INFORMATION COLLECTION
COSTS FOR SECTION 316(b) PHASE III
FOR NEW OFFSHORE OIL AND GAS
EXTRACTION FACILITIES
May-09
(APPENDIX)
Exhibit A.1 (New Permits)
Facility Cost and Burden Estimates for NPDES Permit Application Activities
Exhibit A.1a
Start-up Activities
Activity
Read and Understand Rule
Mobilization/Planning
Training
Other Direct Costs
Totals
Facilities (Respondents)
Year 1
Year 2
Year 3
A
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
Facility
Manager
Junior
Technical
CAD
Operator
Total
$91
$41
$37
18
18
18
18
18
12
4
2
0
18
12
8
2
0
22
0
0
0
0
0
Contracted
Biological
Manager
Biologist Statistician Technician Clerical
Burden Per Facility
Assumed Loaded Hourly Rate
$115
$66
$75
$41
$22
B
Level of Effort (hrs)
0
0
0
0
1
25
0
0
0
0
1
13
0
0
0
0
1
5
0
0
0
0
0
0
0
0
0
0
3
43
Labor Cost per
Facility
C
Capital Cost O&M Cost Total Cost
Total Burden (hrs.)
per Facility per Facility Per Facility
D
$1,602
$711
$285
$0
$2,598
E
$0
$0
$0
C+D+E
$0
$0
$0
$60
$60
$0
A*B
450
234
90
774
$2,658
Total Initial Cost
A*(C+D+E)
$28,836
$12,802
$5,130
$1,080
$47,848
Exhibit A.1b
Permit Application Activities
Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator
Manager
Biologist Statistician Technician Clerical
Burden Per Facility
Facilities (Respondents)
Assumed Loaded Hourly Rate
$91
$41
$37
$115
$66
$75
$41
$22
Year 1
Year 2
Year 3
Total
B
Level of Effort (hrs)
A
Activity
6
6
6
18
1
0
0
0
0
0
0
1
2
Statement of Compliance Option Selected
6
6
6
18
1
3
8
0
0
0
0
0
12
Source Water Physical Data
6
6
6
18
1
1
2
0
0
0
0
0
4
Configuration and Location of CWIS
6
6
6
18
1
1
1
0
0
0
0
0
3
Facility Water Balance Diagram
6
6
6
18
3
8
0
0
0
0
0
0
11
CWIS Operation Narrative
6
6
6
18
2
6
0
0
0
0
0
0
8
Engineering Calculations
6
6
6
18
0
0
0
0
0
0
0
6
6
Submit Materials for Review by Permitting Authority
6
6
6
18
1
1
1
0
0
0
0
2
5
Recordkeeping
6
6
6
18
0
0
0
0
0
0
0
0
0
Other Direct Costs
6
6
6
18
51
Totals
Water balance diagram is assumed to be taken from the facility design report. The hours reported here are for incorporation of the diagram(s) in the permit.
Exhibit A.1c
Source Water Body Flow Information
Activity
Gather Information Characterizing Flow
Perform Engineering Calculations
Submit Data and Analysis for Review
Recordkeeping
Other Direct Costs
Totals
Facilities (Respondents)
Year 1
Year 2
Year 3
A
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
Total
Activity
Gather Data and Develop Narrative
Perform Engineering Calculations
Submit Data and Analysis for Review
Revise Based on Director review
Recordkeeping
Other Direct Costs
Totals
May 2009
Junior
Technical
$91
$41
18
18
18
18
18
18
Exhibit A.1d
CWIS Velocity Information
Facilities (Respondents)
Year 1
Year 2
Year 3
A
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
Facility
Manager
Total
18
18
18
18
18
18
18
0
4
0
0
0
8
12
0
4
0
Facility
Manager
Junior
Technical
$91
$41
16
8
0
4
2
0
40
32
0
16
4
0
CAD
Operator
Contracted
Biological
Manager
Biologist Statistician Technician Clerical
Burden Per Facility
Assumed Loaded Hourly Rate
$37
$115
$66
$75
$41
$22
B
Level of Effort (hrs)
0
0
0
0
0
0
8
4
0
0
0
0
0
20
0
0
0
0
0
4
4
0
0
0
0
0
2
6
0
0
0
0
0
0
0
38
CAD
Operator
Contracted
Biological
Manager
Biologist Statistician Technician Clerical
Burden Per Facility
Assumed Loaded Hourly Rate
$37
$115
$66
$75
$41
$22
B
Level of Effort (hrs)
0
0
0
0
0
0
56
4
0
0
0
0
0
44
0
0
0
0
0
16
16
0
0
0
0
0
0
20
0
0
0
0
0
8
14
0
0
0
0
0
0
0
150
316(b) Phase III Information Collection Request
Labor Cost per
Facility
C
Capital Cost O&M Cost Total Cost
Total Burden (hrs.)
per Facility per Facility Per Facility
D
$113
$505
$205
$168
$599
$426
$130
$211
$0
$2,356
Labor Cost per
Facility
C
E
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$326
$998
$86
$206
$0
$1,616
C
E
$0
$0
$0
$0
$0
$0
36
216
72
54
198
144
108
90
918
$2,506
C+D+E
$0
$0
$0
$0
$90
$90
A*B
144
360
72
108
684
$1,706
Capital Cost O&M Cost Total Cost
Total Burden (hrs.)
per Facility per Facility Per Facility
D
$3,084
$2,176
$346
$1,015
$518
$0
$7,139
$0
$0
$0
$0
$0
$0
$0
$0
$150
$150
A*B
Capital Cost O&M Cost Total Cost
Total Burden (hrs.)
