Private Sector

Questionnaire for Steam Electric Power Generating Effluent Guidelines (New)

Part D_051310

Private Sector

OMB: 2040-0281

Document [pdf]
Download: pdf | pdf
OMB Control Number: 2040-XXXX
Approval Expires: 05/dd/2013

Plant ID: Insert Plant ID
Plant Name: Insert Plant Name

Steam Electric Questionnaire
PART D - POND/IMPOUNDMENT SYSTEMS AND OTHER WASTEWATER TREATMENT
OPERATIONS
Table of Contents
Section Title

Tab Name

Part D Instructions
Plant Pond/Impoundment Systems and Wastewater
Treatment Systems
Pond/Impoundment System and Wastewater
Treatment System Identification
Wastewater Treatment Diagram
Wastewater Treatment Wastewater Flows
Active/Inactive/Open and Planned
Pond/Impoundment Unit Information
Closed Pond/Impoundment Unit Information
Wastewater Treatment Unit Information - System Level
Wastewater Treatment System Chemical Addition
Pond/Impoundment System and Wastewater
Treatment System Costs
Pond/Impoundment System and Wastewater
Treatment System Equipment
Part D Comments
Steam Electric Questionnaire Code Tables

Part D Instructions
Part D Section 1
Part D Section 2
Part D Section 3.1
Part D Section 3.2
Part D Section 4.1
Part D Section 4.2
Part D Section 5.1
Part D Section 5.2
Part D Section 6.1
Part D Section 6.2
Part D Comments
Code Tables

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Instructions

Plant ID: Insert Plant ID
Plant Name: Insert Plant Name
PART D.

POND/IMPOUNDMENT SYSTEMS AND OTHER WASTEWATER
TREATMENT OPERATIONS
INSTRUCTIONS

Part D requests information about all ponds/impoundments used (or planned to be used
or under construction/installation by December 31, 2020) for the storage, treatment,
and/or disposal of process wastewater, residues, or by-products (or sludges or water
streams containing the residues or by-products) from the combustion of coal, petroleum
coke, or oil, including but not limited to fly ash, bottom ash, boiler slag, or flue gas
emission control residues. Additionally, Part D requests information about wastewater
treatment systems, other than pond/impoundment systems, for the treatment of
wastewaters from ash handling or FGD operations that are located at the plant or are
planned to be located at the plant. Complete Part D if you operate one or more systems,
or if you are currently constructing/installing, or planning to construct/install one or more
systems by December 31, 2020.
Refer to the following definitions throughout Part D.
A "pond/impoundment" is defined as a natural topographic depression, man-made
excavation, or diked area formed from earthen materials or man-made materials or a
combination of them, which is designed to hold an accumulation of liquid process
wastes or process wastes containing free liquids, and which is not an injection well.
Examples of ponds/impoundments include holding, storage, settling, and aeration pits,
ponds, and lagoons. It does not include building sumps and outdoor collection/transfer
concrete basins.
A “pond/impoundment system ” is defined as a system consisting of one or more
ponds/impoundments.
A “wastewater treatment unit ” is defined as a unit operation used to remove pollutants
from process wastewater. Wastewater treatment units include, but are not limited to:
ponds/impoundments, chemical precipitation, pH adjustment, clarification, biological
reactor, thickeners, filters, and constructed wetlands.
A “wastewater treatment system ” is defined as a combination of one or more
“wastewater treatment units”, other than ponds/impoundments, designed to achieve
wastewater treatment.
NOTE: If a pond/impoundment unit (as defined in Section 4.1) is part of a broader
“wastewater treatment system” containing non-pond units (e.g., a
pond/impoundment unit in a biological wastewater treatment system), it is not
considered part of a pond/impoundment system.
Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Instructions

Throughout Part D, information is requested for pond/impoundment and wastewater
treatment units and systems that are under construction/installation, or planned to be
under construction/installation by December 31, 2020. Provide design information, or
best engineering estimates as necessary, for these planned systems/units. Additionally,
indicate “NA” if the information requested is not applicable for planned systems/units
(e.g., a question that requests flow rate data for year 2009).
As you are completing the electronic form, note the following: When you enter your plant
name and plant ID on the Part D Table of Contents tab, all name and ID fields
throughout Part D will automatically populate. Refer to the overall questionnaire
instructions, the glossary, and the acronym list for assistance with completing Part D.
Please provide all free response answers in the highlighted yellow areas. Throughout
Part D, you may need to make copies of certain sections/questions. Instructions are
provided throughout Part D regarding making copies. Note that pond/impoundment
system (and unit) and wastewater treatment system ID's must be populated on the
copied tab or section, located in the upper right corner under "Plant ID" and "Plant
Name", in order to correlate the requested information with the pond/impoundment or
wastewater treatment system.
Use the Part D Comments tab to do the following: provide additional information as
requested in certain questions within Part D; indicate atypical data (e.g., if 2009
information is not representative of normal operations); and note methods used to make
best engineering estimates in the event that exact data are not available.

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Plant ID: Insert Plant ID
Plant Name: Insert Plant Name
Part: D
Section Title: 1. Plant Pond/Impoundment Systems and Wastewater Treatment Systems

CBI?
Yes

D1-1. Have you used, do you use, OR do you plan to use (or begin construction/installation of) by December 31, 2020 any
ponds/impoundments for the storage, treatment, and/or disposal of process wastewater , residues , or by-products (or sludges or
water streams containing the residues or by-products) from the combustion of coal, petroleum coke, or oil, including but not limited to
fly ash , bottom ash , boiler slag, or flue gas emission control residues?
Note: This includes ponds/impoundments located on non-adjoining property that are under the operational control of the plant.
Yes
No

CBI?
Yes

D1-2. Do you operate OR plan to operate (or begin construction/installation of) by December 31, 2020 any wastewater treatment systems,
other than pond/impoundment systems, for the treatment of process wastewaters from ash handling or FGD operations?
Note: This includes systems located on non-adjoining property that are under the operational control of the plant.
Yes
No

If you answered "No" to both Questions D1-1 and D1-2, do NOT complete the remainder of
Part D. Skip to the next Questionnaire Part. Otherwise, continue to Part D Section 2.

D-1

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Plant ID: Insert Plant ID
Plant Name: Insert Plant Name
Part: D
Section Title: 2. Pond/Impoundment System and Wastewater Treatment System Identification
Instructions: Complete Section 2 (Questions D2-1 through D2-7) for pond/impoundment systems and/or wastewater treatment systems that the plant operates and/or plans to operate
(or begin construction/installation of) by December 31, 2020, including those located on non-adjoining property, for the treatment of process wastewaters from ash
handling or FGD operations. Please provide all free response answers in the highlighted yellow areas.
CBI?

D2-1. Has the plant been involved with any ash or FGD wastewater treatment studies (pilot- or full-scale), including studies on pond/impoundment systems, since 2000?

Yes

CBI?

Yes

(Continue)

No

(Skip to Question D2-4)

D2-2. Are any of these studies ongoing?

Yes
Yes
No

CBI?

D2-3. Was a summary and/or report describing/documenting the pilot- or full-scale study prepared (including internal and published reports)?

Yes
Yes

(Provide a copy of the summary/report)

No

(Continue)

Provide a description of the pilot- or full-scale study. Note the types of treatment technologies studied and the analytes measured in influent to and/or effluents from the
wastewater treatment system.

D-2

Approved: May XX, 2010

Steam Electric Questionnaire

CBI?
Yes

CBI?
Yes

CBI?
Yes

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

D2-4. List any ash or FGD wastewater treatment technologies that have been studied by the plant that are not covered by Questions D2-1 through D2-3 (e.g., those that have
been studied in in bench-scale studies).

D2-5. Do you operate OR plan to operate (or begin construction/installation of) by December 31, 2020 any systems, including those located on non-adjoining property, for the
treatment of process wastewaters from ash handling or FGD operations?
Yes

(Continue)

No

(Skip to Section 4.1)

D2-6. Do you operate OR plan to operate (or begin construction/installation of) by December 31, 2020 any pond/impoundment systems, including those located on nonadjoining property, for the treatment of process wastewaters from ash handling or FGD operations?
Yes

(Continue)

No

(Skip to Question D2-7)

List these pond/impoundment systems in Table D-1. For each pond/impoundment system, EPA assigned a number (e.g., POND-1, POND-2) in Table D-1, which will be
used throughout the remainder of the survey. In the "Plant Designation" column, provide the plant's name for each pond/impoundment system. In the "Individual
Ponds/Impoundments Included in the Pond System" column, identify all pond/impoundment units from Table A-4 that are included in the pond system.

NOTE: Do NOT include a pond/impoundment unit in Table D-1 if the pond/impoundment unit is or is planned to be part of a broader wastewater treatment
system containing non-pond wastewater treatment units (e.g., pond/impoundment unit in a biological wastewater treatment system).

