Overview

FacCostState_private
FacCostFed_private
FacCostCombined_private
FacCostState_muni
FacCostFed_muni
FacCostCombined_muni
AdminState
AdminFed
AdminCombined


Sheet 1: FacCostState_private

Table 1A. Privately-owned - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements

of the Emission Guidelines for Large MWC Units Subject to Subpart Cb (State Plans)
























(A) Emission
(B) (C) (D) (E) (F) (G) (H)








Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Footnotes





Hours Per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs






(Technical Per Occurrence Respondent Per Year
@$101.60 @$106.68 @$50.03 Hours Per (b) Per Year


Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year @$160




1. Applications

Not applicable


#VALUE!









2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!



3. Reporting Requirements

















A. Read and Understand Rule Requirements
40 0 $0 1 40 0 0 0 0 0 0 $0 cd


B. Required Activities

















1) Initial performance tests and reports


















a) Initial performance tests and test reports (PM, dioxins/furans, 24 750 $0 1 24 0 0 0 0 0 $0 $0 c




opacity, fugitives, HCl, Cd, Pb, Hg)

















b) Repeat of Initial performance tests 24 750 $0 1 24 0 0 0 0 0 $0 $0 e



2) CEMS demonstration (SO2, NOx, opacity, CO, CO2, O2)


















a) Installation of CEM units 24 200 $100,000 1 24 0 0 0 0 0 $0 $0 c




b) Initial demonstration 24 430 $0 1 24 0 0 0 0 0 $0 $0 c




c) Repeat of initial demonstration 24 430 $0 1 24 0 0 0 0 0 $0 $0 e



3) Annual performance tests and test reports (PM, dioxins/furans,


















opacity, fugitives, HCl, Cd, Pb, Hg)

















a) Plants that do not qualify for reduced D/F testing with 2 units 24 1500 $0 1 24 1 24 1 2 1,500 $242,686 $0 j




b) Plants that do not qualify for reduced D/F testing with 3 units 24 2250 $0 1 24 2 48 2 5 4,500 $725,373 $0 j




c) Plants that qualify for reduced D/F testing with 2 units 24 1428 $0 1 24 10 240 12 24 14,280 $2,311,665 $0 j




d) Plants that qualify for reduced D/F testing with 3 units 24 2106 $0 1 24 14 336 17 34 29,484 $4,755,051 $0 j



4) Quarterly Appendix F audits of CEMS (SO2, NOx, CO)


















a) RATA audit (one per year) 8 350 $0 1 8 71 568 28 57 24,850 $4,039,580 $0 f




b) RAA audit (three per year) 8 130 $0 3 24 71 1,704 85 170 27,690 $4,621,141 $0 f




c) Daily calibration and operation 1 0 $26 365 365 71 25,915 1,296 2,592 0 $2,900,847 $681,600



C. Create Information
Included in 3.B














D. Gather Information
Included in 3.E














E. Report Preparation

















1) Plant startup


















a) Control plan 40 0 $0 1 40 0 0 0 0 0 $0 $0 cd




b) Notification of contract awards 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd




c) Notification of on-site construction start 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd




d) Notification of construction completion 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd




e) Notification of final compliance 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd



2) Notification of initial performance tests
4 0 $0 1 4 0 0 0 0 0 $0 $0 cd



3) Initial compliance reports
40 0 $0 1 40 0 0 0 0 0 $0 $0 c



4) Notification of CEMS demonstration
4 0 $0 1 4 0 0 0 0 0 $0 $0 c



5) Initial CEMS demonstration report
90 0 $0 1 90 0 0 0 0 0 $0 $0 c



6) Annual compliance reports
40 0 $0 1 40 27 1,080 54 108 0 $120,892 $0 d



7) Semi-annual excess emission reports
40 0 $0 2 80 5 431 22 43 0 $48,267 $0 g

Table 1A (continued). Privately-owned - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements

of the Emission Guidelines for Large MWC Units Subject to Subpart Cb (State Plans)
























(A) Emission
(B) (C) (D) (E) (F) (G) (H)








Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Footnotes





Hours Per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs






(Technical Per Occurrence Respondent Per Year
@$101.60 @$106.68 @$50.03 Hours Per (b) Per Year


Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year @$160




4. Recordkeeping Requirements

















A. Read Instructions
Included in 3.A


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




B. Plan Activities
Included in 3.B


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




C. Implement Activities
Included in 3.B


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




D. Develop Record System
Not applicable














E. Record information

















1) Record startups, shutdowns, and malfunctions
4 0 0 47 188 71 13,348 667 1,335 0 $1,494,135 $0 h



2) Records of all emission rates, computations, tests
4 0 0 47 188 71 13,348 667 1,335 0 $1,494,135 $0 h



3) Records of employee review of operations manual
4 0 0 1 4 27 108 5 11 0 $12,089 $0




4) Record amount of sorbent used for Hg and dioxin/furan control
4 0 0 4 16 71 1,136 57 114 0 $127,160 $0 I


F. Personnel Training
Not applicable














G. Time for audits
Not applicable













TOTAL:








#VALUE! #VALUE! #VALUE! 102,304 #VALUE! $681,600

































Total Hours Labor Non-Labor Total











Summary of Respondent Burden

#VALUE! #VALUE! $681,600 #VALUE!











Annualized Capital and Startup

0 0 0 0











O & M Summary

0 0 681,600 681,600


Total Hours per plant (including emission testing contractor hours): #VALUE!