per Facility per Facility Per Facility
D
Labor Cost per
Facility
C+D+E
E
$0
$0
$0
$0
$0
$460
$460
C+D+E
$7,599
A*B
1,008
792
288
360
252
2,700
Total Initial Cost
A*(C+D+E)
$2,027
$9,092
$3,685
$3,028
$10,775
$7,672
$2,333
$3,805
$2,700
$45,115
Total Initial Cost
A*(C+D+E)
$5,861
$17,971
$1,555
$3,708
$1,620
$30,715
Total Initial Cost
A*(C+D+E)
$55,512
$39,175
$6,221
$18,274
$9,317
$8,280
$136,778
A.1-2
Exhibit A.1e
Design and Construction Technology Plan
Activity
Delineate Hydraulic Zone of Influence
Perform Engineering Calculations (Impingement)
Perform Engineering Calculations (Entrainment)
Document that Technologies Are Optimal
Submit Data and Analysis for Review
Recordkeeping
Other Direct Costs
Totals
Facilities (Respondents)
Year 1
Year 2
Year 3
A
6
6
6
6
6
6
1
1
1
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
Total
Junior
Technical
$91
$41
18
18
3
18
18
18
18
18
Exhibit A.1f
Source Water Baseline Biological Characterization Study
Activity
Install Remote Monitoring Device for Impingement Monitoring
Use Regional Study Results for Individual Facility Studies
Finalize Individual Study based on Director review
Totals
Facility
Manager
Facilities (Respondents)
Year 1
Year 2
Year 3
Total
A
6
6
6
18
6
6
6
18
6
6
6
18
6
6
6
6
1
1
1
0
0
1
0
1
2
2
8
0
1
0
Facility
Manager
Junior
Technical
$91
$41
0
40
8
0
80
24
CAD
Operator
Contracted
Biological
Manager
Biologist Statistician Technician Clerical
Burden Per Facility
Assumed Loaded Hourly Rate
$37
$115
$66
$75
$41
$22
B
Level of Effort (hrs)
2
0
0
0
0
0
4
0
0
0
0
0
0
3
0
0
0
0
0
0
3
0
0
0
0
0
6
14
0
0
0
0
0
6
6
0
0
0
0
0
6
8
0
0
0
0
0
0
0
36
Labor Cost per
Facility
C
Capital Cost O&M Cost Total Cost
Total Burden (hrs.)
per Facility per Facility Per Facility
D
$205
$172
$172
$455
$130
$261
$0
$1,262
E
$0
$0
$0
$0
$0
$0
$150
$150
C+D+E
$1,412
A*B
72
54
9
252
108
144
639
CAD
Operator
Contracted
Biological
Avg. Labor Cost
Manager
Biologist Statistician Technician Clerical Avg. Burden Per
Capital Cost O&M Cost Total Cost
Total Burden (hrs.)
per Facility for 3
Facility over 3 yrs
per Facility per Facility Per Facility
Assumed Loaded Hourly Rate
yrs
$37
$115
$66
$75
$41
$22
B
C
D
E
C+D+E
A*B
Level of Effort (hrs)
0
0
0
0
0
0
0
$0
$23,140
$0
0
2
4
0
0
0
126
$7,390
$0
$0
2,268
0
0
0
0
0
8
40
$1,878
$0
$0
720
166
$9,268
$24,501
$0
$33,769
2,988
Total Initial Cost
A*(C+D+E)
$3,685
$3,103
$517
$8,194
$2,333
$4,703
$2,700
$25,235
Total Initial Cost
A*(C+D+E)
$416,520
$133,027
$33,797
$583,344
Total Labor Burden, Labor Cost, Capital Costs and O&M Costs for All NPDES Application Activities
Facilities (Respondents)
Year 1
Year 2
Year 3
Total
Totals
* The ODC estimate was not estimated for each activity, but rather as a lump sum for each provision of the rule.
May 2009
Total Burden (hrs.)
8,703
316(b) Phase III Information Collection Request
Total Initial Cost
$869,035
A.1-3
Exhibit A.1 (Renewals)
Facility Cost and Burden Estimates for NPDES Permit Application Activities
Exhibit A.1a
Start-up Activities
Activity
Read and Understand Rule
Mobilization/Planning
Training
Other Direct Costs
Totals
Facilities (Respondents)
Year 1
Year 2
Year 3
A
0
7
6
0
7
6
0
7
6
0
7
6
0
7
6
Facility
Manager
Junior
Technical
CAD
Operator
Total
$91
$41
$37
13
13
13
13
13
4
1
1
0
6
4
2
1
0
7
0
0
0
0
0
Contracted
Biological
Manager
Biologist Statistician Technician Clerical
Burden Per Facility
Assumed Loaded Hourly Rate
$115
$66
$75
$41
$22
B
Level of Effort (hrs)
0
0
0
0
0
8
0
0
0
0
0
3
0
0
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
13
Labor Cost per
Facility
C
Capital Cost O&M Cost Total Cost
Total Burden (hrs.)
per Facility per Facility Per Facility
D
$527
$172
$132
$0
$831
E
$0
$0
$0
C+D+E
$0
$0
$0
$60
$60
$0
A*B
104
39
26
169
$891
Total Initial Cost
A*(C+D+E)
$6,848
$2,241
$1,712
$780
$11,582
Exhibit A.1b (Renewals)
Permit Application Activities
Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator
Manager
Biologist Statistician Technician Clerical
Burden Per Facility
Facilities (Respondents)
Assumed Loaded Hourly Rate
$91
$41
$37
$115
$66
$75
$41
$22
Year 1
Year 2
Year 3
Total
B
A
Level of Effort (hrs)
Activity
0
0
7
7
0
0
0
0
0
0
0
0
0
Statement of Compliance Option Selected
0
0
7
7
0
1
2
0
0
0
0
0
3
Source Water Physical Data
0
0
7
7
0
0
1
0
0
0
0
0
1
Configuration and Location of CWIS
0
0
7
7
0
0
0
0
0
0
0
0
0
Facility Water Balance Diagram
0
0
7
7
1
2
0
0
0
0
0
0
3
CWIS Operation Narrative
0
0
7
7
1
2
0
0
0
0
0
0
3
Engineering Calculations
0
0
7
7
0
0
0
0
0
0
0
2
2
Submit Materials for Review by Permitting Authority
0
0
7
7
0
0
0
0
0
0
0
1
1
Recordkeeping
0
0
7
7
0
0
0
0
0
0
0
0
0
Other Direct Costs
0
0
7
7
13
Totals
Water balance diagram is assumed to be taken from the facility design report. The hours reported here are for incorporation of the diagram(s) in the permit.
