,000 |
IALehighCementMasonCity |
302.203 |
|
700 25th Street NW |
Mason City |
IA |
50401-9403 |
|
X |
X |
X |
|
|
X |
X |
X |
X |
$10,000 |
IAPellaCorp |
EP-CO |
Pella Corporation - Pella |
102 Main Street |
Pella |
IA |
50219 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
ILDixline |
Paint Stripping Furnace |
Dixline Corporation |
26 SW Fourth Avenue, P.O. Box 166 |
Galva |
IL |
61434 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
ILFlintHillsResources |
HB-2301 |
Flint Hills Resources, LP- Joliet Facility |
23425 Amoco R |
Joliet |
IL |
60434 |
|
X |
|
X |
|
|
X |
X |
|
|
$37,000 |
ILFlintHillsResources |
MB-1012 |
Flint Hills Resources, LP- Joliet Facility |
23425 Amoco R |
Joliet |
IL |
60434 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
ILFlintHillsResources |
NB-800 |
Flint Hills Resources, LP- Joliet Facility |
23425 Amoco R |
Joliet |
IL |
60434 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
ILHiltonLisle |
Incinerator |
Hilton Lisle/Naperville |
3003 Corporate West Drive |
Lisle |
IL |
60532 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
ILInterlakeMaterial |
AN |
Interlake Material Handling, Inc. |
701 Interlake Drive |
Pontiac |
IL |
61764 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
ILJacksonvilleDevelopmentalCenter |
Incinerator |
Jacksonville Developmental Center |
1201 S. Main st. |
Jacksonville |
IL |
62650 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
INBlufftonMotorWorks |
6645, E6 |
Bluffton Motor Works, LLC |
410 East Spring Street |
Bluffton |
IN |
46714 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
INBungeDecatur |
Murray (3SP1) |
|
1200 North 2nd Street |
Decatur |
IN |
46733 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
INCovanceLabsGreenfield |
241-1A |
Covance Laboratories, Inc. (SWI-115) Formerly Eli Lilly Greenfield Labs. |
671 S. Meridian |
Greenfield |
IN |
46140-5006 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
INLehighCementMitchell |
EU15 |
Lehigh Cement Company, Mitchell Plant |
180 N. Meridian Road |
Mitchell |
IN |
47446 |
|
X |
X |
|
X |
|
|
X |
X |
|
$12,000 |
INLehighCementMitchell |
EU17 |
Lehigh Cement Company, Mitchell Plant |
180 N. Meridian Road |
Mitchell |
IN |
47446 |
|
|
X |
|
|
|
|
X |
|
|
$15,000 |
INSupremeCorp |
M-Building |
Supreme Corporation |
2581 E. Kercher Rd. |
Goshen |
IN |
46526 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
INSyndicateSales |
incinerator |
Syndicate Sales Inc. |
945 S. Lindsay Street |
Kokomo |
IN |
46901 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
INWabashNational855 |
BO |
Wabash National |
1000 Sagamore Parkway South |
Lafayette |
IN |
47905 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
INWhirlpool |
Pyrolytic Oven #1 |
Whirlpool Corporation |
5401 U.S Highway 41 North |
Evansville |
IN |
47727 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
KSFCIndustries |
EP-01 |
FC Industries, Inc. |
13508 Oak St. |
Kansas City |
MO |
64145 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
KYCooperStandard |
SN-17 |
Cooper Standard Automotive |
250 Oak Grove Drive |
Mount Sterling |
KY |
40353 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
KYCoxInterior |
WB2 |
Cox Interior, Inc. |
1751 Old Columbia Road |
Campbellsville |
KY |
42718 |
|
X |
|
|
|
|
|
|
|
|
$47,000 |
KYFauntleroy |
D-900 |
Fauntleroy Supply Inc. |
820 North Main Street |
Greenville |
