CRS Record-Keeping Guidance 

2007

Note on this edition: This document has been revised to reflect the following 2006 and
2007 changes in the CRS Coordinator’s Manual:
•

The following new elements have been included:
310—Credit for offsite records storage;
320—Partial credit for using a website or remote computer terminal;
330—Credit for outreach projects that encourage the purchase of flood
insurance; and
510—Detailed analysis of the community’s repetitive loss areas and mitigation.

•

The following elements have been revised:
410—Extensive revisions have been made to this activity;
440—Credit for maintenance of elevation reference marks has been replaced
by a different approach for benchmark maintenance;
520—Credit has been added for acquiring or relocating Severe Repetitive Loss
Properties; and
530—Credit has been added for protecting Severe Repetitive Loss Properties
and critical facilities.

Examples that are included in other publications have not been repeated here, such as the
forms for Activities 430 (Higher Regulatory Standards) and 540 (Drainage System
Maintenance). They can be found in CRS Credit for Higher Regulatory Standards and in
CRS Credit for Drainage System Maintenance.
A community interested in applying for flood insurance premium credits through the
Community Rating System (CRS) should have the CRS Application. The CRS
Coordinator’s Manual provides a more detailed explanation of the credit criteria. These
and other publications on the CRS are available at no cost from
Flood Publications 

NFIP/CRS 

P.O. Box 501016 

Indianapolis, IN 46250-1016 

(317) 848-2898 

Fax: (317) 848-3578 

[email protected]

They can also be viewed and downloaded from FEMA’s website at
http://training.fema.gov/EMIWeb/CRS.

Contents
Section

Page

Introduction ..........................................................................................................1 

Activity Checklist.................................................................................................2 

310 Elevation Certificates..........................................................................2 

320 Map information Service ....................................................................3 

330 Outreach Projects................................................................................4 

340 Hazard Disclosure...............................................................................5 

350 Flood Protection Information .............................................................5 

360 Flood Protection Assistance ...............................................................5 

410 Additional Flood Data ........................................................................6 

420 Open Space Preservation ....................................................................6 

430 Higher Regulatory Standards..............................................................7 

430LD Land Development Criteria ...........................................................8 

440 Flood Data Maintenance.....................................................................8 

450 Stormwater Management....................................................................9 

501 The Repetitive Loss List...................................................................10 

503 Repetitive Loss Area Outreach Project.............................................10 

510 Floodplain Management Planning....................................................10 

520 Acquisition and Relocation...............................................................11 

530 Flood Protection................................................................................11 

540 Drainage System Maintenance .........................................................12 

610 Flood Warning Program ...................................................................12 

620 Levee Safety .....................................................................................13 

630 Dam Safety .......................................................................................14 

Sample Records..................................................................................................15 

310—Checklist for Reviewing the 2006 FEMA Elevation Certificate ....15 

320—Map Information Service Form Letter............................................17 

320—Flood Insurance Purchase Requirement Handout...........................18 

320—Coastal Barrier Resources System Handout ...................................19 

320—Map Inquiry Log.............................................................................20 

360—Handouts on Dealing with Contractors...........................................21 


Record-Keeping Guidance

−i−

Edition: 2007

[This page intentionally blank.]

Record-Keeping Guidance

− ii −

Edition: 2007


Introduction
The Community Rating System (CRS) recognizes local floodplain management activities
that exceed the minimum requirements of the National Flood Insurance Program (NFIP).
To receive the credits and subsequent flood insurance premium discount, communities
must document that they are implementing the credited activities.
Your community’s normal procedures probably already include maintaining documents
and records sufficient for CRS documentation. However, you may be starting a new
activity or you may need to do things differently to receive CRS credit. This guide is a
primer on the records that need to be kept to maintain CRS credit. It should be viewed as
an advisory checklist to help ensure that nothing is forgotten. It is not a mandate or set of
federal requirements.
It is assumed that you are keeping a complete copy of your application to the CRS and all
the documents that were accepted during the verification visit. This publication does not
discuss documents needed for your application. YOUR APPLICATION AND VERIFICATION
VISIT DOCUMENTS SHOULD BE KEPT “ FOREVER .” You cannot expect your community’s
future CRS Coordinators to know what happened at past visits, so keeping a separate set
of CRS documents will prove to be very valuable.
This guide covers things that are needed for the verification and cycle verification visits
and the annual recertification. Some of these papers can be archived or discarded after the
ISO/CRS Specialist conducts the verification or cycle verification visit.

Many community documents, including many of the documents needed for floodplain
management, are vital to your community’s operations after a disaster. Starting in 2007, the
CRS offers credit for maintenance of duplicate copies of your floodplain management permit
records at an offsite facility. Please see Section 310.f in the Coordinator’s Manual.

This guide is based on the 2007 CRS Coordinator’s Manual. The section numbers cited in
this guide refer to that manual. The page numbers refer to pages in this guide.
Documentation of CRS activities is essential for continued CRS credit. This problem
frequently arises in communities when they change CRS Coordinators. At recertification
and cycle time, the new CRS Coordinator may have difficulty documenting the activities
for which the community is receiving credit. If the documentation is properly maintained
from day to day, these problems are greatly reduced.
This guide is organized in two parts. The first part is a checklist of the records that should
be kept for each activity and element. The second part includes example forms. Readers
can skip those activities that are not credited in their communities.
The entire text of this document, including the example forms, is available online at
http://training.fema.gov/EMIWeb/CRS (go to the “Resources” tab and find (control-F) “Record”).
This document is in Adobe Acrobat (pdf) format. The text can be copied and converted to a
word processing program to prepare checklists and forms tailored to your community.

Record-Keeping Guidance

−1−

Edition: 2007

Activity Checklist
The CRS Coordinator should keep the application and recertification records. In most
cases the other records should be kept by the offices that are actually implementing the
activities. The CRS Coordinator should know the location and contents of any CRS files
that are kept by another office.

