EIA-860 Annual Electric Generator Report

Electric Power Surveys

860

Electric Power Surveys

OMB: 1905-0129

Document [pdf]
Download: pdf | pdf
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

Form Approved
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 9.4 hours

ANNUAL ELECTRIC
GENERATOR REPORT

NOTICE: This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to
comply may result in criminal fines, civil penalties and other sanctions as provided by law. For further information
concerning sanctions and disclosure information, see the provisions stated on the last page of the instructions. Title 18
USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department
of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1. IDENTIFICATION
Survey Contact
First Name:______________________________________

Last Name:_______________________________________

Title:____________________________________________

Address:_________________________________________

Phone (include extension):__________________________

Fax:____________________________________________

Email:_____________________________________________________________________________________________
Supervisor of Contact Person for Survey
First Name:______________________________________

Last Name:_______________________________________

Title:____________________________________________

Address:_________________________________________

Phone (include extension):__________________________

Fax:____________________________________________

Email:_____________________________________________________________________________________________
Report For
Operator Name:_____________________________________________________________________________________
Operator ID:________________________________________________________________________________________
Reporting as of December 31 of year:____________________________________________________________________
Operator and Preparer Information
Legal Name of Operator:______________________________________________________________________________
Current Address of Principal Business Office of Plant Operator:________________________________________________
__________________________________________________________________________________________________
Preparer's Legal Name (If Different From Operator’s Legal Name):_____________________________________________
__________________________________________________________________________________________________
Current Address of Preparer's Office (If Different From Current Address of Principal Business Office of Entity):___________
__________________________________________________________________________________________________
Is the Operator an Electric Utility?

[ ] Yes

[ ] No

For questions or additional information about the Form EIA-860, contact the survey staff:
Patricia Hutchins
Telephone Number: (202) 586-1029
Fax Number: (202) 287-1960
Email: [email protected]

Vlad Dorjets
Telephone Number: (202) 586-3141
Fax Number: (202) 287-1960
Email: [email protected]

34

Form Approved
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 9.4 hours
Operator Name:_____________________________________________________________________________________
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

ANNUAL ELECTRIC
GENERATOR REPORT

Operator ID:__________

Reporting as of December 31 of Year:____________

SCHEDULE 2. POWER PLANT DATA
(EXISTING POWER PLANTS AND THOSE PLANNED FOR INITIAL COMMERCIAL OPERATION WITHIN 10 YEARS)
LINE

PLANT 1
EIA Plant
Code

1

Plant Name

2

Street
Address

3

County Name

4

State

5

Zip Code

6

Latitude (Degrees, Minutes,
Seconds)

7

Enter Datum for Latitude and Longitude, if Known; Otherwise Enter “UNK”

8a

NERC Region

8b

Does this Plant Belong to a RTO or ISO?

City Name

[
[
[
[

Longitude (Degrees, Minutes,
Seconds)

[ ] Yes

] California ISO
] Southwest Power Pool
] PJM Interconnection
] ISO New England

[
[
[
[

[ ] No

] Electric Reliability Council of Texas
] Midwest ISO
] New York ISO
] Other

8c

Name of RTO or ISO

9

Name of Water Source (For Purpose of Cooling or Hydroelectric)

10

Steam Plant Status

11

Steam Plant Type

12

Primary Purpose of the Plant (North American Industry Classification System
Code)

13

Does this plant have Federal Energy Regulatory Commission (FERC) Qualifying
Facility (QF) Cogenerator status? If Yes, provide all QF docket number(s).
Separate by using a comma.
_______________________________________________________________________

[ ] Yes

[ ] No

14

Does this plant have Federal Energy Regulatory Commission (FERC) Qualifying
Facility (QF) Small Power Producer status? If Yes, provide all QF docket
number(s). Separate by using a comma.
_______________________________________________________________________

[ ] Yes

[ ] No

15

Does this plant have Federal Energy Regulatory Commission (FERC) Qualifying
Facility (QF) Exempt Wholesale Generator status? If Yes, provide all QF docket
number(s). Separate by using a comma.
_______________________________________________________________________

[ ] Yes

[ ] No

16a

Owner of Transmission and/or Distribution Facilities

16b

Grid Voltage (in kilovolts)

[ ] existing
[
[
[

[ ] planned

[

] retired

[ ] NA

] Combustible 100 MW or more generator nameplate capacity
] Combustible 10 MW or Greater to Under 100 MW generator nameplate capacity
] NA

35

Form Approved
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 9.4 hours
Operator Name:_____________________________________________________________________________________
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

ANNUAL ELECTRIC
GENERATOR REPORT

Operator ID:__________

Reporting as of December 31 of Year:____________

SCHEDULE 2. POWER PLANT DATA
(EXISTING POWER PLANTS AND THOSE PLANNED FOR INITIAL COMMERCIAL OPERATION WITHIN 10 YEARS)
LINE

PLANT 2
EIA Plant
Code

1

Plant Name

2

Street
Address

3

County Name

4

State

5

Zip Code

6

Latitude (Degrees, Minutes,
Seconds)

7

Enter Datum for Latitude and Longitude, if Known; Otherwise Enter “UNK”

8a

NERC Region

8b

Does this Plant Belong to a RTO or ISO?

City Name

[
[
[
[

Longitude (Degrees, Minutes,
Seconds)

[ ] Yes

] California ISO
] Southwest Power Pool
] PJM Interconnection
] ISO New England

[
[
[
[

[ ] No

] Electric Reliability Council of Texas
] Midwest ISO
] New York ISO
] Other

8c

Name of RTO or ISO

9

Name of Water Source (For Purpose of Cooling or Hydroelectric)

10

Steam Plant Status

11

Steam Plant Type

12

Primary Purpose of the Plant (North American Industry Classification System
Code)

13

Does this plant have Federal Energy Regulatory Commission (FERC) Qualifying
Facility (QF) Cogenerator status? If Yes, provide all QF docket number(s).
Separate by using a comma.
_______________________________________________________________________

[ ] Yes

[ ] No

14

Does this plant have Federal Energy Regulatory Commission (FERC) Qualifying
Facility (QF) Small Power Producer status? If Yes, provide all QF docket
number(s). Separate by using a comma.
_______________________________________________________________________

[ ] Yes

[ ] No

15

Does this plant have Federal Energy Regulatory Commission (FERC) Qualifying
Facility (QF) Exempt Wholesale Generator status? If Yes, provide all QF docket
number(s). Separate by using a comma.
_______________________________________________________________________

[ ] Yes

[ ] No

16a

Owner of Transmission and/or Distribution Facilities

16b

Grid Voltage (in kilovolts)

[ ] existing
[
[
[

[ ] planned

[

] retired

[ ] NA

] Combustible 100 MW or more generator nameplate capacity
] Combustible 10 MW or Greater to Under 100 MW generator nameplate capacity
] NA

36

Form Approved
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 9.4 hours
Operator Name:_____________________________________________________________________________________
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

ANNUAL ELECTRIC
GENERATOR REPORT

Operator ID:__________

Reporting as of December 31 of Year:____________

SCHEDULE 2. POWER PLANT DATA
(EXISTING POWER PLANTS AND THOSE PLANNED FOR INITIAL COMMERCIAL OPERATION WITHIN 10 YEARS)
LINE

PLANT 3
EIA Plant
Code

1

Plant Name

2

Street
Address

3

County Name

4

State

5

Zip Code

6

Latitude (Degrees, Minutes,
Seconds)

7

Enter Datum for Latitude and Longitude, if Known; Otherwise Enter “UNK”

8a

NERC Region

8b

Does this Plant Belong to a RTO or ISO?

