Download:
pdf |
pdfAppendix 1. Time and Cost (Private Sector) Page 1
Subchapter
Recordkeeping
K
K
K
K
K Reg
115.310
116.520
116.530
116.610 (g)(4)
T Reg
Certification expiration date stickers
Emergency evacuation plan
Fire control plan
Ventilation ducts
Logbook for vessels of >19.8 mtrs
(65ft) with overnight accomodation for
>49 passengers
Passenger safety bill
176.302 Certificates and Permits
176.306 Stability letter
K
K
K, T
K, T
122.282
122.515
115.302
115.306
K, T
K, T
K, T
K, T
K, T
115.710
115.810 (b)
120.220 (d)
121.420
121.506
176.710
176.810 (b)
183.220 (d)
184.420
184.506
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
122.220
122.280
122.340( c)
122.402
122.506
122.510
122.514
122.516
122.518
122.602
122.604
185.220
185.280
185.340( c)
185.402
185.506
185.510
185.514
185.516
185.518
185.602
185.604
K, T
K, T
K, T
K, T
K, T
K, T
T
Reporting
K, T
K, T
K, T
K, T
K, T
Title
Inspection and testing prior to hot work
Fire protection
General safety provisions
Charts and nautical publications
Emergency broadcast placard
Records of a voyage resulting in a
marine casualty
Official logbook for foreign voyages
Vessels carrying vehicles
Licenses
Passenger safety orientation
Emergency instructions
Station bill
Life jacket placards
Inflatable survival craft placards
Hull markings
Lifesaving equipment markings
185.606 Escape hatches and emergency exits
185.608 Fuel shutoff valves
Watertight doors and watertight
122.610
185.610 hatches
122.612
185.612 Fire protection equipment
122.702
185.702 Maintenance
122.704 ( c)
185.704( c) Maintenance of falls
183.320 (d) and (e) Generators and motors
122.606
122.608
115.105 (a)
115.202
115.204
115.500 (a)
115.612
176.105 (a)
176.202
176.204
176.500 (a)
176.612
How to obtain or renew
Permit to proceed
Permit to carry Excursion Party
When required
Notice and plans required
Time
burden
(hours)
Time
burden
(minutes) Frequency
0.08
0.50
0.08
0.17
5
30
5
10
Every 5 yrs.
One time
One time
One time
0.02
0.08
0.17
0.08
1
5
10
5
Every trip
One time
One time
One time
0.25
1.00
0.50
2.00
0.08
15
60
30
120
5
1
0.08
0.33
0.50
0.03
0.08
0.08
0.33
0.17
1.00
2.00
60
5
20
30
2
5
5
20
10
60
120
0.17
0.25
10
120
15
10
10
0.50
0.25
0.25
0.08
0.50
30
15
15
5
30
Number of vessels
affected
All K
New K
New K
New K
Total
annual
time
burden
(hours)
6
4
1
1
Unit time Total time
cost
cost
($/hour)
37
$236
61
$244
61
$41
37
$49
10.95
0.08
0.17
0.08
Some K
New K
New K & T
New K & T
3,854
1
21
11
61
37
37
37
$235,118
$25
$789
$395
As needed
Every 5 years
One time
Annual
One time
0.25
0.20
0.50
2.00
0.08
All K & T
All K & T
New K & T
All K & T
New K & T
1,476
1,181
64
11,806
11
91.5
91.5
37
61
37
$135,031
$108,025
$2,368
$720,166
$395
As needed
Every voyage
One time
Annual
Every trip
One time
One time
One time
One time
One time
One time
1
29.12
0.33
0.50
*
0.08
0.08
0.33
0.17
1.00
2.00
Some K & T
Some K & T
Some New K & T
All K & T
All K & T
New K & T
New K & T
New K & T
New K & T
New K & T
New K & T
0
8,595
2
2,952
51,427
11
11
42
21
128
256
61
61
37
61
61
37
37
37
37
37
37
$0
$524,281
$78
$180,042
$3,137,075
$395
$395
$1,563
$789
$4,736
$9,472
21
32
37
37
$789
$1,184
10 One time
15 One time
0.17
2.00
0.25
0.17
0.17
Annual
time
burden/
vessel
(hours)
0.02
0.50
0.08
0.17
0.17 New K & T
0.25 New K & T
One time
One time
One time
Every 2.5 years
One time
0.17
2.00
0.25
0.07
0.17
New K & T
New K & T
Some new K & T
Some K & T
New T
21
256
7
13
20
37
37
61
37
37
$789
$9,472
$451
$467
$740
Every 5 yrs.