Total Hours per plant (not including emission testing contractor hours): #VALUE!
































a Assumes 144 large MWC units at 55 plants, 49% of which are privately owned.



































b Costs are based on the following hourly rates, including overhead and benefits: technical at $101.60, management at $106.68, and clerical at $50.03.



































c One-time only costs.



































d Cost incurred by a plant regardless of the number of MWC units at the plant.



































e Assumes 20 % of reporting plants must repeat initial tests due to failure at one unit at the plant.



































f RATA audits are performed for one of the four quarterly audits. RAA tests are performed for three of the four quarterly audits. Audits of the diluent monitor (O2 or CO2) are not required because tests on SO2 and CO

















monitors will incorporate the use of the diluent monitor.



































g Assumes 20% of affected plants must submit two semiannual reports per year due to exceeding one or more pollutant emission limits.



































h Based on weekly recordkeeping. Assumes 47 weeks of operation (90% availability) per year per MWC.



































I Based on quarterly calculation of sorbent use for entire plant, regardless of the number of affected facilities at the plant.



































j Assumes 750 contractor hours for each unit for full sampling and analysis; 12 hours for each unit's dioxin/furan sampling, and $4,800 for each unit's dioxin/furan analysis.

















Sheet 2: FacCostFed_private

Table 1B. Privately -owned - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements

of the Emission Guidelines for Large MWC Units Subject to Subpart FFF (Federal Plan)
























(A) Emission
(B) (C) (D) (E) (F) (G) (H)








Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Footnotes





Hours Per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs






(Technical Per Occurrence Respondent Per Year
@$101.60 @$106.68 @$50.03 Hours Per (b) Per Year


Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year @$160




1. Applications

Not applicable


#VALUE!









2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!



3. Reporting Requirements

















A. Read and Understand Rule Requirements
40 0 $0 1 40 0 0 0 0 0 0 $0 cd


B. Required Activities

















1) Initial performance tests and reports


















a) Initial performance tests and test reports (PM, dioxins/furans, 24 750 $0 1 24 0 0 0 0 0 $0 $0 c




opacity, fugitives, HCl, Cd, Pb, Hg)

















b) Repeat of Initial performance tests 24 750 $0 1 24 0 0 0 0 0 $0 $0 e



2) CEMS demonstration (SO2, NOx, opacity, CO, CO2, O2)


















a) Installation of CEM units 24 200 $100,000 1 24 0 0 0 0 0 $0 $0 c




b) Initial demonstration 24 430 $0 1 24 0 0 0 0 0 $0 $0 c




c) Repeat of initial demonstration 24 430 $0 1 24 0 0 0 0 0 $0 $0 e



3) Annual performance tests and test reports (PM, dioxins/furans,


















opacity, fugitives, HCl, Cd, Pb, Hg)

















a) Plants that do not qualify for reduced D/F testing 24 1500 $0 1 24 0 0 0 0 0 $0 $0 jk




b) Plants that qualify for reduced D/F testing with 2 units 24 1428 $0 1 24 3 72 4 7 4,284 $693,499 $0 j




c) Plants that qualify for reduced D/F testing with 3 units 24 2106 $0 1 24 1 24 1 2 2,106 $339,646 $0 j



4) Quarterly Appendix F audits of CEMS (SO2, NOx, CO)


















a) RATA audit (one per year) 8 350 $0 1 8 9 72 4 7 3,150 $512,059 $0 f




b) RAA audit (three per year) 8 130 $0 3 24 9 216 11 22 3,510 $585,778 $0 f




c) Daily calibration and operation 1 0 $26 365 365 9 3,285 164 329 0 $367,713 $86,400



C. Create Information
Included in 3.B














D. Gather Information
Included in 3.E














E. Report Preparation

















1) Plant startup


















a) Control plan 40 0 $0 1 40 0 0 0 0 0 $0 $0 cd




b) Notification of contract awards 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd




c) Notification of on-site construction start 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd




d) Notification of construction completion 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd




e) Notification of final compliance 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd



2) Notification of initial performance tests
4 0 $0 1 4 0 0 0 0 0 $0 $0 cd



3) Initial compliance reports
40 0 $0 1 40 0 0 0 0 0 $0 $0 c



4) Notification of CEMS demonstration
4 0 $0 1 4 0 0 0 0 0 $0 $0 c



5) Initial CEMS demonstration report
90 0 $0 1 90 0 0 0 0 0 $0 $0 c



6) Annual compliance reports
40 0 $0 1 40 4 160 8 16 0 $17,910 $0 d



7) Semi-annual excess emission reports
40 0 $0 2 80 1 80 4 8 0 $8,955 $0 g

Table 1B (continued). Privately-owned - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements

of the Emission Guidelines for Large MWC Units Subject to Subpart FFF (Federal Plan)
























(A) Emission
(B) (C) (D) (E) (F) (G) (H)








Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Footnotes





Hours Per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs






(Technical Per Occurrence Respondent Per Year
@$101.60 @$106.68 @$50.03 Hours Per (b) Per Year


Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year @$160




4. Recordkeeping Requirements

















A. Read Instructions
Included in 3.A


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




B. Plan Activities
Included in 3.B


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




C. Implement Activities
Included in 3.B


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




D. Develop Record System
Not applicable














E. Record information

















1) Record startups, shutdowns, and malfunctions
4 0 0 47 188 9 1,692 85 169 0 $189,397 $0 h



2) Records of all emission rates, computations, tests
4 0 0 47 188 9 1,692 85 169 0 $189,397 $0 h



3) Records of employee review of operations manual
4 0 0 1 4 4 16 1 2 0 $1,791 $0




4) Record amount of sorbent used for Hg and dioxin/furan control
4 0 0 4 16 9 144 7 14 0 $16,119 $0 I


F. Personnel Training
Not applicable














G. Time for audits
Not applicable













TOTAL:








#VALUE! #VALUE! #VALUE! 13,050 #VALUE! $86,400

































Total Hours Labor Non-Labor Total











Summary of Respondent Burden

#VALUE! #VALUE! $86,400 #VALUE!











Annualized Capital and Startup

0 0 0 0











O & M Summary

0 0 86,400 86,400


Total Hours per plant (including emission testing contractor hours): #VALUE!