310 Elevation Certificates
This checklist should be reviewed with the building department or other office that has
been assigned responsibility for this activity.
____ E
	 levation certificates are needed for every new building or substantial
improvement to a building in the Special Flood Hazard Area (SFHA) (see Section
314.c of the CRS Coordinator’s Manual).
____ E
	 ACH CERTIFICATE NEEDS TO BE DOUBLE CHECKED TO ENSURE THAT IT IS PROPERLY
COMPLETED . Use the checklist on pages 15–16. If more than 20% of your elevation
certificates are verified with errors, your community will lose the credit for this
activity and you will be reclassified as a CRS Class 10.
____ 	 The elevation certificates need to be filed so they can be retrieved, copied, and
provided to requestors. This can be either in a separate elevation certificate file or
in files kept for each property or each permit. What counts is that they are easily
retrievable by address. These records would most likely be kept by the building
department. Note that if your community is requesting credit for maintaining preCRS or pre-FIRM (Flood Insurance Rate Map) elevation certificates (ECPO or
ECPR), you need to be able to retrieve them even if your community discards or
archives old permit records.
____ 	 A note or memo to the files that shows how your impact adjustments (rECPO,
rECPR, rECCF, and/or rECWS) were determined is needed for the verification and
cycle verification visits (see Section 314.d).
____ 	 If you are receiving credit for keeping your elevation certificates in computer
format (ECCF), each elevation certificate needs to be entered into the elevation
certificate software data base (see Section 314.e). The computer file needs to be
maintained and updated. If you had new construction in the floodplain since the last
submittal, a disk with the new data is submitted with each year’s recertification.
____ 	 If you are receiving credit for putting your elevation certificates on a website
(ECWS), each elevation certificate needs to be entered. The ISO/CRS Specialist
verified this by logging on to the website, so no separate records are needed.
____ 	 If you are applying for credit for off-site record storage (ORS) under Section 311.f,
you must have a note or memo to the files describing the offsite storage location
and arrangements for copying the records. An alternative is a receipt or other
record that shows that the records were sent for storage.

Record-Keeping Guidance

− 2 −	

Edition: 2007

320 Map Information Service
This checklist should be reviewed with the building department, engineer, or other office
assigned responsibility for this activity.
____ 	 Keep copies of the materials you use to publicize the service each year (see Section
323.a). This could be done through one of three options:
●	 Keep a copy of each year’s letter to lenders, real estate agencies, and insurance
agencies, and a copy of the mailing list used (see Section 323.c). Some
communities mail undated letters. If so, note when yours was distributed each
year; OR
●	 Keep copies of the publications issued by other organizations, institutions, or
agencies each year that include an article on the service; OR
●	 Keep a copy of each year’s outreach project. If your community publicizes this
service via an outreach project credited under Activity 330 (Outreach Projects),
the copy could be kept in the files for Activity 330.
____	 Copies of the publicity materials (except for the mailing list) are submitted with
each year’s recertification. Examples of publicizing the map information service
are found in CRS Credit for Outreach Projects.
____ 	 You need to keep a record of delivering this service (see Section 323.d). There are
three common approaches to doing this:
●	 Keep copies of your written letters or e-mails, such as the form letter in the
example on page 17; OR
●	 Keep copies of the completed inquiry forms or “complaint” forms your
community uses to record and respond to requests from citizens; OR
●	 Keep a log of inquiries. Examples of this approach are found on page 20 of this
guide and in Figure 320-5 of the Coordinator’s Manual.
____ 	 If you don’t already have a system for filing correspondence, the written responses
should be kept in chronological order or by address. A copy of a recent page from
one of the records is submitted with each year’s recertification.
____ 	 Make sure you are using the latest FIRM and that it is kept updated to show new
subdivisions, changes in corporate limits, and all new FIRM data from flood
insurance restudies, map revisions, and map amendments (see Section 323.e). This
may mean plotting every Letter of Map Amendment (LOMA) and Map Revision
(LOMR) or noting on the paper FIRM those sites for which LOMAs and LOMRs
have been issued.
You must maintain copies of old FIRMs that have been in effect since 1999 or the
date you applied to the CRS, whichever is later. If you maintain a copy of every
FIRM that has been published for your community, you may be eligible for credit
under Activity 440 (Flood Data Maintenance).

Record-Keeping Guidance

− 3 −	

Edition: 2007

____ 	 You should keep copies of flyers or other information on the flood insurance
purchase requirement (see example on page 18). The person who responds to the
requests needs to remember to include a copy of the flyer with each written
response or to discuss it with each caller if the property is located in the SFHA.
____ 	 If your community has a Coastal Barrier Resources System designation on its
FIRM, you should include a flyer or other information that is given to inquirers to
explain the System and what it means to property owners (see example on page 19).
____ 	 If your community has a mapped coastal A Zone, you should include a flyer or
other information to give to inquirers that explains what the designation means to
property owners.
____ 	 If your community is receiving credit for special hazards mapping and
management, you should include a flyer or other information that is given to
inquirers to explain the special hazard and what it means to property owners.

330 Outreach Projects
For additional guidance on this activity, see CRS Credit for Outreach Projects.
This checklist should be reviewed with the public information officer or other office that
has been assigned responsibility for this activity.
____ 	 Keep a copy of each year’s outreach projects (see Sections 334.a, c, and e). This
would include copies of newsletters, mailings to residents, and similar
informational materials. The articles on flooding should be highlighted so they can
be found easily. For projects like public meetings and information booths, the
documentation could be copies of newspaper articles or announcements about the
meetings, correspondence relating to them, or memos to the file. These are
submitted with each year’s recertification. If they are not dated, make a note on
them of when they were distributed.
____ 	 If you are receiving credit for outreach projects pursuant to a public information
program strategy, keep all the projects’ materials, just as you do for your other
outreach projects (see Section 333.b). These need to be submitted with each annual
recertification, too.
____ 	 You will also need to prepare and keep an annual evaluation of your strategy (see
Section 333.f). This is either a separate report or a completed AW-330-3. A blank
copy of AW-330-3 is included in the CRS Activity Worksheets, found at the end of
the Coordinator’s Manual, or you can make your own local version. A filled-out
example is shown at the end of Activity 330 in the Coordinator’s Manual. A
completed copy is submitted with each year’s recertification.