As needed
As needed
Every 3 yrs.
Every 6 yrs.
0.10
0.00
0.03
0.03
0.08
All K & T
All K & T
All K & T
All K & T
All K & T
590
15
148
157
492
61
61
61
61
61
$36,008
$900
$9,002
$9,602
$30,007
Appendix 1. Time and Cost (Private Sector) Page 2
Subchapter
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K Reg
115.700
115.704
115.920 ( c)
115.930
116.202
116.330
116.340
122.208
K, T
122.230
Recordkeeping and Reporting
K, T
122.502
K, T
122.503
K, T
122.504
T Reg
Title
Time
burden
(hours)
Time
burden
(minutes) Frequency
Permission for repairs and alterations
Breaking of safety valve seals
Exemption
Equivalents
Plans and information required
Sailing vessels
Alternate design considerations
Accidents to machinery
Report of an accident to an aid to
185.230 navigation
0.50
0.17
0.50
0.25
1.00
0.33
0.33
0.17
30
10
30
15
60
20
20
10
0.17
10 As needed
185.502 Crew and passenger list
185.503 Voyage plan
185.504 Passenger count
0.5
0.67
0.08
30 All approp. trips
40 All approp. trips
5 All approp. trips
176.700
176.704
176.920( c)
176.930
177.202
177.330
177.340
185.208
As needed
As needed
As needed
As needed
One time
One time
One time
As needed
Annual
time
burden/
vessel
0.50
0.00
0.50
0.00
1.00
0.33
0.33
0.09
Number of vessels
affected
All K & T
All K & T
Some K & T
All K & T
New K & T
Some new K & T
Some new K & T
All K & T
0.09 All K & T
25.00 Some K & T
33.50 Some K & T
20.73 Some K & T
Total Annual Hours
Total
annual
time
burden
Unit time
cost
Total time
cost
2,952
10
2,804
15
128
0.4
4
502
61
61
61
61
61
61
61
61
$180,042
$612
$171,039
$900
$7,808
$26
$258
$30,607
502
61
61
61
61
61
Total Cost
$30,607
73,788
98,875
116,246
379,479
$4,501,038
$6,031,390
$7,091,009
$23,206,456
* Not all K and T vessels have the same annual burden for this item. Those vessels that regularly operate on foreign voyages have an annual burden equal to 26 trips per year x 1 announcement per trip
x 0.03 hours (2 minutes) per announcement = 0.78 hours. Those vessels that do not regularly operate on foreign voyages have an annual per vessel burden of 274 trips per year x 1 announcement per
trip x 0.03 (2 minutes) per announcement = 8.22 hours.