Total Hours per plant (not including emission testing contractor hours): #VALUE!
































a Assumes 18 large MWC units at 8 plants, 49% of which are privately owned.



































b Costs are based on the following hourly rates, including overhead and benefits: technical at $101.60, management at $106.68, and clerical at $50.03.



































c One-time only costs.



































d Cost incurred by a plant regardless of the number of MWC units at the plant.



































e Assumes 20 % of reporting plants must repeat initial tests due to failure at one unit at the plant.



































f RATA audits are performed for one of the four quarterly audits. RAA tests are performed for three of the four quarterly audits. Audits of the diluent monitor (O2 or CO2) are not required because tests on SO2 and CO

















monitors will incorporate the use of the diluent monitor.



































g Assumes 20% of affected plants must submit two semiannual reports per year due to exceeding one or more pollutant emission limits.



































h Based on weekly recordkeeping. Assumes 47 weeks of operation (90% availability) per year per MWC.



































I Based on quarterly calculation of sorbent use for entire plant, regardless of the number of affected facilities at the plant.



































j Assumes 750 contractor hours for each unit for full sampling and analysis; 12 hours for each unit's dioxin/furan sampling, and $4,800 for each unit's dioxin/furan analysis.



































k Assumes one plant with two units does not qualify for reduced dioxin/furan testing each year.

















Sheet 3: FacCostCombined_private

Table 1C. Privately-owned - Combined Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements

of the Emission Guidelines for Large MWC Units Subject to Subpart Cb (State Plans) and Subpart FFF (Federal Plan)
























(A) Emission
(B) (C) (D) (E) (F) (G) (H)








Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Footnotes





Hours Per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs






(Technical Per Occurrence Respondent Per Year
@$101.60 @$106.68 @$50.03 Hours Per (b) Per Year


Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year @$160




1. Applications

Not applicable


#VALUE!









2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!



3. Reporting Requirements

















A. Read and Understand Rule Requirements
40 0 $0 1 40 0 0 0 0 0 0 $0 cd


B. Required Activities

















1) Initial performance tests and reports


















a) Initial performance tests and test reports (PM, dioxins/furans, 24 750 $0 1 24 0 0 0 0 0 $0 $0 c




opacity, fugitives, HCl, Cd, Pb, Hg)

















b) Repeat of Initial performance tests 24 750 $0 1 24 0 0 0 0 0 $0 $0 e



2) CEMS demonstration (SO2, NOx, opacity, CO, CO2, O2)


















a) Installation of CEM units 24 200 $100,000 1 24 0 0 0 0 0 $0 $0 c




b) Initial demonstration 24 430 $0 1 24 0 0 0 0 0 $0 $0 c




c) Repeat of initial demonstration 24 430 $0 1 24 0 0 0 0 0 $0 $0 e



3) Annual performance tests and test reports (PM, dioxins/furans,


















opacity, fugitives, HCl, Cd, Pb, Hg)

















a) Plants that do not qualify for reduced D/F testing with 2 units 24 1500 $0 1 24 1 24 1 2 1,500 $242,686 $0 j




b) Plants that do not qualify for reduced D/F testing with 3 units 24 2250 $0 1 24 2 48 2 5 4,500 $725,373 $0 j




c) Plants that qualify for reduced D/F testing with 2 units 24 1428 $0 1 24 13 312 16 31 18,564 $3,005,164 $0 j




d) Plants that qualify for reduced D/F testing with 3 units 24 2106 $0 1 24 15 360 18 36 31,590 $5,094,697 $0 j



4) Quarterly Appendix F audits of CEMS (SO2, NOx, CO)


















a) RATA audit (one per year) 8 350 $0 1 8 80 640 32 64 28,000 $4,551,640 $0 f




b) RAA audit (three per year) 8 130 $0 3 24 80 1,920 96 192 31,200 $5,206,919 $0 f




c) Daily calibration and operation 1 0 $26 365 365 80 29,200 1,460 2,920 0 $3,268,560 $768,000



C. Create Information
Included in 3.B














D. Gather Information
Included in 3.E














E. Report Preparation

















1) Plant startup


















a) Control plan 40 0 $0 1 40 0 0 0 0 0 $0 $0 cd




b) Notification of contract awards 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd




c) Notification of on-site construction start 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd




d) Notification of construction completion 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd




e) Notification of final compliance 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd



2) Notification of initial performance tests
4 0 $0 1 4 0 0 0 0 0 $0 $0 cd



3) Initial compliance reports
40 0 $0 1 40 0 0 0 0 0 $0 $0 c



4) Notification of CEMS demonstration
4 0 $0 1 4 0 0 0 0 0 $0 $0 c



5) Initial CEMS demonstration report
90 0 $0 1 90 0 0 0 0 0 $0 $0 c



6) Annual compliance reports
40 0 $0 1 40 31 1,240 62 124 0 $138,802 $0 d



7) Semi-annual excess emission reports
40 0 $0 2 80 6 511 26 51 0 $57,222 $0 g

Table 1C (continued). Privately-owned - Combined Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements

of the Emission Guidelines for Large MWC Units Subject to Subpart Cb (State Plans) and Subpart FFF (Federal Plan)
























(A) Emission
(B) (C) (D) (E) (F) (G) (H)








Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Footnotes





Hours Per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs






(Technical Per Occurrence Respondent Per Year
@$101.60 @$106.68 @$50.03 Hours Per (b) Per Year


Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year @$160




4. Recordkeeping Requirements

















A. Read Instructions
Included in 3.A


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




B. Plan Activities
Included in 3.B


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




C. Implement Activities
Included in 3.B


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




D. Develop Record System
Not applicable














E. Record information

















1) Record startups, shutdowns, and malfunctions
4 0 0 47 188 80 15,040 752 1,504 0 $1,683,532 $0 h



2) Records of all emission rates, computations, tests
4 0 0 47 188 80 15,040 752 1,504 0 $1,683,532 $0 h



3) Records of employee review of operations manual
4 0 0 1 4 31 124 6 12 0 $13,880 $0




4) Record amount of sorbent used for Hg and dioxin/furan control
4 0 0 4 16 80 1,280 64 128 0 $143,279 $0 I


F. Personnel Training
Not applicable














G. Time for audits
Not applicable













TOTAL:








#VALUE! #VALUE! #VALUE! 115,354 #VALUE! $768,000

































Total Hours Labor Non-Labor Total











Summary of Respondent Burden

#VALUE! #VALUE! $768,000 #VALUE!