Exhibit A.1c (Renewals)
Source Water Body Flow Information
Activity
Gather Information Characterizing Flow
Perform Engineering Calculations
Submit Data and Analysis for Review
Recordkeeping
Other Direct Costs
Totals
Facilities (Respondents)
Year 1
Year 2
Year 3
Total
A
0
0
7
7
0
0
7
7
0
0
7
7
0
0
7
7
0
0
7
7
0
0
7
7
Exhibit A.1d (Renewals)
CWIS Velocity Information
Activity
Gather Data and Develop Narrative
Perform Engineering Calculations
Submit Data and Analysis for Review
Revise Based on Director review
Recordkeeping
Other Direct Costs
Totals
May 2009
Facilities (Respondents)
Year 1
Year 2
Year 3
Total
A
0
0
7
7
0
0
7
7
0
0
7
7
0
0
7
7
0
0
7
7
0
0
7
7
0
0
7
7
Facility
Manager
Junior
Technical
$91
$41
0
1
0
0
0
2
4
0
1
0
Facility
Manager
Junior
Technical
$91
$41
5
2
0
1
1
0
12
10
0
5
1
0
CAD
Operator
Contracted
Biological
Manager
Biologist Statistician Technician Clerical
Burden Per Facility
Assumed Loaded Hourly Rate
$37
$115
$66
$75
$41
$22
B
Level of Effort (hrs)
0
0
0
0
0
0
2
1
0
0
0
0
0
6
0
0
0
0
0
1
1
0
0
0
0
0
1
2
0
0
0
0
0
0
0
11
CAD
Operator
Contracted
Biological
Manager
Biologist Statistician Technician Clerical
Burden Per Facility
Assumed Loaded Hourly Rate
$37
$115
$66
$75
$41
$22
B
Level of Effort (hrs)
0
0
0
0
0
0
17
1
0
0
0
0
0
13
0
0
0
0
0
5
5
0
0
0
0
0
0
6
0
0
0
0
0
2
4
0
0
0
0
0
0
0
45
316(b) Phase III Information Collection Request
Labor Cost per
Facility
C
Capital Cost O&M Cost Total Cost
Total Burden (hrs.)
per Facility per Facility Per Facility
D
$0
$114
$37
$0
$172
$172
$43
$22
$0
$560
Labor Cost per
Facility
C
E
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$81
$290
$22
$62
$0
$456
C
E
$0
$0
$0
$0
$0
$0
$710
C+D+E
$0
$0
$0
$0
$90
$90
A*B
14
42
7
14
-
$546
E
$0
$0
$0
$0
$0
$460
$460
C+D+E
$2,606
Total Initial Cost
A*(C+D+E)
21
7
21
21
14
7
91
77
Capital Cost O&M Cost Total Cost
Total Burden (hrs.)
per Facility per Facility Per Facility
D
$943
$626
$108
$295
$175
$0
$2,146
$0
$0
$0
$0
$0
$0
$0
$0
$150
$150
A*B
Capital Cost O&M Cost Total Cost
Total Burden (hrs.)
per Facility per Facility Per Facility
D
Labor Cost per
Facility
C+D+E
A*B
119
91
35
42
28
315
$0
$796
$256
$0
$1,207
$1,207
$302
$151
$1,050
$4,969
Total Initial Cost
A*(C+D+E)
$570
$2,032
$151
$436
$630
$3,819
Total Initial Cost
A*(C+D+E)
$6,604
$4,379
$756
$2,062
$1,224
$3,220
$18,244
A.1 renewal-4
Exhibit A.1e (Renewals)
Design and Construction Technology Plan
Activity
Delineate Hydraulic Zone of Influence
Perform Engineering Calculations (Impingement)
Perform Engineering Calculations (Entrainment)
Document that Technologies Are Optimal
Submit Data and Analysis for Review
Recordkeeping
Other Direct Costs
Totals
Facilities (Respondents)
Year 1
Year 2
Year 3
Total
A
0
0
7
7
0
0
6
6
0
0
2
2
0
0
7
7
0
0
7
7
0
0
7
7
0
0
7
7
0
0
7
7
Exhibit A.1f (Renewals)
Source Water Baseline Biological Characterization Study
Activity
Use Regional Study Results for Individual Facility Studies
Finalize Individual Study based on Director review
Totals
Facilities (Respondents)
Year 1
Year 2
Year 3
Total
A
0
0
7
7
0
0
7
7
0
0
7
7
Facility
Manager
Junior
Technical
$91
$41
1
1
1
0
0
1
0
1
1
1
4
0
1
0
Facility
Manager
Junior
Technical
$91
$41
12
2
24
7
CAD
Operator
Contracted
Biological
Manager
Biologist Statistician Technician Clerical
Burden Per Facility
Assumed Loaded Hourly Rate
$37
$115
$66
$75
$41
$22
B
Level of Effort (hrs)
1
0
0
0
0
0
3
0
0
0
0
0
0
2
0
0
0
0
0
0
2
0
0
0
0
0
3
7
0
0
0
0
0
3
3
0
0
0
0
0
3
5
0
0
0
0
0
0
0
20
Labor Cost per
Facility
C
Capital Cost O&M Cost Total Cost
Total Burden (hrs.)
per Facility per Facility Per Facility
D
$168
$132
$132
$228
$65
$197
$0
$808
E
$0
$0
$0
$0
$0
$0
$150
$150
C+D+E
A*B
21
12
4
49
21
35
$958
142
CAD
Operator
Contracted
Biological
Avg. Labor Cost
Manager
Biologist Statistician Technician Clerical Avg. Burden Per
Capital Cost O&M Cost Total Cost
per Facility for 3
Total Burden (hrs.)
Facility over 3 yrs
per Facility per Facility Per Facility
Assumed Loaded Hourly Rate
yrs
$37
$115
$66
$75
$41
$22
B
C
D
E
C+D+E
A*B
Level of Effort (hrs)
0
1
1
0
0
0
38
$2,250
$0
$0
266
0
0
0
0
0
2
11
$510
$0
$0
77
49
$2,760
$0
$0
$2,760
343
Total Initial Cost
A*(C+D+E)
$1,177
$790
$263
$1,593
$454
$1,376
$1,050
$6,703
Total Initial Cost
A*(C+D+E)
$15,749
$3,571
$19,320
Total Labor Burden, Labor Cost, Capital Costs and O&M Costs for All NPDES Application Activities
Facilities (Respondents)
Year 1
Year 2
Year 3
Total
Totals
* The ODC estimate was not estimated for each activity, but rather as a lump sum for each provision of the rule.