Appendix 2. Time and Cost (Government) Page 3
Subchapter
K Reg
T Reg
Recordkeeping
K
115.310
K
116.520
K
116.530
K
116.610 (g)(4)
K
K
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
T
Reporting
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
122.282
122.515
115.302
176.302
115.306
176.306
115.710
176.710
115.810 (b) 176.810 (b)
120.220 (d) 183.220 (d)
121.420
184.420
121.506
184.506
122.220
185.220
122.280
185.280
122.340( c) 185.340( c)
122.402
185.402
122.506
185.506
122.510
185.510
122.514
185.514
122.518
185.518
122.516
185.516
122.602
185.602
122.604
185.604
122.606
185.606
122.608
185.608
122.610
185.610
122.612
185.612
122.702
185.702
122.704 ( c)
185.704( c)
183.320 (d) and (e)
115.105 (a)
115.202
115.204
115.500 (a)
115.612
115.700
115.704
115.920 ( c)
115.930
116.202
176.105 (a)
176.202
176.204
176.500 (a)
176.612
176.700
176.704
176.920( c)
176.930
177.202
Title
Time
burden
(hours)
Frequency
Annual
time
burden
Number of vessels
affected
Total
annual
time
burden
(hours)
Unit time Total time
cost
cost
($/hour)
24
$0
49
$196
49
$33
24
$0
Certification expiration date stickers
Emergency evacuation plan
Fire control plan
Ventilation ducts
0.00
0.50
0.08
0.00
NA
One time
One time
One time
0.00
0.50
0.08
0.00
All K
New K
New K
New K
0
4
1
0
Logbook for vessels of >19.8 mtrs (65ft) with
overnight accomodation for >49 passengers
Passenger safety bill
Certificates and Permits
Stability letter
Inspection and testing prior to hot work
Fire protection
General safety provisions
Charts and nautical publications
Emergency broadcast placard
Records of a voyage resulting in a marine casualty
Official logbook for foreign voyages
Vessels carrying vehicles
Licenses
Passenger safety orientation
Emergency instructions
Station bill
Inflatable survival craft placards
Life jacket placards
Hull markings
Lifesaving equipment markings
Escape hatches and emergency exits
Fuel shutoff valves
Watertight doors and watertight hatches
Fire protection equipment
Maintenance
Maintenance of falls
Generators and motors
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Every trip
One time
One time
One time
As needed
Every 3 years
One time
Annual
One time
As needed
Every voyage
One time
Annual
Every trip
One time
One time
One time
One time
One time
One time
One time
One time
One time
One time
One time
Every 2.5 years
One time
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Some K
New K
New K & T
New K & T
All K & T
All K & T
New K & T
All K & T
New K & T
Some K & T
Some K & T
Some New K & T
All K & T
All K & T
New K & T
New K & T
New T
New K & T
New K & T
New K & T
New K & T
New K & T
New K & T
New K & T
Some new K & T
Some K & T
New T
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
49
33.5
33.5
33.5
46
46
33.5
33.5
33.5
49
49
33.5
49
49
33.5
33.5
33.5
33.5
33.5
33.5
33.5
33.5
33.5
33.5
49
33.5
33.5
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
How to obtain or renew
Permit to proceed
Permit to carry Excursion Party
When required
Notice and plans required
Permission for repairs and alterations
Breaking of safety valve seals
Exemption
Equivalents
Plans and information required
0.17
0.08
0.08
0.08
0.50
0.17
0.17
0.17
0.17
1.00
Every 3 yrs.
As needed
As needed
Every 3 yrs.
As needed
As needed
As needed
As needed
As needed
One time
0.06
0.00
0.01
0.03
0.08
0.50
0.00
0.17
0.00
1.00
All K & T
All K & T
All K & T
All K & T
All K & T
All K & T
All K & T
Some K & T
All K & T
New K & T
335
5
47
157
492
2,952
10
2,804
10
128
49
49
49
49
49
49
49
49
49
49
$16,391
$231
$2,314
$7,713
$24,104
$144,624
$492
$137,392
$492
$6,272
Appendix 2. Time and Cost (Government) Page 4
Subchapter
K Reg
T Reg
K, T
116.330
177.330
K, T
116.340
177.340
K, T
122.208
185.208
K, T
122.230
185.230
Recordkeeping and Reporting
K, T
115.505
176.505
K, T
122.502
185.502
K, T
122.503
185.503
K, T
122.504
185.504
Title
Sailing vessels
Alternate design considerations
Accidents to machinery
Report of an accident to an aid to navigation
Stability verification
Crew and passenger list
Voyage plan
Passenger count
Time
burden
(hours)
0.33
0.33
0.17
0.17
0.17
0.02
0.02
0.02
Frequency
One time
One time
As needed
As needed
As needed
All approp. trips
All approp. trips
All approp. trips
Annual
time
burden
0.33
0.33
0.09
0.09
0.17
0.83
0.83
4.15
Number of vessels
affected
Some new K & T
Some new K & T
All K & T
All K & T
Some K & T
Some K & T
Some K & T
Some K & T
Total Annual Hours
Total
annual
time
burden
0
4
502
502
Unit time Total time
cost
cost
49
$21
49
$207
49
$24,586
49
$24,586
0
77
2,460
49
2,460
49
23,249
49
36,120 Total Cost
$0
$120,520
$120,520
$1,139,211
$1,769,903
Appendix 3. Assumptions Page 5
Subchapter
Recordkeeping
K Reg
T Reg
Title
Assumptions
K
115.310
Certification expiration date stickers
The application of the stickers takes about 5 minutes (0.08 hrs.) and occurs every 3 years. All K
vessels (471) must do this. The work is done by an E1 - 5, outside government.
