PURPOSE
Form OE-781R collects international electricity export and import data from persons authorized by Order to export
electric energy from the United States to foreign countries and persons authorized by Presidential permit or treaty to
construct, operate, maintain, or connect electric power transmission lines that cross the U.S. international border. Such
persons are required to report monthly the flows of electric energy received or delivered, the cost and revenues
associated with those transactions, related ancillary services, the characteristics of transmission operations, and the
current and proposed capacities of cross-border lines. The data collected on this form may appear in the following
Energy Information Administration (EIA) and Office of Electricity Delivery and Energy Reliability (OE) publications:
Electric Power Annual, Annual Energy Review, Annual Energy Outlook, Electric Power Monthly, and Transactions
Across International Borders.
REQUIRED RESPONDENTS
Form OE-781R is mandatory pursuant to 15 U.S.C. 772 and must be completed monthly by persons issued Orders authorizing them
to export electricity from the United States to foreign countries and by owners and operators of international electricity transmission
lines authorized by Presidential permit or treaty.
RESPONSE DUE DATE
Submit the completed Form OE-781R for each month to the EIA no later than the last day of the month following the reporting month.
For example, if reporting data is for June, the survey is due on July 30.
METHODS OF FILING RESPONSE
The method for filing the Form OE-781R is via EIA’s electronic forms (e-filing) system. That system is secure, has built-in edits
to catch errors before the form is submitted to EIA, saves time and effort, and reduces the likelihood of a callback from EIA. If you are
not already validated in the system, log on to http://www.eia.doe.gov/electricity/edc for instructions. If your firm’s activities encompass
multiple NERC functional categories (TSO, PSE, and TO), each group will require a unique validation code to help maintain the
separation of scheduling and marketing information within the firm.
There are other filing options if access to the Internet is not available:
E-mail the form to: [email protected]
Fax the form to: (202) 287-1959 or (202) 287-1960
Mail the form to: U.S. Department of Energy, Energy Information Administration, Mail Stop: BG-076 (Form OE-781R), 1000
Independence Avenue, SW, Washington, DC 20586-0690
Note that commonly used facsimile and e-mail transmissions (including files attached to email messages) travel over ordinary
telephone lines and are not considered secure electronic methods of transmitting survey data. Please retain a copy of your
submission for your files.
CONTACTS
For questions or additional information regarding the Form OE-781R, contact the Survey Managers:
Survey Processing Issues:
Regulatory Issues:
Name: Michelle Bowles
Telephone: (202) 586-2430
Email: [email protected]
Name: Steven Mintz
Telephone: (202) 586-9506
Email: [email protected]
U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)
Monthly Electricity
Imports and Exports Report
Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month: ________________ Reporting Year:____________
SCHEDULE 1. IDENTIFICATION INFORMATION (All Respondents)
NERC Functional Area Categories:
□ Purchasing and Selling Entity □ Transmission System Operator □ Transmission Owner
Organizations Having U.S. Treaty Obligations:
□ Treaty Entity
Survey Contact: Persons to contact with questions about this form
First Name: ______________________________________
Last Name: ____________________________________
Title: ___________________________________________
Telephone: ______________________________________
E-mail: ________________________________________
(including extension number)
Address: ________________________________________
City: __________________________________________
State/Province ___________________________________
Zip/Postal Code _________________________________
Country:_________________________________________
Supervisor Contact
First Name: ______________________________________
Last Name: _____________________________________
Title: ___________________________________________
Telephone: ______________________________________
E-mail: _________________________________________
(including extension number)
Address: ________________________________________
City: ___________________________________________
State/Province: ___________________________________
Zip/Postal Code: _________________________________
