FERC Form No. 556 Page
FERC Form No. 556
18 C.F.R. § 131.80
CERTIFICATION OF QUALIFYING FACILITY STATUS FOR AN EXISTING OR A PROPOSED SMALL POWER PRODUCTION OR COGENERATION FACILITY
INFORMATION ABOUT COMPLIANCE
Compliance with the information collection requirements established by the FERC Form No. 556 is required to obtain and maintain status as a qualifying facility. See 18 C.F.R. § 131.80 and Part 292. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
SUBMITTING COMMENTS ON PUBLIC REPORTING BURDEN
The estimated burden for completing FERC Form No. 556, including gathering and reporting information, is 4 hours for self-certifications and 38 hours for applications for Commission certification. Send comments regarding this burden estimate or any aspect of this collection of information, including suggestions for reducing this burden, to the following: Michael Miller, Office of the Executive Director (ED-34), Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426; and Desk Officer for FERC, Office of Information and Regulatory Affairs, Office of Management and Budget, Washington, DC 20503 ([email protected]). Include the Control No. 1902-0075 in any correspondence.
GENERAL INSTRUCTIONS
Complete this form by replacing bold text below with responses to each item, as required.
PART A: GENERAL INFORMATION TO BE SUBMITTED BY ALL APPLICANTS
1a.
Full name of applicant: [Note:
Applicant is the legal entity submitting this form, not the
individual employee making the filing. Generally, the Applicant will
be a company, corporation or organization, unless the facility is
owned directly by an individual or individuals.]
[insert name of applicant]
Docket
Number assigned to the immediately preceding submittal filed with the
Commission in connection with the instant facility, if any:
[insert Docket Number QF__-___-___ or “none”]
Purpose
of instant filing (self-certification or self-recertification [18
C.F.R. § 292.207(a)(1)], or application for Commission
certification or recertification [18 C.F.R. §§ 292.207(b)
and (d)(2)]):
[insert “Self-certification,” “Self-recertification,” “Application for Commission certification,” or “Application for Commission recertification”; if this is a recertification, also describe the reason for the recertification]
1b.
Full address of applicant:
[insert text]
1c.
Indicate the owner(s) of the facility (including the percentage of
ownership held by any electric utility or electric utility holding
company, or by any persons owned by either) and the operator of the
facility.
[insert ownership information, including (1) identification of each direct owner; (2) identification of whether or not each owner is an electric utility or electric utility holding company, or is owned by either; and (3) identification of the percentage ownership held by each direct owner that is an electric utility or electric utility holding company, or is owned by either]
[insert operator information]
Additionally, state whether or not any of the non-electric utility owners or their upstream owners are engaged in the generation or sale of electric power, or have any ownership or operating interest in any electric facilities other than qualifying facilities.
[for each direct owner that is not an electric utility, state whether such owners or their upstream owners are engaged in the generation or sale of electric power, or have any ownership or operating interest in any electric facilities other than qualifying facilities]
In
order to facilitate review of the application, the applicant may also
provide an ownership chart identifying the upstream ownership of the
facility. Such chart should indicate ownership percentages where
appropriate.
1d. Signature of authorized individual
evidencing accuracy and authenticity of information provided by
applicant: [Note: A signature
on a filing shall constitute a certificate that (1) the signer has
read the filing and knows its contents; (2) the contents are true as
stated, to the best knowledge and belief of the signer; and (3) the
signer possesses full power and authority to sign the filing. A
person submitting a self-certification electronically via eFiling may
use typed characters representing their name to show that the person
has signed the document. See
18 C.F.R. § 385.2005.]
[insert signature; for electronic filings, typed characters representing the name of the signer may be used as signature]
2.
Person to whom communications regarding the filed information may be
addressed:
Name: [insert text]
Title: [insert text]
Telephone number: [insert text]
Mailing address: [insert text]
3a.
Location of facility to be certified:
State: [insert
text]
County: [insert text]
City or town: [insert text]
Street
address (if known): [insert text]
3b.