Record-Keeping Guidance

− 4 −	

Edition: 2007

340 Hazard Disclosure
You do not need to maintain any special records for this activity because it is implemented
by real estate offices. However, you should have current copies of all documents for
which credit has been verified. This includes
the real estate agents’ disclosure notices, the
If any of the credited elements change,
ordinance language, and real estate agents’
the materials submitted with the
brochures (REB credit). You are also expected
application should be changed as well. If
the change involves enough points to
to recertify each year that the activity is being
change your community’s CRS
implemented. At your cycle verification visit,
classification, a modification should be
you will need the current versions of the
submitted.
documentation you used when applying for the
credit.

350 Flood Protection Information
You do not need to maintain any special records for the library. However, you are still
expected to recertify each year that the activity is being implemented and that the
publications that are available are the most current.
____ 	 If you are receiving credit for putting flood protection information on a website,
you must review the site each year and certify that the information and links have
been updated as needed (see Section 353.c).

360 Flood Protection Assistance
This checklist should be reviewed with the building department, engineer, or other office
that has been assigned responsibility for this activity.
____ 	 Make sure there is an outreach project each year that discusses the assistance
provided. If it is part of a CRS-credited outreach project, documentation for it is
submitted with each year’s Activity 330 recertification. If it is distributed
separately, then it is to be included with each year’s Activity 360 documentation
(see Section 363.a). Examples of publicizing the service are found in CRS Credit
for Outreach Projects.
____ 	 You need to keep a record of your site visits and retrofitting advice (see Section
363.e). A copy of one of the recent memos or reports is submitted with each year’s
recertification.
____ 	 You should keep copies of flyers or other information that you hand out to people
who have been assisted (see Section 363.d). Examples of what you can include are
●	 An updated list (organized by area of expertise) of contractors knowledgeable,
experienced, or licensed in retrofitting activities (e.g., plumbers, house movers,
waterproofers, etc.); and
●	 Information on selecting a contractor (see pages 21–22).

Record-Keeping Guidance

− 5 −	

Edition: 2007

410 Additional Flood Data
This checklist should be reviewed with the engineer or other office that has been assigned
responsibility for this activity. It is appropriate both for regular flood data as explained in
the Coordinator’s Manual and for data on special hazards flooding as explained in the
special hazards supplements. See CRS Credit for Additional Flood Data for additional
guidance.
____ 	 If you have prepared and adopted new studies since the last verification visit, keep
the appropriate documentation for the next cycle verification visit:
●	 The ordinance or law language that adopts the new study for regulatory purposes
or that requires site-specific flood elevation or floodway studies to be conducted
at the time of permit application. The ordinance or law should either specify what
standard is to be used or adopt the studies or maps for regulatory purposes (see
Section 414.a).
●	 A copy of the study or an explanation of the technique used and a licensed
professional engineer’s statement that the study was based on a technique
approved by FEMA; or a copy of the Flood Insurance Study pages or LOMR that
show that the study has been accepted by FEMA to revise the FIRM (see Section
414.b).
●	 Documentation that shows how much of the study was paid by FEMA and how
much was paid by a non-FEMA source (see Section 414.d).
●	 Documentation that shows the relation between the study or standard and the
Cooperating Technical Partner agreement (see Section 414.f).
____ 	 If your community is receiving credit for a new study (NS) under Section 411.a, at
the time of the cycle verification visit you will need to provide a statement by your
engineer on whether the study reflects current conditions. This statement need only
address the maps that are credited by this activity (see Section 414.g). Note that
you will not lose credit if the study is outdated. This documentation is for
informational purposes only.
____ 	 If your floodplain areas or corporate limits change, a new Impact Adjustment Map
will be needed at the next cycle verification visit (see Section 414.e).

420 Open Space Preservation
If your open space areas or credits do not change between verification visits, no records
need to be kept other than the original documents upon which the credit is based.
____ 	 If your floodplain areas, open space areas, or corporate limits change, a new Impact
Adjustment Map will be needed at the next cycle verification visit (see Section
424.e).

Record-Keeping Guidance

− 6 −	

Edition: 2007

430 Higher Regulatory Standards
See CRS Credit for Higher Regulatory Standards for additional guidance.
This checklist should be reviewed with the planning, zoning, or building department,
engineer, or other office that is responsible for this activity. The following records are
typically kept with each permit file or with the records on each subdivision or other
development. You will need to be able to retrieve them during the cycle verification visit
(see Section 434.c).
____ E
	 levation and floodproofing certificates, which are used to document enforcement
of the following elements: freeboard (FRB), enclosure limits (ENL), manufactured
home park (MHP), and coastal A-Zone regulations (CAZ). M AKE SURE YOUR
RECORDS SHOW THE LOCATION OF ANY UTILITIES AND DUCTWORK THAT ARE
NORMALLY LOCATED OUTSIDE THE BUILDING OR BELOW THE LOWEST FLOOR.

Photographs at the time of final inspection are useful.
____ 	 If you are receiving credit for foundation protection (FDN), your building permit
records need to include engineering certifications or other documentation
appropriate for your credit.
____ 	 If you are receiving cumulative substantial improvement (CSI) credit or lower
substantial improvement threshold (LSI) credit, the building permit records must
show the value of building additions, improvements, and repairs and the building’s
value. For credit, you need to keep a running total of the costs or percentages of
past improvements. An example form can be found in CRS Credit for Higher
Regulatory Standards.
____ 	 If you are receiving credit for protecting critical facilities (PCF), permit records for
critical facilities will be needed to check that the facilities are protected according
to your regulations.
____ 	 If you are receiving credit for protection of floodplain storage capacity (PSC) based
on compensatory storage, permit records need to show compensatory storage
calculations. Grading plans or maps that show where the cutting and filling is done
are needed for subdivisions and larger developments.
____ 	 If you are receiving credit for natural and beneficial functions regulations (NBR)
that require setbacks or buffer zones along watercourses, the setback areas or buffer
zones should be shown on permit plans.
____ 	 If you are receiving credit for other higher standards (OHS) or special hazards
regulations (SH), your permit records need to document compliance with these
regulations.
____ 	 If you are receiving credit for staff training under staffing (STF), certificates of
graduation are needed (see Section 434.d). If a staff member has qualified as a
Certified Floodplain Manager, the credit is verified by checking the list of CFMs
on the appropriate association’s website. Note that if personnel leave, you will lose

Record-Keeping Guidance

− 7 −	

Edition: 2007

the credit at the next cycle visit, unless their replacements have the same training or
certification.
____ 	 If your floodplain areas or corporate limits change, a new Impact Adjustment Map
will be needed at the next cycle verification visit (see Section 434.b).