Annualized Capital and Startup

0 0 0 0











O & M Summary

0 0 768,000 768,000


Total Hours per plant (including emission testing contractor hours): #VALUE!













Total Hours per plant (not including emission testing contractor hours): #VALUE!
































a Assumes 162 large MWC units at 63 plants, 49% of which are privately owned.



































b Costs are based on the following hourly rates, including overhead and benefits: technical at $101.60, management at $106.68, and clerical at $50.03.



































c One-time only costs.



































d Cost incurred by a plant regardless of the number of MWC units at the plant.



































e Assumes 20 % of reporting plants must repeat initial tests due to failure at one unit at the plant.



































f RATA audits are performed for one of the four quarterly audits. RAA tests are performed for three of the four quarterly audits. Audits of the diluent monitor (O2 or CO2) are not required because tests on SO2 and CO

















monitors will incorporate the use of the diluent monitor.



































g Assumes 20% of affected plants must submit two semiannual reports per year due to exceeding one or more pollutant emission limits.



































h Based on weekly recordkeeping. Assumes 47 weeks of operation (90% availability) per year per MWC.



































I Based on quarterly calculation of sorbent use for entire plant, regardless of the number of affected facilities at the plant.



































j Assumes 750 contractor hours for each unit for full sampling and analysis; 12 hours for each unit's dioxin/furan sampling, and $4,800 for each unit's dioxin/furan analysis.

















Sheet 4: FacCostState_muni

Table 2A. Publicly-owned - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements

of the Emission Guidelines for Large MWC Units Subject to Subpart Cb (State Plans)
























(A) Emission
(B) (C) (D) (E) (F) (G) (H)








Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Footnotes





Hours Per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs






(Technical Per Occurrence Respondent Per Year
@$44.24 @$59.63 @$23.94 Hours Per (b) Per Year


Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year @$160




1. Applications

Not applicable


#VALUE!









2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!



3. Reporting Requirements

















A. Read and Understand Rule Requirements
40 0 $0 1 40 0 0 0 0 0 0 $0 cd


B. Required Activities

















1) Initial performance tests and reports


















a) Initial performance tests and test reports (PM, dioxins/furans, 24 750 $0 1 24 0 0 0 0 0 $0 $0 c




opacity, fugitives, HCl, Cd, Pb, Hg)

















b) Repeat of Initial performance tests 24 750 $0 1 24 0 0 0 0 0 $0 $0 e



2) CEMS demonstration (SO2, NOx, opacity, CO, CO2, O2)


















a) Installation of CEM units 24 200 $100,000 1 24 0 0 0 0 0 $0 $0 c




b) Initial demonstration 24 430 $0 1 24 0 0 0 0 0 $0 $0 c




c) Repeat of initial demonstration 24 430 $0 1 24 0 0 0 0 0 $0 $0 e



3) Annual performance tests and test reports (PM, dioxins/furans,


















opacity, fugitives, HCl, Cd, Pb, Hg)

















a) Plants that do not qualify for reduced D/F testing with 2 units 24 1500 $0 1 24 2 48 2 5 3,000 $482,382 $0 j




b) Plants that do not qualify for reduced D/F testing with 3 units 24 2250 $0 1 24 2 48 2 5 4,500 $722,382 $0 j




c) Plants that qualify for reduced D/F testing with 2 units 24 1428 $0 1 24 10 240 12 24 14,280 $2,296,708 $0 j




d) Plants that qualify for reduced D/F testing with 3 units 24 2106 $0 1 24 15 360 18 36 31,590 $5,072,262 $0 j



4) Quarterly Appendix F audits of CEMS (SO2, NOx, CO)


















a) RATA audit (one per year) 8 350 $0 1 8 73 584 29 58 25,550 $4,116,975 $0 f




b) RAA audit (three per year) 8 130 $0 3 24 73 1,752 88 175 28,470 $4,642,126 $0 f




c) Daily calibration and operation 1 0 $26 365 365 73 26,645 1,332 2,665 0 $1,322,005 $700,800



C. Create Information
Included in 3.B














D. Gather Information
Included in 3.E














E. Report Preparation

















1) Plant startup


















a) Control plan 40 0 $0 1 40 0 0 0 0 0 $0 $0 cd




b) Notification of contract awards 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd




c) Notification of on-site construction start 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd




d) Notification of construction completion 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd




e) Notification of final compliance 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd



2) Notification of initial performance tests
4 0 $0 1 4 0 0 0 0 0 $0 $0 cd



3) Initial compliance reports
40 0 $0 1 40 0 0 0 0 0 $0 $0 c



4) Notification of CEMS demonstration
4 0 $0 1 4 0 0 0 0 0 $0 $0 c



5) Initial CEMS demonstration report
90 0 $0 1 90 0 0 0 0 0 $0 $0 c



6) Annual compliance reports
40 0 $0 1 40 28 1,120 56 112 0 $55,569 $0 d



7) Semi-annual excess emission reports
40 0 $0 2 80 6 449 22 45 0 $22,267 $0 g

Table 2A (continued). Publicly-owned - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements

of the Emission Guidelines for Large MWC Units Subject to Subpart Cb (State Plans)
























(A) Emission
(B) (C) (D) (E) (F) (G) (H)








Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Footnotes





Hours Per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs






(Technical Per Occurrence Respondent Per Year
@$44.24 @$59.63 @$23.94 Hours Per (b) Per Year


Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year @$160




4. Recordkeeping Requirements

















A. Read Instructions
Included in 3.A


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




B. Plan Activities
Included in 3.B


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




C. Implement Activities
Included in 3.B


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




D. Develop Record System
Not applicable














E. Record information

















1) Record startups, shutdowns, and malfunctions
4 0 0 47 188 73 13,724 686 1,372 0 $680,923 $0 h



2) Records of all emission rates, computations, tests
4 0 0 47 188 73 13,724 686 1,372 0 $680,923 $0 h



3) Records of employee review of operations manual
4 0 0 1 4 28 112 6 11 0 $5,557 $0




4) Record amount of sorbent used for Hg and dioxin/furan control
4 0 0 4 16 73 1,168 58 117 0 $57,951 $0 I


F. Personnel Training
Not applicable














G. Time for audits
Not applicable













TOTAL:








#VALUE! #VALUE! #VALUE! 107,550 #VALUE! $700,800

































Total Hours Labor Non-Labor Total











Summary of Respondent Burden

#VALUE! #VALUE! $700,800 #VALUE!











Annualized Capital and Startup

0 0 0 0











O & M Summary

0 0 700,800 700,800


Total Hours per plant (including emission testing contractor hours): #VALUE!













Total Hours per plant (not including emission testing contractor hours): #VALUE!
































a Assumes 144 large MWC units at 55 plants, 51% are owned by a municipal or local government.



































b Costs are based on the following hourly rates, including overhead and benefits: technical at $44.24, management at $59.63, and clerical at $23.94.



































c One-time only costs.



































d Cost incurred by a plant regardless of the number of MWC units at the plant.



































e Assumes 20 % of reporting plants must repeat initial tests due to failure at one unit at the plant.



































f RATA audits are performed for one of the four quarterly audits. RAA tests are performed for three of the four quarterly audits. Audits of the diluent monitor (O2 or CO2) are not required because tests on SO2 and CO

















monitors will incorporate the use of the diluent monitor.



































g Assumes 20% of affected plants must submit two semiannual reports per year due to exceeding one or more pollutant emission limits.



































h Based on weekly recordkeeping. Assumes 47 weeks of operation (90% availability) per year per MWC.



































I Based on quarterly calculation of sorbent use for entire plant, regardless of the number of affected facilities at the plant.



































j Assumes 750 contractor hours for each unit for full sampling and analysis; 12 hours for each unit's dioxin/furan sampling, and $4,800 for each unit's dioxin/furan analysis.

















Sheet 5: FacCostFed_muni

Table 2B. Publicly-owned - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements

of the Emission Guidelines for Large MWC Units Subject to Subpart FFF (Federal Plan)
























(A) Emission
(B) (C) (D) (E) (F) (G) (H)








Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Footnotes





Hours Per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs






(Technical Per Occurrence Respondent Per Year
@$44.24 @$59.63 @$23.94 Hours Per (b) Per Year


Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year @$160




1. Applications

Not applicable


#VALUE!









2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!



3. Reporting Requirements

















A. Read and Understand Rule Requirements
40 0 $0 1 40 0 0 0 0 0 0 $0 cd


B. Required Activities

















1) Initial performance tests and reports


















a) Initial performance tests and test reports (PM, dioxins/furans, 24 750 $0 1 24 0 0 0 0 0 $0 $0 c




opacity, fugitives, HCl, Cd, Pb, Hg)

















b) Repeat of Initial performance tests 24 750 $0 1 24 0 0 0 0 0 $0 $0 e



2) CEMS demonstration (SO2, NOx, opacity, CO, CO2, O2)


















a) Installation of CEM units 24 200 $100,000 1 24 0 0 0 0 0 $0 $0 c




b) Initial demonstration 24 430 $0 1 24 0 0 0 0 0 $0 $0 c




c) Repeat of initial demonstration 24 430 $0 1 24 0 0 0 0 0 $0 $0 e



3) Annual performance tests and test reports (PM, dioxins/furans,


















opacity, fugitives, HCl, Cd, Pb, Hg)

















a) Plants that do not qualify for reduced D/F testing 24 1500 $0 1 24 1 24 1 2 1,500 $241,191 $0 jk




b) Plants that qualify for reduced D/F testing with 2 units 24 1428 $0 1 24 4 96 5 10 5,712 $918,683 $0 j




c) Plants that qualify for reduced D/F testing with 3 units 24 2106 $0 1 24 1 24 1 2 2,106 $338,151 $0 j



4) Quarterly Appendix F audits of CEMS (SO2, NOx, CO)


















a) RATA audit (one per year) 8 350 $0 1 8 9 72 4 7 3,150 $507,572 $0 f




b) RAA audit (three per year) 8 130 $0 3 24 9 216 11 22 3,510 $572,317 $0 f




c) Daily calibration and operation 1 0 $26 365 365 9 3,285 164 329 0 $162,987 $86,400



C. Create Information
Included in 3.B














D. Gather Information
Included in 3.E














E. Report Preparation

















1) Plant startup


















a) Control plan 40 0 $0 1 40 0 0 0 0 0 $0 $0 cd




b) Notification of contract awards 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd




c) Notification of on-site construction start 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd




d) Notification of construction completion 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd




e) Notification of final compliance 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd



2) Notification of initial performance tests
4 0 $0 1 4 0 0 0 0 0 $0 $0 cd



3) Initial compliance reports
40 0 $0 1 40 0 0 0 0 0 $0 $0 c



4) Notification of CEMS demonstration
4 0 $0 1 4 0 0 0 0 0 $0 $0 c



5) Initial CEMS demonstration report
90 0 $0 1 90 0 0 0 0 0 $0 $0 c



6) Annual compliance reports
40 0 $0 1 40 4 160 8 16 0 $7,938 $0 d



7) Semi-annual excess emission reports
40 0 $0 2 80 1 80 4 8 0 $3,969 $0 g

Table 2B (continued). Publicly-owned - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements

of the Emission Guidelines for Large MWC Units Subject to Subpart FFF (Federal Plan)
