Indicate the electric utilities that are contemplated to transact
with the qualifying facility (if known) and describe the services
those electric utilities are expected to provide:
[insert text]
Indicate
utilities interconnecting with the facility and/or providing wheeling
service [18 C.F.R. §§ 292.303(c) and (d)]:
[insert text]
Indicate
utilities purchasing the useful electric power output [18 C.F.R. §§
292.101(b)(2), 292.202(g) and 292.303(a)]:
[insert text]
Indicate
utilities providing supplementary power, backup power, maintenance
power, and/or interruptible power service [18 C.F.R. §§
292.101(b)(3), (b)(8), 292.303(b) and 292.305(b)]:
[insert text]
4a.
Describe the principal components of the facility including boilers,
prime movers and electric generators, and explain their operation.
Include transmission lines, transformers and switchyard equipment, if
included as part of the facility.
[insert text]
4b.
Indicate the maximum gross and maximum net electric power production
capacity of the facility at the point(s) of delivery and show the
derivation. [Note: Maximum
gross output is the maximum amount of power that the facility is able
to produce, measured at the terminals of the generator(s). Maximum
net output is maximum gross output minus (1) any auxiliary load for
devices that are necessary and integral to the power production
process (fans, pumps, etc.), and (2) any losses incurred from the
generator(s) to the point of delivery. If any electric power is
consumed at the location of the QF (or thermal host) for purposes not
related to the power production process, such power should not be
subtracted from gross output for purposes of reporting maximum net
output here.]
Gross output: [insert maximum gross output in kW or MW]
Net output: [insert maximum net output at point of delivery in kW or MW]
Derivation (assumptions about losses, auxiliary load or lack thereof, and calculation of gross and net output):
[insert text]
4c.
Indicate the actual or expected installation and operation dates of
the facility, or the actual or expected date of completion of the
reported modification to the facility:
[insert text]
4d.
Describe the primary energy input (e.g., hydro, coal, oil [18 C.F.R.
§ 292.202(l)], natural gas [18 C.F.R. § 292.202(k)], solar,
geothermal, wind, waste, biomass [18 C.F.R. § 292.202(a)], or
other). For a waste energy input that does not fall within one of the
categories on the Commission's list of previously approved wastes,
demonstrate that such energy input has little or no current
commercial value and that it exists in the absence of the qualifying
facility industry [18 C.F.R § 292.202(b)].
[insert text]
5.
Provide the average annual hourly energy input in terms of Btu for
the following fossil fuel energy inputs, and provide the related
percentage of the total average annual hourly energy input to the
facility [18 C.F.R § 292.202(j)]. For any oil or natural gas
fuel, use lower heating value [18 C.F.R § 292.202(m)]:
Natural
gas: [insert average annual hourly energy input in Btu or “None”]
Oil: [insert average annual hourly energy input in Btu or “None”]
Coal
(applicable only to a small power production facility): [insert
average annual hourly energy input in Btu, “None,” or
“N/A”]
6.
Discuss any particular characteristic of the facility which the
cogenerator or small power producer believes might bear on its
qualifying status.
[insert text or “None”]
PART B: DESCRIPTION OF THE SMALL POWER PRODUCTION FACILITY
Items 7 and 8 only need to be answered by applicants seeking certification as a small power production facility. Applicants for certification as a cogeneration facility may delete Items 7 and 8 from their application, or enter “N/A” at both items.
7.
Describe how fossil fuel use will not exceed 25 percent of the total
annual energy input limit [18 C.F.R §§ 292.202(j) and
292.204(b)]. Also, describe how the use of fossil fuel will be
limited to the following purposes to conform to Federal Power Act
section 3(17)(B): ignition, start-up, testing, flame stabilization,
control use, and minimal amounts of fuel required to alleviate or
prevent unanticipated equipment outages and emergencies directly
affecting the public.
[insert text or “N/A”; if any fossil fuel will be used, this response must include a statement that the applicant will limit such fossil fuel use to the purposes listed above]
8.
If the facility reported herein is not an eligible solar, wind, waste
or geothermal facility, and if any other non-eligible facility
located within one mile of the instant facility is owned by any of
the entities (or their affiliates) reported in Part A at item 1c
above and uses the same primary energy input, provide the following
information about the other facility for the purpose of demonstrating
that the total of the power production capacities of these facilities
does not exceed 80 MW [18 C.F.R § 292.204(a)]: [See
definition of an “eligible facility” below. Note that an
“eligible facility” is a specific type of small power
production facility that is eligible for special treatment under the
Wind, Waste and Geothermal Power Production Incentives Act of 1990,
as subsequently amended in 1991, and should not be confused with
facilities that are generally eligible for QF status.]
