Emission Guidelines and Compliance Times for Municipal Solid Waste Landfills (40 CFR part 60, subpart Cc and 40 CFR part 62, subpart GGG) (Renewal)

Burden Tables 1-4 (Excel)

OMB: 2060-0430

Document [ppt]
Download: ppt | pdf

Overview

Industry-Private
Industry-Public
Agency-EPA
Agency-States


Sheet 1: Industry-Private

Table 1 - Respondent Burden for Existing Municipal Solid Waste Landfills





Privately-Owned Landfills

















A B C D E F G H I
Burden Item Technical person-hours per occurrence Number of occurrences per respondent per year Technical person-hours per respondent per year (AxB) Respondents per year Responses per year (BxD) Technical person- hours per year (CxD) Management person- hours per year (CxDx0.05) per year Clerical hours per year (CxDx0.10) per year Total cost per year ($)
1. Reporting Requirements









A. Initial Design Capacity Report N/A 1 0 0 0 0.00 0.0 0.0 $0
B. Initial and Annual NMOC Emission Rate Reports (Note a) N/A 1 0 0 0 0.00 0.0 0.0 $0
C. Collection and Control System Design Plan N/A 1 0 0 0 0.00 0.0 0.0 $0
D. Increments of Progress N/A 5 0 0 0 0.00 0.0 0.0 $0
E. Annual Compliance Report (Note b) 2 1 2 172 172 344.00 17.2 34.4 $33,542
F. Landfill Closure Report (Note c) 2 1 2 5 5 10.32 0.5 1.0 $1,006
G. Equipment Removal Report (Note d) 2 1 2 0 0 0.00 0.0 0.0 $0
H. Surface methane monitoring 14 4 56 172 688 9,632.00 481.6 963.2 $939,165
Reporting Subtotal



865 9,986.32 499 999

2. Recordkeeping Requirements









A. Records of control system monitoring 0.5 12 6 172
1,032.00 51.6 103.2 $100,625
B. Records of accumulated refuse 8 1 8 172
1,376.00 68.8 137.6 $134,166
C. Records of surface methane monitoring 0.5 4 2 172
344.00 17.2 34.4 $33,542
D. Records of collection and control system exceedances 0.5 4 2 172
344.00 17.2 34.4 $33,542
E. Records of system design and initial performance test N/A 4 0 172
0.00 0.0 0.0 $0
F. O&M of portable monitor (Note e) N/A N/A N/A 172



$240,800
Recordkeeping Subtotal




3,096.00 155 310

Total Labor Burden and Cost




13,082.32 654 1,308 $1,275,587



Rspns per year 865 Total private landfills (this table):
15,045 $1,275,587






Total public landfills (from Table 2):
30,352 $1,922,731






Total State/local agncy (from Table 3):
749 $31,403






TOTAL RESPONDENT LABOR:
46,146 $3,229,721
Note a: This ICR assumes that all landfills affected by a State plan or the Federal plan have already exceeded the 50 Mg/yr NMOC emission threshold and are no longer submitting annual NMOC emission rate reports.




Note b: This count of 172 private landfills includes 57 private landfills subject to the Federal plan and 115 private landfills subject to a State plan. EPA estimates that 67% of landfills are public and 33% are private.

Note c: This ICR assumes 3 percent of landfills will submit a landfill closure report per year.






Note d: No landfills would submit an equipment removal report. To remove collection and control equipment and submit the removal report, landfills must have had a collection and control system in place for 15 years. No landfills would meet this criteria because 15 years have not expired since the earliest time a landfill would have been required to install gas collection and control equipment.

Note e: Operating and maintenance costs for the year are estimated at $1,400 per monitor.


1 Labor rates for other privately-owned landfill owners/operators were estimated using the average May 2008 labor rates for NAICS industry grouping 541000, Professional, Scientific, and Technical Services. Occupational groupings assumed for clerical labor were Executive Secretaries and Administrative Assistants, for technical labor were Environmental Engineers, and for managerial labor were Managers, All Other. A March 2009 labor rate was estimated using a 3.2% growth factor from the employment cost index to account for increases in wages from June 2007 to March 2009. The growth factor came from Table 2 - Seasonally adjusted: Employment Cost Index for wages and salaries, by ownership, occupational group, and industry, located at: http://www.bls.gov/news.release/eci.t02.htm. All labor rates incorporate a factor of 110% to account for overhead and fringe benefit costs.
Labor Rates Technical Management Clerical






Unloaded 39.99 $55.29 $22.36






Loaded 86.67 $119.83 $48.47







Sheet 2: Industry-Public

Table 2 - Respondent Burden for Existing Municipal Solid Waste Landfills
Publicly-Owned Landfills