430LD Land Development Criteria
This checklist should be reviewed with the planning, zoning, or building department,
engineer, or other office that is responsible for this activity. The following records are
typically kept with each permit file or with the records on each subdivision or other
development built in the regulatory floodplain. You will need to be able to retrieve them
during the verification and cycle verification visits (see Section 434.c).
____ 	 If your community receives credit for land development criteria (LDC) or for low
density zoning (LZ), your building or zoning permit records need to include
documentation appropriate to your credit.
____ 	 If your floodplain areas or corporate limits change, a new Impact Adjustment Map
will be needed at the next cycle verification visit (see Section 434LD.b).

440 Flood Data Maintenance
This checklist should be reviewed with the engineer, geographic information system (GIS)
staff, data processor, or other office that has been assigned responsibility for this activity.
____ 	 If you are receiving credit for additional map data (AMD), the permit office must
routinely use the map or parcel system to obtain flood hazard information when
reviewing an application for a permit in the regulatory floodplain (see Section
441.a.1(a)). If the credit is for a GIS or other digitized mapping system, the permit
office may either directly use the computer system or use a hard copy printout of
the map.
____ 	 The map or parcel system must be updated at least once each year to reflect
changes in corporate boundaries, new subdivisions, new flood data, and map
revisions and amendments (LOMRs and LOMAs) (see Section 441.a.1(b)).
____ 	 If you are receiving credit for benchmark maintenance (BMM), keep your list of
the qualifying benchmarks updated and available to the public (see Section
441.b.1(a)(2)).
____ 	 If you are receiving credit for benchmark maintenance (BMM), make a note about
any elevation reference marks that appear on your FIRM that are reported missing
or inaccurate. You must report these with your annual recertification so FEMA can
correct future FIRMs (see Section 444.e).
____ 	 If you are receiving credit for FIRM maintenance (FM), you must have copies of
every FIRM, Flood Boundary Floodway Map, and Flood Insurance Study that has

Record-Keeping Guidance

− 8 −	

Edition: 2007

been issued for the community. The old maps and studies must be made readily
available for inquirers to use (see Section 441.d).
____ 	 If your floodplain areas or corporate limits change, a new Impact Adjustment Map
will be needed at the next cycle verification visit (see Section 444.b).

450 Stormwater Management
For additional guidance on this activity, see CRS Credit for Stormwater Management.
This checklist should be reviewed with the engineer, building department, or other office
assigned responsibility for this activity. THESE RECORDS APPLY TO CONSTRUCTION
THROUGHOUT THE COMMUNITY , NOT JUST IN THE FLOODPLAIN.
____ 	 If your community is receiving credit for stormwater management regulations or a
watershed master plan (SMR or WMP), your permit records for subdivisions and
other large developments need to include plans that show the locations and
dimensions of retention and detention basins (see Section 454.i).
____ 	 If your community is receiving credit for public maintenance of stormwater
facilities (PUB), keep copies of inspections and subsequent maintenance activities
(see Section 454.i). These records should be part of your drainage system
maintenance records under Activity 540. See also CRS Credit for Drainage System
Maintenance.
____ 	 If your community is receiving credit for a watershed master plan (WMP) that is
more than five years old, the engineer’s evaluation report should be kept (see
Section 454.j).
____ 	 If your community is receiving credit for freeboard in B, C, D, and X Zones (FRX),
depending on the basis for your credit, your building permit records need to either
document that the lowest floor (or lowest opening) was checked and confirmed to
be the correct height above the street or they need to include drainage plans for
each building site (see Section 454.i).
____ 	 If your community is receiving credit for erosion and sedimentation control (ESC)
or water quality regulations (WQ), your permit records and/or subdivision plans
need to show how these requirements were met for each development project under
the regulations’ jurisdiction (see Section 454.i).
____ 	 If your watersheds or corporate limits change, a new Impact Adjustment Map will
be needed at the next cycle verification visit (see Section 444.f).

Record-Keeping Guidance

− 9 −	

Edition: 2007

501 The Repetitive Loss List
____ 	 Each year, you will receive an updated file of your repetitive loss properties and a
set of AW-501 worksheets for your repetitive loss properties. You are encouraged
to review these to update your database of flood problems, because they may help
your flood protection planning efforts. At the time of your cycle verification, you
will have to review every repetitive loss address and determine if the worksheets
need to be updated. You will be required to certify that each address has been
checked (see Section 501).

503 Repetitive Loss Area Outreach Project
____ 	 Keep a copy of each year’s outreach project to your repetitive loss areas and the list
of addresses to which the project was sent (see Sections 503.b, c, and e). These are
submitted each year with your annual recertification, either as part of your Activity
330 recertification or as part of the repetitive loss documentation.
____ 	 If you are a Category C community (see Section 502.a), you must keep the records
required for Activity 510.

510 Floodplain Management Planning
For additional guidance on this activity, see Example Plans.
This checklist should be reviewed with the planner, planning committee, or other office
assigned responsibility for this activity.
____ 	 A progress report must be prepared each year and submitted with the annual
recertification. The report must cover the five items noted in Section 514.g. Copies
must be provided to your governing board and the media and made available to the
public.
FAILURE TO SUBMIT THIS REPORT EACH YEAR WILL RESULT IN LOSS OF CREDIT FOR
THIS ACTIVITY . I F YOU ARE A C ATEGORY C REPETITIVE LOSS COMMUNITY , YOU WILL
BE RECLASSIFIED AS A CRS C LASS 10.
____ 	 At least every five years, your community must prepare an update to the plan, in
accordance with Section 514.h. FAILURE TO ADOPT AND SUBMIT THE UPDATE WILL
RESULT IN LOSS OF CREDIT FOR THIS ACTIVITY . I F YOU ARE A C ATEGORY C
REPETITIVE LOSS COMMUNITY , YOU WILL BE RECLASSIFIED AS A CRS CLASS 10.