May 2009
Total Burden (hrs.)
1,137
316(b) Phase III Information Collection Request
Total Initial Cost
$64,637
A.1 renewal-5
Exhibit A.2
Facility Cost and Burden Estimates for Annual Activities
Exhibit A.2a
Biological Monitoring for Impingement
Facility
Manager
Junior
Technical
Contracted
Manager
Biologist
Statistician
Biological
Technician
Clerical
$41
$22
Totals Per Facility for the ICR Approval Period
Assumed Loaded Hourly Rate
Facilities (Respondents)
Burden (hrs) Labor Cost
Year 1 Year 2 Year 3
Activity
Total
$91
$41
$115
$66
Total
Costs**
Burden (hrs.)
Total Cost ($)
D
C+D
A*B
A*(C+D)
144
0
0
0
288
0
$15,379
$0
$0
$11,570
20,736
-
$1,107,302
$833,040
96
0
48
0
156
$9,679
$0
11,232
$696,902
0
36
0
0
58
$4,645
$0
4,176
$334,426
1
7
1
0
16
28
$1,187
$0
1,987
$85,464
0
0
0
0
0
0
0
$0
$790
5
19
247
37
192
16
$30,890
$12,360
18
18
24
24
30
30
30
30
Review of Video for Taxonomic Identification
18
24
30
30
0
0
12
Perform Statistical Analysis
18
24
30
30
12
4
6
Recordkeeping
Other Direct Costs
18
24
30
30
1
1
18
24
30
30
0
Totals
18
24
30
13
30
O & M Costs
0
0
B
Level of Effort (hrs)
0
144
0
0
A
Monthly Sample Collection
Operation & Maintenance of Remote Monitoring Device
0
0
$75
Total for All Facilities in the ICR
Approval Period
0
0
C
530
$43,250
38,131
$56,880
$3,114,014
Exhibit A.2b
Biological Monitoring for Entrainment
Facility
Manager
Junior
Technical
$91
$41
Contracted
Manager
Activity
Total
Statistician
Assumed Loaded Hourly Rate
$115
$66
$75
Facilities (Respondents)
Year 1 Year 2 Year 3
Biologist
Biological
Technician
Clerical
$41
$22
Totals Per Facility for the ICR Approval Period
Burden (hrs) Labor Cost
B
Level of Effort (hrs)
A
C
Total for All Facilities in the ICR
Approval Period
O & M Costs
Total
Costs**
Burden (hrs.)
Total Cost ($)
D
C+D
A*B
A*(C+D)
Helicopter Transportation to and from Facility
4
5
6
6
0
0
0
0
0
0
0
0
$0
$13,880
Monthly Sample Collection
4
5
6
6
0
0
0
144
0
144
0
288
$15,379
$0
-
$208,200
4,320
$230,688
-
$54,150
Laboratory Identifies & Enumerates Entrained Marine Biota
4
5
6
6
0
0
0
0
0
0
0
0
$0
$3,610
Perform Statistical Analysis
4
5
6
6
12
4
6
0
36
0
0
58
$4,645
$0
870
$69,672
Recordkeeping
Other Direct Costs
4
5
6
6
1
1
1
4
1
0
16
24
$966
$0
365
$14,493
4
5
6
0
0
0
0
0
0
0
Totals
4
5
6
13
5
7
148
37
144
16
6
6
0
370
$0
$790
$20,990
$18,280
$39,270
-
$11,850
5,555
$589,053
Exhibit A.2c
Biological Monitoring for Entrainment (Alaska)
Facility
Manager
Junior
Technical
$91
$41
Contracted
Manager
Activity
Total
Statistician
Assumed Loaded Hourly Rate
$115
$66
$75
Facilities (Respondents)
Year 1 Year 2 Year 3
Biologist
Biological
Technician
Clerical
$41
$22
Totals Per Facility for the ICR Approval Period
Burden (hrs) Labor Cost
B
Level of Effort (hrs)
A
C
Total for All Facilities in the ICR
Approval Period
O & M Costs
Total
Costs**
Burden (hrs.)
Total Cost ($)
D
C+D
A*B
A*(C+D)
Helicopter Transportation to and from Facility in Alaska
1
1
1
1
0
0
0
0
0
0
0
0
$0
$20,820
Monthly Sample Collection
1
1
1
1
0
0
0
216
0
216
0
432
$23,069
$0
-
$62,460
1,296
$69,206
Laboratory Identifies & Enumerates Entrained Marine Biota
1
1
1
1
0
0
0
0
0
0
0
0
$0
$3,610
-
$10,830
Perform Statistical Analysis
1
1
1
1
12
4
6
0
36
0
0
58
$4,645
$0
174
$13,934
Recordkeeping
Other Direct Costs
1
1
1
1
1
1
1
6
1
0
16
26
$1,098
$0
79
1
1
1
1
0
0
0
0
0
0
0
0
$0
$790
Totals
1
1
1
13
0
7
222
37
216
16
$28,812
$25,220
May 2009
1
316(b) Phase III Information Collection Request
516
$54,032
1,549
$3,295
$2,370
$162,096
A.2-6
Exhibit A.2d
Velocity Monitoring
Facility
Manager
Junior
Technical
$91
$41
Contracted
Manager
Activity
Total
Statistician
Assumed Loaded Hourly Rate
$115
$66
$75
Facilities (Respondents)
Year 1 Year 2 Year 3
Biologist
Biological
Technician
Clerical
$41
$22
Burden (hrs) Labor Cost
B
Level of Effort (hrs)
A
Total for All Facilities in the ICR
Approval Period
Totals Per Facility for the ICR Approval Period
C
O & M Costs
Total
Costs**
Burden (hrs.)
