1128t09

1128t09.xls

NSPS for Secondary Lead Smelters (40 CFR part 60, subpart L) (Renewal)

1128t09

OMB: 2060-0080

Document [xlsx]
Download: xlsx | pdf

Overview

TABLE 1
TABLE 2


Sheet 1: TABLE 1

TABLE 1:

Annual Respondent Burden and Cost - NSPS for Secondary Lead Smelters (40 CFR PART 60, SUBPART L)




















REPORTING/RECORDKEEPING REQUIREMENT

(A) Respondent Hours per Occurence (Technical hours) (B) Number of Occurences per Respondent per Year (C) Hours per Respondent per Year (C=A x B) (D) Number of Respondents per Year (E) Technical Hours per Year @ $97.88 (E=C x D) (F) Management Hours per Year @ $115.40 (F= E x 0.05) (G) Clerical Hours per Year @ $48.38 (G= E x 0.1) Total Labor Costs per Year
1. APPLICATIONS

N/A N/A N/A N/A N/A N/A N/A N/A
2. SURVEY AND STUDIES

N/A N/A N/A N/A N/A N/A N/A N/A
3. REPORTING REQUIREMENTS










New Sourcesa










a. Read Instructionsb
1 1 1 0 0 0 0 $0.00

b. Required Activities











Initial Performance Testsc 21 1 21 0 0 0 0 $0.00



Repeat of Performance Testsd 21 0.2 4.2 0 0 0 0 $0.00



Method 5 or 9 Testinge 3 1.2 4 0 0 0 0 $0.00

c. Create Information
------------------------Included in 3b----------------------------

d. Gather Existing Information
------------------------Included in 3b----------------------------

e. Write Report











Notification of Construction/Reconstructionf 2 1 1.7 0 0 0 0 $0.00



Notification of Initial Performance Testf 2 1 1.7 0 0 0 0 $0.00



Report of Initial Performance Test ------------------------Included in 3b---------------------------- $0.00




Total Reporting Hours by Labor Category 0 0 0

TOTAL REPORTING BURDEN






0 Hours $0
4. RECORDKEEPING REQUIREMENTS










a. Read Instructions
------------------------Included in 3a----------------------------

b. Plan Activities
------------------------Included in 3b----------------------------

c. Implement Activities
------------------------Included in 3b----------------------------

d. Develop Record System
N/A N/A N/A N/A N/A N/A N/A N/A

e. Time to Enter Information











Records of startup, shutdown, and malfunctionsg&h 1.3 1 1.3 25 32.6 1.6 3.3 $3,537.65

f. Audits
N/A N/A N/A N/A N/A N/A N/A N/A




Total Recordkeeping Hours by Labor Category 32.6 1.6 3.3

TOTAL RECORDKEEPING BURDEN






37.5 Hours $3,538




Total Hours by Labor Category 32.6 1.6 3.3

TOTAL ANNUAL LABOR BURDEN AND COST






37.5 Hours $3,538












Assumptions:










a. Number of new facilities (per year): 0










b. Technical hours required to read instructions (hours): 1










c. Technical required to complete performance test (hours): 21










d. Rate of failed performance tests: 20%










e. Technical hours required to complete Method 5 or 9 (hours): 3










f. Technical hours required for notification preparation (hours): 2










g. Technical hours required to record startups, shutdowns and malfunctions (hours): 1.3










h. Number of affected facilities (per year): 25











Sheet 2: TABLE 2

TABLE 2:
Average Annual EPA Burden and Cost - NSPS for Secondary Lead Smelters (40 CFR PART 60, SUBPART L)


















REPORTING/RECORDKEEPING REQUIREMENT

(A) EPA Hours per Occurence (Technical hours) (B) Number of Occurences per Plant per Year (C) EPA Hours per Year (C=A x B) (D) Plants per Year (E) Technical Hours per Year @ $45.52 (E=C x D) (F) Management Hours per Year @ $61.36 (F= E x 0.05) (G) Clerical Hours per Year @ $24.64 (G= E x 0.1) Costs per Year
INITIAL PERFORMANCE TESTSb









New Planta
21 1 21 0 0 0 0 $0.00
REPEAT PERFORMANCE TESTc










New Planta
21 0.2 4.2 0 0 0 0 $0.00
REPORT REVIEW










New Planta










Notification of Constructiond 2 1 2 0 0 0 0 $0.00


Notification of Initial Startupe 0.4 1 0 0 0 0 0 $0.00


Notification of Actual Startupe 0.4 1 0 0 0 0 0 $0.00


Notification of Initial Teste 0.4 1 0 0 0 0 0 $0.00


Review Test Resultsf 7 1 7 0 0 0 0 $0.00
TOTAL ANNUAL HOURS





0 0 0
SALARY BURDEN (per year)








$0.00
ANNUAL TRAVEL EXPENSESg&h











(1 person x 0 plants/year x 3 d/plant x $75 per diem) + ($350 round trip/plant x0 plant/yr) =






$0.00
TOTAL ANNUAL BURDEN








$0.00











Assumptions









a. Number of new facilities (per year): 0









b. Technical hours required to participate with performance test (hours per plant): 21









c. Rate of failed performance tests: 20%









d. Technical hours required to review construction notification: 2









e. Technical hours required to review startup and initial test notifications: 0.4









f. Technical hours required to review performance test results: 7









g New plant visits (per year): 0









h. Round trip airfare to visit plant: $350









File Typeapplication/vnd.ms-excel
Last Modified ByCourtney Kerwin
File Modified2009-11-25
File Created2006-08-15

© 2024 OMB.report | Privacy Policy