A B C D E F G H I
Burden Item Technical person-hours per occurrence Number of occurrences per respondent per year Technical person-hours per respondent per year (AxB) Respondents per year Responses per year (BxD) Technical person- hours per year (CxD) Management person- hours per year (CxDx0.05) per year Clerical hours per year (CxDx0.10) per year Total cost per year
1. Reporting Requirements








A. Initial Design Capacity Report N/A 1 0 0.00 0 0.00 0.00 0.00 0.00
B. Initial and Annual NMOC Emission Rate Reports N/A 1 0 0.00 0 0.00 0.00 0.00 0.00
C. Collection and Control System Design Plan N/A 1 0 0.00 0 0.00 0.00 0.00 0.00
D. Increments of Progress N/A 5 0 0.00 0 0.00 0.00 0.00 0.00
E. Annual Compliance Report (Note a) 2 1 2 347.00 347 694.00 34.70 69.40 37,784.14
F. Landfill Closure Report (Note b) 2 1 2 10.41 10 20.82 1.04 2.08 1,133.52
G. Equipment Removal Report (Note c) 2 1 2 0.00 0 0.00 0.00 0.00 0.00
H. Surface methane monitoring 14 4 56 347.00 1,388 19,432.00 971.60 1,943.20 1,057,955.81
Reporting Subtotal



1,745 20,146.82 1,007.34 2,014.68
2. Recordkeeping Requirements








A. Records of control system monitoring 0.5 12 6 347.00
2,082.00 104.10 208.20 113,352.41
B. Records of accumulated refuse 8 1 8 347.00
2,776.00 138.80 277.60 151,136.54
C. Records of surface methane monitoring 0.5 4 2 347.00
694.00 34.70 69.40 37,784.14
D. Records of collection and control system exceedances 0.5 4 2 347.00
694.00 34.70 69.40 37,784.14
E. Records of system design and initial performance test N/A 4 0 347.00
0.00 0.00 0.00 0.00
F. O&M of portable monitor (Note d)


347.00



485,800.00
Recordkeeping Subtotal




6,246.00 312.30 624.60
Total Labor Burden and Cost




26,392.82 1,319.64 2,639.28 1,922,730.69



Rspnses per year 1,745
Total public landfills: 30,352 $1,922,731




















Note a: This ICR assumes that all landfills affected by a State plan or the Federal plan have already exceeded the 50 Mg/yr NMOC emission threshold and are no longer submitting annual NMOC emission rate reports. This count of 348 landfills includes 116 public landfills subject to the Federal plan and 232 public landfills subject to a State plan. EPA estimates that 67% of landfills are public and 33% are private.

Note b: This ICR assumes 3 percent of landfills will submit a landfill closure report per year.





Note c: No landfills would submit an equipment removal report. To remove collection and control equipment and submit the removal report, landfills must have had a collection and control system in place for 15 years. No landfills would meet this criteria because 15 years have not expired since the earliest time a landfill would have been required to install gas collection and control equipment.
Note d: Operating and maintenance costs for the year is estimated at $1,400 per monitor.








1 Labor rates for Federal agency personnel were applied to local agencies. Source for EPA labor rates: Department of Personnel Management, "Salary Table 2008 - GS, Incorporating the 1.70% general schedule increase, Effective January 2008" located at www.opm.gov/oca/08tables/pdf/gs_h.pdf. For the Managerial labor rate, level GS-15, step 1 was used; for the Technical labor rate, Level GS-12, Step 5 was used; for the Clerical labor rate, Level GS-5, Step 1 was used. All agency labor rates include a multiplier of 1.6 to account for overhead and fringe benefit costs.
Labor Rates Technical Management Clerical





Unloaded $30.57 $44.59 $12.28





Loaded $48.91 $71.34 $19.65






Sheet 3: Agency-EPA

Table 4 - Agency Burden for Existing Municipal Solid Waste Landfills
Federal Agency Burden - EPA











A B C D E F G H I
Burden Item Technical person-hours per occurrence Number of occurrences per respondent per year Technical person-hours per respondent per year (AxB) Landfills per year Responses per year Technical person- hours per year (CxDx0.85) Management person- hours per year (CxDx0.05) per year Clerical hours per year (CxDx0.10) per year Total cost per year
1. Reporting Requirements








A. Review Initial Design Capacity Report N/A 1 0 0 0 0 0.0 0.0 $0
B. Review Initial and Annual NMOC Emission Rate Reports N/A 1 0 0 0 0 0.0 0.0 $0
C. Review Collection and Control System Design Plan N/A 1 0 0 0 0 0.0 0.0 $0
D. Review Increments of Progress N/A 5 0 0 0