City Name

[
[
[
[

Longitude (Degrees, Minutes,
Seconds)

[ ] Yes

] California ISO
] Southwest Power Pool
] PJM Interconnection
] ISO New England

[
[
[
[

[ ] No

] Electric Reliability Council of Texas
] Midwest ISO
] New York ISO
] Other

8c

Name of RTO or ISO

9

Name of Water Source (For Purpose of Cooling or Hydroelectric)

10

Steam Plant Status

11

Steam Plant Type

12

Primary Purpose of the Plant (North American Industry Classification System
Code)

13

Does this plant have Federal Energy Regulatory Commission (FERC) Qualifying
Facility (QF) Cogenerator status? If Yes, provide all QF docket number(s).
Separate by using a comma.
_______________________________________________________________________

[ ] Yes

[ ] No

14

Does this plant have Federal Energy Regulatory Commission (FERC) Qualifying
Facility (QF) Small Power Producer status? If Yes, provide all QF docket
number(s). Separate by using a comma.
_______________________________________________________________________

[ ] Yes

[ ] No

15

Does this plant have Federal Energy Regulatory Commission (FERC) Qualifying
Facility (QF) Exempt Wholesale Generator status? If Yes, provide all QF docket
number(s). Separate by using a comma.
_______________________________________________________________________

[ ] Yes

[ ] No

16a

Owner of Transmission and/or Distribution Facilities

16b

Grid Voltage (in kilovolts)

[ ] existing
[
[
[

[ ] planned

[

] retired

[ ] NA

] Combustible 100 MW or more generator nameplate capacity
] Combustible 10 MW or Greater to Under 100 MW generator nameplate capacity
] NA

37

Form Approved
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 9.4 hours
Operator Name:_____________________________________________________________________________________
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

ANNUAL ELECTRIC
GENERATOR REPORT

Operator ID:__________

Reporting as of December 31 of Year:____________

SCHEDULE 2. POWER PLANT DATA
(EXISTING POWER PLANTS AND THOSE PLANNED FOR INITIAL COMMERCIAL OPERATION WITHIN 10 YEARS)
LINE

PLANT 4
EIA Plant
Code

1

Plant Name

2

Street
Address

3

County Name

4

State

5

Zip Code

6

Latitude (Degrees, Minutes,
Seconds)

7

Enter Datum for Latitude and Longitude, if Known; Otherwise Enter “UNK”

8a

NERC Region

8b

Does this Plant Belong to a RTO or ISO?

City Name

[
[
[
[

Longitude (Degrees, Minutes,
Seconds)

[ ] Yes

] California ISO
] Southwest Power Pool
] PJM Interconnection
] ISO New England

[
[
[
[

] Electric Reliability Council of Texas
] Midwest ISO
] New York ISO
] Other

8c

Name of RTO or ISO

9

Name of Water Source (For Purpose of Cooling or Hydroelectric)

10

Steam Plant Status

[ ] existing
[
[
[

[ ] planned

[ ] No

[

] retired

[ ] NA

] Combustible 100 MW or more generator nameplate capacity
] Combustible 10 MW or Greater to Under 100 MW generator nameplate capacity
] NA

11

Steam Plant Type

12

Primary Purpose of the Plant (North American Industry Classification System
Code)

13

Does this plant have Federal Energy Regulatory Commission (FERC) Qualifying
Facility (QF) Cogenerator status? If Yes, provide all QF docket number(s).
Separate by using a comma.
_______________________________________________________________________

[ ] Yes

[ ] No

14

Does this plant have Federal Energy Regulatory Commission (FERC) Qualifying
Facility (QF) Small Power Producer status? If Yes, provide all QF docket
number(s). Separate by using a comma.
_______________________________________________________________________

[ ] Yes

[ ] No

15

Does this plant have Federal Energy Regulatory Commission (FERC) Qualifying
Facility (QF) Exempt Wholesale Generator status? If Yes, provide all QF docket
number(s). Separate by using a comma.
_______________________________________________________________________

[ ] Yes

[ ] No

16a

Owner of Transmission and/or Distribution Facilities

16b

Grid Voltage (in kilovolts)
38

Form Approved
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 9.4 hours
Operator Name:_____________________________________________________________________________________
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

ANNUAL ELECTRIC
GENERATOR REPORT

Operator ID:__________

Reporting as of December 31 of Year:____________

SCHEDULE 2. POWER PLANT DATA
(EXISTING POWER PLANTS AND THOSE PLANNED FOR INITIAL COMMERCIAL OPERATION WITHIN 10 YEARS)
LINE

PLANT 5
EIA Plant
Code

1

Plant Name

2

Street
Address

3

County Name

4

State

5

Zip Code

6

Latitude (Degrees, Minutes,
Seconds)

7

Enter Datum for Latitude and Longitude, if Known; Otherwise Enter “UNK”

8a

NERC Region

8b

Does this Plant Belong to a RTO or ISO?

City Name

[
[
[
[

Longitude (Degrees, Minutes,
Seconds)

[ ] Yes

] California ISO
] Southwest Power Pool
] PJM Interconnection
] ISO New England

[
[
[
[

] Electric Reliability Council of Texas
] Midwest ISO
] New York ISO
] Other

8c

Name of RTO or ISO

9

Name of Water Source (For Purpose of Cooling or Hydroelectric)

10

Steam Plant Status

[ ] existing
[
[
[

[ ] planned

[ ] No

[

] retired

[ ] NA

] Combustible 100 MW or more generator nameplate capacity
] Combustible 10 MW or Greater to Under 100 MW generator nameplate capacity
] NA

11

Steam Plant Type

12

Primary Purpose of the Plant (North American Industry Classification System
Code)

13

Does this plant have Federal Energy Regulatory Commission (FERC) Qualifying
Facility (QF) Cogenerator status? If Yes, provide all QF docket number(s).
Separate by using a comma.
_______________________________________________________________________

[ ] Yes

[ ] No

14

Does this plant have Federal Energy Regulatory Commission (FERC) Qualifying
Facility (QF) Small Power Producer status? If Yes, provide all QF docket
number(s). Separate by using a comma.
_______________________________________________________________________

[ ] Yes

[ ] No

15

Does this plant have Federal Energy Regulatory Commission (FERC) Qualifying
Facility (QF) Exempt Wholesale Generator status? If Yes, provide all QF docket
number(s). Separate by using a comma.
_______________________________________________________________________

[ ] Yes

[ ] No

16a

Owner of Transmission and/or Distribution Facilities

16b

Grid Voltage (in kilovolts)
39

Form Approved
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 9.4 hours
Operator Name:_____________________________________________________________________________________
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

ANNUAL ELECTRIC
GENERATOR REPORT

Operator ID:__________

Reporting as of December 31 of Year:____________

SCHEDULE 2. POWER PLANT DATA
(EXISTING POWER PLANTS AND THOSE PLANNED FOR INITIAL COMMERCIAL OPERATION WITHIN 10 YEARS)
LINE

PLANT 6
EIA Plant
Code

1

Plant Name

2

Street
Address

3

County Name

4

State

5

Zip Code

6

Latitude (Degrees, Minutes,
Seconds)

7

Enter Datum for Latitude and Longitude, if Known; Otherwise Enter “UNK”

8a

NERC Region

8b

Does this Plant Belong to a RTO or ISO?

