If your community has contributed to, improved upon, or added to the floodplain map and data
provided by FEMA, you could receive Community Rating System credit under Activity 410,
Additional Flood Data. Follow these seven steps to determine the credit.
Step 1. Creditable activities. If you can answer “yes” to any of these questions, you should
receive credit for your program.
1. Did your community contribute to the study or mapping that you use to regulate
floodplain development? For any portion of your FIRM or regulatory floodplain map:
─ Did you contribute to the cost of one or more studies?
─ Did you prepare the hydrology or do part of a study?
─ Did you contribute topographical mapping?
─ Did you submit a study to FEMA for a map revision or LOMR?
─ If so, you should get credit under New Study (NS) and Leverage (LEV).
2. Did anyone besides FEMA contribute to the study or mapping? It doesn’t have to be
your city or county in order to receive CRS credit. Credit is for any agency or organization
other than FEMA, including your state, a regional district, a private developer, or a federal
agency, such as the Corps of Engineers or the Tennessee Valley Authority. However, you do
need to double check that the mapping agency was not under contract with FEMA.
─ If so, you should get credit under New Study (NS) and Leverage (LEV).
FEMA Mapping Terminology
BFE
CRS
CTP
FIRM
FIS
LOMR
NFIP
SFHA
Zone A
Zone B
Zone C
Zone V
Zone X

FEMA Mapping Terms
Base Flood Elevation
Community Rating System
Cooperating Technical Partner
Flood Insurance Rate Map
Flood Insurance Study
Letter of Map Revision
National Flood Insurance Program
Special Flood Hazard Area
SFHA for inland areas
500-year floodplain
Areas outside the A or B Zones
Coastal high hazard SFHA
Areas outside the mapped SFHA

AFD
FWS
HSS
LEV
NS

CRS Acronyms
Additional Flood Data
Floodway Standard
Higher Study Standard
Leverage
New Study

A FIRM with a detailed flood
study shows the SFHA as
Zone AE or VE. The map
includes base flood elevations and, usually, a floodway (shown with the slanted
lines). Areas outside the
SFHA are designated Zone
X. The 500-year floodplain is
the “shaded” Zone X.

On FIRMS prepared before
1986, A and V Zones with
BFEs show numbers (e.g.,
A4). A and V Zones without
numbers or other letters
mean the FIRM does not
include BFEs. BFEs are not
provided by FEMA in B, C,
D, or X Zones.

See also Section 130 and the Index of the CRS Coordinator's Manual

CRS Credit for Floodplain Mapping

−1−

October 16, 2007

3. Did your new study raise the base flood elevation shown on your earlier FIRM? If yes,
you should get credit under New Study (NS). There is no CRS credit for studies that lower
the FIRM’s BFE because that would duplicate the benefit of reduced flood insurance
premium rates for the properties that are taken out of the SFHA. If the BFE is raised in some
areas and lowered in other areas, the credit can be pro-rated.
4. Do you require builders and developers to provide regulatory flood data as a condition
of a floodplain development permit? Many communities require permit applicants in
approximate A or V Zones or B, C, or X Zones to calculate a BFE, floodway boundary, or
other data needed to ensure their project will be protected from the base flood. Note that
there are some minimum requirements of the NFIP in approximate A or V Zones that do not
receive CRS credit:
─ Larger projects (greater than five acres or 50 lots) in the SFHA must calculate a BFE,
so there is no CRS credit unless the requirement is for smaller projects (e.g., a single
family home) or developments in B, C, or X Zones, outside the SFHA.
─ All projects in a riverine floodplain must determine whether the cumulative effect of
a proposed development will increase the water surface elevation of the base flood.
─ If your community requires regulatory flood data where it is not required by the NFIP,
you should get credit under New Study (NS).
5. Were your regulatory flood studies conducted using standards higher than FEMA’s?
FEMA’s criteria are spelled out in Guidelines and Specifications for Flood Hazard Mapping
Partners, found at www.fema.gov/library/viewRecord.do?id=2206. Sometimes, a regular
FEMA Flood Insurance Study is done to a higher standard, such as under a CTP agreement
that includes a higher standard, or when an existing study with a higher standard is
incorporated into a FEMA map. The more common higher standards are:
─ A study reviewed and approved by a qualified state review program may qualify for
the New Study (NS) “with review” credit. Your ISO/CRS Specialist can tell you
whether your state has or had such a program and when it was in effect.
─ A study that used a base map that has topographic data better than what is available
from the U.S. Geological Survey may qualify for Higher Study Standard (HSS).
─ A study that used future conditions hydrology may qualify for HSS credit.
─ A map that shows 500-year flood elevations and the boundaries of the 500-year
floodplain where the FIRM only shows an A Zone may qualify for HSS credit.
─ If you mapped and are regulating one of the designated special flood related
hazards (alluvial fans, moveable bed streams, closed basin lakes, ice jams, land
subsidence, mudflows, coastal erosion, and tsunamis), the study may qualify for
Additional Flood Data for Special Hazards. These hazards and credits are
explained in separate publications and are not covered in this paper.