Facility
name, if any (as reported to the Commission):
[insert names of other facility or facilities or “N/A”]
Commission
Docket Number:
[insert Docket Numbers (QF__-___-___) for the facilities listed above or “N/A”]
Name
of common owner:
[insert text or “N/A”]
Common
primary energy source used as energy input:
[insert text or “N/A”]
Power
production capacity (MW):
[insert net power production capacity of each facility listed above or “N/A”]
An eligible solar, wind, waste or geothermal facility, as
defined in Section 3(17)(E) of the Federal Power Act, is a small
power production facility that produces electric energy solely by the
use, as a primary energy input, of solar, wind, waste or geothermal
resources, for which either an application for Commission
certification of qualifying status [18 C.F.R § 292.207(b)] or a
notice of self-certification of qualifying status [18 C.F.R §
292.207(a)] was submitted to the Commission not later than December
31, 1994, and for which construction of such facility commences not
later than December 31, 1999, or if not, reasonable diligence is
exercised toward the completion of such facility, taking into account
all factors relevant to construction of the facility.
PART
C: DESCRIPTION OF THE COGENERATION FACILITY
Items 9 through 15 only need to be answered by applicants seeking certification as a cogeneration facility. Applicants for certification as a small power production facility may delete Items 9 through 15 from their application, or enter “N/A” at each item.
9.
Describe the cogeneration system [18 C.F.R §§ 292.202(c)
and 292.203(b)], and state whether the facility is a topping-cycle
[18 C.F.R § 292.202(d)] or bottoming-cycle [18 C.F.R §
292.202(e)] cogeneration facility.
[insert description or “N/A”]
[insert statement identifying cogeneration facility as a topping or bottoming-cycle or “N/A”]
10.
To demonstrate the sequentiality of the cogeneration process [18
C.F.R § 292.202(s)] and to support compliance with other
requirements such as the operating and efficiency standards (Item 11
below), provide a mass and heat balance (cycle) diagram depicting
average annual hourly operating conditions. Also, provide:
Using
lower heating value [18 C.F.R § 292.202(m)], all fuel flow
inputs in Btu/hr., separately indicating fossil fuel inputs for any
supplementary firing in Btu/hr. [18 C.F.R § 292.202(f)]:
[insert text and insert or attach mass and heat balance diagram, or insert “N/A”]
Average
net electric output (kW or MW) [18 C.F.R § 292.202(g)]:
[insert average annual hourly net electric output in kW or MW, or “N/A”]
Average
net mechanical output in horsepower [18 C.F.R § 292.202(g)]:
[insert average annual hourly net mechanical output in horsepower, or “N/A”]
Number
of hours of operation used to determine the average annual hourly
facility inputs and outputs:
[insert number of hours or “N/A”]
Working
fluid (e.g., steam) flow conditions at input and output of prime
mover(s) and at delivery to and return from each useful thermal
application, including flow rates (lbs./hr.), temperature (deg. F),
pressure (psia), and enthalpy (Btu/lb.):
[insert text here or include this data on diagram required above, or insert “N/A”]
11.
Compute the operating value [applicable to a topping-cycle facility
under 18 C.F.R § 292.205(a)(1)] and the efficiency value [18
C.F.R §§ 292.205(a)(2) and (b)], based on the information
provided in and corresponding to item 10, as follows:
Pt =
Average annual hourly useful thermal energy output
Pe = Average annual hourly electrical output
Pm = Average annual hourly mechanical output
Pi = Average annual hourly energy input (natural gas or oil)
Ps =
Average annual hourly energy input for supplementary firing (natural
gas or oil)
Operating standard = 5% or more
Operating
value = Pt / ( Pt + Pe + Pm )
[insert calculation of topping-cycle operating value or “N/A”]
Efficiency
standard applicable to natural gas and oil fuel used in a
topping-cycle facility:
= 45% or more when operating value
is less than 15%, or 42.5% or more when operating value is equal to
or greater than 15%.