Record-Keeping Guidance

− 10 −	

Edition: 2007

520 Acquisition and Relocation
Between verification visits, no records need to be kept other than the original documents
upon which the credit is based.
____ 	 If qualifying buildings are acquired, relocated, or otherwise removed from your
floodplain, you should keep copies of the appropriate records so you can readily
provide them for additional credit at your next cycle verification visit.
____ 	 If your floodplain areas or corporate limits change or new buildings are constructed
in the floodplain, the impact adjustment factors are revised at the next cycle
verification visit to reflect the current total number of buildings in the floodplain
(see Section 524.c).
____ 	 If your credit is for acquisition or relocation of buildings located outside of your
SFHA, you will need documentation at the next verification visit that shows that
your community is continuing to enforce floodplain management regulations in the
X Zone (see Section 524.e). Elevation certificates or similar as-built records of
flood protection for new construction would be appropriate.

530 Flood Protection
Between verification visits, no records need to be kept other than the original documents
upon which the credit is based.
____ 	 If qualifying buildings are elevated, retrofitted, or otherwise protected from
flooding, you should keep copies of the appropriate records so you can readily
provide them for additional credit at your next cycle verification visit.
____ 	 If your floodplain areas or corporate limits change or new buildings are constructed
in the floodplain, the impact adjustment factors are revised at the next cycle
verification visit to reflect the current total number of buildings in the floodplain
(see Section 534.d).
____ 	 If your credit is based on flood protection provided by a structural flood control
project, you will need documentation at the next verification visit that shows that
●	 The project is being properly maintained, in accordance with the operations and
maintenance plan (see Section 531.a.3(c)); and
●	 Your community is enforcing development regulations that prevent or minimize
the impact of future development on the project’s flood protection level (see
Section 531.a.3(d)).
____ 	 If your credit is for protection of buildings located outside of your SFHA, you will
need documentation at the next verification visit that shows that your community is
continuing to enforce floodplain management regulations in the X Zone (see
Section 534.e). Elevation certificates or similar as-built records of flood protection
for new construction would be appropriate.

Record-Keeping Guidance

− 11 −	

Edition: 2007

540 Drainage System Maintenance
For additional guidance on this activity, see CRS Credit for Drainage System
Maintenance.
This checklist should be reviewed with the public works department, drainage district, or
other office that has been assigned responsibility for this activity.
____ 	 Copies of inspection records for ditches, streams, detention basins, and other parts
of your drainage system need to be kept for the verification and cycle verification
visits (see Section 544.f). A copy of a recently completed example must be sent in
each year with your recertification.
These records should be completed copies of the form adopted in your drainage
maintenance procedures. A form should be completed for every inspection, even if
follow-up maintenance is not needed. Examples of forms used by some
communities are provided in CRS Credit for Drainage System Maintenance.
____ 	 If you are receiving credit for stream dumping regulations (SDR) and for
publicizing the regulations with an outreach project, make sure there is an outreach
project each year that discusses the regulations. If it is part of a CRS-credited
outreach project, it is submitted with each year’s Activity 330 recertification. If it
is distributed separately, then it is to be included with each year’s Activity 540
documentation (see Section 364.d). Examples of ways to publicize the regulations
can be found in CRS Credit for Outreach Projects.
____ 	 If there are changes in your drainage system, corporate limits, or the areas covered
by your maintenance program, a new Impact Adjustment Map will be needed at the
next cycle verification visit (see Section 544.e).

610 Flood Warning Program
For additional guidance on this activity, see CRS Credit for Flood Warning Programs.
This checklist should be reviewed with the emergency manager or other office that has
been assigned responsibility for this activity.
____ 	 A memo or other record is needed after each year’s test of the data collection,
communications, and data analysis components of the flood threat recognition
system (see Section 611.a.1(a)).
____ 	 If you are receiving emergency warning dissemination credit (EWD), a memo or
other record is needed after each year’s test of the warning dissemination
equipment and procedures (see Section 611.b.1(d)). A test is not needed if a
warning was issued in response to a real threat, although there still must be a record
of what happened.
____ 	 If you are receiving emergency warning dissemination credit (EWD), make sure
there is an outreach project each year that discusses the warning procedures, signals
Record-Keeping Guidance

− 12 −	

Edition: 2007

used, warning times, what radio/TV stations to tune to, and flood safety. If it is part
of a CRS-credited outreach project, it is submitted with each year’s Activity 330
recertification. If it is distributed separately, then it is to be included with each
year’s Activity 610 documentation (see Section 614.b.1(e)). Some examples of
flood warning and safety publicity can be found in CRS Credit for Outreach
Projects.
____ 	 If you are receiving credit for other response efforts (ORE), a description is needed
of the exercise, drill, or response to an actual emergency or disaster conducted
during the previous year. The description must include a list of who participated
and any lessons learned from the exercise, drill, emergency, or disaster (see Section
614.d). An exercise is not needed if the plan was implemented in response to a real
threat, although there still must be a record of what happened.
____ 	 If you are receiving critical facilities planning credit (CFP), the information on the
critical facilities needs to be updated each year (see Section 614.e).
____ 	 If your floodplain areas or corporate limits change or new buildings are constructed
in the floodplain, the impact adjustment factors are revised at the next cycle
verification visit to reflect the current total number of buildings in the floodplain
(see Section 614.c).
____ 	 If there is a flood that damages more than 10 buildings, causes more than $50,000
in damage, or causes the death of one or more persons, then a report needs to be
prepared that evaluates how well the warning and response system worked (see
Section 614.f). It is submitted with the annual recertification.