CRS Credit for Floodplain Mapping

−2−

October 16, 2007

6. Is your floodway map based on a more restrictive standard than a one foot surcharge?
Check the “Increase” column in your FIS’ Floodway Data Table. If all the numbers are 0.5 or
smaller, you might qualify for this credit. The standard used is spelled out in the text of your
Flood Insurance Study, usually in section 4.2. If your floodway map was based on a more
restrictive standard, you should get credit under Floodway Standard (FWS).
Note that credit for FWS should not be confused with the minimum NFIP requirement that
new development in the floodway may not result in any increase in flood heights. The FWS
credit is for using less than a one foot surcharge to delineate the floodway.
Step 2. Prerequisites. If you can answer “yes” to all of the following questions for each study
or map, they should qualify for credit. These prerequisites are spelled out on pages 410-5 − 4106 of the CRS Coordinator’s Manual.
1. Do you use the study or map data when you regulate new development? The CRS
does not credit studies conducted for drainage improvements or the design of a flood
control project if they are not also used for regulatory purposes. Your floodplain
regulations must either be amended to adopt the new study or authorize a local official,
such as your engineer, to approve new base flood elevations, floodways and velocity
zones in unstudied areas. If the latter, there must be a record showing that the new
study has been approved by the official.
2. Is the study incorporated into the FIRM? Is the study or map part of the official
FIRM or was it added later through the LOMR process? This is a prerequisite for a
study that affects a length of stream or shoreline. If the study has not been incorporated in the official FEMA map, it must be submitted to FEMA with a request to revise
your FIRM. This prerequisite is not met if FEMA denies the submittal because the
study was not prepared in accordance with FEMA mapping standards. However, the
prerequisite is met even if FEMA does not immediately publish the map revision, as
long as it does not deny the request.
3. Are site-specific studies done in accordance with FEMA mapping criteria? Sitespecific studies do not have meet prerequisite 2, above. If your regulations require that
a study be conducted for a single site at the time of development, the study technique
must meet FEMA criteria, but the results do not have to be submitted to FEMA. An
engineer’s statement that the technique used meets the criteria in Guidelines and
Specifications for Flood Hazard Mapping Partners is acceptable. If your site-specific
study standards are not in Guidelines and Specifications, you may still receive credit if
your FEMA Regional Office states that it accepts the technique for CRS purposes.
4. Are you willing to conduct an assessment of your credited floodplain maps every
five years? This is done to help determine if your community would benefit from a
revised or updated map that reflects current conditions or better data. Your engineer
must agree to write a memo that states whether the floodplain maps and related data
that receive New Study (NS) credit reflect current conditions. This is done as part of
your cycle verification process, every 5 years (every 3 years for Class 5 or better
communities). The details of this statement are spelled out on page 410-30 of the CRS
Coordinator’s Manual.
CRS Credit for Floodplain Mapping