Total Cost ($)
D
C+D
A*B
A*(C+D)
Monitor Average Through Technology
19
25
31
31
2
100
0
0
0
0
0
102
$4,252
$0
7,650
$318,900
Analyze Data
19
25
31
31
4
40
0
0
0
0
0
44
$1,992
$0
3,300
$149,400
Recordkeeping
Other Direct Costs
19
25
31
31
1
8
0
0
0
0
8
17
$589
$0
1,275
$44,205
19
25
31
31
0
0
0
0
0
0
0
0
$0
$580
Totals
19
25
31
7
148
0
0
0
0
8
$6,833
$580
31
163
$7,413
-
$43,500
12,225
$556,005
Exhibit A.2e
Visual Inspections
Facility
Manager
Junior
Technical
$91
$41
Contracted
Manager
Activity
Total
Statistician
Assumed Loaded Hourly Rate
$115
$66
$75
Facilities (Respondents)
Year 1 Year 2 Year 3
Biologist
Biological
Technician
Clerical
$41
$22
Burden (hrs) Labor Cost
B
Level of Effort (hrs)
A
Total for All Facilities in the ICR
Approval Period
Totals Per Facility for the ICR Approval Period
C
O & M Costs
Total
Costs**
Burden (hrs.)
Total Cost ($)
D
C+D
A*B
A*(C+D)
Visually Inspect All Installed Technologies
18
24
30
30
24
208
0
0
0
0
0
232
$10,650
$0
16,704
Recordkeeping
Totals
18
24
30
30
3
16
0
0
0
0
2
21
$967
$0
1,512
$69,653
18
24
30
27
224
0
0
0
0
2
253
$11,617
$0
18,216
$836,424
30
$0
$766,771
Exhibit A.2f
Yearly Status Report Activities
Facility
Manager
Junior
Technical
$91
$41
Contracted
Manager
Activity
Total
Statistician
Assumed Loaded Hourly Rate
$115
$66
$75
Facilities (Respondents)
Year 1 Year 2 Year 3
Biologist
Biological
Technician
Clerical
$41
$22
Totals Per Facility for the ICR Approval Period
Burden (hrs) Labor Cost
B
Level of Effort (hrs)
A
C
Total for All Facilities in the ICR
Approval Period
O & M Costs
Total
Costs**
Burden (hrs.)
Total Cost ($)
D
C+D
A*B
A*(C+D)
Report on Inspection and Maintenance
19
25
31
31
16
16
0
0
0
0
0
32
$2,107
$0
2,400
$158,040
Detail Biological Monitoring Results
19
25
31
31
12
16
8
8
12
0
0
56
$4,092
$0
4,200
$306,900
Detail Velocity Monitoring Results
19
25
31
31
8
16
0
0
0
0
0
24
$1,379
$0
1,800
$103,440
Compile and Submit Report
19
25
31
31
40
40
0
0
0
0
16
96
$5,614
$0
7,200
$421,020
Recordkeeping
Other Direct Costs
19
25
31
31
2
2
1
1
1
0
8
15
$692
$0
1,125
$51,923
19
25
31
31
0
0
0
0
0
0
0
0
$0
$910
Totals
19
25
31
78
90
9
9
13
0
24
$13,884
$910
31
223
$14,794
16,725
$68,250
$1,109,573
Total Cost for All NPDES Application Activities
Facilities (Respondents)
Year 1 Year 2 Year 3
Total Burden
Total Annual Cost
(hrs.)
Total
Totals
May 2009
74,185
316(b) Phase III Information Collection Request
$5,530,741
A.2-7
Exhibit A.3
Director Burden and Cost Estimates for Activities
Exhibit A.3a
Director Start-up Activities
Directors
(Responses)
A
Activity
Senior
Junior
Burden
Technical
Technical
Clerical
Per
Assumed Loaded Hourly Rate
Director
$48
$31
$24
B
Level of Effort (hrs)
12
12
0
24
Read and Understand Rule
-
Mobilization/Planning
-
24
16
0
Training
Other Direct Costs
-
4
32
0
-
0
0
0
-
Totals
-
40
60
0
100
Labor
Cost per
Director
ODCs
lump
sum*
Total Cost
Per
Director
Total
Burden
(hrs.)
Total Initial
Cost
C
D
C+D
A*B
A*(C+D)
$948
$0
-
$0
40
$1,648
$0
-
$0
36
$1,184
$0
-
$0
$0
$60
-
$0
$3,780
$60
-
$0
$3,840
Exhibit A.3b
Director Permit Issuance Activities
Directors
(Responses)
A
Activity
May 2009
Review Source Water Physical Data
Review CWIS Data
Review Source Water Body Flow Information
18
18
18
Senior
Technical
Junior
Technical
Clerical
Assumed Loaded Hourly Rate
$48
$31
$24
Level of Effort (hrs)
2
6
0
6
18
0
2
6
0
Labor
Burden
Cost per
Per Permit
Permit
B
C
ODCs
lump
sum*
Total Cost
Per Permit
Total
Burden
(hrs.)
Total Initial
Cost*
D
C+D
A*B
A*(C+D)
8
24
8
$282
$846
$282
$0
$0
$0
144
432
144
$5,076
$15,228
$5,076
$22,752
Review CWIS Velocity Information
18
16
16
0
32
$1,264
$0
576
Review Design and Construction Technology Plan
18
24
8
0
32
$1,400
$0
576
$25,200
Review Source Water Baseline Biological Characterization Study
18
40
25
0
65
$2,695
$0
1,170
$48,510
Determine Monitoring Frequency
Determine Record keeping and Reporting Frequency
18
18
2
2
6
6
0
0
8
8
$282
$282
$0
$0
144
144
$5,076
$5,076
Considering Public Comments
18
16
16
0
32
$1,264
$0
576
$22,752
Issuing Permit
18
1
6
1
8
$258
$0
144
$4,635
Permit Record Keeping
Other Direct Costs
18
18
1
0
1
0
2
0
4
$0
$360
72
-
$126
$0
$2,268
$6,480
Totals
18
452
188
3
229
4,122
$168,129
316(b) Phase III Information Collection Request
$8,981
360
$9,341
A.3-8
Exhibit A.3c
Annual Director Activities
Directors
(Responses)
A
Activity
Senior
Technical
Junior
Technical
Clerical
Assumed Loaded Hourly Rate
$48
$31
$24
Level of Effort (hrs)
6
12
0
Review of Yearly Status Report
75
Compliance Tracking
75
4
12
Determination on Monitoring Frequency Reduction
75
4
Record Keeping
Other Direct Costs
75
Totals
Labor
Burden
Cost per
Per Permit
Permit
B
C
ODCs
lump
sum*
Total Cost
Per Permit
Total
Burden
(hrs.)
