CHARTER FISHING SURVEY
(Personal Interview or Mail Survey)
OMB 0710-0001
Expires: 30 September 2012
The public report burden for this information collection is estimated to average 25 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this data collection, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Executive Services Directorate, Information Management Division, and the Office of Information and Regulatory Affairs, Office of Management and Budget, Washington, D.C. 20503, Attn.: Desk Officer for U.S. Army Corps of Engineers. Respondents should be aware that notwithstanding any other provision of law, an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Please DO NOT RETURN your completed form to either of these offices.
CHARTER FISHING SURVEY
Please read each question carefully. Answer each question as accurately as possible.
1. How many years have you been a charter boat operator?
________YEARS
2. How many years have you operated a charter boating
service on (Project Area)? ________YEARS
3. How many boats are owned and operated as part of your
charter business? ________BOATS
4. For each vessel in your operation, please answer the following:
Vessel #1 Vessel #2 Vessel #3
4a. BOAT LENGTH (FEET) _________ _________ _________
4b. BOAT BEAM OR WIDTH (FEET) _________ _________ _________
4c. BOAT DRAFT (INCHES) _________ _________ _________
4d. What do you feel should be the MINIMUM CHANNEL DEPTH, in feet, for each of your vessels (from the water surface to the channel bottom) to navigate safely in all weather conditions?
Channel Channel Channel
Depth Depth Depth
For For For
Vessel #1=____FEET Vessel #2=_____FEET Vessel #3=____FEET
4e. Vessel Type(s)? (Mark One Blank/Vessel) Vessel #1 Vessel #2 Vessel #3
Inboard /Outboard ___ ___ ___ Inboard ___ ___ ___
Outboard ___ ___ ___
4f. In what year was (were) boat(s) purchased? (year) (year) (year)
4g. Price you paid for boat:(s)? $________ $________ $________
4h. For each boat, total the current market
value of all on-board equipment: $________ $________ $________
5 a. Does the income from your charter business constitute the majority of
your total annual household income? (Circle)
1. YES [Go to Q.6]
2. NO
5 b. If you answered "NO" to question 5 a, what occupation does provide the
majority of your total annual household income (Include Spouse’s Income)?
________________________________________________________________
6. Please describe your rate structure for the (year) season, by trip type:
Walleye Trip Bass Trip Perch Trip
(7-hour) (10-hour) (7-hour)
Cost Per Trip (6 People): $_______ $_______ $_______
Minimum Cost Per Trip: $_______ $_______ $_______
Average Number of Paying
Clients Per Trip: ______ ______ ______
If further clarification of your rate structure is needed, please describe
below:
__________________________________________________________
________________________________________________________________
7 a. Please record, on the blanks below, the average number of chartered trips you make for each species each month, during a typical annual season. Include all trips for all boats used in your operation.
|
NUMBER OF TRIPS PER MONTH |
||
|
Walleye Trips |
Bass Trips |
Perch Trips |
April |
|
|
|
May |
|
|
|
June |
|
|
|
July |
|
|
|
August |
|
|
|
September |
|
|
|
October |
|
|
|
November |
|
|
|
TOTAL ANNUAL FISHING SEASON TRIPS:
7b. If a combination of a breakwater construction, removal of old jetties and channel dredging were to take place at (PROJECT AREA), how many additional total trips do you estimate your charter service would make during a typical annual season as compared to the total trips you recorded for each species in question 7a above?
Walleye Bass Perch
ADDITIONAL TOTAL TRIPS: ______ ______ ______
8. Please estimate the percent of total charter trips (for all species) that you made
through the entrance channel, since your charter service has been in operation, when the channel had the following wave heights:
8 a. Waves in the entrance channel approximately 3 feet high, while
you were leaving or entering the harbor?
_____% of TOTAL TRIPS
8 b. Waves in the entrance channel approximately 4 feet high, while you were leaving or entering the harbor?
% of TOTAL TRIPS
9. Given the present state of the harbor entrance, what open lake wave
conditions, would cause you to cancel your trip to the (PROJECT AREA)?
(Circle)
With Wave Heights in the Open Lake Greater Than:
1 feet 2 feet 3 feet 4 feet 5 feet 6 feet
10. How many trips did you cancel in the (year) season on account of HIGH WAVES
on the open lake?
_______TRIPS CANCELED
11. During the past five years, did your BOAT incur any damage that you can attribute to the entrance channel at (PROJECT AREA)? If so, please record
the dollar damage amount(s) beside the appropriate year(s) below:
(year);$________COST OF BOAT DAMAGE
(year);$________COST OF BOAT DAMAGE
(year);$________COST OF BOAT DAMAGE
(year);$________COST OF BOAT DAMAGE
(year);$________COST OF BOAT DAMAGE
12. If a combination of a breakwater construction, removal of the old jetties and channel dredging were to take place at (PROJECT AREA), it WOULD provide a
safer harbor of refuge for boats caught in the lake in the event of a sudden storm. What is the most that you would be willing to pay as a one-time contribution toward a construction fund created by a non-profit group whose express purpose was to raise funds to ensure that these actions would be implemented?
$ __________ONE TIME CONTRIBUTION
13. If ONLY a removal of the old jetties and channel dredging were to take place at (PROJECT AREA), it MAY provide a safer harbor condition than exists presently in the lake in the event of a sudden storm. What is the most that you would be willing to pay as a one-time contribution toward a construction fund created by a non-profit group whose express purpose was to raise funds to ensure that these actions would be implemented?
$ __________ ONE TIME CONTRIBUTION
Please give your approximate business costs for each of the items listed below for the previous business year. For each item, include total costs for all vessels owned or operated. Do your best to give your most accurate figure or estimate for each of these expenditures. (Your (year) Federal Income Tax Form, Schedule C, is a good source of this information.)
a. Boat fuel (including oil if outboard): $__________
b. Boat access: Dockage and storage fees: $__________
Launching fees: $__________
c. Boat maintenance: (normal servicing, oil change,
hauling, tune‑ups, registration, etc): $__________
d. Boat repair: (accidental damages, breakdowns not
covered by insurance): $__________
e. Annual charter boat insurance premiums: $__________
f. Monthly boat loan payments: $__________
g. Publicity/advertising/promotions:
(ads, flyers, signs, cards, show expenses, etc.) $__________
h. Communications (telephone, postage, stationery): $__________
I. Equipment repair and replacement:
(for fixing or replacing lost, worn or old gear): $__________
j. Labor costs (for payment of first mates): $__________
k. Captain’s labor (total hours per season spent by
Captain(s) on charter trips): ______ HOURS
Thank You for completing this Questionnaire!
File Type | application/msword |
File Title | Charter Fishing Survey |
Author | USACE WRC |
Last Modified By | Stuart A. Davis |
File Modified | 2009-05-21 |
File Created | 2005-06-27 |