NSPS for Surface Coating of Plastic Parts for Business Machines (40 CFR part 60, subpart TTT) (Renewal)

1093.09 Tables

OMB: 2060-0162

Document [xlsx]
Download: xlsx | pdf

Overview

TABLE 1
TABLE 2


Sheet 1: TABLE 1

TABLE 1:

Annual Respondent Burden and Cost - NSPS for the Surface Coating of Plastic Parts for Business Machines










(40 CFR part 60, subpart TTT)








REPORTING/RECORDKEEPING REQUIREMENT

(A) Respondent Hours per Occurence (Technical hours) (B) Number of Occurences per Respondent per Year (C) Hours per Respondent per Year (C=A x B) (D) Number of Respondents per Year (E) Technical Hours per Year @ $97.88 (E=C x D) (F) Management Hours per Year @ $115.40 (F= E x 0.05) (G) Clerical Hours per Year @ $48.38 (G= E x 0.1) Total Labor Costs per Year
1. APPLICATIONS

N/A N/A N/A N/A N/A N/A N/A N/A
2. SURVEY AND STUDIES

N/A N/A N/A N/A N/A N/A N/A N/A
3. REPORTING REQUIREMENTS










New Sourcesa










a. Read Instructionsb
1 1 1 0 0 0 0 $0.00

b. Required Activities











Initial Performance Testsc 3 1 3 0 0 0 0 $0.00



Demonstration of CMS N/A N/A N/A N/A N/A N/A N/A N/A



Repeat of Performance Testsd 3 0.2 0.5 0 0 0 0 $0.00



Method 24 Testinge&f 78 4 313 0.001 0.31 0.016 0.031 $33.96

c. Create Information
------------------------Included in 3b----------------------------

d. Gather Existing Information
------------------------Included in 3e----------------------------

e. Write Report











Notification of Construction/Reconstructiong 2 1 2 0 0 0 0 $0.00



Notification of Actual Startupg 2 1 2 0 0 0 0 $0.00



Notification of Initial Performance Testg 2 1 2 0 0 0 0 $0.00



Report of Performance Test 5.2 1 5.2 0 0 0 0 $0.00



Quarterly Report of Noncomplianceh 14 4 56 2 111 5.6 11.1 $12,075.18



Semiannual Report of Compliancei 0.4 2 0.87 10 8.7 0.43 0.87 $943.37




Total Reporting Hours by Labor Category 120.3 6.0 12.0

TOTAL REPORTING BURDEN






138 Hours $13,053
4. RECORDKEEPING REQUIREMENTS










a. Read Instructions
------------------------Included in 3a----------------------------

b. Plan Activities
------------------------Included in 3b----------------------------

c. Implement Activities
------------------------Included in 3b----------------------------

d. Develop Record System
1 1 1 0 0 0 0 $0.00

e. Time to Enter Information











Record of monthly performance testsi&j 6 12 73 10 730 37 73 $79,243.39

f. Train Personnel
N/A N/A N/A N/A N/A N/A N/A N/A

g. Audits
N/A N/A N/A N/A N/A N/A N/A N/A




Total Recordkeeping Hours by Labor Category 730.4 36.5 73.0

TOTAL RECORDKEEPING BURDEN






840 Hours $79,243




Total Hours by Labor Category 850.7 42.5 85.1

TOTAL ANNUAL LABOR BURDEN AND COST






978 Hours $92,296












Assumptions










a. Number of new facilities (per year): 0










b. Technical hours required to read instructions: 1










c. Technical hours required to complete performance test: 3










d. Rate of failed performance tests: 20%










e. Technical hours required to complete Method 24: 78. It is assumed the EPA Reference Method 24 test performed on the coatings used by the respondents is generally done by the coatings manufacturers, who provide the test results to the respondents.
f. It is assumed that 0.1% of all respondents must generate Method 24 data for a coating because they modify the coatings. This situation is assumed to occur 4 times per year.










g. Technical hours required for notification preparation: 2










h. It is assumed that 20% of all NSPS facilities report non-compliance each year.










i. Number of affected facilities (per year): 10










j. Technical hours required to record monthly performance tests: 6











Sheet 2: TABLE 2

TABLE 2:
Annual Agency Burden and Cost - NSPS for the Surface Coating of Plastic Parts for Business Machines









(40 CFR part 60, subpart TTT)


















REPORTING/RECORDKEEPING REQUIREMENT

(A) EPA Hours per Occurence (Technical hours) (B) Number of Occurences per Plant per Year (C) EPA Hours per Year (C=A x B) (D) Plants per Year (E) Technical Hours per Year @ $45.52 (E=C x D) (F) Management Hours per Year @ $61.36 (F= E x 0.05) (G) Clerical Hours per Year @ $24.64 (G= E x 0.1) Costs per Year
INITIAL PERFORMANCE TESTSb









New Planta
3 1 3 0 0 0 0 $0.00
REPEAT PERFORMANCE TEST










New Planta
3 0.2 0.5 0 0 0 0 $0.00
REPORT REVIEW










New Planta










Notification of Constructionc 2 1 2 0 0 0 0 $0.00


Notification of Initial Startupd 2 1 2 0 0 0 0 $0.00


Notification of Actual Startupd 2 1 2 0 0 0 0 $0.00


Notification of Initial Testd 2 1 2 0 0 0 0 $0.00


Review Test Resultse 2 1 2 0 0 0 0 $0.00
QUARTERLY REPORTS OF NONCOMPLIANCE

7 4 28 2 56 2.8 5.6 $2,841.15
SEMIANNUAL REPORTS OF COMPLIANCEf

0.4 2 0.9 10 9 0.4 0.9 $443.93
TOTAL ANNUAL HOURS





64.3 3.2 6.4
SALARY BURDEN (per year)








$3,285.08
ANNUAL TRAVEL EXPENSESg&h











(1 person x 1 plants/year x 3 d/plant x $75 per diem) + ($350 round trip/plant x 1 plant/yr) =






$575.00
TOTAL ANNUAL BURDEN








$3,860.08











Assumptions









a. Number of new facilities (per year): 0









b. Technical hours required to complete performance test: 3









c. Technical hours required to review construction notification: 2









d. Technical hours required to review startup and initial test notifications: 2









e. Technical hours required to review performance test results: 3









f. It is assumed that 20% of all NSPS facilities report non-compliance each year.









g Percentage of plant visits (per year): 10%









h. Round trip airfare to visit plant: $350









File Typeapplication/vnd.ms-excel