Form OE-781R Monthly Electricity Import and Export Survey

Monthly Electricity Import and Export Survey

OE-781R Revised Form

Monthly Electricity Import and Export Survey

OMB: 1901-0296

Document [pdf]
Download: pdf | pdf
U.S. Department of Energy
Office of Electricity Delivery and
Energy Reliability
Form OE-781R (2010)

MONTHLY ELECTRICITY IMPORTS AND
EXPORTS REPORT

Form Approved
OMB No. 1901-0296
Approval Expires 11/30/2012

PURPOSE

Form OE-781R collects international electricity export and import data from persons authorized by Order to export
electric energy from the United States to foreign countries and persons authorized by Presidential permit or treaty to
construct, operate, maintain, or connect electric power transmission lines that cross the U.S. international border. Such
persons are required to report monthly the flows of electric energy received or delivered, the cost and revenues
associated with those transactions, related ancillary services, the characteristics of transmission operations, and the
current and proposed capacities of cross-border lines. The data collected on this form may appear in the following
Energy Information Administration (EIA) and Office of Electricity Delivery and Energy Reliability (OE) publications:
Electric Power Annual, Annual Energy Review, Annual Energy Outlook, Electric Power Monthly, and Transactions
Across International Borders.
REQUIRED RESPONDENTS
Form OE-781R is mandatory pursuant to 15 U.S.C. 772 and must be completed monthly by persons issued Orders authorizing them
to export electricity from the United States to foreign countries and by owners and operators of international electricity transmission
lines authorized by Presidential permit or treaty.
RESPONSE DUE DATE
Submit the completed Form OE-781R for each month to the EIA no later than the last day of the month following the reporting month.
For example, if reporting data is for June, the survey is due on July 30.
METHODS OF FILING RESPONSE
The method for filing the Form OE-781R is via EIA’s electronic forms (e-filing) system. That system is secure, has built-in edits
to catch errors before the form is submitted to EIA, saves time and effort, and reduces the likelihood of a callback from EIA. If you are
not already validated in the system, log on to http://www.eia.doe.gov/electricity/edc for instructions. If your firm’s activities encompass
multiple NERC functional categories (TSO, PSE, and TO), each group will require a unique validation code to help maintain the
separation of scheduling and marketing information within the firm.
There are other filing options if access to the Internet is not available:
E-mail the form to: [email protected]
Fax the form to: (202) 287-1959 or (202) 287-1960
Mail the form to: U.S. Department of Energy, Energy Information Administration, Mail Stop: BG-076 (Form OE-781R), 1000
Independence Avenue, SW, Washington, DC 20586-0690
Note that commonly used facsimile and e-mail transmissions (including files attached to email messages) travel over ordinary
telephone lines and are not considered secure electronic methods of transmitting survey data. Please retain a copy of your
submission for your files.

CONTACTS
For questions or additional information regarding the Form OE-781R, contact the Survey Managers:
Survey Processing Issues:

Regulatory Issues:

Name: Michelle Bowles
Telephone: (202) 586-2430
Email: [email protected]

Name: Steven Mintz
Telephone: (202) 586-9506
Email: [email protected]

U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)

Monthly Electricity
Imports and Exports Report

Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012

Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________

Reporting Month: ________________ Reporting Year:____________

SCHEDULE 1. IDENTIFICATION INFORMATION (All Respondents)
NERC Functional Area Categories:

□ Purchasing and Selling Entity □ Transmission System Operator □ Transmission Owner

Organizations Having U.S. Treaty Obligations:

□ Treaty Entity

Survey Contact: Persons to contact with questions about this form
First Name: ______________________________________

Last Name: ____________________________________

Title: ___________________________________________
Telephone: ______________________________________

E-mail: ________________________________________

(including extension number)
Address: ________________________________________

City: __________________________________________

State/Province ___________________________________

Zip/Postal Code _________________________________

Country:_________________________________________
Supervisor Contact
First Name: ______________________________________