D-3

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Table D-1. Plant Pond/Impoundment Systems

Pond/ Impoundment Year Initially Brought
Online
System ID

Individual Pond/Impoundments (Identified in Table A-4) Included in the
Plant Designation
Pond/Impoundment System
Active/Inactive/Open Pond/Impoundment Systems

POND-1
POND-2
POND-3
POND-4
POND-5
POND-6
POND-7
POND-8
POND-9
POND-10

D-4

SPD - 1

SPD - 3

SPD - 5

SPD - 7

SPD - 9

SPD - 11

SPD - 13

SPD - 2

SPD - 4

SPD - 6

SPD - 8

SPD - 10

SPD - 12

SPD - 14

SPD - 1

SPD - 3

SPD - 5

SPD - 7

SPD - 9

SPD - 11

SPD - 13

SPD - 2

SPD - 4

SPD - 6

SPD - 8

SPD - 10

SPD - 12

SPD - 14

SPD - 1

SPD - 3

SPD - 5

SPD - 7

SPD - 9

SPD - 11

SPD - 13

SPD - 2

SPD - 4

SPD - 6

SPD - 8

SPD - 10

SPD - 12

SPD - 14

SPD - 1

SPD - 3

SPD - 5

SPD - 7

SPD - 9

SPD - 11

SPD - 13

SPD - 2

SPD - 4

SPD - 6

SPD - 8

SPD - 10

SPD - 12

SPD - 14

SPD - 1

SPD - 3

SPD - 5

SPD - 7

SPD - 9

SPD - 11

SPD - 13

SPD - 2

SPD - 4

SPD - 6

SPD - 8

SPD - 10

SPD - 12

SPD - 14

SPD - 1

SPD - 3

SPD - 5

SPD - 7

SPD - 9

SPD - 11

SPD - 13

SPD - 2

SPD - 4

SPD - 6

SPD - 8

SPD - 10

SPD - 12

SPD - 14

SPD - 1

SPD - 3

SPD - 5

SPD - 7

SPD - 9

SPD - 11

SPD - 13

SPD - 2

SPD - 4

SPD - 6

SPD - 8

SPD - 10

SPD - 12

SPD - 14

SPD - 1

SPD - 3

SPD - 5

SPD - 7

SPD - 9

SPD - 11

SPD - 13

SPD - 2

SPD - 4

SPD - 6

SPD - 8

SPD - 10

SPD - 12

SPD - 14

SPD - 1

SPD - 3

SPD - 5

SPD - 7

SPD - 9

SPD - 11

SPD - 13

SPD - 2

SPD - 4

SPD - 6

SPD - 8

SPD - 10

SPD - 12

SPD - 14

SPD - 1

SPD - 3

SPD - 5

SPD - 7

SPD - 9

SPD - 11

SPD - 13

SPD - 2

SPD - 4

SPD - 6

SPD - 8

SPD - 10

SPD - 12

SPD - 14

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Retired/Closed Pond/Impoundment Systems
RET-POND-1
RET-POND-2
RET-POND-3
RET-POND-4
RET-POND-5

RET SPD - 1

RET SPD - 3

RET SPD - 2

RET SPD - 4

RET SPD - 1

RET SPD - 3

RET SPD - 2

RET SPD - 4

RET SPD - 1

RET SPD - 3

RET SPD - 2

RET SPD - 4

RET SPD - 1

RET SPD - 3

RET SPD - 2

RET SPD - 4

RET SPD - 1

RET SPD - 3

RET SPD - 2

RET SPD - 4

Planned Pond/Impoundment Systems
POND-A
POND-B
POND-C

CBI?
Yes

SPD - A

SPD - C

SPD - B

SPD - D

SPD - A

SPD - C

SPD - B

SPD - D

SPD - A

SPD - C

SPD - B

SPD - D

SPD - E

SPD - E

SPD - E

D2-7. Do you operate OR plan to operate (or begin construction/installation of) by December 31, 2020 any wastewater treatment systems, including those located on nonadjoining property, other than pond/impoundment systems for the treatment of process wastewaters from ash handling or FGD operations?
Yes

(Continue)

No

(Skip to Section 3.1)

List these wastewater treatment systems in Table D-2. For each wastewater treatment system, EPA assigned a number (e.g., WWT-1, WWT-2) in Table D-2, which will
be used throughout the remainder of the survey. In the “Plant Designation” column, provide the plant’s name for each wastewater treatment system. As an example, if a
plant operates a chemical precipitation FGD wastewater treatment system that discharges to an ash pond/impoundment system (as shown in EPA example diagrams
EPA_D-1 and EPA_D-2 located at the bottom of Part D Section 3.1) the FGD wastewater treatment system should be identified in Table D-2 (e.g., as WWT-1) and the
ash pond/impoundment system should have been previously identified in Table D-1 (e.g., as POND-1).
Note that "Approximate Length of Piping from FGD Scrubber System" refers to the length of piping from the FGD solids separation overflow storage tank (or FGD
scrubber absorber if no FGD solids separation) to the beginning of the FGD wastewater treatment system. "Approximate Length of Piping to Subsequent Treatment or
Discharge" refers to the length of piping from the end of the FGD wastewater treatment system to either the beginning of the subsequent treatment system or the
wastewater discharge point,
as appropriate.

D-5

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Table D-2. Plant Wastewater Treatment Systems
FGD Wastewater Treatment

Wastewater
Treatment System ID

Plant Designation

Treatment System Footprint
Year Initially Brought On
(ft2)
Line
Operating Wastewater Treatment Systems

Approximate
Approximate
Length of Piping Length of Piping
from FGD
to Subsequent
Scrubber System
Treatment or
(ft)
Discharge (ft)

WWT-1
WWT-2
WWT-3
WWT-4
WWT-5
WWT-6
Planned Wastewater Treatment Systems
WWT-A
WWT-B
WWT-C

D-6

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Plant ID: Insert Plant ID
Plant Name: Insert Plant Name
Pond/Impoundment System ID or Wastewater Treatment System ID: Insert System ID
Part: D
Section Title: 3.1. Wastewater Treatment Diagram
Instructions: Complete Section 3.1 (Question D3-1) for each pond/impoundment system or wastewater treatment system identified in Table D-1
and Table D-2, including planned systems, systems under construction/installation, or planned to be under construction/installation by
December 31, 2020. Enter the pond/impoundment system ID or wastewater treatment system ID in the yellow highlighted space
provided above (use the pond/impoundment system ID or wastewater treatment system ID assigned in Table D-1 and Table D-2).
Make a copy of Section 3.1 for each pond/impoundment system or wastewater treatment system identified in Table D-1 and Table D-2
using the "Copy Section 3.1" button below.

Copy Section 3.1

CBI?
Yes

D3-1. Attach a block diagram that shows the pond/impoundment system or wastewater treatment system operations, the process
wastewaters that currently enter or are planned to enter the pond/impoundment system or wastewater treatment system, and the
ultimate destinations of the pond/impoundment system or wastewater treatment system effluent(s). Specific instructions for the
diagram are provided in the checklist below. The diagram should have a similar level of detail as EPA’s example diagrams, EPA_D-1
and EPA_D-2.
NOTE: You may use an existing diagram, such as a water balance diagram included in the plant’s NPDES Form 2C, and mark
the additional required information on the diagram by hand.
Provide as many diagrams as necessary to convey the information requested in the checklist below. Number each block diagram in
the upper right corner; the first block diagram should be numbered D-1, the second D-2, etc. Include the plant name, plant ID, and
pond/impoundment system ID or wastewater treatment system ID in the upper right hand corner of the diagram.
Diagram attached.

D-7

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Block Diagram Checklist
Mark the boxes below to verify that you have completed each checklist item…
Include the block diagram number, plant name, plant ID, and pond/impoundment system ID or wastewater treatment system ID
on the diagram.
Include each pond/impoundment or wastewater treatment unit operation. Show all influent and effluent streams from the units
and label all influent and effluent streams from the pond/impoundment system or wastewater treatment system using the code
tables on the "Code Tables" tab provided at the end of this workbook. Note that the "Code Tables" tab provides codes for
wastewater treatment units that are operated in series and/or in parallel (e.g., in EPA_D-1, Chemical Precipitation Reaction
Tank 1-1 and Chemical Precipitation Reaction Tank 2-1 are in series). Effluent streams may include process wastewater and
sludges .
If applicable, use EPA-assigned numbers from Part A or B (e.g., FGD-1) to label process operations . If a process operation
does not have an EPA-assigned number (e.g., boiler, air preheater), use the plant-designated name for the process operation.
When sources or destinations are not shown on the diagram (i.e., the stream is entering from a location not shown on the
diagram), describe the source or destination and add the block diagram number, when appropriate, where the stream's previous
location can be seen. Use codes from the code tables on the "Code Tables" tab provided at the end of this workbook.

Indicate where chemical addition occurs (i.e., into or between which wastewater treatment units). For pond/impoundment
wastewater treatment units, indicate and note on the diagram where within or near the pond/impoundment the chemical is
added (e.g., within the pond/impoundment near the process wastewater influent point, within the pond/impoundment near the
effluent, in the effluent/discharge canal). The chemicals indicated should correspond to the chemicals listed in Table D-7 and
Table D-13.
Identify the final, general destination of the treated process wastewater and waste streams (e.g., treated process wastewater
effluent to POTW or surface waters; solid wastes to on- or off-site destinations). Use codes from code tables on the "Code
Tables" tab provided at the end of this workbook, when applicable.
Indicate, as appropriate, where treated process wastewater is reused or recycled within the plant (e.g., reuse of settling
pond/impoundment water as fly ash sluice).
Include the average annual (2009) flow rates for influent and effluent streams from the wastewater treatment system on the
diagram (in gpm or gpd). For planned pond/impoundment systems and wastewater treatment systems, provide the design flow
rates for the system. Note that these should be the same flow rates that are entered into Tables D-3 and D-4 in Questions D3-2
and D3-3. If the actual number of days of operation for 2009 is not known, the total annual flow may be divided by 365 days and
a comment added to the Comments page. If the process wastewater stream is intermittent, provide amount and frequency; for
example “100 gal, twice/day, 100 dpy” or “1000 gpm, 4 hpd, 365 dpy”. For sludges, provide amount in tpd.

Include NPDES permit outfall numbers, if applicable.
D-8

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

If you believe that the diagram should be treated as confidential, stamp it "Confidential" or write "Confidential" or "CBI" across the top. If
any diagram is not marked "Confidential", it will be considered nonconfidential under 40 CFR Part 2, Subpart B.

Review:
If any of the statements above were not checked, revise the block diagram(s) and ensure all statements have been checked.

Example EPA_D-1. Block Diagram for FGD Wastewater Treatment System

D-9

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Example EPA_D-2. Block Diagram for Ash Pond System

NOTE: The codes used in these diagrams correspond the code tables on the "Code Tables" tab provided at the end of this
workbook.

D-10

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Plant ID: Insert Plant ID
Plant Name: Insert Plant Name
Pond/Impoundment System ID or Wastewater Treatment System ID: Insert System ID
Part: D
Section Title: 3.2. Wastewater Treatment Wastewater Flows
Instructions: Complete Section 3.2 (Question D3-2 and D3-3) for each pond/impoundment system or wastewater treatment system identified in Table D-1 and Table D-2, including planned systems, systems under
construction/installation, or planned to be under construction/installation by December 31, 2020. Enter the pond/impoundment system ID or wastewater treatment system ID in the yellow highlighted space provided
above (use the pond/impoundment system ID or wastewater treatment system ID assigned in Table D-1 and Table D-2).
Make a copy of Section 3.2 for each pond/impoundment system or wastewater treatment system identified in Table D-1 and Table D-2 using the "Copy Section 3.2" button below.