−3−

October 16, 2007

Step 3. Identify the areas. Mark up a map to show each study or mapping activity that you
think may deserve CRS credit. This is called an impact adjustment map. Mark each area as
“AFD1,” “AFD2,” etc. If more than one area was mapped using the same criteria (e.g., three
streams were studied by the same contractor using the same study standards), mark them all with
the same number. Below is an example impact adjustment map for Floodville.
Floodville’s Example Impact Adjustment Map

Floodville has three areas that qualify for CRS credit:
AFD1: The City paid a consulting firm to prepare a new detailed study as part of a plan to reduce
flooding along a small ditch that was not mapped as SFHA on its FIRM. area. The study produced base
flood elevations, a floodway delineation, and a map.
AFD2: This area was mapped by FEMA as an approximate A Zone. Because there are few buildings and
because there is no development expected, the City decided not to finance a detailed study. Instead, its
floodplain management ordinance requires that an applicant for a development permit in the Deadman’s
Run A Zone determine a base flood elevation for the proposed development site.
AFD3: FEMA’s FIS mapped the Foster Creek floodplain with BFEs. The floodway delineation was based
on a state required 0.5 foot allowable surcharge.

CRS Credit for Floodplain Mapping

−4−

October 16, 2007

Note: Now that you know what studies deserve CRS credit, you can stop at this point and let
your ISO/CRS Specialist calculate the credit points. The following discussion explains how
this is done, using the Floodville example.
Step 4. Calculate the points. This step reviews how to score five of the six elements in
Activity 410. The credits for special hazards are covered in separate publications. More details
on these first four are provided in Sections 411.a − d in the CRS Coordinator’s Manual.
1. New Study (NS − Section 411.a).
a. See your answers to Step 1, items 1 – 4, to see which studies qualify under NS.
b. In the first column in the table below, identify the study’s scope.
c. Identify your FIRM’s original zone designation for the area studied.
d. Assume “without review” credit unless your ISO/CRS Specialist tells you
otherwise.
e. Match the study scope with the appropriate column to determine the points.
Original FIRM Zone
B, C, D, or X

A or V

AE, VE, A#

Without With Without With Without With
review review review review review review

Study scope
1. Delineation of an approximate A Zone

50

−

25

−

−

−

2. Flood elevations for a site at time of development

100

150

75

115

−

−

3. New profile or length of shoreline, base flood
elevations/depths in AH and AO zones.

200

300

150

225

125

190

4. New profile with floodway, length of shoreline
with coastal velocity zone delineation, or
converting coastal A Zones to V Zones

240

360

180

270

150

225

50

50

25

25

25

25

5. If the study includes new data for repetitive loss
area(s) (add to the score for 1−4)

f. If the study includes one or more of your community’s repetitive loss areas (see
Section 502 of the CRS Coordinator's Manual), add the credit in line 5 in the table.
g. Floodville example:
─ AFD1: New profile with floodway in an X Zone: 240 points. Because this area is
also one of Floodville’s repetitive loss areas, the study warrants 50 more points.
NS1 = 240 + 50 = 290 points.
─ AFD2: Flood elevations for a site at time of development in an approximate A Zone:
NS2 = 75 points.
─ AFD3: Not a New Study credit. The floodway standard is credited under FWS.
CRS Credit for Floodplain Mapping