KY |
42345 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
LADeltech |
HB-507 |
Deltech Corporation |
11911 Scenic Highway |
Baton Rouge |
LA |
70807 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
LAInternationalPaper-Pineville |
Power Boiler / 0601 |
International Paper-Pineville Mill |
300 Williams Lake Rd |
Pineville |
LA |
71360 |
X |
X |
|
X |
X |
X |
|
X |
|
|
$30,000 |
LAInternationalPaperRedRiverMill |
EQT011 Hogged Fuel Boiler No. 2 |
International Paper - Red River Mill |
4537 Highway 480 |
Campti |
LA |
71411 |
|
|
|
|
|
|
|
X |
|
|
$45,000 |
MDMirantChalkPoint |
Unit 4 |
Mirant Chalk Point Generating Station |
25100 Chalk Point Road |
Aquasco |
MD |
20608-2600 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
MDSeverstalSparrows |
1BLR |
|
1430 Sparrows Point Boulevard |
Sparrows Point |
MD |
21219 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
MEBoralex |
Boiler #1 |
Boralex- Livermore Falls |
267 Diamond Rd. |
Livermore Falls |
ME |
4254 |
X |
X |
X |
X |
X |
X |
X |
X |
X |
|
$7,000 |
MEBoralexStratton |
Boiler #1 |
Boralex Stratton Energy LP |
PO Box 140 27 Fox Farm Rd |
Stratton |
ME |
4982 |
X |
X |
X |
X |
X |
X |
X |
X |
X |
|
$7,000 |
MEHuberEngineeredWoodLLC |
Boiler No.1 |
|
333 Station Road |
Easton |
ME |
_04740 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
MEHuberEngineeredWoodLLC |
Dryer Furnace |
|
333 Station Road |
Easton |
ME |
_04740 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
MEPioneerPlastics |
Boiler #5/Thermal Oxidizer |
Pioneer Plastics Corporation |
1 Pionite Road |
Auburn |
ME |
04210 |
|
|
|
|
|
|
|
X |
|
|
$45,000 |
MIGraylingGeneratingStation |
Boiler1 |
Grayling Generating Station |
4400 W. Four Mile Road |
Grayling |
MI |
49738 |
X |
X |
|
X |
X |
X |
X |
X |
X |
X |
$15,000 |
MIHermanMiller |
EUBBLR |
Herman Miller, Inc. |
855 E. Main Ave. |
Zeeland |
MI |
49464 |
X |
X |
|
X |
X |
X |
|
X |
X |
|
$17,000 |
MIVikingEnergyMcBain |
19313 |
Viking Energy of McBain |
6751 W. Gerwoude DR |
McBain |
MI |
49657 |
|
X |
|
|
X |
X |
X |
X |
X |
X |
$20,000 |
MNAinsworthEngineeredCook |
EU006 Keeler Boiler #1 |
Ainsworth Engineered LLC - Cook |
9358 US Highway 53 |
Cook |
MN |
55723 |
|
X |
|
|
|
|
|
X |
X |
|
$17,000 |
MNSappiCloquet |
EU002 |
Sappi Cloquet LLC |
2201 Avenue B |
Cloquet |
MN |
55720 |
|
X |
X |
|
|
X |
|
X |
X |
X |
$10,000 |
NCDukeEnergyAllen |
ES-6(AuxB) |
Duke Energy Carolinas LLC, Allen Steam Station |
253 Plant Allen Road |
Belmont |
NC |
28012 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
NDADMNorthernSun |
EU17 |
Northern Sun - ADM |
5525 136th Ave. SE |
Enderlin |
ND |
58027 |
X |
X |
|
X |
X |
X |
|
X |
X |
X |
$22,000 |
NDCNHAmerica |
INC-1 |
CNH America LLC, Fargo ND |
3401 1st Avenue North |
Fargo |
ND |
58102 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
NECNHAmericaGrandIsland |
7996 |
CNH America LLC Grand Island Operation |
3445 Stolley Park Rd |
Grand Island |
NE |
68802 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
NJNovartis |
34 |
Novartis Pharmaceuticals Corporation |
59 Route 10 |
East Hanover |
NJ |
07936 |
|
X |
|
|
|
|
X |
X |
|
X |
$35,000 |
OHWhirlpoolClyde |
N001 |
Whirlpool Corporation, Clyde Division |
119 Birdseye St. |
Clyde |
OH |
43410 |
|
|
|
|
|
|
|
X |
|
|
$42,000 |
OKVRCOklahoma |
HI-501 |
Valero Refining Company -Oklahoma |
Highway 142 E and Cameron Road |
Ardmore |
OK |