City Name

[
[
[
[

Longitude (Degrees, Minutes,
Seconds)

[ ] Yes

] California ISO
] Southwest Power Pool
] PJM Interconnection
] ISO New England

[
[
[
[

] Electric Reliability Council of Texas
] Midwest ISO
] New York ISO
] Other

8c

Name of RTO or ISO

9

Name of Water Source (For Purpose of Cooling or Hydroelectric)

10

Steam Plant Status

[ ] existing
[
[
[

[ ] planned

[ ] No

[

] retired

[ ] NA

] Combustible 100 MW or more generator nameplate capacity
] Combustible 10 MW or Greater to Under 100 MW generator nameplate capacity
] NA

11

Steam Plant Type

12

Primary Purpose of the Plant (North American Industry Classification System
Code)

13

Does this plant have Federal Energy Regulatory Commission (FERC) Qualifying
Facility (QF) Cogenerator status? If Yes, provide all QF docket number(s).
Separate by using a comma.
_______________________________________________________________________

[ ] Yes

[ ] No

14

Does this plant have Federal Energy Regulatory Commission (FERC) Qualifying
Facility (QF) Small Power Producer status? If Yes, provide all QF docket
number(s). Separate by using a comma.
_______________________________________________________________________

[ ] Yes

[ ] No

15

Does this plant have Federal Energy Regulatory Commission (FERC) Qualifying
Facility (QF) Exempt Wholesale Generator status? If Yes, provide all QF docket
number(s). Separate by using a comma.
_______________________________________________________________________

[ ] Yes

[ ] No

16a

Owner of Transmission and/or Distribution Facilities

16b

Grid Voltage (in kilovolts)
40

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

Form Approved
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 9.4 hours
Operator Name:_____________________________________________________________________________________
ANNUAL ELECTRIC
GENERATOR REPORT

Operator ID:__________

Reporting as of December 31 of Year:____________

SCHEDULE 3. GENERATOR INFORMATION
(EXISTING GENERATORS AND THOSE PLANNED FOR INITIAL COMMERCIAL OPERATION WITHIN 10 YEARS)
SCHEDULE 3, PART A. GENERATOR INFORMATION – GENERATORS
(COMPLETE ONE COLUMN FOR EACH GENERATOR, BY PLANT)
1 Plant Name
2 EIA Plant Code
Generator (a)
Generator (b)
Generator (c)
Operator’s Generator
3
Identification
1 ____
5 ____
1 ____
5 ____
1 ____
5 ____
Associated Boiler
2 ____
6 ____
2 ____
6 ____
2 ____
6 ____
4
3 ____
7 ____
3 ____
7 ____
3 ____
7 ____
Identifications
4 ____
8 ____
4 ____
8 ____
4 ____
8 ____
5

Prime Mover

6

Unit Code (Multi-Generator
Code)

7

Ownership

8

Is This Generator an Electric
Utility Generator?

9

Date of Sale If Sold (MM-YYYY)

10

11

Can This Generator Deliver
Power to the Transmission Grid?
For Combined-Cycle Steam
Turbines (i.e. Prime Mover = CA,
CS or CC) Does this Generator
Have Duct-Burners?

[

] Yes

[

] No

[

] Yes

[

] No

[

] Yes

[

] No

[

] Yes

[

] No

[

] Yes

[

] No

[

] Yes

[

] No

[ ] Yes

[ ] No

41

[ ] Yes

[ ] No

[ ] Yes

[ ] No

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

Operator Name:____________________________________

Form Approved
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 9.4 hours
Operator ID:___________

Plant Name:_______________________________________

Plant Code:___________

ANNUAL ELECTRIC GENERATOR
REPORT

Reporting as of December 31 of Year:___________________
SCHEDULE 3, PART B. GENERATOR INFORMATION – EXISTING GENERATORS
(COMPLETE ONE COLUMN FOR EACH GENERATOR, BY PLANT)
Generator (a)
Generator (b)
Generator (c)
Generator Nameplate
1
Capacity (Megawatts)
2

3a
3b
4
5
6
7
8a

8b

9a

9b

Summer:

Summer:

Summer:

Winter:

Winter:

Winter:

Net Capacity (Megawatts)
Maximum Expected
Reactive Power Output
(MVAR)
Maximum Reactive Power
Absorption (MVAR)
Status Code
If Status Code is Standby,
Can the Generator be
Synchronized to the Grid?
Initial Date of Operation
(MM-YYYY)
Retirement Date (MM-YYYY)
Is This Generator
Associated with a
Combined Heat and Power
System?
If Yes, Is This Generator
Part of a Topping or
Bottoming Cycle?
ENERGY SOURCES
Predominant Energy Source
If coal-fired or petroleum
coke fired, check all
combustion technologies
that apply to the associated
boiler(s) and steam
conditions

10

Start-Up and Flame
Stabilization Energy
Sources

11

Second Most Predominant
Energy Source

12

Other Energy Sources

[

] Yes

[

] No

[

] Yes

[

] No

[

] Yes

[

] No

[

] Yes

[

] No

[

] Yes

[

] No

[

] Yes

[

] No

[ ] Topping
[ ] Bottoming

[
[
[
[
[
[

]
]
]
]
]
]

[ ] Topping
[ ] Bottoming

Pulverized coal
Fluidized Bed
Sub-critical
Super-critical
Ultra super-critical
Carbon-capture

[
[
[
[
[
[

]
]
]
]
]
]

[ ] Topping
[ ] Bottoming

Pulverized coal
Fluidized Bed
Sub-critical
Super-critical
Ultra super-critical
Carbon-capture

[
[
[
[
[
[

]
]
]
]
]
]

Pulverized coal
Fluidized Bed
Sub-critical
Super-critical
Ultra super-critical
Carbon-capture

a

b

c

d

a

b

c

d

a

b

c

d

a

b

c

d

a

b

c

d

a

b

c

d

42

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

Operator Name:____________________________________

Form Approved
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 9.4 hours
Operator ID:___________

Plant Name:_______________________________________

Plant Code:___________

ANNUAL ELECTRIC GENERATOR
REPORT

Reporting as of December 31 of Year:___________________
SCHEDULE 3, PART B. GENERATOR INFORMATION – EXISTING GENERATORS
(COMPLETE ONE COLUMN FOR EACH GENERATOR, BY PLANT)
Generator (a)
Generator (b)
Generator (c)
Is This Generator Part of a
Solid Fuel Gasification
System?
Number of Turbines, Buoys,
14
or Inverters
15a Tested Heat Rate
13