Country:__________________________________________
U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)
Monthly Electricity
Imports and Exports Report
Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month: ________________ Reporting Year:____________
Company and Federal Licenses
Name of Company: ___________________________________________
Address: ________________________________________
City: __________________________________________
State/Province: ___________________________________
Zip/Postal Code: ________________________________
Country: ______________________
Presidential Permits (Transmission Owners):
a. ___________________________________________
b. ___________________________________________
Export Authorizations (Purchasing and Selling Entities):
Month:
Year:
a. _ ________________
_______
_______
b. _ ________________
_______
_______
FERC EQR Filer Identification (Purchasing and Selling Entities):
a. _ ________________
b. _ ________________
U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)
Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012
Monthly Electricity
Imports and Exports Report
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month: ____________________ Reporting Year:___________
SCHEDULE 2A. IMPORTS—CONTRACTS AND FINANCE (Purchasing and Selling Entities)
Cost-of-Service Transactions
(Payments to International Entities)
Unbundled
Import Categories
Imports
(MWh)
Energy
($)
Transmission
U.S. Side
($)
Imports To Balancing Authority (Name of) by Delivery Terms
1
Market Rate Transactions
(Payments to International Entities)
Payments – Sums may not equal total because of adjustable
financial transactions
Bundled
Ancillary
U.S. Side
($)
Total
($)
Imports
MWh
Energy and
Ancillary
U.S. Side
Transmission
U.S. Side
($)
($)
[ ] Check if Revision Made to Prior Monthly Filing
Completely
Bundled
($)
Total
($)
Imports
(MWh)
Contracted
($)
[ ] No activity this month
Balancing Authority
Hourly:
Less than 1 Year:
1 Year or Greater:
Other
Interface Total:
2
Grand Total-Imports
Imports Acquired Under Commercial Terms By Fuel Source
[ ] Check if Revision Made to Prior Monthly Filing
[ ] No activity this month
Received from International Sellers, Generated from:
3
System
4
Fossil
5
6
Hydropower
Nuclear
7
Renewable
Interface Total:
Grand Total-Imports
Imports Acquired Under U.S. Treaties
Non Financial
8
Columbia River
9
St. Lawrence Seaway
10
Rio Grande
11
Colorado River
12
Other
Financial
13 Canadian Special
Operations
14
Other
[ ] Check if Revision Made to Prior Monthly Filing
[ ] No activity this month
Booked
Out
($)
Delivered
($)
Transmission
U.S. Side
Ancillary
U.S. Side
($)
($)
Total
($)
Exchange Imports
MWh
Total
($)
U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)
Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012
Monthly Electricity
Imports and Exports Report
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month: ____________________ Reporting Year:___________
SCHEDULE 2B. EXPORTS—CONTRACTS AND FINANCE (Purchasing and Selling Entities)
Cost-of-Service Transactions
(Payments to International Entities)
Unbundled
Export Categories
Exports
(MWh)
Energy
($)
Transmission
U.S. Side
($)
Market Rate Transactions
(Payments to International Entities)
Ancillary
U.S. Side
($)
Exports from Balancing Authority (Name of) and Delivery Terms
Total
($)
Exports
MWh
Energy and
Ancillary
U.S. Side
Transmission
U.S. Side
($)
($)
[ ] Check if Revision Made to Prior Monthly Filing
Completely
Bundled
($)
Total
($)
Exports
(MWh)
Hourly:
Less than 1 Year:
1 Year or Greater:
Other
Interface Total:
2 Grand Total-Exports
[ ] Check if Revision Made to Prior Monthly Filing
[ ] No activity this month
Delivered to International Sellers, Generated from:
3
System
4
Fossil
5
Hydropower
6
Nuclear
Renewable
7
Interface Total:
Grand Total-Exports
Exports Under U.S. Treaties
Non Financial
8
Columbia River
9
St. Lawrence Seaway
10
Rio Grande
11
Colorado River
12
Other
Financial
13 Canadian Special
Operations
14
Other
[ ] Check if Revision Made to Prior Monthly Filing
Contracted
[ ] No activity this month
1 Balancing Authority
Exports Under Commercial Terms By Fuel Source
Exchange Exports
Payments – Sums may not equal total because of adjustable financial
transactions
Bundled
[ ] No activity this month
($)
Booked
Out
($)
Delivered
($)
Transmission
U.S. Side
Ancillary
U.S. Side
($)
($)
Total
($)
MWh
Total
($)
U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)
Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012
Monthly Electricity
Imports and Exports Report