Copy Section 3.2
CBI?
Yes

D3-2. Complete a row in Table D-3 for each process wastewater stream or treated wastewater stream that enters this pond/impoundment system or wastewater treatment system. For planned pond/impoundment
systems and wastewater treatment systems, provide the design flow rates for the system. Use the process and treated wastewater terms provided in the drop down menus. Note that these terms originated from
code tables on the "Code Tables" tab provided at the end of this workbook.
Note: The examples in Tables D-3 and D-4 are derived from the EPA examples diagrams, EPA_D-1 and EPA_D-2, provided at the bottom of Part D Section 3.1.
Table D-3. Pond/Impoundment System or Wastewater Treatment System Influent Flows in 2009

Process or Treated Wastewater
Example (from EPA_D-1):

Average Annual (2009) Wastewater Flow Rate

FGD scrubber purge

Other:

200 gpm
OR

Wastewater Treatment Unit ID

10 hpd
gpd

365 dpy
dpy

Other:

24 hpd
gpd

365 dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

Equalization, Primary

Example (from EPA_D-2):
175 gpm

WWT-1 Effluent

Other:

OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

D-11

Pond Unit - 1

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations
Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Process or Treated Wastewater (Influent Table D-3)

Other:

gpm
OR

Wastewater Treatment Units

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

hpd
gpd

dpy
dpy

Other:

D-12

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Wastewater Treatment Units

Approved: May XX, 2010

Steam Electric Questionnaire

CBI?
Yes

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

D3-3. Complete a row in Table D-4 for each treated wastewater stream or sludge stream that exits this pond/impoundment system or wastewater treatment system (i.e., streams that are discharged , recycled , or
disposed). For planned pond/impoundment systems and wastewater treatment systems, provide the design flow rates for the system. Use the treated wastewater, wastewater treatment unit, and destination terms
provided in the drop down menus. Note that these terms originated from code tables on the "Code Tables" tab provided at the end of this workbook.
*Provide the NPDES permit outfall number of the effluent in the last column of the table, if applicable.
Table D-4. Pond/Impoundment System or Wastewater Treatment System Effluent Flows in 2009
Solids and Sludge
Treated Wastewater
Example (from EPA_D-1):

Average Annual (2009) Wastewater Flow Rate

Amount (tpd or gpm)

% Moisture

Final Destination
Wastewater Treatment
Unit ID

NPDES Permit
Outfall Number*

Destination

tpd

175 gpm

Effluent - 1

Other:
Example (from EPA_D-1):

OR

Filter backwash

NA
OR

gpm

NA
OR

gpm

NA

24 hpd
gpd

365 dpy NA
NA
dpy

gpm

NA

NA

POND-1

Other:

Other:

NA

tpd

Other:

dpy NA
365 dpy

Other:
Example (from EPA_D-2):

NA
NA

hpd
gpd

NA
NA

NA

24 hpd
gpd

365 dpy NA
NA
dpy

24 hpd
gpd

365 dpy NA
dpy

gpm

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

gpm

OR

OR
gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

dpy
dpy

500

gpm

30

NA

Hauled off site for reuse (removal fee)

Other:

Other:

NA

gpm

NA

NA

Reuse as fly ash sluice

Other:

Other:

NA

tpd

1,175 gpm

Treated Wastewater (Table D-4)

Other:

NA

tpd

5,000 gpm

Effluent - 3

Other:

NA

tpd

Effluent - 2

Other:
Example (from EPA_D-2):

NA

Other:

NA

Example (from EPA_D-2):
Sludge

Equalization, Secondary

Other:

hpd
10,000 gpd

NA

gpm
OR

gpm

D-13

NA

NA

Discharge to surface water

Other:

Other:

Wastewater Treatment Units

Other:

001

Destinations

Other:

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations
Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR
gpm

Treated Wastewater (Table D-4)

Other:

OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

Treated Wastewater (Table D-4)

Other:

gpm
OR

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

hpd
gpd

dpy
dpy

tpd

Wastewater Treatment Units

Destinations

gpm

Other:

Other:

D-14

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Plant ID: Insert Plant ID
Plant Name: Insert Plant Name
Pond/Impoundment Unit ID: Insert Unit ID
Part: D
Section Title: 4.1. Active/Inactive/Open and Planned Pond/Impoundment Unit Information
Instructions: Complete Section 4.1 (Questions D4-1 through D4-12) for each active/inactive/open pond/impoundment unit used OR planned to be used (or constructed/installed), including those located on non-adjoining property, by
December 31, 2020 for the storage, treatment, and/or disposal of process wastewater, residues , or by-products (or sludges or water streams containing the residues or by-products) from the combustion of coal, petroleum
coke, or oil, including but not limited to fly ash, bottom ash, boiler slag, or flue gas emission control residues. Use the pond/impoundment unit IDs assigned in Table A-4.
Make a copy of Section 4.1 for each active/inactive/open and planned pond/impoundment units used (or planned to be used) for the storage, treatment, and/or disposal of process wastewater, residues, or by-products (or
sludges or water streams containing the residues or by-products) from the combustion of coal, petroleum coke, or oil, including but not limited to fly ash, bottom ash, boiler slag, or flue gas emission control residues using the
"Copy Section 4.1" button below.

NOTE: If a pond/impoundment unit is part of a broader wastewater treatment system containing non-pond wastewater treatment units (e.g., a pond/impoundment unit in a biological wastewater
treatment system), complete questions in this section for the pond/impoundment unit.

CBI?
Yes

D4-1. Do you use OR plan to use (or begin construction/installation of) by December 31, 2020, any active/inactive/open ponds/impoundments, including those located on non-adjoining property, for the storage, treatment, and/or
disposal of process wastewater, residues, or by-products (or sludges or water streams containing the residues or by-products) from the combustion of coal, petroleum coke, or oil, including but not limited to fly ash, bottom
ash, boiler slag, or flue gas emission control residues?
Yes

(Continue)

No

(Skip to Section 4.2)

Copy Section 4.1
CBI?

D4-2. Provide the residence time of the process wastewater in the pond/impoundment unit, the life of the pond/impoundment unit (based on the current estimation), and the number of cells in the pond/impoundment unit.

Yes

Residence time, hours (as currently operated)
Life of pond/impoundment unit, years (based on current estimation)
Number of cells in pond/impoundment unit

CBI?
Yes

D4-3. Complete Table D-5. Provide the pond/impoundment unit's volume, surface area, bottom and top elevation, freeboard height, maximum height of berms and dams above the surrounding grade, and the total quantity of solids
placed in the pond/impoundment when it was originally built or planned/designed, at its current status, and at its expected end of life. Additionally, provide the expected year of closure/retirement in the "Expected End of Life"
column. Volume should reflect the free water volume, including the stored solids. For planned pond/impoundment units, enter "NA" in all fields in the "Current" column. Figure D-1 presents an illustration of pond/impoundment
dimensions.
Note: Respondents are not required to take new measurements to provide this data; however, best available information should be used to complete Table D-5.

D-15

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Figure D-1. Pond/Impoundment Dimensions
Table D-5. Active/Inactive/Open and Planned Pond/Impoundment Information
Originally Built or
Planned/Designed

Current

Expected End of Life

Volume, ft3
Surface area, ft2
Bottom elevation, ft
Top elevation, ft
Freeboard height, ft
Maximum height of berms/dams
above grade, ft
Total solids placed in the
pond/impoundment, tons
Expected year of
closure/retirement

D-16

Approved: May XX, 2010

Steam Electric Questionnaire

CBI?

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

D4-4. Does the pond/impoundment unit have a liner ?

Yes
Yes

(Complete Table D-6)

No

(Skip to Question D4-5)

NA

(Pond/Impoundment is planned to be constructed. Information is currently unavailable. Skip to Question D4-10).
Table D-6. Pond/Impoundment Unit Liner

Liner Layer Number (number
from inner to outer layer)

Type of Liner

Thickness of Liner Layer
(cm)

Permeability of Liner Layer
(cm/sec)

Compacted clay
Geosynthetic clay
High density polyethylene (HDPE)
Other (provide below:)

Compacted clay
Geosynthetic clay
High density polyethylene (HDPE)
Other (provide below:)

Compacted clay
Geosynthetic clay
High density polyethylene (HDPE)
Other (provide below:)

Compacted clay
Geosynthetic clay
High density polyethylene (HDPE)
Other (provide below:)

CBI?

D4-5. Has the pond/impoundment unit ever been dredged?

Yes
Yes (Provide following information)

Year of last dredging
Frequency of dredging that year, dpy
Amount of material removed that year, tons
Number of times dredged in the last five years
Number of days dredged in the last five years
Amount of material removed in the last five years, tons
No
NA

(Skip to Question D4-7)
(Pond/Impoundment is planned to be constructed. Skip to Question D4-10)

D-17

Approved: May XX, 2010

Steam Electric Questionnaire

CBI?

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

D4-6. Indicate where the dredged solids are transferred or are planned to be transferred.

Yes
Dredged solids used in embankment construction.
Dredged solids transferred to landfill.
Dredged solids marketed/sold for reuse.
Other (Explain):

CBI?

D4-7. Has the pond/impoundment unit been expanded since the date it was built?

Yes

CBI?

Yes

(Continue)

No

(Skip to Question D4-10)

NA

(Pond/Impoundment is planned to be constructed. Skip to Question D4-10)

D4-8. Identify the type of expansion.

Yes

Lateral expansion
Vertical expansion
Both lateral and vertical expansion

CBI?

D4-9. Describe any expansion(s), since January 1, 2000, to the pond/impoundment unit, including the starting and ending dimensions.

Yes

Provide the total cost associated with the expansion(s). Total costs should include labor, materials, energy, hazardous and nonhazardous waste disposal, purchased equipment, installation, buildings, site preparation, land,
engineering costs, construction expenses, and any other costs available.
Total cost of expansion

$
CBI?