15b

16

[

] Yes

[

] No

[

] Yes

[

] No

[

] Yes

[

] No

Fuel Used For Heat Rate
Test
Annual Average Operating
Efficiency for Solar
Photovoltaic, Wind and
Hydroelectric Generators
PROPOSED CHANGES TO EXISTING GENERATORS (WITHIN THE NEXT 10 YEARS)

Are There Any Planned
Modifications to This
17a
Generator, Including
Retirement?
Planned Uprates:

[ ] Yes

[ ] No

[ ] Yes

[ ] No

[ ] Yes

[ ] No

[ ] Yes

[ ] No

[ ] Yes

[ ] No

[ ] Yes

[ ] No

1. Incremental Net Summer
capacity (MW)
17b 2. Incremental Net Winter
capacity (MW)
3. Planned Effective Date
(MM-YYYY)
Planned Uprates:
1. Incremental Net Summer
capacity (MW)
17c 2. Incremental Net Winter
capacity (MW)
3. Planned Effective Date
(MM-YYYY)
Planned Repowering:
1. New Prime Mover
17d

2. New Energy Source
3. New Nameplate Capacity

4. Planned Effective Date
(MM-YYYY)
Other Modifications?
(explain in Notes)
17e
Planned Effective Date (MMYYYY)

43

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

Operator Name:____________________________________

Form Approved
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 9.4 hours
Operator ID:___________

Plant Name:_______________________________________

Plant Code:___________

ANNUAL ELECTRIC GENERATOR
REPORT

Reporting as of December 31 of Year:___________________
SCHEDULE 3, PART B. GENERATOR INFORMATION – EXISTING GENERATORS
(COMPLETE ONE COLUMN FOR EACH GENERATOR, BY PLANT)
Generator (a)
Generator (b)
Generator (c)
Planned Generator
17f
Retirement Date (MM-YYYY)
FUEL SWITCHING AND CO-FIRING CAPABILITY

18

Can This Generator be
Powered by Multiple Fuels?

19

Can This Unit Co-Fire
Fuels?

20

Fuel Options for Co-Firing

21

Can This Generator be
Powered by Co-Fired Fuel
Oil and Natural Gas?

Can This Generator be Run
on 100% Oil?

22

If No, What is the Maximum
Oil Heat Input When CoFiring with Natural Gas?
What is the Maximum
Output Achievable (Net
Summer Capacity in MW)
When Making the Maximum
Use of Oil and Co-Firing
Natural Gas?

[ ] Yes

Can This Unit Fuel Switch?

24

Can This Unit Switch
Between Oil and Natural
Gas?
If Yes, Can the Unit Switch
Fuels While Operating?

[ ] Yes

If No, Skip to SCHEDULE
3, PART C.
[ ] Yes

[ ] No

[ ] No

[ ] Yes

If No, Skip to SCHEDULE
3, PART C.
[ ] Yes

[ ] No

[ ] No

If No, Skip to SCHEDULE
3, PART C.
[ ] Yes

[ ] No

If No, Skip to Line 23.

If No, Skip to Line 23.

If No, Skip to Line 23.

a

b

c

a

b

c

a

b

c

d

e

f

d

e

f

d

e

f

[ ] Yes

[ ] No

If Yes, Skip to Line 23.
[ ] Yes

[ ] No

[ ] Yes

[ ] No

If Yes, Skip to Line 23.
[ ] Yes

[ ] No

[ ] Yes

[ ] No

If Yes, Skip to Line 23.
[ ] Yes

[ ] No

If Yes, Skip to Line 23.

If Yes, Skip to Line 23.

If Yes, Skip to Line 23.

________ %

________ %

________ %

________ MW

________ MW

________ MW

[ ] Yes
23

[ ] No

[ ] No

If No, Skip to Schedule 3,
Part C.
[ ] Yes

[ ] No

If No, Skip to Line 26.
[ ] Yes

[ ] No
44

[ ] Yes

[ ] No

If No, Skip to Schedule 3,
Part C.
[ ] Yes

[ ] No

If No, Skip to Line 26.
[ ] Yes

[ ] No

[ ] Yes

[ ] No

If No, Skip to Schedule 3,
Part C.
[ ] Yes

[ ] No

If No, Skip to Line 26.
[ ] Yes

[ ] No

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

Operator Name:____________________________________

Form Approved
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 9.4 hours
Operator ID:___________

Plant Name:_______________________________________

Plant Code:___________

ANNUAL ELECTRIC GENERATOR
REPORT

Reporting as of December 31 of Year:___________________
SCHEDULE 3, PART B. GENERATOR INFORMATION – EXISTING GENERATORS
(COMPLETE ONE COLUMN FOR EACH GENERATOR, BY PLANT)
Generator (a)
Generator (b)
Generator (c)
What is the Maximum Net
Summer Output Achievable
________ MW
________ MW
________ MW
(MW) When Running on
Natural Gas?
What is the Maximum Net
Summer Output Achievable
________ MW
________ MW
________ MW
(MW) When Running on
Fuel Oil?

25

26

[ ] 0 to 6 hours
How Much Time is Required [ ] over 6 to 24 hours
to Switch This Unit From
[ ] over 24 to 72 hours
Using 100% Natural Gas to
[ ] over 72 hours.
Using 100% Oil?
[ ] Unknown or uncertain
Are There Factors That
[ ] Yes [ ] No
Limit the Unit’s Ability to
Switch From Natural Gas to
If No, Skip to Line 26.
Oil?
[ ] Limited on site fuel
storage.
[ ] Air Permit limits
If Yes, Check All Factors
[ ] Other (specify in
That Apply
SCHEDULE 7.
COMMENTS)

Fuel Switching Options

[
[
[
[
[

] 0 to 6 hours
] over 6 to 24 hours
] over 24 to 72 hours
] over 72 hours.
] Unknown or uncertain
[ ] Yes

[ ] No

[
[
[
[
[

] 0 to 6 hours
] over 6 to 24 hours
] over 24 to 72 hours
] over 72 hours.
] Unknown or uncertain
[ ] Yes

If No, Skip to Line 26.
[ ] Limited on site fuel
storage.
[ ] Air Permit limits
[ ] Other (specify in
SCHEDULE 7.
COMMENTS)

[ ] No

If No, Skip to Line 26.
[ ] Limited on site fuel
storage.
[ ] Air Permit limits
[ ] Other (specify in
SCHEDULE 7.
COMMENTS)

a

b

c

a

b

c

a

b

C

d

e

f

d

e

f

d

e

f

45

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

Operator Name:____________________________________

Form Approved
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 9.4 hours
Operator ID:___________

Plant Name:_______________________________________

Plant Code:___________

ANNUAL ELECTRIC GENERATOR
REPORT

Reporting as of December 31 of Year:___________________
SCHEDULE 3, PART C. GENERATOR INFORMATION – PROPOSED GENERATORS
(COMPLETE ONE COLUMN FOR EACH GENERATOR, BY PLANT)
Generator (a)
Generator (b)
Generator (c)
Generator Nameplate
1
Capacity (Megawatts)
2