Total Annual
Cost
D
C+D
A*B
A*(C+D)
18
$660
$0
1,350
$49,500
0
16
$564
$0
1,200
$42,300
8
0
12
$440
$0
900
$33,000
1
2
1
4
$134
$0
300
$10,013
75
0
0
0
$0
$30
75
15
34
1
$1,798
$30
50
$1,828
3,750
$2,250
$137,063
Total Burden and Cost for All Director Activities
Total
Burden
(hrs.)
Totals
May 2009
316(b) Phase III Information Collection Request
7,872
Total Initial
Cost
$305,192
A.3-9
Exhibit A.3b (Renewals)
Director Burden and Cost Estimates for Permit Renewal
Directors
(Responses)
A
Activity
May 2009
Review Source Water Physical Data
Review CWIS Data
Review Source Water Body Flow Information
7
7
7
Senior
Technical
Junior
Technical
Clerical
Assumed Loaded Hourly Rate
$48
$31
$24
Level of Effort (hrs)
2
0
2
5
0
7
2
0
2
Labor
Burden
Cost per
Per Permit
Permit
B
C
ODCs
lump
sum*
Total Cost
Per Permit
Total
Burden
(hrs.)
Total Initial
Cost*
D
C+D
A*B
A*(C+D)
4
12
4
$143
$405
$143
$0
$0
$0
28
84
28
$1,001
$2,832
$1,001
$3,325
Review CWIS Velocity Information
7
5
0
10
15
$475
$0
105
Review Design and Construction Technology Plan
7
2
0
10
12
$331
$0
84
$2,317
Review Source Water Baseline Biological Characterization Study
7
8
0
20
28
$854
$0
196
$5,978
Determine Monitoring Frequency
Determine Record keeping and Reporting Frequency
7
7
2
2
0
0
2
2
4
4
$143
$143
$0
$0
28
28
$1,001
$1,001
Considering Public Comments
7
5
0
10
15
$475
$0
105
$3,325
Issuing Permit
Permit Record Keeping
7
7
2
0
0
1
2
1
4
2
$143
$55
$0
$0
28
14
$1,001
$382
Totals
7
35
1
68
104
728
$23,163
316(b) Phase III Information Collection Request
3,309
$360
$3,309
A.3 renewal-10
Exhibit A.4
Federal Burden and Cost Estimates for Activities
Exhibit A.4a
Federal Permit Program Oversight Activities
Federal
(Responses)
A
Activity
Review Source Water Physical Data
-
Review CWIS Data
-
Senior Technical
Junior Technical
Assumed Loaded Hourly Rate
$48
$31
Level of Effort (hrs)
0
0
0
0
Burden per Labor Cost
permit
per Permit
Review
Review
Clerical
ODCs
lump
sum*
Total Cost
per Permit
Review
Total
Burden
(hrs.)
Total Initial
Cost *
D
C+D
A*B
A*(C+D)
$24
B
C
0
-
$0
-
$0
0
-
$0
-
$0
Review Source Water Body Flow Information
-
0
0
0
-
$0
-
$0
Review CWIS Velocity Information
-
0
0
0
-
$0
-
$0
Review Design and Construction Technology Plan
-
0
0
0
-
$0
-
$0
Review Regional Monitoring Study Design and Sampling Plans
-
0
0
0
-
$0
-
$0
Review Regional Monitoring Study
-
0
0
0
-
$0
-
$0
Review Source Water Baseline Biological Characterization Study
-
0
0
0
-
$0
-
$0
Review Pilot Study for New Impingement & Entrainment Technology
-
0
0
0
-
$0
-
$0
Review the Monitoring Frequency
Permit Record Keeping
-
0
0
0
-
$0
-
$0
-
0
0
0
-
Totals
-
0
0
0
May 2009
316(b) Phase III Information Collection Request
$0
0
$0
$0
$0
-
$0
-
$0
A.4-11
Exhibit A.5
Respondents for the ICR Approval Period Year by Year by Activity
Facilities
Year 1
Year 2
Year 3
2010
2011
2012
Start-up Activities
Permit Application Activities
Source Water Body Flow Information
CWIS Velocity Information
Design and Construction Technology Plan (Impingement Only)
Design and Construction Technology Plan (Entrainment Only)
Design and Construction Technology Plan (Impingement & Entrainment)
Use Regional Study Results for Individual Facility Studies
Biological Monitoring for Impingement
Biological Monitoring for Entrainment
Biological Monitoring for Entrainment (Alaska)
Velocity Monitoring
Visual Inspections
Yearly Status Report Activities
6
6
6
6
5
0
1
6
18
4
1
19
18
19
31
Respondents
13
6
6
6
5
0
1
6
24
5
1
25
24
25
37
12
13
13
13
10
1
2
13
30
6
1
31
30
31
43
Annual
Average1
10
8
8
8
7
0
1
8
24
5
1
25
24
25
37
Directors
Year 1
Year 2
Year 3
2010
2011
2012
0
0
Annual
Average2
0
0
Review Permit Application Information
Review Source Water Body Flow Information
Review CWIS Velocity Information
Review Design and Construction Technology Plan
Review Source Water Baseline Biological Characterization Study
Determine Monitoring Frequency
Determine Permit Requirements and Issue Permit
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
3
3
3
3
3
3
2
2
2
2
2
2
2
Review of Yearly Status Report
Compliance Tracking
Determination on Monitoring Frequency Reduction
Record Keeping
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
43
3
46
Annual
Average
37
3
40
Director Start-up Activities
Director Permit Issuance Activities
Annual Director Activities
Respondents
Sum for Facilities and Directors
Year 1
Year 2
Year 3
2010
2011
2012
Facilities
Directors
Yearly Total
31
3
34
37
3
40
[1] Each facility is one respondent. One respondent may be involved in more than one activity;
however, in order to avoid double-counting, the maximum number of respondents expected to be involved
in the rule activities annually is assumed to be the number of respondents for that year.