D4-10. Indicate the pollutants targeted for removal by this pond/impoundment unit using techniques other than solely settling (e.g., adding chemicals to remove certain metals). [Check all boxes that apply.]

Yes
Metals (specify):
TSS
Nitrogen compounds (ammonia, nitrate, nitrite)
Organic Acids
Chlorine or other oxidizing agents
Oil and grease
Other:
NA

(Skip to Question D4-12)

D-18

Approved: May XX, 2010

Steam Electric Questionnaire

CBI?

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

D4-11. Of the pollutants listed in D4-10, which effluent limitation(s) drives/will drive the operation of this pond/impoundment unit? Provide the pollutant and the limitation (mg/L or ug/L).

Yes

Pollutant:
Limitation:

Units

Pollutant:
Limitation:

Units

Pollutant:
Limitation:
CBI?

Units

D4-12. Did the plant add chemicals to this pond/impoundment unit in 2009?

Yes
Yes

(Complete Table D-7)

No

(Skip to Section 4.2)

NA

(Pond/impoundment is planned to be constructed. Provide information in Table D-7 to the extent possible based on plans.)

Note that "Chemical Type" refers to the generic name of the chemical added to the pond/impoundment (e.g., lime, sodium hydroxide, alum, polymer ). “Average Dose Concentration” refers to the average
concentration of the chemical within the pond/impoundment unit just after it is added to the unit. In the “Location of Chemical Addition” column, indicate where within or near the pond/impoundment the
chemical is added (e.g., within the pond/impoundment near the process wastewater influent point, within the pond/impoundment near the effluent, in the effluent/discharge canal). If chemical addition is known
only on a yearly basis, divide the yearly value by the approximate number of days the plant added chemicals (which should be the same estimate for the "Frequency of Addition" column).

Table D-7. Chemicals Used in Pond/Impoundment Unit Operations

Chemical Type

Trade Name

Manufacturer

Purpose

D-19

Location of
Chemical
Addition

Average Dose
Concentration
(g/L)

Average Addition Rate (gpd or
lb/day)
gpd

Solid

lb/day

Liquid

gpd

Solid

lb/day

Liquid

gpd

Solid

lb/day

Liquid

gpd

Solid

lb/day

Liquid

gpd

Solid

lb/day

Liquid

Frequency of
Addition (dpy)

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Plant ID: Insert Plant ID
Plant Name: Insert Plant Name
Pond/Impoundment Unit ID: Insert Unit ID
Part: D
Section Title: 4.2. Closed Pond/Impoundment Unit Information
Instructions: Complete Section 4.2 (Questions D4-13 through D4-24) for all pond/impoundment units closed on or after January 1, 2000,
including those located on non-adjoining property, that were used for the storage, treatment, and/or disposal of process
wastewater , residues , or by-products (or sludges or water streams containing the residues or by-products) from the combustion of
coal, petroleum coke, or oil, including but not limited to fly ash, bottom ash, boiler slag, or flue gas emission control residues (use
pond/impoundment unit IDs assigned in Table A-4).
Make a copy of Section 4.2 for each closed pond/impoundment unit, including those located on non-adjoining property, that was
used for the storage, treatment, and/or disposal of process wastewater, residues, or by-products (or sludges or water streams
containing the residues or by-products) from the combustion of coal, petroleum coke, or oil, including but not limited to fly ash ,
bottom ash , boiler slag, or flue gas emission control residues using the "Copy Section 4.2" button below.
NOTE: If a pond/impoundment was part of a broader wastewater treatment system containing non-pond wastewater
treatment units (e.g., a pond/impoundment unit in a biological wastewater treatment system), complete questions in this
section for the pond/impoundment unit.
CBI?
Yes

D4-13. Are there any ponds/impoundments closed on or after January 1, 2000, including those located on non-adjoining property, that
were used for the storage, treatment, and/or disposal of residues or by-products (or sludges or water streams containing the
residues or by-products) from the combustion of coal, petroleum coke, or oil, including but not limited to fly ash, bottom ash, boiler
slag, or flue gas emission control residues?
Yes

(Continue)

No

(Skip to Section 5.1)

Copy Section 4.2

D-20

Approved: May XX, 2010

Steam Electric Questionnaire

CBI?
Yes

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

D4-14. Provide the date the pond/impoundment unit was closed, the actual life of the pond/impoundment unit, and the number of cells in
the pond/impoundment unit.
Date Closed (day/month/year)
Life of pond/impoundment unit (years, actual)
Number of cells in pond/impoundment unit

CBI?
Yes

D4-15. Complete Table D-8. Provide the pond/impoundment unit's volume, surface area, bottom and top elevation, freeboard height,
maximum height of berms and dams above the surrounding grade, and the total quantity of solids placed in the pond/impoundment
when it was originally built and at its end of life, prior to any solids removal/cleaning. Volume should reflect original and final
(accounting for any expansions) free water volume, including the stored solids. Please refer back to Figure D-1 for an illustration of
pond/impoundment dimensions.
Table D-8. Closed Pond/Impoundment Information
Originally Built

End of Life

Volume, ft3
Surface area, ft2
Bottom elevation, ft
Top elevation, ft
Freeboard height, ft
Maximum height of
berms/dams above grade, ft
Total solids placed in the
pond/impoundment, tons

D-21

Approved: May XX, 2010

Steam Electric Questionnaire

CBI?

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

D4-16. Does the pond/impoundment unit have a liner ?

Yes
Yes

(Complete Table D-9)

No

(Skip to Question D4-17)
Table D-9. Pond/Impoundment Unit Liner

Liner Layer Number
(number from inner to
outer layer)

Type of Liner

Thickness of Liner
Layer (cm)

Permeability of Liner Layer
(cm/sec)

Compacted clay
Geosynthetic clay
High density polyethylene (HDPE)
Other (provide below:)

Compacted clay
Geosynthetic clay
High density polyethylene (HDPE)
Other (provide below:)

Compacted clay
Geosynthetic clay
High density polyethylene (HDPE)
Other (provide below:)

Compacted clay
Geosynthetic clay
High density polyethylene (HDPE)
Other (provide below:)

Compacted clay
Geosynthetic clay
High density polyethylene (HDPE)
Other (provide below:)

D-22

Approved: May XX, 2010

Steam Electric Questionnaire

CBI?

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

D4-17. Does the pond/impoundment unit have a cap/cover?

Yes
Yes

(Complete Table D-10)

No

(Skip to Question D4-18)
Table D-10. Pond/Impoundment Unit Cap/Cover

Cap/Cover Layer Number
(number from inner to
outer layer)

Type of Cap/Cover Layer

Thickness of
Cap/Cover Layer (cm)

Permeability of Cap/Cover
Layer (cm/sec)

Compacted clay
Geosynthetic clay
Vegetative cover
High density polyethylene (HDPE)
Other (provide below:)

Compacted clay
Geosynthetic clay
Vegetative cover
High density polyethylene (HDPE)
Other (provide below:)

Compacted clay
Geosynthetic clay
Vegetative cover
High density polyethylene (HDPE)
Other (provide below:)

D-23

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations
Compacted clay
Geosynthetic clay
Vegetative cover
High density polyethylene (HDPE)
Other (provide below:)

Compacted clay
Geosynthetic clay
Vegetative cover
High density polyethylene (HDPE)
Other (provide below:)

Compacted clay
Geosynthetic clay
High density polyethylene (HDPE)
Vegetative cover
Other (provide below:)

D-24

Approved: May XX, 2010

Steam Electric Questionnaire

CBI?

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

D4-18. Was the pond/impoundment unit expanded during its life?

Yes

CBI?

Yes

(Continue)

No

(Skip to Question 4-21)

D4-19. Identify the type of expansion.

Yes
Lateral expansion
Vertical expansion
Both lateral and vertical expansions

CBI?

D4-20. Describe any expansion(s), since January 1, 2000, to the pond/impoundment unit, including the starting and ending dimensions.

Yes

Provide the total cost associated with the expansion(s). Total costs should include labor, materials, energy, hazardous and
nonhazardous waste disposal, purchased equipment, installation, buildings, site preparation, land, engineering costs, construction
expenses, and any other costs available.
Total cost of expansion

$
CBI?

D4-21. Did the plant have a closure plan for this pond/impoundment unit?

Yes
Yes

(Provide a copy of the closure plan)

No

(Continue)

D-25

Approved: May XX, 2010

Steam Electric Questionnaire

CBI?

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

D4-22. Describe the closure process, the required steps, and the costs associated with the closure.

Yes

Note: Total costs should include labor, materials, energy, hazardous and nonhazardous waste disposal, purchased
equipment, installation, buildings, site preparation, land, engineering costs, construction expenses, and any other costs
available.
Note: If you attached a closure plan for the previous question that includes information on the required steps and
associated costs of the closure, do not answer this question and indicate that the information is provided in the attached
closure plan.

Information provided in attached closure plan.

CBI?

D4-23. Has the plant built any structures on top of the closed pond/impoundment?

Yes
Yes

(Continue)

No

(Skip to Question D4-24)

Provide a description of the structure(s) and any challenges that the plant faced building on top of the pond/impoundment.

CBI?
Yes

D4-24. Is the plant performing or does it intend to perform long-term groundwater, soil, or overflow monitoring of this closed
pond/impoundment unit?
Yes. Describe the monitoring plan:

No

D-26

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Plant ID: Insert Plant ID
Plant Name: Insert Plant Name
Wastewater Treatment System ID: Insert System ID
Part: D
Section Title: 5.1. Wastewater Treatment Unit Information - System Level
Instructions: Complete Section 5.1 (Questions D5-1 through D5-12) for each wastewater treatment system identified in Table D-2, including planned (under construction/installation, or planned to be under
construction/installation by December 31, 2020) wastewater treatment systems. Enter the wastewater treatment system ID in the space provided above (use wastewater treatment system ID assigned
in Table D-2).
Make a copy of Section 5.1 for each wastewater treatment system identified in Table D-2 using the "Copy Section 5.1" button below.
NOTE: If the wastewater treatment system includes a pond/impoundment unit, include the pond/impoundment unit in Table D-11.
CBI?