3a
3b
4
5
6

7

8

9

10

11

Summer:

Summer:

Summer:

Winter:

Winter:

Winter:

Net Capacity (Megawatts)
Maximum Expected
Reactive Power Output
(MVAR)
Maximum Reactive Power
Absorption (MVAR)
Status Code
Planned Original Effective
Date (MM-YYYY)
Planned Current Effective
Date (MM-YYYY)
Will This Generator be
Associated with a
Combined Heat and Power
System?
Will This Generator be Part
of a Solid Fuel Gasification
System?
Is This Generator Part of a
Site That Was Previously
Reported as Indefinitely
Postponed or Cancelled?
PLANNED ENERGY SOURCES
Expected Predominant
Energy Source
If coal-fired or petroleum
[
coke fired, check all
[
combustion technologies
[
that apply to the associated [
boiler(s) and steam
[
conditions
[

12

Expected Second Most
Predominant Energy Source

13

Other Energy Sources

14

Number of Turbines, Buoys,
or Inverters

[

] Yes

[

] No

[

] Yes

[

] No

[

] Yes

[

] No

[

] Yes

[

] No

[

] Yes

[

] No

[

] Yes

[

] No

[

] Yes

[

] No

[

] Yes

[

] No

[

] Yes

[

] No

]
]
]
]
]
]

a

Pulverized coal
Fluidized Bed
Sub-critical
Super-critical
Ultra super-critical
Carbon-capture

b

c

d

46

[
[
[
[
[
[

]
]
]
]
]
]

a

Pulverized coal
Fluidized Bed
Sub-critical
Super-critical
Ultra super-critical
Carbon-capture

b

c

d

[
[
[
[
[
[

]
]
]
]
]
]

a

Pulverized coal
Fluidized Bed
Sub-critical
Super-critical
Ultra super-critical
Carbon-capture

b

c

d

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

Operator Name:____________________________________

Form Approved
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 9.4 hours
Operator ID:___________

Plant Name:_______________________________________

Plant Code:___________

ANNUAL ELECTRIC GENERATOR
REPORT

Reporting as of December 31 of Year:___________________
SCHEDULE 3, PART C. GENERATOR INFORMATION – PROPOSED GENERATORS
(COMPLETE ONE COLUMN FOR EACH GENERATOR, BY PLANT)
Generator (a)
Generator (b)
Generator (c)
FUEL SWITCHING AND CO-FIRING CAPABILITY

15

[ ] Yes [ ] No
[ ] Yes [ ] No
[ ] Yes [ ] No
Will This Generator be Able
[ ] Undetermined
[ ] Undetermined
[ ] Undetermined
to be Powered by Multiple
If No or Undetermined, Skip If No or Undetermined, Skip If No or Undetermined, Skip
Fuels?
to SCHEDULE 4.
to SCHEDULE 4.
to SCHEDULE 4.

16

Will this Unit be Able to CoFire Fuels?

17

Fuel Options for Co-Firing

18

Will This Generator be Able
to be Powered by Co-Fired
Fuel Oil and Natural Gas?

Will This Generator be able
to Run on 100% Oil?

19

20

21

If No, What is the Expected
Maximum Oil Heat Input
When Co-Firing with Natural
Gas?
What is the Expected
Maximum Output
Achievable (Net Summer
Capacity in MW) When
Making the Maximum Use of
Oil and Co-Firing Natural
Gas?
Will This Unit be Able to
Fuel Switch?
Will This Unit be Able to
Switch Between Oil and
Natural Gas?

[ ] Yes

[ ] No

[ ] Yes

[ ] No

[ ] Yes

[ ] No

If No, Skip to Line 20.

If No, Skip to Line 20.

If No, Skip to Line 20.

a

b

c

a

b

c

a

b

c

d

e

f

d

e

f

d

e

f

[ ] Yes

[ ] No

If No, Skip to Line 20.
[ ] Yes

[ ] No

[ ] Yes

[ ] No

If No, Skip to Line 20.
[ ] Yes

[ ] No

[ ] Yes

[ ] No

If No, Skip to Line 20.
[ ] Yes

[ ] No

If Yes, Skip to Line 20.

If Yes, Skip to Line 20.

If Yes, Skip to Line 20.

________ %

________ %

________ %

________ MW

________ MW

________ MW

[ ] Yes

[ ] No

If No, Skip to Schedule 4.
[ ] Yes

[ ] No

If No, Skip to Line 23.

47

[ ] Yes

[ ] No

If No, Skip to Schedule 4.
[ ] Yes

[ ] No

If No, Skip to Line 23.

[ ] Yes

[ ] No

If No, Skip to Schedule 4.
[ ] Yes

[ ] No

If No, Skip to Line 23.

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

Operator Name:____________________________________

Form Approved
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 9.4 hours
Operator ID:___________

Plant Name:_______________________________________

Plant Code:___________

ANNUAL ELECTRIC GENERATOR
REPORT

Reporting as of December 31 of Year:___________________
SCHEDULE 3, PART C. GENERATOR INFORMATION – PROPOSED GENERATORS
(COMPLETE ONE COLUMN FOR EACH GENERATOR, BY PLANT)
Generator (a)
Generator (b)
Generator (c)
If Yes, Will this Unit be Able
to Switch Fuels While
[ ] Yes [ ] No
[ ] Yes [ ] No
[ ] Yes [ ] No
Operating?
What is the Expected
Maximum Net Summer
________ MW
________ MW
________ MW
Output Achievable (MW)
When Running on Natural
Gas?
What is the Expected
Maximum Net Summer
________ MW
________ MW
________ MW
Output Achievable (MW)
When Running on Fuel Oil?
[ ] 0 to 6 hours
[ ] 0 to 6 hours
How Much Time is Expected [ ] 0 to 6 hours
[ ] over 6 to 24 hours
[ ] over 6 to 24 hours
[ ] over 6 to 24 hours
to be Required to Switch
This Unit From Using 100% [ ] over 24 to 72 hours
[ ] over 24 to 72 hours
[ ] over 24 to 72 hours
Natural Gas to Using 100% [ ] over 72 hours.
[ ] over 72 hours.
[ ] over 72 hours.
Oil?
[ ] Unknown or uncertain [ ] Unknown or uncertain [ ] Unknown or uncertain
Are There Factors That Will
[ ] Yes [ ] No
[ ] Yes [ ] No
[ ] Yes [ ] No
Limit the Unit’s Ability to
Switch From Natural Gas to
If No, Skip to Line 26.
If No, Skip to Line 26.
If No, Skip to Line 26.
Oil?
[ ] Limited on site fuel
[ ] Limited on site fuel
[ ] Limited on site fuel
22
storage.
storage.
storage.
[
]
Air
Permit
limits
[
]
Air
Permit
limits
[ ] Air Permit limits
If Yes, Check All Factors
[ ] Other (specify in
[ ] Other (specify in
[ ] Other (specify in
That Apply
SCHEDULE 7.
SCHEDULE 7.
SCHEDULE 7.
COMMENTS)
COMMENTS)
COMMENTS)