−5−

October 16, 2007

2. Leverage (LEV − Section 411.b).
a. See your answers to Step 1, items 1 and 2. If your community or any agency or
entity other than FEMA paid 100% of the cost of the study, LEV = 1.0. This
includes flood studies and site specific studies done by permit applicants. Proceed
to item 3.
b. If FEMA paid for part of the cost of the study, calculate a ratio based on the nonFEMA share divided by the entire cost of the study.
c. If you can’t obtain study costs, use 0.25 if a better topographic map was contributed to the study effort and 0.15 if other contributions were made to the study effort.
d. Floodville example:
─ AFD1: The City paid 100% of the cost: LEV1 = 1.0
─ AFD2: Developers pay 100% of the cost: LEV2 = 1.0
─ AFD3: Not related to LEV credit. The floodway standard is credited under FWS.
3. Higher Study Standard (HSS − Section 411.c).
a. See your answers to Step 1, item 5, to see which studies qualify for HSS credit.
Note that you may submit additional higher study standards to see if they warrant
credit for HSS.
b. In the first column in the table below, identify the study’s scope.
c. Match this with your FIRM’s original zone designation for the area studied.
d. If you have more than one higher standard for a study, add them up, but do not
exceed the “max per study” points.
Original FIRM Zone
B, C, D,
AE, VE,
A or V
or X
A#, V#
20
10
−

Study scope
1. Delineation of an approximate A Zone

Max per
Study
40

2. Flood elevations for a site at time of
development

40

30

−

80

3. New profile or length of shoreline

80

60

50

160

e. Floodville example:
─ AFD1: The study was done using future conditions hydrology: HSS1 = 80 points
─ AFD2: Developers must use future conditions hydrology: HSS2 = 30 points
─ AFD3: Not an HSS credit. The floodway standard is credited under FWS.
CRS Credit for Floodplain Mapping

−6−

October 16, 2007

4. Floodway Standard (FWS − Section 411.d).
a. See your answers to Step 1, item 6. If you qualify for FWS, determine the official
surcharge used in the floodway study. In most cases, this will be 0.5 or 0.1 feet.
─ If the allowable rise was from 0.01 to 0.2 feet, FWS = 150
─ If the allowable rise was from 0.21 to 0.5 feet, FWS = 100
b. Floodville example:
─ AFD1: The study used the state required floodway standard of 0.5’ FWS1 = 100
─ AFD2: A floodway delineation is not required. There is no FWS credit.
─ AFD3: The FIS used the state required floodway standard of 0.5’ FWS3 = 100
Step 5. Impact adjustment. The credit for each study or AFD is adjusted according to how
much of your SFHA is affected. This is called the impact adjustment. It is in the form of a ratio
from 0.25 to 1.5. In the formulas, it appears as “rAFD” for each area you marked and labeled on
your map. There are three ways this can be done:
1. Option 1: If the study or standard affects your entire SFHA, you can use an impact
adjustment of 1.0. This may be the case in a smaller community with one stream or
where the floodway standard applies to all streams in the community.
2. Option 2: If the study or standard affects less than 25% of the SFHA, you can use the
“default” option that gives you a minimum of 0.25. Some communities use this
approach to save themselves the trouble of calculating areas. However, you can only
use Option 2 for one study or AFD marked on your map. If you want credit for more
than one AFD, you will need to use Option 3 for all your studies.
3. Option 3: If the study or standard affects more than 25% of the SFHA, this option
gives you a higher score than Option 2. Here’s how to use Option 3.
a. Calculate the areas of each AFD. If your maps are digitized, this can be done by
GIS. If you have only paper versions of your maps, you can use a planimeter or the
grid square method. Instructions on the grid square method can be obtained from
your ISO/CRS Specialist. The result is an area or “aAFD” for each study, e.g.,
aAFD1, aAFD2, etc..
b. Calculate the area of your SFHA. Use the same units that you used for the AFDs,
either acres or square miles. This is labeled “aSFHA” in the formulas.
c. Calculate the ratio for each area. This is the area of the AFD divided by the area of
the SFHA. The result is “rAFD” for each area:
rAFD1 = aAFD1
aSFHA

CRS Credit for Floodplain Mapping

rAFD2 = aAFD2
aSFHA

−7−

rAFD3 = aAFD3
aSFHA

…etc.