K
116.520
Emergency evacuation plan
Posting the plan is done once, by an O1/2 level individual, and takes 0.5 hrs. It only affects new K
vessels (50).
K
116.530
Fire control plan
As above
K
116.610 (g)(4)
K
122.282
Ventilation ducts
Logbook for vessels of >19.8 mtrs
(65ft) with overnight accomodation for
>49 passengers
Marking ventilation fire dampers is done once only and takes 10 minutes (0.17 hrs). It should only
affect new K vessels (50) and is performed by an E-1 - 5.
396 K vessels are >19.8 meters (65 ft). Approximately 2 entries, each taking 1minute (0.02 hrs),
are made in the logbook every trip. Affected vessels make 1 trip per day and make trips on 75% of
the year (274 days). Logbook is maintained by an O-1/2
K
122.515
Passenger safety bill
Identical assumptions to 116.520
K, T
115.302
176.302 Certificates and Permits
It takes 10 minutes to post these. Posting is done once and is done by an E- 1- 5. All new T& K
vessels (150) must do this.
K, T
115.306
176.306 Stability letter
Posting takes 5 minutes. All other assumptions are as for 115.302 and 176.302, above.
K, T
115.710
The inspection, as well as the preparation of the certificate, takes 15 minutes. The work is
176.710 Inspection and testing prior to hot work performed by an O-3/4 level individual. All K & T vessels need this once per year.
K, T
115.810 (b)
176.810 (b) Fire protection
The inspection occurs every 3 years. The inspection and preparation of the certificate require one
hour for completion. All other assumptions are as for 115.710 and 176.710.
K, T
120.220 (d)
183.220 (d) General safety provisions
Marking all electrical circuits and equipment takes 30 minutes, is performed once by an E-1 - 5,
and affects all new K & T vessels (150).
K, T
121.420
184.420 Charts and nautical publications
K, T
121.506
K, T
122.220
184.506 Emergency broadcast placard
Records of a voyage resulting in a
185.220 marine casualty
K, T
122.280
185.280 Official logbook for foreign voyages
K, T
122.340( c)
K, T
122.402
185.402 Licenses
K, T
122.506
185.506 Passenger safety orientation
It takes 30 minutes to assemble licenses. The work is done by an O-1/2. All T& K vessels must do
this once annually.
y p
y
is 1 trip made per day for 274 days of the year (non foreign voyages - 80% of pop'n). Vessels that
regularly operate on foreign voyages make weekly trips for 26 weeks of the year. The
announcement takes 2 minutes.
K, T
122.510
185.510 Emergency instructions
Mounting the instructions takes 5 minutes, is done once by all new K & T vessels and the work is
done by an E-1 - 5.
K, T
122.514
185.514 Station bill
As for 122.510 and 185.510 above.
185.340( c) Vessels carrying vehicles
Assembling all the necessary charts takes 2 hours and is performed annually. All K & T veseels
require this and the work is performed by an O-1/2.
Posting this takes 5 minutes and is done once by an E-1 - 5, for all new K and T vessels per year.
Data from MSMS show 181 and 525 marine casualties in 1998 for K & T vessels respectively.
Maintaining and assembling records takes 1 hour per casualty. The work is done by an O-1/2.
Only 5% of K & T vessels (338) regularly make foreign voyages. Approximately 2 entries, each
taking 5 minutes (0.08 hrs), are made in the logbook every day on a voyage. Voyages are 7 days
long and are undertaken 26 times per year. Logbook is maintained by an O-1/2.