D5-1. Did you identify any wastewater treatment systems in Table D-2?

Yes

Yes

(Continue)

No

(Skip to Part D Section 6.1)

Copy Section 5.1

CBI?
Yes

D5-2. In Table D-11, list all wastewater treatment units comprising the wastewater treatment system including units that are under construction/installation, or planned to be under construction/installation
by December 31, 2020, included in the wastewater treatment system. For each wastewater treatment unit, assign an ID using the wastewater treatment unit terms provided in the drop down menu
(e.g., Clarification, Primary-1), which will be used throughout the remainder of the survey; however, if a pond/impoundment unit is included as part of the wastewater treatment system, enter the
pond/impoundment unit ID assigned in Table A-4 in the space labeled "Pond ID". The drop down menu accounts for the possibility of multiple wastewater treatment units; they are numbered
sequentially. Note that these terms originated from the code tables on the "Code Tables" tab, provided at the end of this workbook.
For example, if the wastewater treatment system includes two clarifiers, select Clarification, Primary-1 for the first clarifier and Clarification, Secondary-1 for the second. In the “Plant Designation”
column, provide the plant’s name for each wastewater treatment unit. In the “Date Added to WWT System” column, either enter the date the unit was/will be installed if the unit is a retrofit, or enter
“original” if the unit was part of the original wastewater treatment system installation.
Table D-11. Wastewater Treatment Units

Wastewater Treatment Unit ID

Plant Designation

Date Added to
Wastewater
Treatment System
(day/month/year)

Wastewater Treatment Units

Other:
Pond ID:

Volume
(ft3)

Footprint/
Surface
Area (ft2)

Residence
Time (hours)

Materials of Construction [Check all boxes that apply.]
316L stainless steel

255 stainless steel

Carbon steel

317LM stainless steel

2205 stainless steel

Fiberglass

317LMN stainless steel

625 stainless steel

Carbon steel, lined with:

Wastewater Treatment Units

Other:
Pond ID:

316L stainless steel

255 stainless steel

Carbon steel

317LM stainless steel

2205 stainless steel

Fiberglass

317LMN stainless steel

625 stainless steel

Carbon steel, lined with:

Wastewater Treatment Units

Other:
Pond ID:

Other:
Pond ID:

316L stainless steel

255 stainless steel

Carbon steel

317LM stainless steel

2205 stainless steel

Fiberglass

317LMN stainless steel

625 stainless steel

Titanium
Other:

316L stainless steel

255 stainless steel

Carbon steel

317LM stainless steel

2205 stainless steel

Fiberglass

317LMN stainless steel

625 stainless steel

Carbon steel, lined with:

D-27

Titanium
Other:

Carbon steel, lined with:

Wastewater Treatment Units

Titanium
Other:

Titanium
Other:

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Wastewater Treatment Units

Other:
Pond ID:

316L stainless steel

255 stainless steel

Carbon steel

317LM stainless steel

2205 stainless steel

317LMN stainless steel

625 stainless steel

Fiberglass
Titanium

Carbon steel, lined with:

Wastewater Treatment Units

Other:
Pond ID:

Other:

316L stainless steel

255 stainless steel

Carbon steel

317LM stainless steel

2205 stainless steel

Fiberglass

317LMN stainless steel

625 stainless steel

Carbon steel, lined with:

Wastewater Treatment Units

Other:
Pond ID:

316L stainless steel

255 stainless steel

317LM stainless steel

2205 stainless steel

317LMN stainless steel

625 stainless steel

Carbon steel, lined with:

Wastewater Treatment Units

Other:
Pond ID:

Other:
Pond ID:

Other:
Pond ID:

255 stainless steel

Carbon steel

317LM stainless steel

2205 stainless steel

Fiberglass

317LMN stainless steel

625 stainless steel

Other:
Pond ID:

316L stainless steel

255 stainless steel

Carbon steel

317LM stainless steel

2205 stainless steel

Fiberglass

317LMN stainless steel

625 stainless steel

Other:
Pond ID:

316L stainless steel

255 stainless steel

Carbon steel

317LM stainless steel

2205 stainless steel

Fiberglass

317LMN stainless steel

625 stainless steel

Other:
Pond ID:

316L stainless steel

255 stainless steel

Carbon steel

317LM stainless steel

2205 stainless steel

Fiberglass

317LMN stainless steel

625 stainless steel

Other:
Pond ID:

316L stainless steel

255 stainless steel

317LM stainless steel

2205 stainless steel

317LMN stainless steel

625 stainless steel

Other:
Pond ID:

Other:
Pond ID:

255 stainless steel

Carbon steel

317LM stainless steel

2205 stainless steel

Fiberglass

317LMN stainless steel

625 stainless steel

Other:
Pond ID:

316L stainless steel

255 stainless steel

Carbon steel

317LM stainless steel

2205 stainless steel

Fiberglass

317LMN stainless steel

625 stainless steel

Other:
Pond ID:

316L stainless steel

255 stainless steel

Carbon steel

317LM stainless steel

2205 stainless steel

Fiberglass

317LMN stainless steel

625 stainless steel

Other:
Pond ID:

316L stainless steel

255 stainless steel

Carbon steel

317LM stainless steel

2205 stainless steel

Fiberglass

317LMN stainless steel

625 stainless steel

Titanium
Other:

316L stainless steel

255 stainless steel

317LM stainless steel

2205 stainless steel

317LMN stainless steel

625 stainless steel

Carbon steel
Fiberglass
Titanium
Other:

316L stainless steel

255 stainless steel

Carbon steel

317LM stainless steel

2205 stainless steel

Fiberglass

317LMN stainless steel

625 stainless steel

Titanium
Other:

316L stainless steel

255 stainless steel

Carbon steel

317LM stainless steel

2205 stainless steel

Fiberglass

317LMN stainless steel

625 stainless steel

Carbon steel, lined with:

D-28

Titanium
Other:

Carbon steel, lined with:

Wastewater Treatment Units

Titanium
Other:

Carbon steel, lined with:

Wastewater Treatment Units

Titanium
Other:

Carbon steel, lined with:

Wastewater Treatment Units

Titanium

316L stainless steel

Carbon steel, lined with:

Wastewater Treatment Units

Carbon steel
Fiberglass

Other:

Carbon steel, lined with:

Wastewater Treatment Units

Titanium
Other:

Carbon steel, lined with:

Wastewater Treatment Units

Titanium
Other:

Carbon steel, lined with:

Wastewater Treatment Units

Titanium
Other:

Carbon steel, lined with:

Wastewater Treatment Units

Titanium
Other:

Carbon steel, lined with:

Wastewater Treatment Units

Titanium

316L stainless steel

Carbon steel, lined with:

Wastewater Treatment Units

Carbon steel
Fiberglass

Other:

Carbon steel, lined with:

Wastewater Treatment Units

Titanium
Other:

Titanium
Other:

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Wastewater Treatment Units

Other:
Pond ID:

Other:
Pond ID:

Carbon steel

2205 stainless steel

317LMN stainless steel

625 stainless steel

Fiberglass
Titanium
Other:

316L stainless steel

255 stainless steel

Carbon steel

317LM stainless steel

2205 stainless steel

Fiberglass

317LMN stainless steel

625 stainless steel

Carbon steel, lined with:

Wastewater Treatment Units

Other:

Wastewater Treatment Units

Other:
Pond ID:

Titanium
Other:

316L stainless steel

255 stainless steel

Carbon steel

317LM stainless steel

2205 stainless steel

Fiberglass

317LMN stainless steel

625 stainless steel

Carbon steel, lined with:

Pond ID:

Yes

255 stainless steel

317LM stainless steel

Carbon steel, lined with:

Wastewater Treatment Units

CBI?

316L stainless steel

Titanium
Other:

316L stainless steel

255 stainless steel

Carbon steel

317LM stainless steel

2205 stainless steel

Fiberglass

317LMN stainless steel

625 stainless steel

Carbon steel, lined with:

Titanium
Other:

D5-3. Provide the design flow rate for the wastewater treatment system, as well as both the average and maximum flow rates for 2009. In addition, provide the duration and frequency of the effluent
transfers from the wastewater treatment system in 2009. If the wastewater treatment system is planned, only provide the design flow rate and enter "NA" in all other fields.

Average design flow rate, gpm
Maximum design flow rate, gpm
Typical flow rate in 2009, gpm
Maximum daily flow rate in 2009, gpm
Maximum daily flow rate in 2009, gpd
Duration of effluent transfers from treatment system in 2009, hpd
Frequency of effluent transfers from treatment system in 2009, dpy
CBI?
Yes

D5-4. Indicate the pollutants targeted for removal by this wastewater treatment system using techniques other than solely settling (e.g., adding chemicals to remove certain metals).
[Check all boxes that apply.]
Metals (specify):
TSS
Nitrogen compounds (ammonia, nitrate, nitrite)
Organic Acids
Chlorine or other oxidizing agents
Oil and grease
Other:
NA

(Skip to Question D5-6)

D-29

Approved: May XX, 2010

Steam Electric Questionnaire

CBI?
Yes

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

D5-5. Of the pollutants listed in D5-4, which effluent limitation(s) drives/will drive the operation of this wastewater treatment system? Provide the pollutant and the limitation (mg/L or
ug/L).
Pollutant:
Limitation:

Units

Pollutant:
Limitation:

Units

Pollutant:
Limitation:
CBI?

Units

D5-6. Is this wastewater treatment system capable of performing sulfide addition?

Yes

CBI?

Yes

(Continue)

No

(Skip to Question D5-8)

D5-7. Is the plant currently performing sulfide addition?

Yes
Yes
No

CBI?
Yes

CBI?
Yes

CBI?

D5-8. Provide information on any impacts that climate had, or will have, on the installation of the wastewater treatment system (e.g., equipment had to be housed inside due to cold winters, extra insulation
was necessary to protect equipment in winter, warm climate allowed all wastewater treatment to be located outdoors).

D5-9. Provide information on any impacts that space availability had, or will have, on the design and/or cost of the wastewater treatment system (e.g., cost increases due to fitting the wastewater treatment
system units into tight spaces and/or moving other equipment to accommodate the treatment system units).