Last Name: _____________________________________

Title: ___________________________________________
Telephone: ______________________________________

E-mail: _________________________________________

(including extension number)
Address: ________________________________________

City: ___________________________________________

State/Province: ___________________________________

Zip/Postal Code: _________________________________

Country:__________________________________________

U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)

Monthly Electricity
Imports and Exports Report

Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012

Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________

Reporting Month: ________________ Reporting Year:____________

Company and Federal Licenses
Name of Company: ___________________________________________
Address: ________________________________________

City: __________________________________________

State/Province: ___________________________________

Zip/Postal Code: ________________________________

Country: ______________________

Presidential Permits (Transmission Owners):
a. ___________________________________________
b. ___________________________________________

Export Authorizations (Purchasing and Selling Entities):

Month:

Year:

a. _ ________________

_______

_______

b. _ ________________

_______

_______

FERC EQR Filer Identification (Purchasing and Selling Entities):
a. _ ________________
b. _ ________________

U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)

Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012

Monthly Electricity
Imports and Exports Report

Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________

Reporting Month: ____________________ Reporting Year:___________

SCHEDULE 2A. IMPORTS—CONTRACTS AND FINANCE (Purchasing and Selling Entities)
Cost-of-Service Transactions
(Payments to International Entities)
Unbundled
Import Categories
Imports
(MWh)

Energy
($)

Transmission
U.S. Side
($)

Imports To Balancing Authority (Name of) by Delivery Terms
1

Market Rate Transactions
(Payments to International Entities)
Payments – Sums may not equal total because of adjustable
financial transactions

Bundled
Ancillary
U.S. Side
($)

Total
($)

Imports
MWh

Energy and
Ancillary
U.S. Side

Transmission
U.S. Side

($)

($)

[ ] Check if Revision Made to Prior Monthly Filing

Completely
Bundled

($)

Total
($)

Imports
(MWh)

Contracted

($)

[ ] No activity this month

Balancing Authority
Hourly:
Less than 1 Year:
1 Year or Greater:
Other
Interface Total:

2

Grand Total-Imports

Imports Acquired Under Commercial Terms By Fuel Source

[ ] Check if Revision Made to Prior Monthly Filing

[ ] No activity this month

Received from International Sellers, Generated from:
3

System

4

Fossil

5
6

Hydropower
Nuclear

7

Renewable
Interface Total:
Grand Total-Imports

Imports Acquired Under U.S. Treaties
Non Financial
8
Columbia River
9
St. Lawrence Seaway
10

Rio Grande

11

Colorado River

12

Other

Financial
13 Canadian Special
Operations
14

Other

[ ] Check if Revision Made to Prior Monthly Filing

[ ] No activity this month

Booked
Out

($)

Delivered

($)

Transmission
U.S. Side

Ancillary
U.S. Side

($)

($)

Total
($)

Exchange Imports

MWh

Total
($)

U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)

Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012

Monthly Electricity
Imports and Exports Report

Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________

Reporting Month: ____________________ Reporting Year:___________

SCHEDULE 2B. EXPORTS—CONTRACTS AND FINANCE (Purchasing and Selling Entities)
Cost-of-Service Transactions
(Payments to International Entities)
Unbundled

Export Categories
Exports
(MWh)

Energy
($)

Transmission
U.S. Side
($)

Market Rate Transactions
(Payments to International Entities)

Ancillary
U.S. Side
($)

Exports from Balancing Authority (Name of) and Delivery Terms

Total
($)

Exports
MWh

Energy and
Ancillary
U.S. Side

Transmission
U.S. Side

($)

($)

[ ] Check if Revision Made to Prior Monthly Filing

Completely
Bundled
($)

Total
($)

Exports
(MWh)

Hourly:
Less than 1 Year:
1 Year or Greater:
Other
Interface Total:
2 Grand Total-Exports
[ ] Check if Revision Made to Prior Monthly Filing