[2] Each Director is one respondent.
May 2009
316(b) Phase III Information Collection Request
A.5-12
Exhibit A.6
Responses for the ICR Approval Period Year by Year by Activity
Facilities
Year 1
Year 2
Year 3
2010
2011
2012
Start-up Activities
Permit Application Activities
Source Water Body Flow Information
CWIS Velocity Information
Design and Construction Technology Plan (Impingement Only)
Design and Construction Technology Plan (Entrainment Only)
Design and Construction Technology Plan (Impingement & Entrainment)
Use Regional Study Results for Individual Facility Studies
Biological Monitoring for Impingement
Biological Monitoring for Entrainment
Biological Monitoring for Entrainment (Alaska)
Velocity Monitoring
Visual Inspections
Yearly Status Report Activities
6
6
6
6
5
0
1
6
18
4
1
19
18
19
115
Responses
13
6
6
6
5
0
1
6
24
5
1
25
24
25
147
12
13
13
13
10
1
2
13
30
6
1
31
30
31
206
Annual
Average
10
8
8
8
7
0
1
8
24
5
1
25
24
25
156
Directors
Year 1
Year 2
Year 3
2010
2011
2012
Director Start-up Activities
Director Permit Issuance Activities
Annual
Average
0
0
0
0
Review Permit Application Information
Review Source Water Body Flow Information
Review CWIS Velocity Information
Review Design and Construction Technology Plan
Review Source Water Baseline Biological Characterization Study
Determine Monitoring Frequency
Determine Permit Requirements and Issue Permit
6
6
6
6
6
6
6
6
6
6
6
6
6
6
13
13
13
13
6
13
13
8
8
8
8
6
8
8
Review of Yearly Status Report
Compliance Tracking
Determination on Monitoring Frequency Reduction
Record Keeping
19
19
19
19
118
25
25
25
25
142
31
31
31
31
208
25
25
25
25
156
Annual Director Activities
Responses
Sum for Facilities and Directors
Year 1
Year 2
Year 3
2010
2011
2012
Facilities
Directors
Yearly Total
May 2009
316(b) Phase III Information Collection Request
115
118
233
147
142
289
206
208
414
Annual
Average
156
156
312
A.6-13
Exhibit A.7
Hourly Burden for the ICR Approval Period Year by Year
for Facilities
Facility Activities
Source
(Exhibit)
Year 1
Year 2
Year 3
2010
2011
2012
Annual
Average
NPDES Permit Application Activities
Start-up Activities
Permit Application Activities
Source Water Body Flow Information
CWIS Velocity Information
Design and Construction Technology Plan (Impingement Only)
Design and Construction Technology Plan (Entrainment Only)
Design and Construction Technology Plan (Impingement & Entrainment)
Use Regional Study Results for Individual Facility Studies
NPDES Permit Application Activity Total
Annual Activities
Biological Monitoring for Impingement
Biological Monitoring for Entrainment
Biological Monitoring for Entrainment (Alaska)
Velocity Monitoring
Visual Inspections
Yearly Status Report Activities
Annual Activity Yearly Labor Total
A1a
A1b
A1c
A1d
A1e
A1e
A1e
A1f
258
306
228
900
175
0
38
996
2,901
349
306
228
900
175
0
38
996
2,992
336
397
305
1,215
275
20
60
1,339
3,947
314
336
254
1,005
208
7
45
1,110
3,280
A2a
A2b
A2c
A2d
A2e
A2f
9,533
1,481
516
3,097
4,554
4,237
23,418
12,710
1,852
516
4,075
6,072
5,575
30,800
15,888
2,222
516
5,053
7,590
6,913
38,182
12,710
1,852
516
4,075
6,072
5,575
30,800
26,319
33,792
42,129
34,080
Yearly Labor Total
May 2009
316(b) Phase III Information Collection Request
A.7-14
Exhibit A.8
Hourly Burden for the ICR Approval Period Year by Year
for Directors and Federal Government
Director Activities
Source
(Exhibit)
Director Start-up Activities
A3a
Director Permit Issuance Activities
A3b
Annual Director Activities
A3e
Yearly Total
Year 1
Year 2
Year 3
2010
2011
2012
0
1,374
950
2,324
0
1,374
1,250
2,624
Annual
Average
0
2,102
1,550
3,652
0
1,617
1,250
2,867
Federal Activities
Source
(Exhibit)
Federal Permit Program Oversight Activities
A4a
Yearly Total
May 2009
Year 1
Year 2
Year 3
2010
2011
2012
0
0
316(b) Phase III Information Collection Request
0
0
Annual
Average
0
0
0
0
A.8-15
Exhibit A.9
Costs for the ICR Approval Period Year by Year
for Facilities
Facility Activities
Source
(Exhibit)
Year 1
Year 2
Year 3
2010
2011
2012
Annual
Average
NPDES Permit Application Activities
Start-up Activities
Permit Application Activities
Source Water Body Flow Information
CWIS Velocity Information
Design and Construction Technology Plan (Impingement Only)
Design and Construction Technology Plan (Entrainment Only)
Design and Construction Technology Plan (Impingement & Entrainment)
Use Regional Study Results for Individual Facility Studies
NPDES Permit Application Activity Total
Annual Activities
Biological Monitoring for Impingement
Biological Monitoring for Entrainment
Biological Monitoring for Entrainment (Alaska)
Velocity Monitoring
Visual Inspections
Yearly Status Report Activities
Annual Activity Yearly Labor Tota
A1a
A1b
A1c
A1d
A1e
A1e
A1e
A1f
$15,589
$14,138
$9,698
$42,833
$6,116
$0
$1,396
$55,608
$145,378
$21,406
$14,138
$9,698
$42,833
$6,116
$0
$1,396
$55,608
$151,195
$20,575
$18,057
$12,888
$57,857