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month: ____________________ Reporting Year:___________
SCHEDULE 2C. MONTHLY ANCILLARY SERVICES PROVIDED, VALUE OF SERVICES, AND OTHER KEY SYSTEM SUPPORT (Purchasing and Selling Entities)
BALANCING AUTHORITY NAME AT BORDER CROSSING POINT:
Costs
Imported Services – U.S. Side
Source of Service
1
Total Ancillary Services
2
Replacement Power for Transmission Losses
US Dollars ($)
3rd Party
Power Supplier (Y/N/U)
Exported Service
Source of Service
(Y/N/U)
US Dollars ($)
3rd Party (Y/N/U)
Power Supplier (Y/N/U)
Imported Services – U.S. Side
Exported Services
[ ] Check if No Change Required
[ ] Check if No Change Required
[ ] No activity this month
[ ] No activity this month
TYPES OF ANCILLARY SERVICES
(Check All That Apply)
Source of Services
Power Supplier
3rd Party
Power Supplier
Power
Power
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
4
Reactive Supply & Voltage Control
[]
[]
[]
5
Regulation & Frequency Response
[]
[]
[]
6
Schedule System Control & Dispatch
[]
[]
[]
8
Spinning Reserve
Supplemental Reserve
3rd Party
[]
Black Start Service
Transmission
[]
Services Bundled In
[]
3
7
Source of Services
Services Bundled In
Transmission
[]
Other Key System Support Services
9
Emergency Energy
10
Energy Imbalance
[]
[]
[]
[]
[]
[]
[]
[]
11
Must Run Agreements
[]
[]
[]
[]
[]
[]
[]
[]
U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)
Monthly Electricity
Imports and Exports Report
Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month: _________________ Reporting Year:________
SCHEDULE 3. OPERATION FLOWS—IMPORTS AND EXPORTS (Transmission Operators)
TSIN Interface Name:
CATEGORY
Scheduled Imports
(MWh)
Firm
NonFirm
Scheduled Exports
(MWh)
Total
1
Total Power Flow for Month
2
International Source and U.S. Destination Combinations – For Individual Balancing Authorities
International Source/ U.S. Destination Combo #1
International Source/ U.S. Destination Combo #2
International Source/ U.S. Destination Combo #3
International Source/ U.S. Destination Combo #4
International Source/ U.S. Destination Combo #5
3
U.S. Source and International Destination Combinations - For Individual Balancing Authorities
U.S. Source/ International Destination Combo #1
U.S. Source/ International Destination Combo #2
U.S. Source/ International Destination Combo #3
U.S. Source/ International Destination Combo #4
U.S. Source/ International Destination Combo #5
SCHEDULED IMPORT FUEL SOURCE
Received from International Sources, Generated from:
4
System
5
Non System
6
Received under U.S. Treaty Terms
SCHEDULED EXPORT FUEL SOURCE
Delivered from U.S. Source, Generated from:
7
System
8
Non System
9
Delivered under U.S. Treaty Terms
Firm
NonFirm
Actual
(MWh)
Total
Inadvertent
(MWh)
U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)
Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012
Monthly Electricity
Imports and Exports Report
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month: _________________ Reporting Year:________
SCHEDULE 4. CHARACTERISTICS OF TRANSMISSION OPERATIONS
System Capacity (Transmission Operators)
Measure of Capacity
TSIN Interface Name: A
TSIN Interface Name: A
If transmission line usage is for
Alternating Current
If transmission line usage is for
Direct Current
Imports
Exports
Imports
Exports
System Safety Limits for Season
Electrical System
1a
Summer Limit
2a
Winter Limit
Safe Operating Limits at Time of
Seasonal Peak (MW)
Thermal Limits at Time of
Seasonal Peak
(MW)
Total Transfer Capability for Season (TTC)
3a
Summer TTC
4a
Winter TTC
DOE Operating Requirements
Imports
Exports
Imports
Exports
DOE Presidential Permits (Transmission Owners)
5a
Cite the Presidential Permit Number
5b
Terms of Presidential Permits –
count of exceeded events
5c
Cite what terms were exceeded.
DOE Export Authorizations (Purchasing and Selling Entities)
6a
Cite the Export Authorization
Number
6b
Terms of Export Authorizations –
count of exceeded events
6c
Cite what terms were exceeded.
TSIN Interface Name: A
If transmission line usage is
for Special Facilities using
both Alternating Current and
Direct Current on the Same
Transmission Line, then use
columns for both AC and DC
U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)
Monthly Electricity
Imports and Exports Report
Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month: _________________ Reporting Year:________
SCHEDULE 5A. EXISTING TRANSMISSION FACILITIES CROSSING BORDERS (Transmission Owners)
TRANSMISSION LINE IDENTIFICATION
1b
Transmission Line 1st.
Transmission Line 2nd.
Transmission Line 3rd.