[ ] No activity this month

Delivered to International Sellers, Generated from:
3

System

4

Fossil

5

Hydropower

6

Nuclear
Renewable

7

Interface Total:
Grand Total-Exports
Exports Under U.S. Treaties
Non Financial
8

Columbia River

9

St. Lawrence Seaway

10

Rio Grande

11

Colorado River

12

Other

Financial
13 Canadian Special
Operations
14

Other

[ ] Check if Revision Made to Prior Monthly Filing

Contracted

[ ] No activity this month

1 Balancing Authority

Exports Under Commercial Terms By Fuel Source

Exchange Exports

Payments – Sums may not equal total because of adjustable financial
transactions

Bundled

[ ] No activity this month

($)

Booked
Out

($)

Delivered

($)

Transmission
U.S. Side

Ancillary
U.S. Side

($)

($)

Total
($)

MWh

Total
($)

U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)

Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012

Monthly Electricity
Imports and Exports Report

Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________

Reporting Month: ____________________ Reporting Year:___________

SCHEDULE 2C. MONTHLY ANCILLARY SERVICES PROVIDED, VALUE OF SERVICES, AND OTHER KEY SYSTEM SUPPORT (Purchasing and Selling Entities)

BALANCING AUTHORITY NAME AT BORDER CROSSING POINT:

Costs

Imported Services – U.S. Side
Source of Service

1

Total Ancillary Services

2

Replacement Power for Transmission Losses

US Dollars ($)
3rd Party

Power Supplier (Y/N/U)

Exported Service
Source of Service

(Y/N/U)

US Dollars ($)
3rd Party (Y/N/U)

Power Supplier (Y/N/U)

Imported Services – U.S. Side

Exported Services

[ ] Check if No Change Required

[ ] Check if No Change Required

[ ] No activity this month

[ ] No activity this month

TYPES OF ANCILLARY SERVICES
(Check All That Apply)

Source of Services

Power Supplier

3rd Party

Power Supplier
Power

Power
[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

[]

4

Reactive Supply & Voltage Control

[]

[]

[]

5

Regulation & Frequency Response

[]

[]

[]

6

Schedule System Control & Dispatch

[]

[]

[]

8

Spinning Reserve
Supplemental Reserve

3rd Party

[]

Black Start Service

Transmission
[]

Services Bundled In

[]

3

7

Source of Services

Services Bundled In

Transmission
[]

Other Key System Support Services
9

Emergency Energy

10

Energy Imbalance

[]

[]

[]

[]

[]

[]

[]

[]

11

Must Run Agreements

[]

[]

[]

[]

[]

[]

[]

[]

U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)

Monthly Electricity
Imports and Exports Report

Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012

Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________

Reporting Month: _________________ Reporting Year:________

SCHEDULE 3. OPERATION FLOWS—IMPORTS AND EXPORTS (Transmission Operators)
TSIN Interface Name:
CATEGORY

Scheduled Imports
(MWh)
Firm

NonFirm

Scheduled Exports
(MWh)
Total

1

Total Power Flow for Month

2

International Source and U.S. Destination Combinations – For Individual Balancing Authorities

International Source/ U.S. Destination Combo #1
International Source/ U.S. Destination Combo #2
International Source/ U.S. Destination Combo #3
International Source/ U.S. Destination Combo #4
International Source/ U.S. Destination Combo #5
3

U.S. Source and International Destination Combinations - For Individual Balancing Authorities

U.S. Source/ International Destination Combo #1
U.S. Source/ International Destination Combo #2
U.S. Source/ International Destination Combo #3
U.S. Source/ International Destination Combo #4
U.S. Source/ International Destination Combo #5
SCHEDULED IMPORT FUEL SOURCE
Received from International Sources, Generated from:
4

System

5

Non System

6

Received under U.S. Treaty Terms

SCHEDULED EXPORT FUEL SOURCE
Delivered from U.S. Source, Generated from:
7

System

8

Non System

9

Delivered under U.S. Treaty Terms

Firm

NonFirm

Actual
(MWh)
Total

Inadvertent
(MWh)

U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)

Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012

Monthly Electricity
Imports and Exports Report

Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________

Reporting Month: _________________ Reporting Year:________

SCHEDULE 4. CHARACTERISTICS OF TRANSMISSION OPERATIONS
System Capacity (Transmission Operators)

Measure of Capacity

TSIN Interface Name: A

TSIN Interface Name: A

If transmission line usage is for
Alternating Current

If transmission line usage is for
Direct Current

Imports

Exports

Imports

Exports

System Safety Limits for Season
Electrical System

1a

Summer Limit

2a

Winter Limit

Safe Operating Limits at Time of
Seasonal Peak (MW)

Thermal Limits at Time of
Seasonal Peak
(MW)

Total Transfer Capability for Season (TTC)
3a

Summer TTC

4a

Winter TTC

DOE Operating Requirements
Imports

Exports

Imports

Exports

DOE Presidential Permits (Transmission Owners)
5a

Cite the Presidential Permit Number

5b

Terms of Presidential Permits –
count of exceeded events

5c

Cite what terms were exceeded.

DOE Export Authorizations (Purchasing and Selling Entities)
6a

Cite the Export Authorization
Number

6b

Terms of Export Authorizations –
count of exceeded events

6c

Cite what terms were exceeded.

TSIN Interface Name: A
If transmission line usage is
for Special Facilities using
both Alternating Current and
Direct Current on the Same
Transmission Line, then use
columns for both AC and DC

U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)

Monthly Electricity
Imports and Exports Report

Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012

Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________

Reporting Month: _________________ Reporting Year:________

SCHEDULE 5A. EXISTING TRANSMISSION FACILITIES CROSSING BORDERS (Transmission Owners)

TRANSMISSION LINE IDENTIFICATION

1b

Transmission Line 1st.

Transmission Line 2nd.

Transmission Line 3rd.

Presidential Permit No. is
1a
[___________________________]

Presidential Permit No. is
1a
[___________________________]

Presidential Permit No. is
1a
[__________________________]

TSIN IDENTIFICATION

2

Terminal Location (From)

3

Terminal Location (To)

4

Line Ownership Type

5

Percent Ownership

TRANSMISSION LINE DATA
6

Status of Existing Transmission Line

[ ] OP

[ ] RE

[ ] OS [ ] AB

7

Line Length (miles)

8

Line Type

[ ] OH

[ ] UG

[ ] SM

[ ] OH

[ ] UG

9

Voltage Type

[ ] AC

[ ] DC

[ ] SF

[ ] AC

[ ] DC

10

Voltage Operating (Kilovolts)

11

Voltage Design (Kilovolts)

12

Conductor Size (MCM)

13

Conductor Material Type

(see list)

(see list)

(see list)

14

Bundling Arrangement

(see list)

(see list)

(see list)

15

Circuits per Structure Present

16

Circuits per Structure Ultimate

17

Pole/Tower Type

18

Capacity Ratings (Megavolt amperes)

(see list)

[ ] OP

[ ] RE

[ ] OS [ ] AB

[ ] SM
[ ] SF

[ ] OP

[ ] RE

[ ] OS [ ] AB

[ ] OH

[ ] UG

[ ] SM

[ ] AC

[ ] DC

[ ] SF

(see list)

U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)

Monthly Electricity
Imports and Exports Report

Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012

Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________

Reporting Month: __________________ Reporting Year:________

Legend
Line Type
OH = Overhead
UG = Underground
SM = Submarine

Voltage Type
AC = Alternating Current
DC = Direct Current
SF = Special Facility
using new technologies
for DC and AC

Conductor Material Type
AL = Aluminum
ACCR = Aluminum Composite Conductor
ACSR = Aluminum Core Steel Reinforced

Pole/Tower Type
P = Single Pole
H = H Frame
T = Tower
U = Underground
O = Other

Status of Existing Transmission Line
OP = Operational
RE = Retired in place (lines and facilities not being removed)
OS = Being taken Out of Service or Out of Service
AB = Abandoned