Efficiency value = ( Pe + Pm + 0.5Pt
) / (Pi + Ps)
[insert calculation of topping-cycle efficiency value or “N/A”]
Efficiency
standard applicable to natural gas and oil fuel used for
supplementary firing component of a bottoming-cycle facility:
=
45% or more
Efficiency value = ( Pe + Pm ) / Ps
[insert calculation of bottoming-cycle efficiency value or “N/A”]
FOR
TOPPING-CYCLE COGENERATION FACILITIES
Items 12 and 13 only need to be answered by applicants seeking certification as a topping-cycle cogeneration facility. Applicants for certification as a small power production facility or bottoming-cycle cogeneration facility may delete Items 12 and 13 from their application, or enter “N/A” at each item.
12.
Identify the entity (i.e., thermal host) which will purchase the
useful thermal energy output from the facility [18 C.F.R §
292.202(h)]. Indicate whether the entity uses such output for the
purpose of space and water heating, space cooling, and/or process
use.
[insert text or “N/A”]
13.
In connection with the requirement that the thermal energy output be
useful [18 C.F.R § 292.202(h)]:
For process uses by
commercial or industrial host(s), describe each process (or group of
similar processes using the same quality of steam) and provide the
average annual hourly thermal energy made available to the process,
less process return. For a complex system, where the primary steam
header at the host-side is divided into various sub-uses, each having
different pressure and temperature characteristics, describe the
processes associated with each sub-use and provide the average annual
hourly thermal energy delivered to each sub-use, less process return
from such sub-use. Provide a diagram showing the main steam header
and the sub-uses with other relevant information such as the average
header pressure (psia), the temperature (deg.F), the enthalpy
(Btu/lb.), and the flow (lb./hr.), both in and out of each sub-use.
For space and water heating, describe the type of heating involved
(e.g., office space heating, domestic water heating) and provide the
average annual hourly thermal energy delivered and used for such
purpose. For space cooling, describe the type of cooling involved
(e.g., office space cooling) and provide the average annual hourly
thermal energy used by the chiller.
[insert text; if process engineering data required in Item 13 has not been provided in the diagram required in Item 10, then also insert or attach a diagram containing this required information]
FOR
BOTTOMING-CYCLE FACILITIES
Item 14 only needs to be answered by applicants seeking certification as a bottoming-cycle cogeneration facility. Applicants for certification as a small power production facility or topping-cycle cogeneration facility may delete Item 14 from their application, or enter “N/A.”
14. Provide a description of the commercial or industrial process or other thermal application to which the energy input to the system is first applied and from which the reject heat is then used for electric power production.
FOR NEW COGENERATION FACILITIES
Response to Item 15 is only required for certain applicants for qualified cogeneration facility status, as described below. Applicants for small power production facilities or for cogeneration facilities not meeting the criteria outlined below may delete Item 15 from their application, or enter “N/A.” In addition, per 18 C.F.R. § 292.205(d)(4) all cogeneration facilities 5 MW and smaller are presumed to comply with the requirements of 18 C.F.R. § 292.205(d)(1) and (d)(2), and therefore need not respond to Item 15. For those applicants required to respond to Item 15, see 18 C.F.R. § 292.205(d) and Order No. 671 for more information on making the demonstrations required in Item 15.
15. For any cogeneration facility that had not filed a notice of self-certification or an application for Commission certification under 18 C.F.R. § 292.207 prior to February 2, 2006, also show:
(i) The thermal energy output of the cogeneration facility is used in a productive and beneficial manner [18 C.F.R §§ 292.205(d)(1), (d)(4) and (d)(5)]; and
(ii) The electrical, thermal, chemical and mechanical output of the cogeneration facility is used fundamentally for industrial, commercial, residential or institutional purposes and is not intended fundamentally for sale to an electric utility, taking into account technological, efficiency, economic, and variable thermal energy requirements, as well as state laws applicable to sales of electric energy from a qualifying facility to its host facility [18 C.F.R §§ 292.205(d)(2), (d)(3) and (d)(4)].
[insert text or “N/A”]