Presidential Permit No. is
1a
[___________________________]
Presidential Permit No. is
1a
[___________________________]
Presidential Permit No. is
1a
[__________________________]
TSIN IDENTIFICATION
2
Terminal Location (From)
3
Terminal Location (To)
4
Line Ownership Type
5
Percent Ownership
TRANSMISSION LINE DATA
6
Status of Existing Transmission Line
[ ] OP
[ ] RE
[ ] OS [ ] AB
7
Line Length (miles)
8
Line Type
[ ] OH
[ ] UG
[ ] SM
[ ] OH
[ ] UG
9
Voltage Type
[ ] AC
[ ] DC
[ ] SF
[ ] AC
[ ] DC
10
Voltage Operating (Kilovolts)
11
Voltage Design (Kilovolts)
12
Conductor Size (MCM)
13
Conductor Material Type
(see list)
(see list)
(see list)
14
Bundling Arrangement
(see list)
(see list)
(see list)
15
Circuits per Structure Present
16
Circuits per Structure Ultimate
17
Pole/Tower Type
18
Capacity Ratings (Megavolt amperes)
(see list)
[ ] OP
[ ] RE
[ ] OS [ ] AB
[ ] SM
[ ] SF
[ ] OP
[ ] RE
[ ] OS [ ] AB
[ ] OH
[ ] UG
[ ] SM
[ ] AC
[ ] DC
[ ] SF
(see list)
U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)
Monthly Electricity
Imports and Exports Report
Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month: __________________ Reporting Year:________
Legend
Line Type
OH = Overhead
UG = Underground
SM = Submarine
Voltage Type
AC = Alternating Current
DC = Direct Current
SF = Special Facility
using new technologies
for DC and AC
Conductor Material Type
AL = Aluminum
ACCR = Aluminum Composite Conductor
ACSR = Aluminum Core Steel Reinforced
Pole/Tower Type
P = Single Pole
H = H Frame
T = Tower
U = Underground
O = Other
Status of Existing Transmission Line
OP = Operational
RE = Retired in place (lines and facilities not being removed)
OS = Being taken Out of Service or Out of Service
AB = Abandoned
Line Ownership Type
C = Cooperative
F = Federal
I = Investor-Owned
M = Municipal
A = Municipal Marketing Authority
S = State (Owned by)
P = Political Subdivision (Non-State)
Q = Independent Power Producer or Qualifying Facility
R = Retail Power Marketer (or Energy Service Provider)
O = Other
Bundling Arrangement
1 = Single
2 = Double
3 = Triple
4 = Quadruple
5 = Other
U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)
Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012
Monthly Electricity
Imports and Exports Report
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month: __________________ Reporting Year:________
SCHEDULE 5B. PROPOSED TRANSMISSION FACILITIES CROSSING BORDERS (Transmission Owners)
TRANSMISSION LINE IDENTIFICATION
1b
Transmission Line 1st.
Transmission Line 2nd.
Transmission Line 3rd.
Presidential Permit No. is
1a
[___________________________]
Presidential Permit No. is
1a
[___________________________]
Presidential Permit No. is
1a
[__________________________]
TSIN IDENTIFICATION Number (IF KNOWN)
2
Terminal Location (From)
3
Terminal Location (To)
4
Line Ownership Type
5
Percent Ownership
TRANSMISSION LINE DATA
6
Status of Proposed Transmission Line
[ ] CL
[ ] PL
7
Line Length (miles)
8
Line Type
[ ] OH
[ ] UG
9
Voltage Type
[ ] AC
[ ] DC
[ ] CO [ ] CN
[ ] CL
[ ] PL
[ ] SM
[ ] OH
[ ] UG
[ ] SF
[ ] AC
[ ] DC
[ ] CO [ ] CN
[ ] CL
[ ] PL
[ ] CO [ ] CN
[ ] SM
[ ] OH
[ ] UG
[ ] SM
[ ] SF
[ ] AC
[ ] DC
[ ] SF
10
Voltage Operating (Kilovolts)
11
Voltage Design (Kilovolts)
12
Conductor Size (MCM)
13
Conductor Material Type
(see list)
(see list)
(see list)
14
Bundling Arrangement
(see list)
(see list)
(see list)
15
Circuits per Structure Present
16
Circuits per Structure Ultimate
17
Pole/Tower Type
18
Capacity Ratings (Megavolt amperes)
19
Projected In Service Date
20
Upgrade to Existing Line? If “Yes”, Upgrade Capacity
[ ] Yes [ ] No
21
Right-of-Way Use: (Check All That Apply)
[ ] New
22
New Facilities: (Check All That Apply)
[ ] Improvement to Grid [ ] Other
[ ] Improvement to Substation
(see list)
(see list)
(mm-yyyy)
(mm-yyyy)
Capacity:
[ ] Existing
[ ] Unknown
[ ] Yes [ ] No
[ ] New
(mm-yyyy)
Capacity:
[ ] Existing
[ ] Unknown
[ ] Improvement to Grid [ ] Other
[ ] Improvement to Substation
[ ] Yes [ ] No
[ ] New
Capacity:
[ ] Existing
[ ] Unknown
[ ] Improvement to Grid [ ] Other
[ ] Improvement to Substation
U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)
Monthly Electricity
Imports and Exports Report
Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month: __________________ Reporting Year:________
Legend
Line Type
OH = Overhead
UG = Underground
SM = Submarine
Voltage Type
AC = Alternating Current
DC = Direct Current
SF = Special Facility using new
technologies for DC and AC
Pole/Tower Type
P = Single Pole
H = H Frame
T = Tower
U = Underground
O = Other
Status of Proposed Transmission Line
CL = Conceptual
CN = Cancelled
CO = Under Construction
PL = Planned