Line Ownership Type
C = Cooperative
F = Federal
I = Investor-Owned
M = Municipal
A = Municipal Marketing Authority
S = State (Owned by)
P = Political Subdivision (Non-State)
Q = Independent Power Producer or Qualifying Facility
R = Retail Power Marketer (or Energy Service Provider)
O = Other

Bundling Arrangement
1 = Single
2 = Double
3 = Triple
4 = Quadruple
5 = Other

U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)

Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012

Monthly Electricity
Imports and Exports Report

Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________

Reporting Month: __________________ Reporting Year:________

SCHEDULE 5B. PROPOSED TRANSMISSION FACILITIES CROSSING BORDERS (Transmission Owners)

TRANSMISSION LINE IDENTIFICATION

1b

Transmission Line 1st.

Transmission Line 2nd.

Transmission Line 3rd.

Presidential Permit No. is
1a
[___________________________]

Presidential Permit No. is
1a
[___________________________]

Presidential Permit No. is
1a
[__________________________]

TSIN IDENTIFICATION Number (IF KNOWN)

2

Terminal Location (From)

3

Terminal Location (To)

4

Line Ownership Type

5

Percent Ownership

TRANSMISSION LINE DATA
6

Status of Proposed Transmission Line

[ ] CL

[ ] PL

7

Line Length (miles)

8

Line Type

[ ] OH

[ ] UG

9

Voltage Type

[ ] AC

[ ] DC

[ ] CO [ ] CN

[ ] CL

[ ] PL

[ ] SM

[ ] OH

[ ] UG

[ ] SF

[ ] AC

[ ] DC

[ ] CO [ ] CN

[ ] CL

[ ] PL

[ ] CO [ ] CN

[ ] SM

[ ] OH

[ ] UG

[ ] SM

[ ] SF

[ ] AC

[ ] DC

[ ] SF

10

Voltage Operating (Kilovolts)

11

Voltage Design (Kilovolts)

12

Conductor Size (MCM)

13

Conductor Material Type

(see list)

(see list)

(see list)

14

Bundling Arrangement

(see list)

(see list)

(see list)

15

Circuits per Structure Present

16

Circuits per Structure Ultimate

17

Pole/Tower Type

18

Capacity Ratings (Megavolt amperes)

19

Projected In Service Date

20

Upgrade to Existing Line? If “Yes”, Upgrade Capacity

[ ] Yes [ ] No

21

Right-of-Way Use: (Check All That Apply)

[ ] New

22

New Facilities: (Check All That Apply)

[ ] Improvement to Grid [ ] Other
[ ] Improvement to Substation

(see list)

(see list)

(mm-yyyy)

(mm-yyyy)

Capacity:

[ ] Existing

[ ] Unknown

[ ] Yes [ ] No
[ ] New

(mm-yyyy)

Capacity:

[ ] Existing

[ ] Unknown

[ ] Improvement to Grid [ ] Other
[ ] Improvement to Substation

[ ] Yes [ ] No
[ ] New

Capacity:

[ ] Existing

[ ] Unknown

[ ] Improvement to Grid [ ] Other
[ ] Improvement to Substation

U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)

Monthly Electricity
Imports and Exports Report

Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012

Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________

Reporting Month: __________________ Reporting Year:________

Legend
Line Type
OH = Overhead
UG = Underground
SM = Submarine

Voltage Type
AC = Alternating Current
DC = Direct Current
SF = Special Facility using new
technologies for DC and AC

Pole/Tower Type
P = Single Pole
H = H Frame
T = Tower
U = Underground
O = Other

Status of Proposed Transmission Line
CL = Conceptual
CN = Cancelled
CO = Under Construction
PL = Planned

Line Ownership Type
C = Cooperative
F = Federal
I = Investor-Owned
M = Municipal
A = Municipal Marketing Authority
S = State (Owned by)
P = Political Subdivision (Non-State)
Q = Independent Power Producer or Qualifying Facility
R = Retail Power Marketer (or Energy Service Provider)
O = Other