620 Levee Safety
This checklist should be reviewed with the engineer, public works department, levee
district, or other office that has been assigned responsibility for this activity.
____ 	 Each year a certification by an engineer that the levee has been properly maintained
in accordance with all NFIP criteria is prepared and submitted with your
recertification (see Section 624.f).
____ 	 A log, memo, or other record is needed for each month’s communications check
(see Section 621.c.4 and 624.g). A copy must be included with your annual
recertification.
____	 A memo or other record is needed of each year’s inspection of emergency
equipment and stockpiles (see Section 621.c.5). A copy must be included with your
annual recertification.
____ 	 A memo or other record is needed after each year’s drill of the levee emergency
plan (see Sections 621.c.6 and 624.g). A copy must be included with your annual
recertification. A drill is not needed if the plan was implemented in response to a
real threat, although there still must be a record of what happened.

Record-Keeping Guidance

− 13 −	

Edition: 2007

____ 	 Make sure there is an outreach project each year to the properties protected by the
levee (see Section 624.h). A copy must be included with your annual
recertification. If it is part of a CRS-credited outreach project, it is submitted with
each year’s Activity 330 recertification.
____ 	 If your floodplain areas or corporate limits change or if new buildings are
constructed in the floodplain, the impact adjustment factors are revised at the next
cycle verification visit to reflect the current total number of buildings in the
floodplain (see Section 624.e).

630 Dam Safety
If you received credit only for your state’s dam safety program (SDS), you do not need to
maintain any additional records. The following items are needed only if you are receiving
credit for a dam failure emergency action plan (DFP). This checklist should be reviewed
with the emergency manager or other office that has been assigned responsibility for this
activity.
____ 	 If you are receiving credit for a dam failure emergency action plan (DFP1), a memo
or other record is needed after each year’s exercise of the emergency action plan
(see Sections 631.b.1(a)(3) and 634.e). Copies are submitted with your
recertification and kept for review at the next cycle verification visit. An exercise is
not needed if the plan was implemented in response to a real threat, although there
still must be a record of what happened.
____ 	 If you are receiving credit for a dam failure emergency action plan (DFP1), you
need to keep copies of the annual reports of the dam operators (see Section
631.b.1(b)). Copies must be sent to the state dam safety office, submitted with your
recertification, and kept for review at the next cycle verification visit.
____ 	 If you are receiving credit for a dam failure emergency action plan (DFP1), a log,
memo, or other record is needed after each month’s communications check (see
Sections 631.b.1(c) and 634.e). Copies are submitted with your recertification and
kept for review at the next cycle verification visit.
____ 	 If you are receiving credit for a dam failure emergency action plan (DFP3), make
sure there is an annual outreach project to occupants in the dam failure area that
discusses the hazard, the area affected, evacuation routes, and flood safety. If it is
part of a CRS-credited outreach project, it is submitted with each year’s Activity
330 recertification. If it is distributed separately, then it is to be included with each
year’s Activity 630 documentation (see Sections 631.b.3(c) and 634.c.2).
____ 	 If there are changes to your floodplain areas, corporate limits, or the dam failure
inundation area(s), or if new buildings are constructed in the floodplain, the impact
adjustment factors are revised at the next cycle verification visit to reflect the
current total number of buildings in the floodplain (see Section 634.d).

Record-Keeping Guidance

− 14 −	

Edition: 2007

Sample Records
The following pages have examples of records or forms that your community may want to
adapt for its own use. Some of the forms have been filled in by hand to show how they can
be used.

310—Checklist for Reviewing the 2006 FEMA Elevation Certificate
NOTE: If any of these items are incomplete or incorrect, the ISO/CRS Specialist will
adjust the credit points for that element. If more than 20% of the sampled elevation
certificates have one or more of these deficiencies, the community will lose its credit for
that element. Loss of credit for the first element, EC, will mean that the community will be
reclassified as a Class 10.
SECTION A – PROPERTY INFORMATION
A2 and A3. Complete street address or property description. In either case, the city, state,
and zip code must be listed.
A7 Building diagram number.
A8 a), b), and c). Enclosure and crawl space information for buildings that match
diagrams 6, 7 or 8.
A9 a), b), and c). Attached garage information. If there is no attached garage, enter “N/A”
in all three spaces.
SECTION B – FLOOD INSURANCE RATE MAP (FIRM) INFORMATION
B1. NFIP community name/community number.
B4. Map and panel number.
B5. Panel number suffix.
B7. FIRM panel effective/revised date.
B8. Flood zone(s) in which the building is located.
B9. Base flood elevation(s).
B10. The source of the base flood elevation (BFE) data or base flood depth entered in B9.
B11. The elevation datum used for the BFE in B9.
B12. Whether the building is located in a Coastal Barrier Resources System area or
Otherwise Protected Area
SECTION C – BUILDING ELEVATION INFORMATION (when a survey is required)
C1 Basis for building elevations. Note: “Finished construction” must be checked unless the
building is still under construction.
C2 Elevations. All items are required to have an entry. If the datum is different from the
datum used for the BFE in Section B, the datum conversion must be recorded in this
section or in Section D or G, as appropriate.
Elevation items a), f), and g) must be recorded on every certificate. If an item does
not apply, enter “N/A” in the fields where no data are being supplied.
Items b) and c) must be completed with an elevation if they are applicable and if that
letter appears on the diagram on pages 7 and 8 of the instructions.
Where there is an attached garage, an elevation must be entered for item d);
otherwise the entry is “N/A.” Where there is machinery and/or equipment that
services the building, an elevation must be entered for item e); otherwise the entry
is “N/A.”