(A) Emission
(B) (C) (D) (E) (F) (G) (H)








Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Footnotes





Hours Per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs






(Technical Per Occurrence Respondent Per Year
@$44.24 @$59.63 @$23.94 Hours Per (b) Per Year


Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year @$160




4. Recordkeeping Requirements

















A. Read Instructions
Included in 3.A


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




B. Plan Activities
Included in 3.B


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




C. Implement Activities
Included in 3.B


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




D. Develop Record System
Not applicable














E. Record information

















1) Record startups, shutdowns, and malfunctions
4 0 0 47 188 9 1,692 85 169 0 $83,949 $0 h



2) Records of all emission rates, computations, tests
4 0 0 47 188 9 1,692 85 169 0 $83,949 $0 h



3) Records of employee review of operations manual
4 0 0 1 4 4 16 1 2 0 $794 $0




4) Record amount of sorbent used for Hg and dioxin/furan control
4 0 0 4 16 9 144 7 14 0 $7,145 $0 I


F. Personnel Training
Not applicable














G. Time for audits
Not applicable













TOTAL:








#VALUE! #VALUE! #VALUE! 16,138 #VALUE! $86,400

































Total Hours Labor Non-Labor Total











Summary of Respondent Burden

#VALUE! #VALUE! $86,400 #VALUE!











Annualized Capital and Startup

0 0 0 0











O & M Summary

0 0 86,400 86,400


Total Hours per plant (including emission testing contractor hours): #VALUE!













Total Hours per plant (not including emission testing contractor hours): #VALUE!
































a Assumes 18 large MWC units at 8 plants, 51% of which are owned by a state or local government.



































b Costs are based on the following hourly rates, including overhead and benefits: technical at $44.24, management at $59.63, and clerical at $23.94.



































c One-time only costs.



































d Cost incurred by a plant regardless of the number of MWC units at the plant.



































e Assumes 20 % of reporting plants must repeat initial tests due to failure at one unit at the plant.



































f RATA audits are performed for one of the four quarterly audits. RAA tests are performed for three of the four quarterly audits. Audits of the diluent monitor (O2 or CO2) are not required because tests on SO2 and CO

















monitors will incorporate the use of the diluent monitor.



































g Assumes 20% of affected plants must submit two semiannual reports per year due to exceeding one or more pollutant emission limits.



































h Based on weekly recordkeeping. Assumes 47 weeks of operation (90% availability) per year per MWC.



































I Based on quarterly calculation of sorbent use for entire plant, regardless of the number of affected facilities at the plant.



































j Assumes 750 contractor hours for each unit for full sampling and analysis; 12 hours for each unit's dioxin/furan sampling, and $4,800 for each unit's dioxin/furan analysis.



































k Assumes one plant with two units does not qualify for reduced dioxin/furan testing each year.

















Sheet 6: FacCostCombined_muni

Table 2C. Publicly-owned - Combined Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements

of the Emission Guidelines for Large MWC Units Subject to Subpart Cb (State Plans) and Subpart FFF (Federal Plan)
























(A) Emission
(B) (C) (D) (E) (F) (G) (H)








Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Footnotes





Hours Per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs






(Technical Per Occurrence Respondent Per Year
@$44.24 @$59.63 @$23.94 Hours Per (b) Per Year


Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year @$160




1. Applications

Not applicable


#VALUE!









2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!



3. Reporting Requirements

















A. Read and Understand Rule Requirements
40 0 $0 1 40 0 0 0 0 0 0 $0 cd


B. Required Activities

















1) Initial performance tests and reports


















a) Initial performance tests and test reports (PM, dioxins/furans, 24 750 $0 1 24 0 0 0 0 0 $0 $0 c




opacity, fugitives, HCl, Cd, Pb, Hg)

















b) Repeat of Initial performance tests 24 750 $0 1 24 0 0 0 0 0 $0 $0 e



2) CEMS demonstration (SO2, NOx, opacity, CO, CO2, O2)


















a) Installation of CEM units 24 200 $100,000 1 24 0 0 0 0 0 $0 $0 c




b) Initial demonstration 24 430 $0 1 24 0 0 0 0 0 $0 $0 c




c) Repeat of initial demonstration 24 430 $0 1 24 0 0 0 0 0 $0 $0 e



3) Annual performance tests and test reports (PM, dioxins/furans,


















opacity, fugitives, HCl, Cd, Pb, Hg)

















a) Plants that do not qualify for reduced D/F testing with 2 units 24 1500 $0 1 24 3 72 4 7 4,500 $723,572 $0 j




b) Plants that do not qualify for reduced D/F testing with 3 units 24 2250 $0 1 24 2 48 2 5 4,500 $722,382 $0 j




c) Plants that qualify for reduced D/F testing with 2 units 24 1428 $0 1 24 14 336 17 34 19,992 $3,215,391 $0 j




d) Plants that qualify for reduced D/F testing with 3 units 24 2106 $0 1 24 16 384 19 38 33,696 $5,410,412 $0 j



4) Quarterly Appendix F audits of CEMS (SO2, NOx, CO)


















a) RATA audit (one per year) 8 350 $0 1 8 82 656 33 66 28,700 $4,624,548 $0 f




b) RAA audit (three per year) 8 130 $0 3 24 82 1,968 98 197 31,980 $5,214,443 $0 f




c) Daily calibration and operation 1 0 $26 365 365 82 29,930 1,497 2,993 0 $1,484,992 $787,200