Conductor Material Type
AL = Aluminum
ACCR = Aluminum Composite Conductor
ACSR = Aluminum Core Steel Reinforced

Bundling Arrangement
1 = Single
2 = Double
3 = Triple
4 = Quadruple
5 = Other

U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)

Monthly Electricity
Imports and Exports Report

Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012

Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________

Reporting Month: _________________ Reporting Year:________

SCHEDULE 6: COMMENTS

Please Enter Any Comments Regarding This Survey:

U.S. Department of Energy
Office of Electricity Delivery and Energy Reliability
Form OE-781R (2010)

Monthly Electricity
Imports and Exports Report

Form Approval
OMB No. 1901-0296
Approval Expires: 11/30/2012

Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________

Reporting Month: _________________ Reporting Year:________

GLOSSARY
Additional terms related to this form are available online at:
www.ferc.gov/docs-filing/eqr/news-help/require-guide.pdf (FERC “Electric Quarterly Report, Filing Requirements Guide”)
www.ferc.gov/docs-filing/eqr/soft-Tools/eqrdatadictionary.pdf (FERC “Electric Quarterly Data Dictionary Version 1.0”)
www.tsin.com/glossary.html (NERC, Archived Glossary of OASIS Terms)
www.nerc.com/files/glossary_12Feb08.pdf (NERC Glossary of Terms used in Reliability Standards)
www.eia.doe.gov/glossary/index.html (EIA, Energy Glossary)
SANCTIONS
The terms and conditions of an electricity export authorization and Presidential permit for the construction, operation, maintenance, and
connection of an international electric transmission facility issued by DOE require the holder of such an authorization or permit to submit the
information and data necessary to complete Form OE-781R in a timely and accurate manner. The timely submission of Form OE-781R by those
required to report also is mandatory under Section 13(b) of the Federal Energy Administration Act of 1974 (FEAA) (Public Law 93-275), as
amended.
Failure to respond may result in a penalty of not more than $2,750 per day for each civil violation, or a fine of not more than $5,000 per day for
each criminal violation. The Government may bring a civil action to prohibit reporting violations, which may result in a temporary restraining order
or a preliminary or permanent injunction without bond. In such civil action, the court may also issue mandatory injunctions commanding any
person to comply with these reporting requirements. Title 18 U.S.C. 1001 makes it a criminal offense for any person knowingly and willingly to
make to any Agency or Department of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction.
Obtaining a valid Order from DOE authorizing the export of electricity under section 202(e) of the Federal Power Act (FPA) is a necessary
condition before engaging in the export. Failure to obtain such an Order, or continuing to export after the expiration of such an Order, may result
in a denial of authorization to export in the future and subject the exporter to sanctions and penalties under the FPA. Also, a violation of any terms
or conditions of the Order authorizing the electricity export, including the failure to submit timely and accurate reports, may result in the loss of
authority to export electricity and subject the holder of such authorization to sanctions and penalties under the FPA.

REPORTING BURDEN
Public reporting burden for this collection of information is estimated to average 7.8 hours per respondent, including the time for reviewing
instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of
information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for
reducing this burden to the Energy Information Administration, Statistics and Methods Group, EI-70, 1000 Independence Avenue S.W., Forrestal
Building, Washington, D.C. 20585-0670; and to the Office of Information and Regulatory Affairs, Office of Management and Budget, Washington,
D.C. 20503. A person is not required to respond to the collection of information unless the form displays a valid OMB number.

PROTECTED INFORMATION
Information reported on Form OE-781R will be treated as non-sensitive and may be publicly released in identifiable form. In addition to the use of
the information by EIA for statistical purposes, the information may be used for any nonstatistical purposes, such as administrative, regulatory, law
enforcement, or adjudicatory purposes.


File Typeapplication/pdf
File TitleMicrosoft Word - OE-781R Revised Form 05-27-2010.doc
AuthorJWO
File Modified2010-06-25
File Created2010-06-25

© 2024 OMB.report | Privacy Policy