D5-10. Provide any bid proposals and/or engineering reports that were prepared since January 1, 1995 for the wastewater treatment system.

Yes

Note: All bid proposals and/or engineering reports originally submitted to the plant as CBI, should be marked CBI for the purpose of this collection request.
I have attached the bid proposals/engineering reports.
I did not attach the bid proposals/engineering reports. Below, explain why:

D-30

Approved: May XX, 2010

Steam Electric Questionnaire

CBI?
Yes

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

D5-11. In Table D-12, list all planned improvements (including those currently under construction/installation or those planned to be under construction/installation by December 31, 2020) to the wastewater
treatment system. For each planned improvement to the wastewater treatment system, provide the WWT Unit ID the improvement pertains to (if applicable), using the terms in the drop down menu;
however, if the improvement relates directly to a pond/impoundment, use the pond/impoundment ID assigned in Table A-4. Provide a description of the improvement, the expected date of the
improvement, and the total capital cost related to the improvement.
Note: Total capital costs should include purchased equipment, installation, buildings, site preparation, land, engineering costs, construction expenses, and any other costs available.

Table D-12. Planned Improvements to the Wastewater Treatment System

Wastewater Treatment Unit ID

Description of Improvement

Expected Date of
Improvement
(day/month/year)

Total
Capital
Cost ($)

Wastewater Treatment Units

Other:
Pond ID:
Wastewater Treatment Units

Other:
Pond ID:
Wastewater Treatment Units

Other:
Pond ID:
Wastewater Treatment Units

Other:
Pond ID:
Wastewater Treatment Units

Other:
Pond ID:

CBI?

D5-12. Were any of the above planned improvements to the wastewater treatment system, or the planned wastewater treatment system, planned in preparation for potential limit changes in the future?

Yes

Yes

(Continue)

No

(Skip to Section 5.2)

Please identify which pollutants and/or limits, in particular, the improvements or system will target.

D-31

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Plant ID: Insert Plant ID
Plant Name: Insert Plant Name
Wastewater Treatment System ID: Insert System ID
Part: D
Section Title: 5.2. Wastewater Treatment System Chemical Addition
Instructions: Complete Section 5.2 (Question D5-13) for each wastewater treatment system identified in Table D-2 (including those under construction/installation or planned to be under construction/installation by December 31,
2020). Enter the wastewater treatment system ID in the spaces provided above (use wastewater treatment system IDs assigned in Table D-2).
Make a copy of Section 5.2 for each wastewater treatment system identified in Table D-2 using the "Copy Section 5.2" button below.

Copy Section 5.2
CBI?

D5-13. Did the plant add chemicals to any wastewater treatment units in 2009?

Yes
Yes

(Complete Table D-13)

No

(Skip to Section 6.1)

N/A

(Wastewater treatment unit is planned to be constructed. Provide information in Table D-13 to the extent possible based on plans.)

Complete Table D-13 for each unit (as defined in Table D-11) that chemicals are added to in the wastewater treatment system. Complete a row for each chemical added to each unit in the system.
Note that "Chemical Type" refers to the generic name of the chemical added to the wastewater treatment unit (e.g., lime, organosulfide). "Average Dose Concentration" refers to the average concentration of the
chemical within the wastewater treatment unit just after it is added to the unit. If chemical addition is known only on a yearly basis, divide the yearly value by the approximate number of days the plant added chemicals
(which should be the same estimate for the "Frequency of Addition" column).

Table D-13. Chemicals Used in Wastewater Treatment Unit Operations

Wastewater Treatment Unit ID
(Identified in Table D-11)

Chemical Type

Trade Name

Manufacturer

Purpose

Average Dose
Concentration (g/L)

Frequency of
Average Addition Rate (gpd or lb/day) Addition (dpy)

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

D-32

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations
Wastewater Treatment Units

Other:
Wastewater Treatment Units

gpd

Solid

lb/day

Liquid

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

gpd

Solid

lb/day

Liquid

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

Other:
Wastewater Treatment Units

D-33

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations
Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

D-34

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations
Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

Wastewater Treatment Units

gpd

Solid

Other:

lb/day

Liquid

D-35

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Plant ID: Insert Plant ID
Plant Name: Insert Plant Name
Pond/Impoundment System ID or Wastewater Treatment System ID: Insert System ID
Part: D
Section Title: 6.1. Pond/Impoundment System and Wastewater Treatment System Costs
Instructions: Complete Sections 6.1 and 6.2 (Questions D6-1 through D6-6) for each pond/impoundment system identified in Table D-1, that includes at least one pond/impoundment that began operating
at the plant on or after January 1, 2000. For example if a pond/impoundment system began operating in 1996, but a new pond/impoundment was added in 2002, information regarding the
pond/impoundment system must be provided for this section. Also complete Sections 6.1 and 6.2 (Questions D6-1 through D6-6) for each wastewater treatment system identified in Table D-2
that began operating at the plant on or after January 1, 2000. These pond/impoundment systems and wastewater treatment systems also include those under construction/installation or
planned to be under construction/installation by December 31, 2020. Enter the pond/impoundment system ID or wastewater treatment system ID in the space provided above (use
pond/impoundment system IDs and wastewater treatment system IDs assigned in Table D-1 and Table D-2).
Make a copy of Sections 6.1 and 6.2 for each pond/impoundment system and/or wastewater treatment system identified in Table D-1 and Table D-2 using the "Copy Section 6.1 and 6.2"
button below. Just pressing this button once will generate copies of both tabs.

CBI?
Yes

D6-1. Did any ponds/impoundments , including those that are part of a pond/impoundment system identified in Table D-1, and/or wastewater treatment systems, identified in Table D-2, begin
operating (or plan to begin operating) after January 1, 2000?
Yes

(Continue)

No

(Skip to next Questionnaire Part)

Copy Section 6.1 and 6.2
CBI?
Yes

D6-2. Provide annual O&M cost data in Table D-14 for each pond/impoundment system identified in Table D-1, that includes at least one pond/impoundment that began operating at the plant on or
after January 1, 2000, and/or wastewater treatment system, identified in Table D-2, that began operating at the plant on or after January 1, 2000, that was operated in 2009. Provide best
engineering estimates when actual data are not readily available. If you provide an estimate, note the methods that were used to make the estimates in the Comments page.

Note: Do NOT include corrective actions in the O&M costs for the ponds/impoundments in the system.
Table D-14. O&M Cost for the Pond/Impoundment System or Wastewater Treatment System for 2009

2009 Annual Cost

O&M Cost Category

2009 Rate

Operating labor

$

$

per hour (average
rate of labor)

Maintenance labor

$

$

per hour (average
rate of labor)

Maintenance materials

$

Chemicals

$

D-36

2009 Staffing/ Consumption
No. of workers
hpd
dpy
No. of workers
hpd
dpy

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Energy - Power for pumping

$

$

per kWh

kWh/hr

Energy - Power for operations other than pumping

$

$

per kWh

kWh/hr

Steam

$

$

per pound

pounds/hr

Hazardous Sludge Disposal - Dredging

$

$

per

Hazardous Sludge Disposal - Landfilling

$

$

per

Nonhazardous Sludge Disposal - Dredging

$

$

per

Nonhazardous Sludge Disposal - Landfilling

$

$

per

Gallon
Ton

Gallon
Ton

Gallon
Ton

Gallon
Ton

Other:
$
Other:
$

Total O&M Cost (2009)

CBI?
Yes

$

D6-3. Provide cost data in Table D-15 only for those ponds/impoundments, within the pond/impoundment system identified in Table D-1, that began operating on or after January 1, 2000, and/or
wastewater treatment systems, identified in Table D-2, that began operating at the plant on or after January 1, 2000. These ponds/impoundments and wastewater treatment systems include
retired/closed ponds/impoundments, planned ponds/impoundments, and planned wastewater treatment systems (including those under construction/installation or planned to be under
construction/installation by December 31, 2020). Additionally, include any costs incurred by the pond/impoundment system since January 1, 2000. For example, if a pond/impoundment system
was installed in 1996, and one new pond was added in 2002, report the capital costs for the new pond only, and any capital costs (i.e., piping, pumps) incurred for the entire
pond/impoundment system since 2000.
Provide best engineering estimates when actual data are not readily available. For all costs, do not adjust for inflation. For example, if the plant incurred a land cost in 2002, enter the cost in
the “Cost” column and enter “2002” in the “Year on which Cost is Based” column.
NOTE: If no records are available on this wastewater treatment system, provide an explanation in the Comments page.

D-37

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Table D-15. Capital Cost for the Pond/Impoundment System or Wastewater Treatment System

Project
Direct Costs
Purchased equipment (includes all equipment for the installation or
the upgrade: mechanical equipment; piping; instrumentation;
electrical equipment; spare parts; freight charges; taxes; insurance;
and duties)
Purchased equipment installation (includes installation of all
equipment; piping; instrumentation/calibration; electrical equipment;
mechanical equipment; structural supports, insulation, and paint)

Cost

Year on which Cost is
Based

$

$

$
Buildings (buildings constructed to house pond/impoundment system
and/or wastewater treatment system components, operator rooms, or
other operations associated with the system; also includes plumbing,
heating, ventilation, dust collection, air conditioning, lighting,
telephones, intercoms, painting, sprinklers, fire alarms)
Site preparation (includes site clearing, all demolition, grading, roads, $
walking areas, fences)
Land (includes property costs and survey fees)
Total Direct Costs

$
$

Indirect Costs
Engineering Costs (includes process design and general engineering,
cost engineering, consulting fees, supervision, inspection for each
category below:
a. Engineering Contract Firm Costs
b. Owner's Overhead Engineering Costs

$
$

Hired outside engineering firm to oversee design and/or installation of the treatment system.

Construction expenses (includes temporary construction offices,
roads, communications, fencing; construction tools and equipment;
permits, taxes, insurance)

$

Other Contractor's Fees

$

Contingency actually expended (to compensate for unpredictable
events such as storms, floods, strikes, price changes, errors in
estimates, design changes, etc.)

$

Total Indirect Costs

$

Total Capital Cost

$

D-38

Approved: May XX, 2010

Steam Electric Questionnaire

CBI?