Line Ownership Type
C = Cooperative
F = Federal
I = Investor-Owned
M = Municipal
A = Municipal Marketing Authority
S = State (Owned by)
P = Political Subdivision (Non-State)
Q = Independent Power Producer or Qualifying Facility
R = Retail Power Marketer (or Energy Service Provider)
O = Other
Conductor Material Type
AL = Aluminum
ACCR = Aluminum Composite Conductor
ACSR = Aluminum Core Steel Reinforced
Bundling Arrangement
1 = Single
2 = Double
3 = Triple
4 = Quadruple
5 = Other
U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)
Monthly Electricity
Imports and Exports Report
Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month: _________________ Reporting Year:________
SCHEDULE 6: COMMENTS
Please Enter Any Comments Regarding This Survey:
U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)
Monthly Electricity
Imports and Exports Report
Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month: _________________ Reporting Year:________
GLOSSARY
Additional terms related to this form are available online at:
www.ferc.gov/docs-filing/eqr/news-help/require-guide.pdf (FERC “Electric Quarterly Report, Filing Requirements Guide”)
www.ferc.gov/docs-filing/eqr/soft-Tools/eqrdatadictionary.pdf (FERC “Electric Quarterly Data Dictionary Version 1.0”)
www.tsin.com/glossary.html (NERC, Archived Glossary of OASIS Terms)
www.nerc.com/files/glossary_12Feb08.pdf (NERC Glossary of Terms used in Reliability Standards)
www.eia.doe.gov/glossary/index.html (EIA, Energy Glossary)
SANCTIONS
The terms and conditions of an electricity export authorization and Presidential permit for the construction, operation, maintenance, and
connection of an international electric transmission facility issued by DOE require the holder of such an authorization or permit to submit the
information and data necessary to complete Form OE-781R in a timely and accurate manner. The timely submission of Form OE-781R by those
required to report also is mandatory under Section 13(b) of the Federal Energy Administration Act of 1974 (FEAA) (Public Law 93-275), as
amended.
Failure to respond may result in a penalty of not more than $2,750 per day for each civil violation, or a fine of not more than $5,000 per day for
each criminal violation. The Government may bring a civil action to prohibit reporting violations, which may result in a temporary restraining order
or a preliminary or permanent injunction without bond. In such civil action, the court may also issue mandatory injunctions commanding any
person to comply with these reporting requirements. Title 18 U.S.C. 1001 makes it a criminal offense for any person knowingly and willingly to
make to any Agency or Department of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction.
Obtaining a valid Order from DOE authorizing the export of electricity under section 202(e) of the Federal Power Act (FPA) is a necessary
condition before engaging in the export. Failure to obtain such an Order, or continuing to export after the expiration of such an Order, may result
in a denial of authorization to export in the future and subject the exporter to sanctions and penalties under the FPA. Also, a violation of any terms
or conditions of the Order authorizing the electricity export, including the failure to submit timely and accurate reports, may result in the loss of
authority to export electricity and subject the holder of such authorization to sanctions and penalties under the FPA.
REPORTING BURDEN
Public reporting burden for this collection of information is estimated to average 7.8 hours per respondent, including the time for reviewing
instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of
information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for
reducing this burden to the Energy Information Administration, Statistics and Methods Group, EI-70, 1000 Independence Avenue S.W., Forrestal
Building, Washington, D.C. 20585-0670; and to the Office of Information and Regulatory Affairs, Office of Management and Budget, Washington,
D.C. 20503. A person is not required to respond to the collection of information unless the form displays a valid OMB number.
PROTECTED INFORMATION
Information reported on Form OE-781R will be treated as non-sensitive and may be publicly released in identifiable form. In addition to the use of
the information by EIA for statistical purposes, the information may be used for any nonstatistical purposes, such as administrative, regulatory, law
enforcement, or adjudicatory purposes.
File Type | application/pdf |
File Title | Microsoft Word - OE-781R Revised Form 05-27-2010.doc |
Author | JWO |
File Modified | 2010-06-25 |
File Created | 2010-06-25 |