Record-Keeping Guidance

− 15 −

Edition: 2007

SECTION D – SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION
Certifier’s name and license number.
Certifier’s signature.
Date.
If there is a signature and/or date in the box, there does not have to be a separate
signature or date on the line.
SECTION E – BUILDING ELEVATION INFORMATION (when a survey is not required in a
Zone AO or a Zone A without a base flood elevation)
E1. a) and b). Enter the difference between the top of the bottom floor and the highest
and lowest adjacent grades.
E2. For Building Diagrams 6–-8 with openings (see page 8 of the instructions), enter the
difference between the top of the next higher floor and the highest adjacent grade.
E3. Enter the difference between the top of the garage slab and the highest adjacent
grade.
E4 Enter the difference between the top of the platform for machinery or equipment and
the highest adjacent grade.
E5. Zone AO (only). Elevation of bottom floor complies with the ordinance (if there is no
base flood depth provided).
Note: If Section E is used, then Sections F or G must be completed.
SECTION F – PROPERTY OWNER (OR OWNER’S REPRESENTATIVE) CERTIFICATION
This section is used if Section E is completed by the owner or owner’s representative. If
used, this section must include the property owner’s or representative’s name on the first
line and the signature on the third line.
SECTION G – COMMUNITY INFORMATION
If G1 or G2 is checked, then the first and third lines after G9 (the local official’s name and
signature) must be completed.
NOTE: If a local official, authorized by law to complete an elevation certificate, fills out
ALL the information (including elevation data), then G8, G9, and the signature block must
be completed.

Record-Keeping Guidance

− 16 −

Edition: 2007

320—Map Information Service Form Letter

Record-Keeping Guidance

− 17 −

Edition: 2007


320—Flood Insurance Purchase Requirement Handout
NOTE: This should be attached to the letter on the previous page. It can also be handed
out separately by the community, real estate agents, insurance agents, and others.

About the Purchase of Flood Insurance Requirement
NFIP: This community participates in the National Flood Insurance Program (NFIP), which makes
federally backed flood insurance available for all eligible buildings, whether they are in a floodplain or
not. Flood insurance covers direct losses caused by surface flooding, including a river flowing over its
banks, a lake or ocean storm, and local drainage problems.
The NFIP insures buildings, including mobile homes, with two types of coverage: building and contents.
Building coverage is for the walls, floors, insulation, furnace, and other items permanently attached to the
structure. Contents coverage may be purchased separately, if the contents are in an insurable building.
Mandatory Purchase Requirement: The Flood Disaster Protection Act of 1973 and the National Flood
Insurance Reform Act of 1994 made the purchase of flood insurance mandatory for federally backed
mortgages on buildings located in Special Flood Hazard Areas (SFHAs). This requirement also affects all
forms of Federal or Federally related financial assistance for buildings located in SFHAs. The SFHA is the
base (100-year) floodplain mapped on a Flood Insurance Rate Map (FIRM). It is shown as one or more
zones that begin with the letter “A” or “V.”
The mandatory purchase rule applies to secured mortgage loans from such financial institutions as
commercial lenders, savings and loan associations, savings banks, and credit unions that are regulated,
supervised, or insured by Federal agencies such as the Federal Deposit Insurance Corporation and the
Office of Thrift Supervision. It also applies to all mortgage loans purchased by Fannie Mae or Freddie Mac
in the secondary mortgage market.
Federal financial assistance programs affected by the laws include loans and grants from agencies such as
the Department of Veterans Affairs, Farmers Home Administration, Federal Housing Administration, Small
Business Administration, and the Department of Homeland Security’s Federal Emergency Management
Agency (FEMA).
How it Works: Lenders are required to complete a Standard Flood Hazard Determination (SFHD) form
whenever they make, increase, extend, or renew a mortgage, home equity, home improvement, commercial,
or farm credit loan to determine if the building or manufactured (mobile) home is in an SFHA. It is the
Federal agency’s or the lender’s responsibility to check the current FIRM to determine if the building is in
an SFHA. Copies of the FIRM are available for review in most local government building or planning
departments. Lenders may also have copies or they use a flood zone determination company to provide the
SFHD form.,
If the building is in an SFHA, the Federal agency or lender is required by law to require the recipient to
purchase a flood insurance policy on the building. Federal regulations require that building coverage be
equal to the amount of the loan (excluding appraised value of the land) or the maximum amount of
insurance available from the NFIP, whichever is less. The maximum amount of coverage available for a
single-family residence is $250,000. Government-sponsored enterprises, such as Freddie Mac and Fannie
Mae, have stricter requirements.
The mandatory purchase requirement does not affect loans or financial assistance for items that are not
covered by a flood insurance policy, such as vehicles, business expenses, landscaping, and vacant lots. It
does not affect loans for buildings that are not in an SFHA, even if a portion of the lot lies within the
SFHA. Although not mandated by law to do so, a lender may require a flood insurance policy as a
condition of a loan for a property in any zone on a FIRM.
If a person believes that an SFHD form incorrectly places the property in the SFHA, he or she may request
a Letter of Determination Review from FEMA. This must be submitted within 45 days of the
determination. More information can be found at http://www.fema.gov/business/nfip/sfhdform.shtm .

Record-Keeping Guidance

− 18 −

Edition: 2007

320—Coastal Barrier Resources System Handout
NOTE: This should be attached to the handout on the previous two pages or the letter on
the page before. It can also be handed out separately by the community, real estate
agents, insurance agents, and others.