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

D6-4. Are all components of the pond/impoundment system and/or wastewater treatment system included in the capital costs reported in Table D-15?

Yes

Yes

(Skip to Question D6-5)

No

(Continue)

Please explain what system components are included in the capital costs listed in Table D-15. Additionally, identify the key components of the pond/impoundment system and/or wastewater
treatment system that are not included in the capital costs reported in Table D-15.

CBI?
Yes

D6-5. If applicable, indicate whether the FGD wastewater treatment system, for which the plant provided capital cost data in Table D-15, was a retrofit or was installed when the FGD scrubber
system was installed.

FGD wastewater treatment system was a retrofit
FGD wastewater treatment system was installed when the FGD scrubber system was installed
NA

CBI?

D6-6. If applicable, indicate whether the FGD wastewater treatment system, for which the plant provide capital cost data in Table D-15, was purchased as part of the FGD scrubber package.

Yes

FGD wastewater treatment system was purchased as part of the FGD scrubber package
FGD wastewater treatment system was not purchased as part of the FGD scrubber package
NA

D-39

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Plant ID: Insert Plant ID
Plant Name: Insert Plant Name
Pond/Impoundment System ID or Wastewater Treatment System ID: Insert System ID
Part: D
Section Title: 6.2. Pond/Impoundment System and Wastewater Treatment System Equipment
Instructions: Complete Section 6.2 (Question D6-7) for all ancillary pieces of equipment included in the
pond/impoundment or wastewater treatment system that contribute to the capital costs provided in Table
D-15.
Note: This tab will copy with every copy made for the previous tab (Part D Section 6.1) as the
information is directly related.

CBI?
Yes

D6-7. In Table D-16, list any ancillary pieces of equipment (i.e., equipment such as pumps and agitators)
included in the pond/impoundment system or wastewater treatment system that contribute significantly to
the capital costs provided in Table D-16 and provide the total number of pieces of that equipment included
in the system. Refer to the examples of ancillary equipment shown below.
Examples of ancillary equipment:
Aerator
Agitator
Chemical feed system (specify chemicals)
Pump, sludge (specify purpose/location)
Pump, wastewater (specify purpose/location)

D-40

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Table D-16. Ancillary Equipment of the Pond/Impoundment
System or Wastewater Treatment System
Number of Ancillary
Equipment Pieces in the
Ancillary Equipment (if applicable)
System
Pump, sludge (serving underflow
2
from clarifiers)

D-41

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

D-42

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Plant ID: Insert Plant ID
Plant Name: Insert Plant Name
Part: D
Section Title: Part D Comments
Instructions: Cross reference your comments by question number and indicate the confidential status of your comment by checking the box next to “Yes” under "CBI?"
(Confidential Business Information).

Question
Number

Comments

CBI?
Yes

CBI?
Yes

CBI?
Yes

CBI?
Yes

CBI?
Yes

CBI?
Yes

CBI?
Yes

CBI?
Yes

CBI?
Yes

CBI?
Yes

CBI?
Yes

CBI?
Yes

D-43

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

CBI?
Yes

CBI?
Yes

CBI?
Yes

CBI?
Yes

CBI?
Yes

CBI?
Yes

CBI?
Yes

CBI?
Yes

CBI?
Yes

CBI?
Yes

CBI?
Yes

CBI?
Yes

D-44

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Steam Electric Questionnaire Code Tables
Process Wastewaters

Treated Wastewaters

For Use in Tables and Questions throughout Parts A, B, C, D, and F.
For Use as Effluents from Pond/Impoundment Systems
and/or Wastewater Treatment Systems in Part D, Table D-4.

Air heater cleaning water
Ash pile runoff
Boiler blowdown
Boiler fireside cleaning water
Boiler tube cleaning water
Bottom ash sluice
Carbon capture wastewater
Coal pile runoff
Combined ash sluice
Combustion turbine cleaning (combustion gas portion of
turbine) water

AHCW
APR
BB
BFCW
BTCW
BAS
CCAPW
CPR
CAS
COMBCW

Combustion turbine cleaning (compressor portion of the
turbine) water
Combustion turbine evaporative coolers blowdown
Cooling tower blowdown
FGD scrubber purge
FGD slurry blowdown
Filter Backwash
Floor drain wastewater
Flue gas mercury control system wastewater
Fly ash sluice
General runoff
Gypsum pile runoff
Gypsum wash water
Ion exchange wastewater
Landfill runoff - capped landfill
Landfill runoff - uncapped landfill
Leachate
Limestone pile runoff
Mill reject sluice

COMPRCW

POND-1 Effluent

POND-1-EFF

TECB
CTB
SCRBP
FGDB
FLTBW
FDW
FGMCW
FAS
GR
GPR
GYPWW
IXW
LRC
LRUC
LEACH
LPR
MRS

POND-2 Effluent
POND-3 Effluent
POND-4 Effluent
POND-5 Effluent
POND-6 Effluent
POND-7 Effluent
POND-8 Effluent
POND-9 Effluent
POND-10 Effluent
POND-A Effluent
POND-B Effluent
POND-C Effluent
WWT-1 Effluent
WWT-2 Effluent
WWT-3 Effluent
WWT-4 Effluent
WWT-5 Effluent

POND-2-EFF
POND-3-EFF
POND-4-EFF
POND-5-EFF
POND-6-EFF
POND-7-EFF
POND-8-EFF
POND-9-EFF
POND-10-EFF
POND-A-EFF
POND-B-EFF
POND-C-EFF
WWT-1-EFF
WWT-2-EFF
WWT-3-EFF
WWT-4-EFF
WWT-5-EFF

Effluent - 1
Effluent - 2
Effluent - 3
Effluent - 4
Effluent - 5
Effluent - 6
Filter backwash
Sludge

EFF-1
EFF-2
EFF-3
EFF-4
EFF-5
EFF-6
FltBW
SLDG

For Use as Influents to Pond/Impoundment Systems and/or
Wastewater Treatment Systems in Part D, Table D-3, AND
Recycled Waters Throughout Questionnaire.

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Steam Electric Questionnaire Code Tables
Process Wastewaters

Treated Wastewaters

For Use in Tables and Questions throughout Parts A, B, C, D, and F.

For Use as Influents to Pond/Impoundment Systems and/or
Wastewater Treatment Systems in Part D, Table D-3, AND
Recycled Waters Throughout Questionnaire.

Once -through cooling water
Reverse osmosis reject water
SCR catalyst regeneration wastewater
SCR catalyst washing wastewater
Soot blowing wash water
Steam turbine cleaning water
Yard drain wastewater

CW
RORW
SCRRW
SCRWW
SOOTW
STCW
YARDW

WWT-6 Effluent
WWT-A Effluent
WWT-B Effluent
WWT-C Effluent

WWT-6-EFF
WWT-A-EFF
WWT-B-EFF
WWT-C-EFF

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Steam Electric Questionnaire Code Tables
Wastewater Treatment Units

Destinations

For Use in Tables and Questions Throughout Parts D and F.

For Use in Tables and Questions Throughout Parts A, C, D,
and F.

Adsorptive media
Aerobic Biological Reactor
Anaerobic Biological Reactor
Aerobic/Anaerobic Biological Reactor
Chemical Precipitation Reaction Tank 1 - 1
Chemical Precipitation Reaction Tank 1 - 2
Chemical Precipitation Reaction Tank 2 - 1

ADSORB
AERBIO
ANBIO
AER/ANBIO
CP-1-1
CP-1-2
CP-2-1

Chemical Precipitation Reaction Tank 2 - 2

CP-2-2

Chemical Precipitation Reaction Tank 3 - 1

CP-3-1

Chemical Precipitation Reaction Tank 3 - 2
Clarification, Primary - 1

CP-3-2
CL-P-1

Clarification, Primary - 2

CL-P-2

Clarification, Secondary - 1
Clarification, Secondary - 2
Clarification, Tertiary - 1
Clarification, Tertiary - 2
Constructed wetland - Cell 1
Constructed wetland - Cell 2
Constructed wetland - Cell 3
Constructed wetland - Cell 4
Constructed wetland - Cell 5
Constructed wetland - Cell 6
Constructed wetland system
Equalization, Primary
Equalization, Secondary
Filter, Microfiltration - 1
Filter, Microfiltration - 2

CL-S-1
CL-S-2
CL-T-1
CL-T-2
CWL -1
CWL -2
CWL -3
CWL -4
CWL -5
CWL -6
CWTS
EQ-P
EQ-S
FLT-M-1
FLT-M-2

Burned on site
Deep-well injection
Discharge to POTW
Discharge to PrOTW
Discharge to surface water
Evaporation
Hauled off site for reuse
(removal fee)
Hauled off site for reuse (given
away)
Hauled off site for reuse
(marketed and sold)
Hauled off site for disposal
Mixed with fly ash for disposal
On-site landfill (as reported in
Table A-6)
POND-1
POND-2
POND-3
POND-4
POND-5
POND-6
POND-7
POND-8
POND-9
POND-10
POND-A
POND-B
POND-C
WWT-1
WWT-2

BURN
DWELL
POTW
PrOTW
SW
EVAP
HAULR - RF
HAULR - GA
SOLD
HAUL
MFA
LANDF
POND-1
POND-2
POND-3
POND-4
POND-5
POND-6
POND-7
POND-8
POND-9
POND-10
POND-A
POND-B
POND-C
WWT-1
WWT-2

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Steam Electric Questionnaire Code Tables
Wastewater Treatment Units

Destinations

For Use in Tables and Questions Throughout Parts D and F.

For Use in Tables and Questions Throughout Parts A, C, D,
and F.

