Oil Pollution Prevention; Spill Prevention, Control, and Countermeasure Rule Requirements - Amendments (Final Rule)

ICR 200911-2050-002

OMB: 2050-0021

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2009-11-23
ICR Details
2050-0021 200911-2050-002
Historical Active 200610-2050-002
EPA/OLEM 0328.15
Oil Pollution Prevention; Spill Prevention, Control, and Countermeasure Rule Requirements - Amendments (Final Rule)
Revision of a currently approved collection   No
Regular
Approved without change 06/15/2010
Retrieve Notice of Action (NOA) 11/23/2009
When this ICR is renewed, EPA should review the respondent burden, universe, response number, labor rates, and capital costs and ensure these estimates have been updated.
  Inventory as of this Action Requested Previously Approved
06/30/2013 36 Months From Approved 06/30/2010
652,049 0 446,145
8,041,358 0 2,191,068
161,008,709 0 35,752,645

The 2009 amendments will reduce the burden of the SPCC regulation, with expected benefits for small entities. Specifically, the rule amendments include: exempting hot-mix asphalt; exempting pesticide application equipment and related mix containers; exempting residential heating oil containers; amending the definition of "facility"; amending the facility diagram requirement; defining "loading/unloading rack"; providing streamlined requirements for a subset of Tier 1 qualified facilities; amending general secondary containment requirement; exempting non-transportation-related tank trucks from sized secondary containment requirements; amending security requirements; amending integrity testing requirements; amending requirements for animal fats or vegetable oil containers; streamlining several requirements for onshore oil production facilities; and exempting underground oil storage tanks at nuclear power generation facilities. Differences in burden and costs from the previous ICR are attributed to both adjustments and program changes. Adjustments capture updates to the number of affected facilities, wages, and unit costs in the absence of the 2009 SPCC amendments. Program changes reflect the 2009 revisions to the SPCC rule, which affect both per-facility costs and the number of affected facilities. In total, the burden hours presented in this ICR have increased relative to the current OMB inventory. The new burden estimate shows a net annualized increase of approximately 5.8 million hours. As a result of the final amendments, the reporting and recordkeeping burden would decrease by 1.3 million hours. The final amendments would reduce capital and O&M costs by approximately $7.5 million. The net effect on annualized capital and O&M costs to regulated facilities is estimated at $125 million, mainly due to a larger number of facilities expected to incur paperwork-related costs and the revisions made to the estimates of the per-facility capital and O&M costs.

US Code: 33 USC 1321(j)(1)(C) Sec 311(j)(1)(C) Name of Law: Clean Water Act
  
None

2050-AG16 Final or interim final rulemaking 74 FR 58783 11/13/2009

No

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 652,049 446,145 0 148,347 57,557 0
Annual Time Burden (Hours) 8,041,358 2,191,068 0 -1,274,327 7,124,617 0
Annual Cost Burden (Dollars) 161,008,709 35,752,645 0 -11,181,829 136,437,893 0
Yes
Changing Regulations
Yes
Changing Regulations
Differences in burden and costs from the previous ICR are attributed to both adjustments and program changes. Adjustments capture updates to the number of affected facilities, wages, and unit costs in the absence of the final amendments. Program changes reflect the final revisions to the SPCC rule, which affect both per-facility costs and the number of affected facilities.

$591,000
No
No
Uncollected
Uncollected
No
Uncollected
Hugo Fleischman 202 564-1968 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
11/23/2009


© 2024 OMB.report | Privacy Policy