E. Review Amended Design Capacity Report (Note a) 1 1 1 9 9 7 0.4 0.9 $373
F. Review Annual Compliance Report (Note b) 2 1 2 173 173 294 17.3 34.6 $14,919
G. Review Landfill Closure Report (Note c) 1 1 1 5 5 4 0.3 0.5 $224
H. Review Equipment Removal Report (Note d) 1 1 1 0 0 0 0.0 0.0 $0
I. Review Surface Methane Monitoring 2 4 8 173 692 1,176 69.2 138.4 $59,677




















Total Labor Burden and Cost




1,482 87 174 $75,193



Rspns per year 879
Total 1,744 $75,193










Note a: This ICR assumes 5 percent of landfills will submit an amended design capacity report per year.





Note b: This ICR assumes that all landfills affected by the Federal plan have already exceeded the 50 Mg/yr NMOC emission threshold and are no longer submitting annual NMOC emission rate reports.





Note c: This ICR assumes 3 percent of landfills will submit a landfill closure report each year.





Note d: No landfills would submit an equipment removal report. To remove collection and control equipment and submit the removal report, landfills must have had a collection and control system in place for 15 years. No landfills would meet this criteria because 15 years have not expired since the earliest time a landfill would have been required to install a collection and control system. State plan effective dates were generally in the year 1998 or 1999 and the Federal plan effective date was January 7, 2000.
1 Labor rates for Federal agency personnel. Source for EPA labor rates: Department of Personnel Management, "Salary Table 2008 - GS, Incorporating the 1.70% general schedule increase, Effective January 2008" located at www.opm.gov/oca/08tables/pdf/gs_h.pdf. For the Managerial labor rate, level GS-15, step 1 was used; for the Technical labor rate, Level GS-12, Step 5 was used; for the Clerical labor rate, Level GS-5, Step 1 was used. All agency labor rates include a multiplier of 1.6 to account for overhead and fringe benefit costs.










Labor Rates Technical Management Clerical





Unloaded $27.74 $37.39 $15.01





Loaded $44.38 $59.82 $24.02






Sheet 4: Agency-States

Table 3 - Respondent Burden for Existing Municipal Solid Waste Landfills
State and Local agencies











A B C D E F G H I
Burden Item Technical person-hours per occurrence Landfills per year (Average number of controlled landfills in States enforcing State plans) Person-hours per respondent per year (AxB) Number of agencies enforcing State plans Responses per year Technical person-hours per year (CxDx0.85) Management person- hours per year (CxDx0.05) per year Clerical hours per year (CxDx0.10) per year Total cost per year
1. Reporting Requirements








A. Review Initial Design Capacity Report N/A 9 0 0 0 0 0.0 0.0 $0
B. Review Initial and Annual NMOC Emission Rate Reports N/A 9 0 0 0 0 0.0 0.0 $0
C. Review Collection and Control System Design Plan N/A 9 0 0 0 0 0.0 0.0 $0
D. Review Increments of Progress N/A 9 0 0 0



E. Review Amended Design Capacity Report (Note a) 1 0.45 0.45 40 18 15 0.9 1.8 $776
F. Review Annual Compliance Report (Note b) 2 9 18 40 360 612 36.0 72.0 $31,046
G. Review Landfill Closure Report (Note c) 1 0.27 0.27 40 11 9 0.5 1.1 $466
H. Review Equipment Removal Report (Note d) 1 0 0 40 0 0 0.0 0.0 $0




















Total Labor Burden and Cost




636 37 75 $32,288



Rspns per year 389
Total 749 $32,288










Note a: This ICR assumes 5 percent of landfills will submit an amended design capacity report per year.





Note b: This ICR assumes that all landfills affected by a State plan have already exceeded the 50 Mg/yr NMOC emission threshold and are no longer submitting annual NMOC emission rate reports. This ICR assumes 40 State and local agencies will be enforcing State plans and that 347 landfills are subject to State plans. Thus, each agency is expected to review reports for an average of nine landfills.
Note c: This ICR assumes 3 percent of landfills will submit a landfill closure report each year.





Note d: No landfills would submit an equipment removal report. To remove collection and control equipment and submit the removal report, landfills must have had a collection and control system in place for 15 years. No landfills would meet this criteria b
1 Labor rates for Federal agency personnel. Source for EPA labor rates: Department of Personnel Management, "Salary Table 2008 - GS, Incorporating the 1.70% general schedule increase, Effective January 2008" located at www.opm.gov/oca/08tables/pdf/gs_h.










Labor Rates Technical Management Clerical





Unloaded $27.74 $37.39 $15.01





Loaded $44.38 $59.82 $24.02