$10,060
$789
$2,316
$74,928
$197,469
$19,190
$15,445
$10,761
$47,841
$7,431
$263
$1,702
$62,048
$164,681
A2a
A2b
A2c
A2d
A2e
A2f
$556,024
$83,961
$28,812
$129,835
$209,106
$263,802
$1,271,539
$741,365
$104,951
$28,812
$170,835
$278,808
$347,108
$1,671,878
$926,706
$125,941
$28,812
$211,835
$348,510
$430,413
$2,072,218
$741,365
$104,951
$28,812
$170,835
$278,808
$347,108
$1,671,878
$1,416,917
$1,823,073
$2,269,687
$1,836,559
Year 1
Year 2
Year 3
2010
2011
2012
Yearly Labor Total
Facility O&M
Source
(Exhibit)
Annual
Average
NPDES Application
Install Remote Monitoring Device for Impingement Monitoring
Other Direct Costs
A.1f
A.1a-g
$138,840
$5,460
$138,840
$5,880
$138,840
$11,770
$138,840
$7,703
Operation & Maintenance of Remote Monitoring Device
Helicopter Transportation to and from Facility
Helicopter Transportation to and from Facility in Alaska
Laboratory Identifies & Enumerates Entrained Marine Biota
Other Direct Costs
Equipment Cost Subtotal
Laboratory Analysis Subtotal
Other Direct Costs Subtotal
Yearly O&M Total
A.2a
A.2c
A.2d
A.2c&d
A.2a-g
$208,260
$55,520
$20,820
$18,050
$46,480
$423,440
$18,050
$51,940
$493,430
$277,680
$69,400
$20,820
$21,660
$60,950
$506,740
$21,660
$66,830
$595,230
$347,100
$83,280
$20,820
$25,270
$75,420
$590,040
$25,270
$87,190
$702,500
$277,680
$69,400
$20,820
$21,660
$60,950
$506,740
$21,660
$68,653
$597,053
Annual
May 2009
316(b) Phase III Information Collection Request
A.9-16
Exhibit A.10
Costs for the ICR Approval Period Year by Year
for Directors and Federal Government
Director Activities
Source
(Exhibit)
Director Start-up Activities
A3a
Director Permit Issuance Activities
A3b
Annual Director Activities
A3e
Yearly Total
Year 1
Year 2
Year 3
2010
2011
2012
$0
$53,883
$34,153
$88,036
$0
$53,883
$44,938
$98,821
$0
$77,046
$55,723
$132,769
Annual
Average
$0
$61,604
$44,938
$106,542
Director O&M
Source
(Exhibit)
Start-Up & NPDES Application
Other Direct Costs
Annual
Other Direct Costs
Yearly O&M Cost Total
Year 1
Year 2
Year 3
2010
2011
2012
Annual
Average
A3a-b
$2,160
$2,160
$4,680
$3,000
A3c-d
$570
$2,730
$750
$2,910
$930
$5,610
$750
$3,750
Federal Labor Activities
Source
(Exhibit)
Federal Permit Program Oversight Activities
A4a
Yearly Total
Year 1
Year 2
Year 3
2010
2011
2012
0
$0
0
$0
0
$0
Annual
Average
$0
$0
$0
$0
Annual
Average
$0
$0
Federal O&M
Source
(Exhibit)
Federal Permit Program Oversight ODCs
A4a
Yearly Total
May 2009
Year 1
Year 2
Year 3
2010
2011
2012
$0
$0
316(b) Phase III Information Collection Request
$0
$0
A.10-17
Exhibit A.11
Summary of the Burden, Respondents, Responses, and
Costs for the ICR Approval Period by Year and Annual Averages
Facilities
Year 1
Source
(Exhibit)
Year 2
2010
Year 3
2011
Three Year
Total 1
Annual
Average
2012
Burden (hours)
A7
26,319
33,792
42,129
34,080
102,241
Respondents (number)
A5
31
37
43
37
43
Responses (number)
A6
115
147
206
156
468
Costs (labor)
A9
$1,416,917
$1,823,073
$2,269,687
$1,836,559
$5,509,677
Costs (Equipment)
A9
$423,440
$506,740
$590,040
$506,740
$1,520,220
Costs (Lab Analysis)
A9
$18,050
$21,660
$25,270
$21,660
$64,980
Costs (Other Direct Costs)
Total Costs
A9
$51,940
$1,910,347
$66,830
$2,418,303
$87,190
$2,972,187
$68,653
$2,433,612
$205,960
$7,300,837
[1] Each facility is one respondent. One respondent may perform activities in more than one year. So to avoid double-counting,
the respondent 3 year total, is the total number of facilities that must perform one or more activities during the ICR approval period.
Directors (EPA Region)
Year 1
Source
(Exhibit)
Year 2
2010
Year 3
2011
Three Year
Total 1
Annual
Average
2012
Burden (hours)
A8
2,324
2,624
3,652
2,867
8,600
Respondents (number)
A5
3
3
3
3
3
Responses (number)
A6
118
142
208
156
468
Costs (labor)
A10
$88,036
$98,821
$132,769
$106,542
$319,625
Costs (Other Direct Costs)
Total Costs
A10
$2,730
$90,766
$2,910
$101,731
$5,610
$138,379
$3,750
$110,292
$11,250
$330,875
[1] Each director is one respondent. One respondent may perform activities in more than one year. So to avoid double-counting,
the respondent 3 year total, is the total number of directors that must perform one or more activities during the ICR approval period.
Federal Government
Source
(Exhibit)
Year 1
Year 2
Year 3
2010
2011
2012
-
-
Three Year
Total
Annual
Average
Burden (hours)
A8
-
-
-
Costs (labor)
A10
$0
$0
$0
$0
$0
Costs (O&M)
Total Costs
A10
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Annual
Average
36,947
40
$1,943,101
$600,803
$2,543,904
Three Year
Total
110,841
46
$5,829,302
$1,802,410
$7,631,712
Totals for Respondents (Facilities and Directors)*
Total Respondent Burden (hours)
Total Respondents (number)
Total Respondent Labor Costs
Total Respondent Capital and O&M Costs
Total Respondent Cost for All Activities
* Totals for annual averages may not match exactly due to rounding discrepancies
May 2009
316(b) Phase III Information Collection Request
A.11-18