23

Fuel Switching Options

a

b

c

a

b

c

a

b

C

d

e

f

d

e

f

d

e

f

48

Form Approved
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 9.4 hours
Operator Name:_____________________________________________________________________________________

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

ANNUAL ELECTRIC GENERATOR
REPORT

Operator ID:__________

Reporting as of December 31 of Year:____________

SCHEDULE 4. OWNERSHIP OF GENERATORS OWNED JOINTLY OR BY OTHERS
PLANT NAME (a)
EIA PLANT CODE (b)
OPERATOR’S GENERATOR IDENTIFICATION (c)
IF JOINTLY OWNED – OWNER NAME AND CONTACT INFORMATION (d)
Owner/Joint Owner 1: Name
Street Address
City, State and Zip Code

% OWNED (e):

Joint Owner 2: Name

% OWNED (e):

EIA CODE:

Street Address
City, State and Zip Code

EIA CODE:

Joint Owner 3: Name
Street Address
City, State and Zip Code

% OWNED (e):

Joint Owner 4: Name
Street Address
City, State and Zip Code

% OWNED (e):

Joint Owner 5: Name
Street Address
City, State and Zip Code

% OWNED (e):

Joint Owner 6: Name
Street Address
City, State and Zip Code

% OWNED (e):

Joint Owner 7: Name
Street Address
City, State and Zip Code

% OWNED (e):

Joint Owner 8: Name
Street Address
City, State and Zip Code

% OWNED (e):

EIA CODE:

EIA CODE:

EIA CODE:

EIA CODE:

EIA CODE:

EIA CODE:

Joint Owner 9: Name
Street Address
City, State and Zip Code

% OWNED (e):

Joint Owner 10: Name
Street Address
City, State and Zip Code

% OWNED (e):

EIA CODE:

EIA CODE:
Total

49

100%

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

Form Approved
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 9.4 hours
Operator Name:_____________________________________________________________________________________
ANNUAL ELECTRIC GENERATOR
REPORT

Operator ID:__________
Reporting as of December 31 of Year:____________
SCHEDULE 5. NEW GENERATOR INTERCONNECTION INFORMATION
(COMPLETE FOR EACH GENERATOR ENTERING SERVICE DURING CALENDAR YEAR 2010)
LINE
Name:
Name:
Name:
1
Plant Name and EIA Plant Code
Code:
Code:
Code:
2

Generator ID

3

Date of Actual Generator
Interconnection (MM-YYYY)

4

Date of Initial Interconnection
Request (MM-YYYY)

5

City:

City:

City:

State:

State:

State:

Interconnection Site Location

6

Grid Voltage At The Point Of
Interconnection (kV)

7

Owner of The Transmission or
Distribution Facilities to Which
Generator is Interconnected

8

Total Cost Incurred for the Direct,
Physical Interconnection (Thousand
$)
Equipment Included in the Direct
Interconnection Cost (Check All of
the Following that Apply:)

9

10

11

a. Transmission or Distribution Line

[ ] Yes

[ ] No

[ ] Yes

[ ] No

[ ] Yes

[ ] No

b. Transformer

[ ] Yes

[ ] No

[ ] Yes

[ ] No

[ ] Yes

[ ] No

c. Protective Devices

[ ] Yes

[ ] No

[ ] Yes

[ ] No

[ ] Yes

[ ] No

d. Substation or Switching Station

[ ] Yes

[ ] No

[ ] Yes

[ ] No

[ ] Yes

[ ] No

e. Other Equipment (specify in
SCHEDULE 7. COMMENTS)

[ ] Yes

[ ] No

[ ] Yes

[ ] No

[ ] Yes

[ ] No

b. Will This Cost Be Repaid?

[ ] Yes

[ ] No

[ ] Yes

[ ] No

[ ] Yes

[ ] No

Were Specific Transmission Use
Rights Secured as a Result of the
Interconnection Costs Incurred?

[ ] Yes

[ ] No

[ ] Yes

[ ] No

[ ] Yes

[ ] No

a. Total Cost for Other Grid
Enhancements/ Reinforcements
Needed to Accommodate Power
Deliveries From the Generator
(Thousand $)

50

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

Form Approved
ANNUAL ELECTRIC GENERATOR OMB No. 1905-0129
Approval Expires: 12/31/2013
REPORT
Burden: 9.4 hours
Operator Name:_____________________________________
Operator ID:_________
Plant Name:_________________________________________

Plant Code: _________

Reporting as of December 31 of Year:___________________
SCHEDULE 6. BOILER INFORMATION
PART A. PLANT CONFIGURATION
(FOR PLANTS EQUAL TO OR GREATER THAN 10 MW BUT LESS THAN 100 MW,
COMPLETE ONLY LINES 1, 2, 3, AND IF APPLICABLE LINES 5 AND 6)
EQUIPMENT
EQUIPMENT
EQUIPMENT
EQUIPMENT
EQUIPMENT
LINE EQUIPMENT TYPE IDENTIFICATION IDENTIFICATION IDENTIFICATION IDENTIFICATION IDENTIFICATION
(a)
(b)
(c)
(d)
(e)
1

Boiler ID

2

Associated
Generator(s) ID

3

Generator
Associations with
Boiler as Actual or
Theoretical

4

Associated Cooling
System(s) ID

5

Associated Flue Gas
Particulate
Collector(s) ID

6

Associated Flue Gas
Desulfurization
Unit(s) ID

7

Associated Flue(s) ID

8

Associated Stack(s)
ID

51

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

Form Approved
ANNUAL ELECTRIC GENERATOR OMB No. 1905-0129
Approval Expires: 12/31/2013
REPORT
Burden: 9.4 hours
Operator Name:_____________________________________
Operator ID:_________
Plant Name:_________________________________________

Plant Code: _________

Reporting as of December 31 of Year:___________________
SCHEDULE 6, PART B. BOILER INFORMATION – AIR EMISSION STANDARDS
(DATA NOT REQUIRED FOR PLANTS LESS THAN 100 MW)
(COMPLETE A SEPARATE PAGE FOR EACH BOILER)
LINE
1

Boiler ID

2a

Type Of Boiler Standards Under Which The Boiler Is
Operating (use codes)

2b

3

Is Boiler Operating Under a New Source Review (NSR)
Permit?
If Yes, list date (MM-YYYY) and identification number
of the issued permit
PARTICULATE
CATEGORY
MATTER
(a)
FD [ ]
ST [ ]
Type of Statute or Regulation
(use codes)
LO [ ]
NA [ ]

D[

] Da [
Dc [ ]
[ ] Yes

Date

] Db [
N[ ]

]

[ ] No
Permit Number

SULFUR DIOXIDE
(b)
FD [ ]
ST [ ]

NITROGEN OXIDES
(c)
FD [ ]
ST [ ]

LO [

LO [

]

NA [

]

]