C. Create Information
Included in 3.B














D. Gather Information
Included in 3.E














E. Report Preparation

















1) Plant startup


















a) Control plan 40 0 $0 1 40 0 0 0 0 0 $0 $0 cd




b) Notification of contract awards 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd




c) Notification of on-site construction start 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd




d) Notification of construction completion 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd




e) Notification of final compliance 4 0 $0 1 4 0 0 0 0 0 $0 $0 cd



2) Notification of initial performance tests
4 0 $0 1 4 0 0 0 0 0 $0 $0 cd



3) Initial compliance reports
40 0 $0 1 40 0 0 0 0 0 $0 $0 c



4) Notification of CEMS demonstration
4 0 $0 1 4 0 0 0 0 0 $0 $0 c



5) Initial CEMS demonstration report
90 0 $0 1 90 0 0 0 0 0 $0 $0 c



6) Annual compliance reports
40 0 $0 1 40 32 1,280 64 128 0 $63,508 $0 d



7) Semi-annual excess emission reports
40 0 $0 2 80 7 529 26 53 0 $26,237 $0 g

Table 2C (continued). Publicly-owned - Combined Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements

of the Emission Guidelines for Large MWC Units Subject to Subpart Cb (State Plans) and Subpart FFF (Federal Plan)
























(A) Emission
(B) (C) (D) (E) (F) (G) (H)








Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Footnotes





Hours Per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs






(Technical Per Occurrence Respondent Per Year
@$44.24 @$59.63 @$23.94 Hours Per (b) Per Year


Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year @$160




4. Recordkeeping Requirements

















A. Read Instructions
Included in 3.A


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




B. Plan Activities
Included in 3.B


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




C. Implement Activities
Included in 3.B


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




D. Develop Record System
Not applicable














E. Record information

















1) Record startups, shutdowns, and malfunctions
4 0 0 47 188 82 15,416 771 1,542 0 $764,873 $0 h



2) Records of all emission rates, computations, tests
4 0 0 47 188 82 15,416 771 1,542 0 $764,873 $0 h



3) Records of employee review of operations manual
4 0 0 1 4 32 128 6 13 0 $6,351 $0




4) Record amount of sorbent used for Hg and dioxin/furan control
4 0 0 4 16 82 1,312 66 131 0 $65,096 $0 I


F. Personnel Training
Not applicable














G. Time for audits
Not applicable













TOTAL:








#VALUE! #VALUE! #VALUE! 123,368 #VALUE! $787,200

































Total Hours Labor Non-Labor Total











Summary of Respondent Burden

#VALUE! #VALUE! $787,200 #VALUE!











Annualized Capital and Startup

0 0 0 0











O & M Summary

0 0 787,200 787,200


Total Hours per plant (including emission testing contractor hours): #VALUE!













Total Hours per plant (not including emission testing contractor hours): #VALUE!
































a Assumes 162 large MWC units at 63 plants, 51% of which are owned by a state or local government.



































b Costs are based on the following hourly rates, including overhead and benefits: technical at $44.24, management at $59.63, and clerical at $23.94.



































c One-time only costs.



































d Cost incurred by a plant regardless of the number of MWC units at the plant.



































e Assumes 20 % of reporting plants must repeat initial tests due to failure at one unit at the plant.



































f RATA audits are performed for one of the four quarterly audits. RAA tests are performed for three of the four quarterly audits. Audits of the diluent monitor (O2 or CO2) are not required because tests on SO2 and CO

















monitors will incorporate the use of the diluent monitor.



































g Assumes 20% of affected plants must submit two semiannual reports per year due to exceeding one or more pollutant emission limits.



































h Based on weekly recordkeeping. Assumes 47 weeks of operation (90% availability) per year per MWC.



































I Based on quarterly calculation of sorbent use for entire plant, regardless of the number of affected facilities at the plant.



































j Assumes 750 contractor hours for each unit for full sampling and analysis; 12 hours for each unit's dioxin/furan sampling, and $4,800 for each unit's dioxin/furan analysis.

















Sheet 7: AdminState

Table 3A. Designated Administrator Annual Burden and Cost of Recordkeeping and Reporting Requirements
of the Emission Guidelines for Large MWC Units Subject to Subpart Cb (State Plans)







44.24 59.63 23.94




(A) (B) (C) (D) (E) (F)




Number of Administrator Tech Management Clerical Administrator




Occurrences Hours Hours Hours Hours Cost




Per Year (a) Per Per Year Per Year Per Year Per Year (b)






Occurrence @ $44.24 @ $59.63 @ $23.94
Burden Item


(C=AxB) (D=Cx0.05) (E=Cx0.1)
1. Applications

not applicable




2. Read and Understand Rule Requirements


c 40 0 0 0 $0
3. Required Activities









A. Observe initial performance tests








1) Initial performance tests and test reports (PM, dioxins/furans,









opacity, fugitives, HCl, Cd, Pb, Hg)
0 cd 48 0 0 0 $0


2) Repeat of Initial performance tests
0 ce 10 0 0 0 $0

B. Excess emissions -- Enforcement Activities
11 g 24 264 13 26 $13,098

C. Create Information








D. Gather Information








E. Report Reviews









1) Control plan
0 c 8 0 0 0 $0


2) Notification of contract awards
0 c 8 0 0 0 $0


3) Notification of on-site construction start
0 c 8 0 0 0 $0


4) Notification of construction completion
0 c 8 0 0 0 $0


5) Notification of final compliance
0 c 8 0 0 0 $0


6) Review notification of initial performance test
0 c 8 0 0 0 $0


7) Review notification of initial CEMS demonstration
0 c 4 0 0 0 $0


8) Review initial performance test report
0 c 40 0 0 0 $0


9) Review initial CEMS demonstration report
0 c 40 0 0 0 $0


10) Review annual compliance report
55 f 40 2200 110 220 $109,154


11) Review semi-annual excess emission report
11 g 16 176 9 18 $8,732

F. Prepare annual summary report
0
200 0 0 0 $0
4. Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) =




per trip

$0
TOTAL:





2640 132 264 $130,985
Total Hours per plant: 55.2





a Assumes 144 affected units at 55 plants in 18 states.








b Figures may not add exactly due to rounding.








c One-time only costs.








d Assumes EPA personnel attend about 8 percent of tests (145 units tested x 8% attended = 12).








e Assumes a 20% failure rate and that EPA personnel attend 10% of the retests (7 units tested * 20% failure * 10% retests attended = 1).








f Burden not incurred until second year of operation and later.








g Assumes 20% of affected plants must submit two semiannual reports per year due to exceeding one or more pollutant emission limits.