73401 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
OKVRCOklahoma |
LPLT VCU |
Valero Refining Company -Oklahoma |
Highway 142 E and Cameron Road |
Ardmore |
OK |
73401 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
ORGPToledo |
EU11 - Hog Fuel Boiler #4 |
|
1400 SE Butler Bridge Road |
Toledo |
OR |
97391 |
|
X |
|
X |
|
|
|
X |
|
|
$47,000 |
PAcambria |
Cambria 031/032 |
Cambria Cogen Company |
243 Rubisch Road |
Ebensburg |
PA |
15931 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
PACNHAmericaNewHolland |
INC-1 |
CNH America LLC, New Holland, PA |
300 Diller Avenue |
New Holland |
PA |
17557 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
PAKimberlyClarkChester |
Boiler #10 (ID 035) |
|
One Avenue of the States |
Chester |
PA |
19013 |
|
X |
X |
X |
|
X |
X |
X |
X |
X |
$10,000 |
PALehighCementYork |
200 |
Lehigh Cement Company, York Plant |
200 Hokes Mill Road |
York |
PA |
17403 |
X |
X |
X |
X |
|
X |
X |
X |
|
X |
$5,000 |
PAWardMfg |
C10 Afterburners |
Ward Manufacturing LLC |
115 Gulick St |
Blossburg |
PA |
16912 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
PED Oil Corporation PORTABLE FILTER INCIN |
INCIN #1 |
|
|
Midland |
TX |
79701 |
X |
X |
|
X |
X |
X |
X |
X |
|
|
$15,000 |
SCBASFSeneca |
5 |
|
554 Engelhard Drive |
Seneca |
SC |
29678 |
X |
X |
|
X |
X |
|
|
X |
|
|
$17,000 |
SCBASFSeneca |
23 |
BASF Corporation |
554 Engelhard Drive |
Seneca |
SC |
29678 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
SCCryovac |
FB01 |
Cryovac Inc. (Simpsonville Plant) |
803 North Maple Street |
Simpsonville |
SC |
29681 |
|
|
|
X |
|
|
|
X |
|
|
$37,000 |
SCDixieNarco |
47 |
Dixie-Narco/Crane |
3330 Dixie Narco Blvd |
Williston |
SC |
29583 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
SCINVISTACamdenPlant |
Unit ID 19 - Lindberg |
INVISTA S.à r.l.-Camden Plant |
643 Highway 1 South |
Lugoff |
SC |
29078 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
SCINVISTASpartanburg |
EU39a - Polyester Burn Off Oven #1 |
INVISTA S.à r.l. |
1550 Dewberry Road |
Spartanburg |
SC |
29307 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
SCLafargeHarleyville |
2 |
Lafarge Harleyville |
463 Judge Street |
Harleyville |
SC |
29448 |
X |
X |
X |
X |
X |
X |
|
X |
X |
|
$8,000 |
TNPackagingCorpCounce |
Combination Boiler # 2 |
Packaging Corporation of America, Counce Mill |
6715 Hwy 57 |
Counce |
TN |
38326 |
|
|
|
X |
|
|
X |
X |
|
|
$17,000 |
TNStateIndustries |
Waste Incinerator/Boiler |
State Industries, Inc. |
500 Tennessee Waltz Parkway |
Ashland City |
TN |
37015 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
TNTeknorApex |
Boiler # 5 |
Teknor Apex - Haywood Company |
751 Dupree |
Brownsville |
TN |
38012 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
TNTempleInland2426 |
5000F |
Temple-Inland, Inc |
2877 Sceptor Road |
Waverly |
TN |
37185 |
|
|
|
|
|
|
|
X |
|
X |
$43,000 |
TXBASFFreeport |
IN-4702 |
BASF Corporation Freeport |
602 COPPER RD |
FREEPORT |
TX |
77541 |
X |
X |
|
|
X |
X |
X |
X |
X |
X |
$17,000 |
TXBASFFreeport |
IN-5500 |
BASF Corporation Freeport |
602 Copper Road |
Freeport |
TX |
77541 |
|
X |
|
|
|
|
X |
X |
X |
X |
$30,000 |
TXChemtrade |
PRO-001 |
Chemtrade Refinery Services Inc. |
1400 Olin Road |
Beaumont |
TX |
77705 |
X |
X |
|
X |
|
|
|
X |
X |
X |
$37,000 |
TXDrugEmporium |
01 |
Drug Emporium |
2321 West Loop 281 |
Longview |
TX |