NA [

Emission Standard Specified
4a
4b
5
6

7

8

9

10

Emission Rate
Percent Scrubbed
Unit of Measurement
Specified (use codes)
Time Period Specified (use
codes)
Year Boiler Was or is
Expected to Be in
Compliance With Federal,
State and/or Local Regulation
If Not in Compliance,
Strategy for Compliance (use
codes)
Select Existing Strategies to
meet the Sulfur Dioxide and
Nitrogen Oxides
Requirements of Title IV of
the Clean Air Act Amendment
of 1990 (use codes)
Select Planned Strategies to
meet the Sulfur Dioxide and
Nitrogen Oxides
Requirements of Title IV of
the Clean Air Act Amendment
of 1990 (use codes)

N/A

N/A

N/A

N/A

N/A

N/A

52

]

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

Form Approved
ANNUAL ELECTRIC GENERATOR OMB No. 1905-0129
Approval Expires: 12/31/2013
REPORT
Burden: 9.4 hours
Operator Name:_____________________________________
Operator ID:_________
Plant Name:_________________________________________

Plant Code: _________

Reporting as of December 31 of Year:___________________
SCHEDULE 6, PART C. BOILER INFORMATION – DESIGN PARAMETERS
(Except for Lines 1 and 2, DATA NOT REQUIRED FOR PLANTS LESS THAN 100 MW)
(COMPLETE A SEPARATE PAGE FOR EACH BOILER)
LINE
1
Boiler ID
2

Boiler Status (use codes)

3

Boiler Actual or Projected Date of Commercial Operation (MM-YYYY)

4

Boiler Actual or Projected Retirement Date (MM-YYYY)

5

Boiler Manufacturer (use code)

6

Type of Firing Used with Primary Fuels (use codes)

7

Maximum Continuous Steam Flow at 100 Percent Load (thousand pounds
per hour)

8

Design Firing Rate at Maximum Continuous Steam Flow for Coal (nearest
0.1 ton per hour)

9

Design Firing Rate at Maximum Continuous Steam Flow for Petroleum
(nearest 0.1 barrels per hour)

10

Design Firing Rate at Maximum Continuous Steam Flow for Gas (nearest
0.1 thousand cubic feet per hour)

11

Design Firing Rate at Maximum Continuous Steam Flow for Other
(specify fuel and unit in SCHEDULE 7. COMMENTS)

12

Design Waste Heat Input Rate at Maximum Continuous Steam Flow
(million Btu per hour)

13

Primary Fuels Used in Order of Predominance (use codes)

14

Boiler Efficiency When Burning Primary Fuel at 100 Percent Load
(nearest 0.1 percent)

15

Boiler Efficiency When Burning Primary Fuel at 50 Percent Load (nearest
0.1 percent)

16

Total Air Flow Including Excess Air at 100 Percent Load (cubic feet per
minute at standard conditions)

17

Wet Or Dry Bottom (for coal-capable boilers), (enter "W" for Wet or "D"
for Dry)

18

Fly Ash Re-injection (enter "Y" for Yes or "N" for No)

53

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

Form Approved
ANNUAL ELECTRIC GENERATOR OMB No. 1905-0129
Approval Expires: 12/31/2013
REPORT
Burden: 9.4 hours
Operator Name:_____________________________________
Operator ID:_________
Plant Name:_________________________________________

Plant Code: _________

Reporting as of December 31 of Year:___________________
SCHEDULE 6, PART D. BOILER INFORMATION – NITROGEN OXIDE EMISSION CONTROLS
(COMPLETE A SEPARATE PAGE FOR EACH BOILER)
1
Boiler ID
2

Nitrogen Oxide Control Status (use
codes)
NITROGEN OXIDE CONTROL EQUIPMENT AND OR PROCESS

3

Low Nitrogen Oxide Control Process
(use codes)

4

Manufacturer of Low Nitrogen Oxide
Control Burners (use code)
SCHEDULE 6, PART E. BOILER INFORMATION – MERCURY EMISSION CONTROLS

1

Does This Boiler Have Mercury
Emission Controls?

2

If “Yes,” Select Up To Three Mercury
Emission Controls (use codes)

Yes [

54

]

No [

]

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

Form Approved
ANNUAL ELECTRIC GENERATOR OMB No. 1905-0129
Approval Expires: 12/31/2013
REPORT
Burden: 9.4 hours
Operator Name:_____________________________________
Operator ID:_________
Plant Name:_________________________________________

Plant Code: _________

Reporting as of December 31 of Year:___________________
SCHEDULE 6, PART F. COOLING SYSTEM INFORMATION - DESIGN PARAMETERS
(DATA NOT REQUIRED FOR PLANTS LESS THAN 100 MW)
(COMPLETE A SEPARATE PAGE FOR EACH COOLING SYSTEM)
LINE
1

Cooling System ID (as reported on SCHEDULE 6, PART A, Line 4)

2

Cooling System Status (use codes)

3

Cooling System Actual or Projected In-Service Date of Commercial Operation
(MM-YYYY)

4a

Type of Cooling System (use codes)

4b

For Hybrid Cooling Systems, Indicate Percent of Cooling Load Served by Dry Cooling
Components.

5a

Source (Name) of Cooling Water Including Makeup Water (if discharge is into different
water body, specify in SCHEDULE 7. COMMENTS)

5b

Type of Cooling Water Source (use codes)

5c

Type of Cooling Water (use codes)

6

Design Cooling Water Flow Rate at 100 percent Load at Intake (cubic feet per second)

7

Actual or Projected In-Service Date for Chlorine Discharge Control Structures and
Equipment (MM-YYYY)
COOLING PONDS

8

Actual or Projected In-Service Date (month and year of commercial operation, e.g. 121982)

9

Total Surface Area (acres)

10

Total Volume (acre-feet)
COOLING TOWERS

11

Actual or Projected In-service Date (MM-YYYY)

12

Type of Towers (use codes)

13

Maximum Design Rate of Water Flow at 100 Percent Load (cubic feet per second)

14

Maximum Power Requirement at 100 Percent Load (megawatts)
INSTALLED COST OF COOLING SYSTEM EXCLUDING LAND AND CONDENSERS (thousand dollars)

15

Total System

16

Ponds (if applicable)
55

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

Form Approved
ANNUAL ELECTRIC GENERATOR OMB No. 1905-0129
Approval Expires: 12/31/2013
REPORT
Burden: 9.4 hours

17

Towers (if applicable)

18

Chlorine Discharge Control Structures and Equipment (if applicable)
COOLING WATER INTAKE AND OUTLET LOCATIONS
ITEM
INTAKE (a)

19

Maximum Distance from Shore (feet)

20

Average Distance below Water Surface (feet)

21

Latitude (degrees, minutes, seconds)

22

Longitude (degrees, minutes, seconds)

23

Enter Datum for Latitude and Longitude, if Known;
Otherwise Enter “UNK”

56

OUTLET (b)

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

Form Approved
ANNUAL ELECTRIC GENERATOR OMB No. 1905-0129
Approval Expires: 12/31/2013
REPORT
Burden: 9.4 hours
Operator Name:_____________________________________
Operator ID:_________
Plant Name:_________________________________________
Plant Code: _________
Reporting as of December 31 of Year:___________________
SCHEDULE 6, PART G. FLUE GAS PARTICULATE COLLECTOR INFORMATION
(COMPLETE A SEPARATE PAGE FOR EACH FLUE GAS PARTICULATE COLLECTOR)
LINE
1