Sheet 8: AdminFed

Table 3B. Designated Administrator Annual Burden and Cost of Recordkeeping and Reporting Requirements
of the Emission Guidelines for Large MWC Units Subject to Subpart FFF (Federal Plan)







44.24 59.63 23.94




(A) (B) (C) (D) (E) (F)




Number of EPA Tech Management Clerical EPA




Occurrences Hours Hours Hours Hours Cost




Per Year (a) Per Per Year Per Year Per Year Per Year (b)






Occurrence @ $44.24 @ $59.63 @ $23.94
Burden Item


(C=AxB) (D=Cx0.05) (E=Cx0.1)
1. Applications

not applicable




2. Read and Understand Rule Requirements


c 40 0 0 0 $0
3. Required Activities









A. Observe initial performance tests








1) Initial performance tests and test reports (PM, dioxins/furans,









opacity, fugitives, HCl, Cd, Pb, Hg)
0 cd 48 0 0 0 $0


2) Repeat of Initial performance tests
0 ce 10 0 0 0 $0

B. Excess emissions -- Enforcement Activities
2 g 24 38 2 4 $1,905

C. Create Information








D. Gather Information








E. Report Reviews









1) Control plan
0 c 8 0 0 0 $0


2) Notification of contract awards
0 c 8 0 0 0 $0


3) Notification of on-site construction start
0 c 8 0 0 0 $0


4) Notification of construction completion
0 c 8 0 0 0 $0


5) Notification of final compliance
0 c 8 0 0 0 $0


6) Review notification of initial performance test
0 c 8 0 0 0 $0


7) Review notification of initial CEMS demonstration
0 c 4 0 0 0 $0


8) Review initial performance test report
0 c 40 0 0 0 $0


9) Review initial CEMS demonstration report
0 c 40 0 0 0 $0


10) Review annual compliance report
8 f 40 320 16 32 $15,877


11) Review semi-annual excess emission report
2 g 16 26 1 3 $1,270

F. Prepare annual summary report
0
200 0 0 0 $0
4. Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) =




per trip

$0
TOTAL:





384 19 38 $19,052
Total Hours per plant: 55.2





a Assumes 18 affected units at 8 plants in 4 states.








b Figures may not add exactly due to rounding.








c One-time only costs.








d Assumes EPA personnel attend about 8 percent of tests (22 units tested x 8% attended = 2).








e Assumes a 20% failure rate and that EPA personnel attend 10% of the retests (7 units tested * 20% failure * 10% retests attended = 1).








f Burden not incurred until second year of operation and later.








g Assumes 20% of affected plants must submit two semiannual reports per year due to exceeding one or more pollutant emission limits.









Sheet 9: AdminCombined

Table 3C. Designated Administrator Combined Annual Burden and Cost of Recordkeeping and Reporting
Requirements of the Emission Guidelines for Large MWC Units
Subject to Subpart Cb (State Plans) and Subpart FFF (Federal Plan)







44.24 59.63 23.94




(A) (B) (C) (D) (E) (F)




Number of Administrator Tech Management Clerical Administrator




Occurrences Hours Hours Hours Hours Cost




Per Year (a) Per Per Year Per Year Per Year Per Year (b)






Occurrence @ $44.24 @ $59.63 @ $23.94
Burden Item


(C=AxB) (D=Cx0.05) (E=Cx0.1)
1. Applications

not applicable




2. Read and Understand Rule Requirements


c 40 0 0 0 $0
3. Required Activities









A. Observe initial performance tests








1) Initial performance tests and test reports (PM, dioxins/furans,









opacity, fugitives, HCl, Cd, Pb, Hg)
0 cd 48 0 0 0 $0


2) Repeat of Initial performance tests
0 ce 10 0 0 0 $0

B. Excess emissions -- Enforcement Activities
13 g 24 302 15 30 $15,004

C. Create Information








D. Gather Information








E. Report Reviews









1) Control plan
0 c 8 0 0 0 $0


2) Notification of contract awards
0 c 8 0 0 0 $0


3) Notification of on-site construction start
0 c 8 0 0 0 $0


4) Notification of construction completion
0 c 8 0 0 0 $0


5) Notification of final compliance
0 c 8 0 0 0 $0


6) Review notification of initial performance test
0 c 8 0 0 0 $0


7) Review notification of initial CEMS demonstration
0 c 4 0 0 0 $0


8) Review initial performance test report
0 c 40 0 0 0 $0


9) Review initial CEMS demonstration report
0 c 40 0 0 0 $0


10) Review annual compliance report
63 f 40 2520 126 252 $125,031


11) Review semi-annual excess emission report
13 g 16 202 10 20 $10,002

F. Prepare annual summary report
0
200 0 0 0 $0
4. Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) =




per trip

$0
TOTAL:





3024 151 302 $150,037
Total Hours per plant: 55.2





a Assumes 162 affected units at 63 plants in 22 states.








b Figures may not add exactly due to rounding.








c One-time only costs.








d Assumes EPA personnel attend about 8 percent of tests (145 units tested x 8% attended = 12).








e Assumes a 20% failure rate and that EPA personnel attend 10% of the retests (7 units tested * 20% failure * 10% retests attended = 1).








f Burden not incurred until second year of operation and later.








g Assumes 20% of affected plants must submit two semiannual reports per year due to exceeding one or more pollutant emission limits.