Download:
pdf |
pdfOMB No. 2130-XXXX
TYPE OF INSPECTION
CWR JOINT BAR
FRACTURE REPORT
PERIODIC JOINT INSPECTION (213.119[g][5][i])
TRACK INSPECTION (213.233)
TURNOUT INSPECTION (213.235)
RAILROAD:
SUBDIVISION:
DATE FOUND: _____ / _____ / 20_____
ANNUAL MGT:
MILEPOST:
TRACK #:
CURVE _____ degrees
LOW / INNER RAIL
IN SPIRAL
HIGH / OUTER RAIL
RAIL SECTION(S): ________ / ________
TANGENT
DATE OF LAST JOINT INSPECTION:
ANNUAL JOINT INSPECTION FREQUENCY FOR THIS SEGMENT:
1x
2x
3x
BAR TYPE
4x
OTHER: ______________
STANDARD
NUMBER OF HOLES:
(check all that apply)
_____ / _____ / 20_____
INSULATED
4
5
6
COMPROMISE
8
7
FIELD SIDE BAR
GAGE SIDE BAR
BROKEN THROUGH
Check location of break:
CENTER
INNER BOLT HOLE
CRACKED
TRACK CLASS:
OTHER
Check location(s) and record length(s):
BROKEN THROUGH
Check location of break:
CENTER
INNER BOLT HOLE
CRACKED
OTHER
Check location(s) and record length(s):
TOP CENTER
______________ inches
TOP CENTER
______________ inches
BOTTOM CENTER
______________ inches
BOTTOM CENTER
______________ inches
INNER BOLT HOLE
______________ inches
INNER BOLT HOLE
______________ inches
OTHER BOLT HOLE
______________ inches
OTHER BOLT HOLE
______________ inches
OTHER (describe)
______________ inches
OTHER (describe)
______________ inches
GAP BETWEEN RAIL ENDS
_____________ INCHES
(Figures 1 and 2)
RAIL END BATTER OR RAMP
NORTH or
EAST RAIL END
_____________ INCHES HIGH
_____________ INCHES LONG
SOUTH or
WEST RAIL END
_____________ INCHES HIGH
_____________ INCHES LONG
TREAD MISMATCH
_____________ INCHES
JOINT VERTICAL MOVEMENT
_____________ INCHES
(Figure 3)
IF JOINT IN CURVE or SPIRAL:
GAGE RAMP
(Figure 4)
_____________ INCHES OUT
GAGE MISMATCH
(Figure 5)
_____________ INCHES
JOINT LATERAL MOVEMENT
_____________ INCHES LONG
_____________ INCHES
OTHER COMMENTS:
Public reporting burden for this information collection is estimated to average 10 minutes per response, including the time for reviewing instructions,
searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. According to
the Paperwork Reduction Act of 1995, a federal agency may not conduct or sponsor, and a person is not required to respond to, nor shall a person be
subject to a penalty for failure to comply with, a collection of information unless it displays a currently valid OMB control number. The valid OMB
control number for this information collection is 2130-XXXX. All responses to this collection of information are mandatory. Send comments
regarding this burden estimate or any other aspect of this collection, including suggestions for reducing this burden to: Information Collection Officer,
Federal Railroad Administration, 1120 Vermont Ave., N.W., Washington, D.C. 20590.
Form FRA F6180.124
(8/06)
OMB approval expires XX/XX/20XX
FRACTURE REPORT INSTRUCTIONS (DRAFT)
TYPE OF INSPECTION – Indicate the type of inspection being performed when fracture
was found.
RAILROAD – FRA railroad reporting code, (e.g. CSX or NS).
SUBDIVISION – Railroad's subdivision or district. If none enter "system".
MILEPOST – Railroad's designated milepost at the location of the fracture.
DATE FOUND – Date the fracture was found.
ANNUAL MGT – Million Gross Tons (from previous year) for the specific track with the
fracture.
TRACK CLASS – FRA Class for track with the fracture.
TANGENT/CURVE/SPIRAL/INNER/OUTER – Indicate whether fracture found on
tangent, curve (include degree of curvature) or spiral and if inner or outer rail, if applicable.
RAIL SECTION – Indicate each rail section comprising the joint, (e.g. for a standard bar,
enter 136/ or for a compromise bar, enter 132/115).
ANNUAL JOINT INSPECTION FREQUENCY – Number of times per year that walking joint
bar inspection is performed.
DATE OF LAST JOINT BAR INSPECTION – Date the last walking joint bar inspection was
performed.
BAR TYPE/HOLES – Indicate bar type:
number of holes.
standard, insulated, or compromise bar and
BROKEN THROUGH – For each bar, field and gage, check appropriate box if broken
completely through and indicate the location of the break (through center, through inner
bolt hole or other location).
CRACKED – For each bar, field and gage, indicate the crack location(s) and corresponding
length(s).
GAP BETWEEN RAIL ENDS – Measure and record the distance between the rail ends. If
joint is pulled apart or separated, estimate the gap prior to separation.
RAIL END BATTER OR RAMP - Measure and record the height and length of the batter
or ramp for each rail end and record even if found to be zero. See Figures 1 and 2 for
method of measurement.
TREAD MISMATCH – Measure and record the tread mismatch. See Figure 3 for method of
measurement.
JOINT VERTICAL MOVEMENT – Record the vertical movement of the rail joint (not track
surface) according to 213.13.
GAGE RAMP – In curves only, measure and record the gage ramp distance out and length.
See Figure 4 for method of measurement.
GAGE MISMATCH – In curves only, measure and record the gage mismatch. See Figure 5
for method of measurement.
JOINT LATERAL MOVEMENT – In curves only, record the lateral movement of the rail
joint (not gage) according to 213.13.
OTHER COMMENTS: - Other comments, including any other factors or conditions that may
have contributed to the fracture of the bar(s).
File Type | application/pdf |
File Title | Visio-CWR-Form124.vsd |
Author | sbolak |
File Modified | 2006-09-21 |
File Created | 2006-09-21 |