Developing and Recording Costs for Railroad Adjustments

Developing and Recording Costs for Railroad Adjustments

Non-Regulatory Supplement, NS 23 CFR 646B, Attachment 1 - Federal-Aid Policy Guide (FAPG)

Developing and Recording Costs for Railroad Adjustments

OMB: 2125-0521

Document [doc]
Download: doc | pdf

eFAPG

 

FHWA > Directives > FAPG > Title 23 > NS 23 CFR 646B 


Federal-Aid Policy Guide
July 6, 2005, Transmittal 34

NS 23 CFR 646B

Attachment 1

Non-Regulatory Supplement
Attachment

OPI: HSA-10

EXAMPLE OF AN ESTIMATE OF COST FOR GRADE CROSSING WARNING DEVICES TO SUPPORT AN AUTHORIZATION TO PROCEED WITH CONSTRUCTION UNDER AN ACTUAL COST AGREEMENT

  1. Description of Improvement

Installation or two automatic gate units with cantilever mounted flashing light signals controlled by motion sensor and other track circuit equipment at the crossing of ___ Road and a single main line track, replacing existing reflectorized crossbuck signs.

  1. Estimate of Cost

ITEM

QUANTITY

AMOUNT

Preliminary Engineering

________

________

Construction Engineering

________

________

Material

 

 

     Automatic gate signal

________

________

     Cantilever mounted flashing light signals

________

________

     Motion sensor

________

________

     (any other major item)

________

________

     Other Material

________

________

     Total Material

________

________

     Transportation of Material

________

________

     Store expense

________

________

Equipment

 

________

Labor

 

 

     Direct Labor

 

________

     Holidays, Vacation, and pension

 

________

     Payroll taxes

 

________

     Insurance

 

________

     Meals and lodging

 

________

     Total Labor

 

________

Contingencies

 

 

     Total Cost

 

________

     Less Credit for salvage

 

________

     Net Total

 

________

  1. NOTE: Where agreed to by the State and the railroad and concurred in by FHWA, this estimate format may be used for any program or agreement purpose except for support of an authorization to proceed with construction under a lump sum agreement.


FHWA Home | FAPG | Feedback

United States Department of Transportation - Federal Highway Administration

File Typeapplication/msword
File TitleNon-Regulatory Supplement, NS 23 CFR 646B, Attachment 1 - Federal-Aid Policy Guide (FAPG)
AuthorFHWA
Last Modified ByFHWA
File Modified2007-03-16
File Created2007-03-16

© 2024 OMB.report | Privacy Policy