Flue Gas Particulate Collector ID (as reported on SCHEDULE 6, PART A line 5)

2

Flue Gas Particulate Collector Actual or Projected In-Service Date of Commercial
Operation (e.g., 12-2001)

3

Flue Gas Particulate Collector Status (use code)

4

Type of Flue Gas Particulate Collector (use codes)

5

Installed Cost of Flue Gas Particulate Collector Excluding Land (thousand dollars)
DESIGN FUEL SPECIFICATIONS FOR ASH (AS BURNED, TO NEAREST 0.1 PERCENT BY WEIGHT)

6

For Coal

7

For Petroleum
DESIGN FUEL SPECIFICATIONS FOR SULFUR (AS BURNED, TO NEAREST 0.1 PERCENT BY WEIGHT)

8

For Coal

9

For Petroleum
DESIGN SPECIFICATIONS AT 100 PERCENT GENERATOR LOAD

10

Collection Efficiency (to nearest 0.1 percent)

11

Particulate Emission Rate (pounds per hour)

12

Particulate Collector Gas Exit Rate (actual cubic feet per minute)

13

Particulate Collector Gas Exit Temperature (degrees Fahrenheit)

57

U.S. Department of Energy
Form Approved
U.S. Energy Information Administration ANNUAL ELECTRIC GENERATOR OMB No. 1905-0129
Form EIA-860 (2011)
Approval Expires: 12/31/2013
REPORT
Burden: 9.4 hours
Operator Name:_____________________________________
Operator ID:_________
Plant Name:_________________________________________

Plant Code: _________

Reporting as of December 31 of Year:___________________
SCHEDULE 6, PART H. FLUE GAS DESULFURIZATION UNIT - DESIGN PARAMETERS
(COMPLETE A SEPARATE PAGE FOR EACH FLUE GAS DESULFURIZATION UNIT)
LINE
1

Flue Gas Desulfurization Unit ID (as reported on SCHEDULE 6, PART A line 6)

2

Flue Gas Desulfurization Unit Status (use codes)

3

Flue Gas Desulfurization Unit Actual or Projected In-Service Date of Commercial
Operation (MM-YYYY)

4

Type of Flue Gas Desulfurization Unit (use code)

5

Type of Sorbent (use code)

6

Salable Byproduct Recovery (enter "Y" for Yes or "N" for No)

7

Flue Gas Desulfurization Unit Manufacturer (use code)

8

Annual Pond and Land Fill Requirements (nearest acre foot per year)

9

Is Sludge Pond Lined (enter "Y" for Yes, "N" for No, or "NA" for Not Applicable)

10

Can Flue Gas Bypass Flue Gas Desulfurization Unit (enter "Y" for Yes or "N" for No)
DESIGN FUEL SPECIFICATIONS FOR COAL

11

Ash (to nearest 0.1 percent by weight)

12

Sulfur (to nearest 0.1 percent by weight)
NUMBER OF FLUE GAS DESULFURIZATION UNIT SCRUBBER TRAINS (OR MODULES)

13

Total

14

Operated at 100 Percent Load

DESIGN SPECIFICATIONS OF FLUE GAS DESULFURIZATION UNIT AT 100 PERCENT GENERATOR LOAD
15

Removal Efficiency for Sulfur Dioxide (to nearest 0.1 percent by weight)

16

Sulfur Dioxide Emission Rate (pounds per hour)

17

Flue Gas Exit Rate (actual cubic feet per minute)

18

Flue Gas Exit Temperature (degrees Fahrenheit)

19

Flue Gas Entering Flue Gas Desulfurization Unit (percent of total)

INSTALLED COST OF FLUE GAS DESULFURIZATION UNIT, EXCLUDING LAND (THOUSAND DOLLARS)
20

Structures and Equipment

21

Sludge Transport and Disposal System

58

U.S. Department of Energy
Form Approved
U.S. Energy Information Administration ANNUAL ELECTRIC GENERATOR OMB No. 1905-0129
Form EIA-860 (2011)
Approval Expires: 12/31/2013
REPORT
Burden: 9.4 hours
22

Other (installed cost of flue gas desulfurization unit)

23

Total (sum of lines 20, 21, 22)

59

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

Form Approved
ANNUAL ELECTRIC GENERATOR OMB No. 1905-0129
Approval Expires: 12/31/2013
REPORT
Burden: 9.4 hours
Operator Name:_____________________________________
Operator ID:_________
Plant Name:_________________________________________

Plant Code: _________

Reporting as of December 31 of Year:___________________
SCHEDULE 6, PART I. STACK AND FLUE INFORMATION - DESIGN PARAMETERS
(DATA NOT REQUIRED FOR PLANTS LESS THAN 100 MW)
(COMPLETE A SEPARATE PAGE FOR EACH STACK AND FLUE)
LINE
1

Flue ID (as reported on SCHEDULE 6, PART A line 8)

2

Stack ID (as reported on SCHEDULE 6, PART A line 7)

3

Stack (or Flue) Actual or Projected In-Service Date of Commercial Operation (e.g., 122001)

4

Status of Stack (or Flue) (use code)

5

Flue Height at Top from Ground Level (feet)

6

Cross-Sectional Area at Top of Flue (nearest square foot)
DESIGN FLUE GAS EXIT (AT TOP OF STACK)

7

Rate at 100 Percent Load (actual cubic feet per minute)

8

Rate at 50 Percent Load (actual cubic feet per minute)

9

Temperature at 100 Percent Load (degrees Fahrenheit)

10

Temperature at 50 Percent Load (degrees Fahrenheit)

11

Velocity at 100 Percent Load (feet per second)

12

Velocity at 50 Percent Load (feet per second)
ACTUAL SEASONAL FLUE GAS EXIT TEMPERATURE (DEGREES FAHRENHEIT)

13

Summer Season

14

Winter Season

15

Source (enter "M" for measured or "E" for estimated)
STACK LOCATION

16

Stack Location - Latitude (degrees, minutes, seconds)

17

Stack Location - Longitude (degrees, minutes, seconds)

18

Enter Datum for Latitude and Longitude, if Known; Otherwise Enter “UNK”

60

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-860 (2011)

Form Approved
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 9.4 hours
Operator Name:_____________________________________________________________________________________
ANNUAL ELECTRIC
GENERATOR REPORT

Operator ID:__________

Reporting as of December 31 of Year:____________
SCHEDULE 7. COMMENTS
(USE ADDITIONAL PAGES IF NECESSARY)

SCHEDULE
NUMBER

PART

LINE
NUMBER

COMMENTS
(Including all identifying codes such as plant code, generator ID,
or boiler ID to which the comment applies)

61


File Typeapplication/pdf
File TitleAppendix C
AuthorGrace Sutherland
File Modified2010-09-30
File Created2010-09-30

© 2024 OMB.report | Privacy Policy