75608 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
TXInternationalPaperQueenCity |
PB02 |
International Paper Texarkana Mill |
9978 FM 3129 |
Queen City |
TX |
75572 |
X |
X |
X |
|
X |
X |
X |
X |
X |
X |
$5,000 |
TXLuciteNederland |
Acrylo Incinerator |
Lucite International, Inc. |
6350 North Twin City Highway |
Nederland |
TX |
77627 |
|
|
|
|
|
|
X |
|
|
|
$42,000 |
TXMadix |
Building C - Burn-off Oven |
Madix, Inc. |
500 Airport Rd. |
Terrell |
TX |
75160 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
TXReichhold |
Thermal Oxidizer |
Reichhold, Inc. |
1503 Haden Road |
Houston |
TX |
77213 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
TXSterlingChemTexasCity |
53H3 |
Sterling Chemicals, Inc. |
201 Baystreet South |
Texas City |
TX |
77590 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
VABAENorfolk |
003 |
|
750 West West Berkley Avenue |
Norfolk |
VA |
23523 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
VABearIslandPaperCoAshland |
Unit Ref #2 (Combo Boiler) |
Bear Island Paper Company, L.L.C. |
10026 Old Ridge Road |
Ashland |
VA |
23005 |
X |
|
|
X |
X |
X |
|
|
|
X |
$20,000 |
VACovance |
100264 |
Covance Inc. |
9200 Leesburg Pike |
Vienna |
VA |
22182 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
VAHapcoAbingdon |
RGF TO-30 |
Hapco, Inc |
26252 Hillman Hwy |
Abingdon |
VA |
24210 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
VANautilusSystems |
Controlled pyrolysis furnace 1 |
Nautilus Human Performance Systems Incorporated |
709 Powerhouse Rd |
Independence |
VA |
24348 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
VAQuadrantEPP |
Controlled pyrolysis cleaning furnace |
Quadrant EPP USA, Inc. |
2530 North Fourth St. |
Wytheville |
VA |
24382 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
VARadfordArmyAmmunitionPlant |
Decontamination Oven |
|
Route 114 |
Radford |
VA |
24143-0100 |
X |
X |
X |
X |
X |
|
|
X |
|
|
$7,000 |
VATransInd |
50825 |
Trans Ind Corporation - Coxendale Incinerator |
1711 Coxendale Road |
Chester |
VA |
23831 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
WABoeingDevelopmentalCenter |
9-67 data-destroy incinerator |
Boeing Developmental Center |
P.O. Box 3707 MC 46-23 |
Seattle |
WA |
98124-2207 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
WAEmeraldKalama |
U-2 |
Emerald Kalama Chemical |
2801 E 7th St |
Kalama |
WA |
98625-9799 |
|
X |
|
|
|
|
|
|
|
|
$47,000 |
WALongviewFPP |
#12 Power Boiler |
Longview Fibre Paper & Packaging, Inc. |
300 Fibre Way |
Longview |
WA |
98632 |
X |
X |
|
X |
X |
X |
|
X |
|
|
$23,000 |
WALongviewFPP |
#20 Power Boiler |
Longview Fibre Paper & Packaging, Inc. |
300 Fibre Way |
Longview |
WA |
98632 |
X |
X |
|
X |
X |
X |
X |
X |
|
X |
$15,000 |
WAPortTownsendPaper |
#10 Power Boiler |
Port Townsend Paper Corp. |
100 Mill Road |
Port Townsend |
WA |
98368 |
X |
X |
|
X |
X |
X |
X |
|
|
|
$22,000 |
WINSPWAshland |
B20 |
|
122 N. 14th Avenue West |
Ashland |
WI |
54806 |
X |
|
|
|
X |
X |
|
X |
X |
|
$23,000 |
WIRichardsonBrosYacht |
B-38 |
Richardson Brothers Yacht Interiors |
635 Cty. Rd. PP |
Sheboygan Falls |
WI |
53085 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
WYSinclairWyoming |
Pt 67 Catalytic Oxidizer Unit |
Sinclair Wyoming Refining Company |
100 East Lincoln Highway |
Sinclair |
WY |
82334 |
|
|
|
|
|
|
|
|
|
|
$51,000 |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$5,184,000 |