October 16, 2007

d. The total of all your ratio(s) can be greater than 1.0 if you have new studies outside
the SFHA.
4. Floodville example:
─ aAFD1: 71 acres for the newly mapped problem ditch (C Zone)
─ aAFD2: 58 acres for the Deadman’s Run floodplain (A Zone)
─ aAFD3: 267 acres for the Foster Creek floodplain (A15 Zone)
─ aSFHA: 325 acres for the entire SFHA (the A plus the A15 Zones)
rAFD1 = 71 = 0.22
325

rAFD2 = 58 = 0.18
325

rAFD3 = 267 = 0.82
325

Step 6. CTP credit. There are three ways to credit involvement in FEMA’s Cooperating
Technical Partnership program. More information on the CTP program can be found at
www.fema.gov/plan/prevent/fhm/ctp_main.shtm.
1. CTP community: If your community has signed a Cooperating Technical Partner
agreement with FEMA that identifies shared mapping responsibilities and costs, you
can receive 10 points (CTP1). You do not receive this credit if there has not yet been
an agreement to conduct a specific study in your community.
2. CTP state or region: Another 10 points are available if one of your community’s
flood problem areas is being studied under a CTP agreement with your state or a
regional agency, such as a water management district. Again, you do not receive this
credit if there has not yet been an agreement to conduct a specific study in your
community. However, the credit for a community and a state CTP study is cumulative
(the max for CTP1 is 20 points).
3. CTP study: Once a study under a CTP agreement is completed, it can be credited and
scored as discussed earlier in this paper. Under the CTP2 credit, you will receive a
10% bonus on top of the score because the study was done pursuant to a CTP
agreement.
Step 7. Total the points. The last step in calculating CRS credit for mapping is to add up all
the credit points. This can be done by the ISO/CRS Specialist at the verification visit or you can
do it. For help, you can use the activity worksheets or the CRS calculation software. Both are
free (see Appendix E of the CRS Coordinator's Manual or the “Resources” page on the CRS
Resource Center website, http://training.fema.gov/EMIWeb/CRS/).
1. Score each study: For each AFD you marked on the map (AFD1, AFD2, etc.), multiply its New Study (NS) score times its Leverage (LEV) score. Then add its points for
Higher Study Standard (HSS) and Floodway Standard (FWS). The following formula
can help:
AFD = (NS x LEV) + HSS + FWS

CRS Credit for Floodplain Mapping

−8−

October 16, 2007

Floodville example (see step 4, items 1.g, 2.d, 3.e, and 4.b)
─ AFD1 = (290 x 1.0) + 80 + 100 = 470
─ AFD2 = ( 75 x 1.0) + 30 + 0 = 105
─ AFD3 = ( 0 x 0 ) + 0 + 100 = 100
2. Impact adjustment: Multiply each study’s score times the impact adjustment ratio
calculated in step 5.
Floodville example (see step 5, item 4)
─ AFD1: 470 x 0.22 = 103.4
─ AFD2: 105 x 0.18 = 18.9
─ AFD3: 100 x 0.82 = 82.0
3. Add the CTP credit: Multiply each study times any CTP2 bonus it receives and add
the CTP1 credit for the community, state, or regional agency CTP agreement. This
produces the credit for each study, shown in the formulas as the little “c” before the
AFD.
Floodville example (neither Floodville nor its state are CTPs):
─ cAFD1 = 103.4 + 0 = 103.4
─ cAFD2 = 23.4 + 0 = 23.4
─ cAFD3 = 82.0 + 0 = 82.0
4. Total the points: Add up the credit for each study. Include any special hazards study
credits that are calculated separately. The result is the total credit for Activity 410,
shown as “c410” in the formulas.
Floodville example:
c410 = cAFD1 + cAFD2 + cAFD3 = 103.4 + 18.9 + 82.0 = 204.3

CRS Credit for Floodplain Mapping

−9−

October 16, 2007


File Typeapplication/pdf
File TitleMicrosoft Word - CRS Credit for Mapping 10-16-07.doc
AuthorFrench
File Modified2008-06-05
File Created2007-10-16

© 2024 OMB.report | Privacy Policy