The Coastal Barrier Resources System
The Coastal Barrier Resources Act of 1982 (CBRA), and the Coastal Barrier Improvement Act of
1990 removed the federal government from financial involvement associated with building and
development in undeveloped portions of coastal areas (including the Great Lakes). These areas were
mapped and designated as units of the Coastal Barrier Resources System (CBRS) or as Otherwise
Protected Areas. They are colloquially called “CBRA areas” (pronounced “cobra” but not spelled
that way).
Any federal program that may have the effect of encouraging development on coastal barrier islands
is restricted by law. These programs include “any form of loan, grant, guarantee, insurance, payment,
rebate, subsidy or any other form of direct or indirect Federal assistance” with specific and limited
exceptions. For example, federal disaster assistance is limited to emergency relief in CBRA areas—
there are no federal loans or grants to repair or rebuild buildings in those areas.
The legislation also banned the sale of National Flood Insurance Program (NFIP) flood insurance for
structures built or substantially improved on or after a specified date. For the first CBRA
designations, that date is October 1, 1983. For all subsequent designations, it is the date the CBRA
area was identified. CBRA areas and their identification dates are shown in the legend of Flood
Insurance Rate Maps (FIRMs).
If an owner of a building in a CBRA area wants to buy flood insurance, he or she needs a copy of the
building permit showing that the building was properly built before the designation date and a signed
statement from the floodplain ordinance administrator that it has not been substantially damaged or
improved since then. The insurance agent may need to provide more documentation.
The boundaries of a CBRA area cannot be revised through the Letter of Map Amendment or
Revision (LOMA/LOMR) process. They can only be revised through
● Congressional action,
● Interpretation of boundaries by the U.S. Department of the Interior’s Fish and Wildlife
Service, or
● Cartographic modifications by the Department of Homeland Security’s FEMA to correct
errors in the transcription of the Department of the Interior maps onto FIRMs.
If an NFIP policy is issued in error in a CBRA area, it will be cancelled and the premium refunded.
No claim can be paid, even if the mistake is not found until the claim is made.
If a grandfathered building (i.e., a building built before the date of designation) is substantially
improved or substantially damaged, its flood insurance policy will be cancelled.
Lenders are required to notify borrowers if the structure is in a CBRA area and that NFIP flood
insurance and/or disaster assistance may not be available . Many lenders are reluctant to lend without
protecting their investment with flood insurance, and private flood insurance may not be available.

Record-Keeping Guidance

− 19 −

Edition: 2007

320—Map Inquiry Log
NOTE: If all of the map information comes from the same FIRM, the community number is
not logged. The community in this example has only one FIRM based upon NGVD, so the
FIRM date and datum are not included in the log. Also, the panel number logged includes
the suffix. The community has all of the data required for this activity in its log.
Communities that have no coastal A Zones or undeveloped coastal barriers designated on
their FIRMs do not need the last column of the log. Communities receiving credit for one
or more of the special flood-related hazards need to include a column on special hazards
as a reminder to advise inquirers if the property is subject to that hazard.

Record-Keeping Guidance

− 20 −

Edition: 2007

360—Handouts on Dealing with Contractors
The City of ________________ requires that certain work be done only by licensed contractors.
The _______________________ [name of building department or other office] has a register of
licensed contractors, listed by their areas of expertise.
If you have been satisfied with work done by licensed local contractors, try them first. If they
cannot help you, ask them for recommendations. If you must hire a contractor you do not know,
talk to several contractors before you sign anything. Reputable contractors agree that you
should take the steps described below.
Check on the firm’s reputation. The Better Business Bureau, Home Builders Association, and
building trades council are excellent sources. Ask if the firm has had unanswered complaints
filed against it.
Look out for “special deals.” Be cautious when unfamiliar contractors offer “special deals”
after a disaster or want to use your home as a “model home.” Ask for complete financial details
in writing and for an explanation of any differences from regular prices. Sales are worthwhile
and they do exist, but be sure you are getting the services and products you are paying for.
Ask for proof of insurance. Worker’s compensation and general liability insurance are
absolutely essential. If the contractor is not insured, you may be liable for accidents on your
property.
Ask for references. Contractors should be willing to provide names of previous customers.
Call some of the customers and ask if they would hire the contractor again.
Ask for a written estimate. Check it for thoroughness. Some contractors may charge a fee for
an estimate, which is understandable when they have plenty of work to do.
Ask for a contract. The contract should be complete and clearly state all the work and the
costs. Never sign a blank contract or one with blank spaces. If a lot of money is involved, it
may be worth your while to have the contract reviewed by a lawyer.
Ask for any guarantees in writing. If the contractor provides guarantees, a written statement
should include what is guaranteed, who is responsible for the guarantee (the dealer, the
contractor, or the manufacturer), what is covered beyond the written guarantee, and its duration.
Obtain a copy of the final signed contract. Once signed, it is binding on both you and the
contractor.
Cool off. Do not sign a contract when a salesperson has pressured you. Federal law requires a
three-day “cooling off” period for unsolicited door-to-door sales of more than $25. If you want
to cancel such a contract within three business days of signing it, send your cancellation by
registered mail. Other types of sales may have contracts with varying decision clauses.
Avoid cash payments. Beware if you are asked to pay cash on the spot instead of a check
made out to the contracting company. A reasonable down payment is 10% to 30% of the total
cost of the project.
Don’t sign off before the job is finished. Wait until the work is completed to your satisfaction
before signing completion papers or making the final payment. A reputable contractor will not
threaten you or pressure you to sign if the job is not done.
Record-Keeping Guidance

− 21 −

Edition: 2007

Get your permits. Most home improvements, filling, fences, and other yard work require a
permit from the _________________________[name of building department or other office]. A
permit is needed before the project is started to be sure that it meets code and will not cause a
drainage problem on neighboring properties.
Get your inspections. The ____________________________[name of building department or
other office] needs to inspect electrical and plumbing lines before the walls are covered with
wallboard or paneling. When the project is finished, make sure your contractor calls you and the
___________________________________ [name of building department or other office] to
inspect work before it is covered over. Shoddy work on sewers or basement walls will be hidden
from view and you won’t know if there is a problem until the next flood.
Get help. If you are a victim of fraud or have problems with a less-than-reputable contractor,
the _________________[name of attorney general or other office] has a consumer protection
office that can tell you what steps to take. The _______________[name of building department
or other office] would also like to know of any problems in case it needs to revoke a license.
For more information on the city’s building requirements, contact the _____________________
[name of building department or other office] at ______________ [telephone number].

NOTE: Communities are welcome to use state brochures on choosing a contractor instead of
preparing and printing their own. The one below left is from California and can be found at
http://www.cslb.ca.gov/ General-Information/library/guides-and-pamphlets.asp . The Florida brochure,
on the right, is posted at http://www.myfloridalicense.com/dbpr/os/BrochurePage.html .

Record-Keeping Guidance

− 22 −

Edition: 2007


File Typeapplication/pdf
File TitleMicrosoft Word - AA Record-Keeping Guidance FINAL.doc
AuthorOwner
File Modified2009-01-09
File Created2009-01-09