Filter, Microfiltration - 3
Filter, Microfiltration - 4
Filter, Sand/Gravity - 1
Filter, Sand/Gravity - 2
Filter, Sand/Gravity - 3
Filter, Sand/Gravity - 4
Filter, Ultrafiltration - 1
Filter, Ultrafiltration - 2
Filter, Ultrafiltration - 3
Filter, Ultrafiltration - 4

FLT-M-3
FLT-M-4
FLT-S-1
FLT-S-2
FLT-S-3
FLT-S-4
FLT-U-1
FLT-U-2
FLT-U-3
FLT-U-4

WWT-3
WWT-4
WWT-5
WWT-6
WWT-A
WWT-B
WWT-C
Reuse as boiler water
Reuse as bottom ash sluice
Reuse as combined ash sluice

WWT-3
WWT-4
WWT-5
WWT-6
WWT-A
WWT-B
WWT-C
RECYC - BW
RECYC - BAS
RECYC - CAS

Filter press - 1

FP-1

RECYC - FGDP

Filter press - 2

FP-2

Holding tank
Ion exchange
Natural wetlands
pH adjustment - 1
pH adjustment - 2
pH adjustment - 3
Reverse osmosis
Pond Unit - 1
Pond Unit - 2
Pond Unit - 3
Pond Unit - 4
Pond Unit - 5
Pond Unit - 6
Pond Unit - 7
Pond Unit - 8
Pond Unit - 9

HT
IX
NW
PH-1
PH-2
PH-3
ROS
SPD-1
SPD-2
SPD-3
SPD-4
SPD-5
SPD-6
SPD-7
SPD-8
SPD-9

Reuse as FGD slurry
preparation water
Reuse as FGD absorber
makeup
Reuse as fly ash sluice
Reuse as mill reject sluice
Reuse in cooling towers

RECYC - FGDAB
RECYC - FAS
RECYC - MRS
RECYC - CW

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Steam Electric Questionnaire Code Tables
Wastewater Treatment Units

Solids Handling

For Use in Tables and Questions Throughout Parts D and F.

For Use as Planned Solids Handling for the FGD Slurry
Blowdown in Part B Table B-2.

Pond Unit - 10
Pond Unit - 11
Pond Unit - 12
Pond Unit - 13
Pond Unit - 14
Settling tank - 1
Settling tank - 2
Settling tank - 3
Settling tank - 4
Settling tank - 5
Thickener - 1
Thickener - 2
Vacuum drum filter - 1
Vacuum drum filter - 2
Vacuum filter belt - 1
Vacuum filter belt - 2

SPD-10
SPD-11
SPD-12
SPD-13
SPD-14
ST-1
ST-2
ST-3
ST-4
ST-5
TH-1
TH-2
VF-1
VF-2
VFB-1
VFB-2

Centrifuge - 1
Centrifuge - 2
Centrifuge - 3
Centrifuge - 4
Hydrocyclones - 1
Hydrocyclones - 2
Hydrocyclones - 3
Hydrocyclones - 4
Filter press - 1
Filter press - 2
Thickener - 1
Thickener - 2
Vacuum drum filter - 1
Vacuum drum filter - 2
Vacuum filter belt - 1
Vacuum filter belt - 2

CENT-1
CENT-2
CENT-3
CENT-4
HYC-1
HYC-2
HYC-3
HYC-4
FP-1
FP-2
TH-1
TH-2
VF-1
VF-2
VFB-1
VFB-2

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Part D Drop Downs
Process Wastewaters
Process Wastewaters
Select
Air heater cleaning water
Ash pile runoff
Boiler blowdown
Boiler fireside cleaning water
Boiler tube cleaning water
Bottom ash sluice
Carbon capture wastewater
Coal pile runoff
Combined ash sluice
Combustion turbine cleaning (combustion gas portion of turbine) water
Combustion turbine cleaning (compressor portion of the turbine) water
Combustion turbine evaporative coolers blowdown
Cooling tower blowdown
FGD scrubber purge
FGD slurry blowdown
Filter Backwash
Floor drain wastewater
Flue gas mercury control system wastewater
Fly ash sluice
General runoff
Gypsum pile runoff
Gypsum wash water
Ion exchange wastewater
Landfill runoff - capped landfill
Landfill runoff - uncapped landfill
Leachate
Limestone pile runoff
Mill reject sluice
Once -through cooling water
Reverse osmosis reject water
SCR catalyst regeneration wastewater
SCR catalyst washing wastewater
Soot blowing wash water
Steam turbine cleaning water
Yard drain wastewater
Other

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations
Treated Wastewaters

Treated Wastewaters
Select
Effluent - 1
Effluent - 2
Effluent - 3
Effluent - 4
Effluent - 5
Effluent - 6
Filter backwash
POND-1 Effluent
POND-2 Effluent
POND-3 Effluent
POND-4 Effluent
POND-5 Effluent
POND-6 Effluent
POND-7 Effluent
POND-8 Effluent
POND-9 Effluent
POND-10 Effluent
POND-A Effluent
POND-B Effluent
POND-C Effluent
Sludge
WWT-1 Effluent
WWT-2 Effluent
WWT-3 Effluent
WWT-4 Effluent
WWT-5 Effluent
WWT-6 Effluent
WWT-A Effluent
WWT-B Effluent
WWT-C Effluent
Other

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Process or Treated Wastewater (Influent Table D-3)
Process or Treated Wastewater (Influent Table D-3)
Select
Air heater cleaning water
Ash pile runoff
Boiler blowdown
Boiler fireside cleaning water
Boiler tube cleaning water
Bottom ash sluice
Carbon capture wastewater
Coal pile runoff
Combined ash sluice
Combustion turbine cleaning (combustion gas portion of turbine) water
Combustion turbine cleaning (compressor portion of the turbine) water
Combustion turbine evaporative coolers blowdown
Cooling tower blowdown
FGD scrubber purge
FGD slurry blowdown
Filter Backwash
Floor drain wastewater
Flue gas mercury control system wastewater
Fly ash sluice
General runoff
Gypsum pile runoff
Gypsum wash water
Ion exchange wastewater
Landfill runoff - capped landfill
Landfill runoff - uncapped landfill
Leachate
Limestone pile runoff
Mill reject sluice
Once -through cooling water
Reverse osmosis reject water
SCR catalyst regeneration wastewater
SCR catalyst washing wastewater
Sludge
Soot blowing wash water
Steam turbine cleaning water
Yard drain wastewater
POND-1 Effluent
POND-2 Effluent
POND-3 Effluent
POND-4 Effluent
POND-5 Effluent
POND-6 Effluent
POND-7 Effluent
POND-8 Effluent
POND-9 Effluent
POND-10 Effluent
POND-A Effluent
POND-B Effluent
POND-C Effluent
WWT-1 Effluent
WWT-2 Effluent
WWT-3 Effluent

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

WWT-4 Effluent
WWT-5 Effluent
WWT-6 Effluent
WWT-A Effluent
WWT-B Effluent
WWT-C Effluent
Other
Treated Wastewater (Effluents Table D-4)
Treated Wastewater (Table D-4)
Select
Effluent - 1
Effluent - 2
Effluent - 3
Effluent - 4
Effluent - 5
Effluent - 6
Filter backwash
Sludge
Other

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Wastewater Treatment Units
Wastewater Treatment Units
Select
Adsorptive media
Aerobic Biological Reactor
Aerobic/Anaerobic Biological Reactor
Anaerobic Biological Reactor
Brine concentrator
Chemical Precipitation Reaction Tank 1 - 1
Chemical Precipitation Reaction Tank 1 - 2
Chemical Precipitation Reaction Tank 2 - 1
Chemical Precipitation Reaction Tank 2 - 2
Chemical Precipitation Reaction Tank 3 - 1
Chemical Precipitation Reaction Tank 3 - 2
Clarification, Primary - 1
Clarification, Primary - 2
Clarification, Secondary - 1
Clarification, Secondary - 2
Clarification, Tertiary - 1
Clarification, Tertiary - 2
Dryer
Constructed wetlands
Equalization, Primary
Equalization, Secondary
Evaporator
Filter press - 1
Filter press - 2
Filter, Microfiltration - 1
Filter, Microfiltration - 2
Filter, Microfiltration - 3
Filter, Microfiltration - 4
Filter, Sand/Gravity - 1
Filter, Sand/Gravity - 2
Filter, Sand/Gravity - 3
Filter, Sand/Gravity - 4
Filter, Ultrafiltration - 1
Filter, Ultrafiltration - 2
Filter, Ultrafiltration - 3
Filter, Ultrafiltration - 4
Holding tank
Ion exchange
Natural wetlands
pH adjustment - 1
pH adjustment - 2
pH adjustment - 3
Pond Unit - 1
Pond Unit - 2
Pond Unit - 3
Pond Unit - 4
Pond Unit - 5
Pond Unit - 6
Pond Unit - 7
Pond Unit - 8
Pond Unit - 9

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Pond Unit - 10
Pond Unit - 11
Pond Unit - 12
Pond Unit - 13
Pond Unit - 14
Reverse osmosis
Settling tank - 1
Settling tank - 2
Settling tank - 3
Settling tank - 4
Settling tank - 5
Thickener - 1
Thickener - 2
Vacuum drum filter - 1
Vacuum drum filter - 2
Vacuum filter belt - 1
Vacuum filter belt - 2
NA
Other
Destinations
Destinations
Select
Burned on site
Deep-well injection
Discharge to POTW
Discharge to PrOTW
Discharge to surface water
Evaporation
Hauled off site for reuse (given away)
Hauled off site for reuse (marketed and sold)
Hauled off site for reuse (removal fee)
Hauled off site for disposal
Mixed with fly ash for disposal
On-site company owned landfill
POND-1
POND-2
POND-3
POND-4
POND-5
POND-6
POND-7
POND-8
POND-9
POND-10
POND-A
POND-B
POND-C
Reuse as boiler water
Reuse as bottom ash sluice
Reuse as combined ash sluice
Reuse as FGD absorber makeup
Reuse as FGD slurry preparation water
Reuse as fly ash sluice
Reuse as mill reject sluice

Approved: May XX, 2010

Steam Electric Questionnaire

Part D. Pond/Impoundment Systems and Other Wastewater Treatment Operations

Reuse in cooling towers
WWT-1
WWT-2
WWT-3
WWT-4
WWT-5
WWT-6
WWT-A
WWT-B
WWT-C
NA
Other
Units
Units
Select
µg/L
mg/L

Approved: May XX, 2010


File Typeapplication/pdf
File TitlePart D_050610- Mapped for pdf.xls
AuthorBSchwantes
File Modified2010-05-13
File Created2010-05-13

© 2024 OMB.report | Privacy Policy