Assume 5% of new K&T carry vehicles. It takes 20 minutes for each one to post all the "No
Smoking" signs. The work is done by an E-1 - 5.
Appendix 3. Assumptions Page 6
Subchapter
K Reg
T Reg
Title
Assumptions
K, T
122.516
185.516 Life jacket placards
Posting life jacket placards takes 20 minutes. All other assumptions are as for 122.510 and
185.510 above.
K, T
122.518
185.518 Inflatable survival craft placards
Posting the placards takes10 minutes. "X" have inflatable survival craft. All other assumptions are
as for 122.510 and 185.510 above.
3
122.602
185.602 Hull markings
Making all the necessary hull markings takes 1 hour, is done once by an E-1 - 5 for all new K & T
vessels.
K, T
122.604
185.604 Lifesaving equipment markings
Complying with all the requirements here takes 2 hours. All other assumptions are as for 122.602
and 185.602.
K, T
122.606
185.606 Escape hatches and emergency exits
Marking emergency exits and escape hatches takes 10 minutes. All other assumptions are as for
122.602 and 185.602.
K, T
122.608
185.608 Fuel shutoff valves
Marking fuel shutoff valves takes 15 minutes. All other assumptions are as for 122.602 and
185.602.
K, T
122.610
Watertight doors and watertight
185.610 hatches
Marking watertight doors and hatches takes 10 minutes. All other assumptions are as for 122.602
and 185.602.
K, T
122.612
185.612 Fire protection equipment
K, T
122.702
185.702 Maintenance
K, T
T
122.704 ( c)
185.704( c) Maintenance of falls
183.320 (d) and (e) Generators and motors
Marking all fire protection equipment takes 2 hrs. All other assumptions are as for 122.602 and
185.602.
s s do e o ce a d s equ ed o a e
&
esse s t at a e p a y esa g equ p e t
(survival craft). 343 and 985 existing K & T vessels have said equipment. Assume the same
proportion of new vessels have survival craft. The work is done by an O-1/2.
The information collection required - marking the falls- takes 5 minutes and must be performed
every 2.5 years. The recordkeeping is done by an E-1 - 5 for all K & T vessels.
Attaching the nameplates to generators and motors takes 10 minutes per vessel. It is performed
by an E-1 - 5 for all new T vessels and is done once per vessel. The report is made by an O-1/2.
Reporting
176.105 (a) How to obtain or renew
This takes 30 minutes, occurs every 3 yrs., is required for all K and T vessels and is performed by
an O-1/2.
K, T
115.105 (a)
K, T
115.202
176.202 Permit to proceed
This takes 15 minutes. All K & T vessels do this once every other year. The application is filled out
and submitted by an O-1/2.
K, T
115.204
176.204 Permit to carry Excursion Party
Assumptions identical to those of 115.202 and 176.202.
K, T
115.500 (a)
K, T
115.612
176.612 Notice and plans required
K, T
115.700
176.700 Permission for repairs and alterations
All K&T vessels have to be drydocked for safety related repairs or load line examination
approximately once every 6 years. The notice and plans are prepared and submitted by an O-1/2.
Submitting drawings etc. for alterations and repairs takes 30 minutes and occurs once every other
year for all K and T vessels. The submission is performed by an O-1/2. Preparation and
submission of plans takes 30 minutes.
K, T
115.704
176.704 Breaking of safety valve seals
Reporting takes 10 minutes and is necessary once every 10 years for all K & T vessels. The
reporting
by an
80%
o a is done
& do
ot O-1/2.
egu a y a e o e g oyages O t ese, 50% do a e o e g oyage
K, T
115.920 ( c)
K, T
115.930
176.500 (a) When required
176.920( c) Exemption
176.930 Equivalents
This takes a 5 minute phone call every 3 years. All K & T vessels are required to do this. The call
is made by an O-1/2.
per year and have to apply for exemption. The time requirement is 30 minutes and performed by
an O-1/2.
Submitting the request for approval takes 15 minutes. All K & T vessels do this once per year. The
submission is done by an O-1/2.
Appendix 3. Assumptions Page 7
Subchapter
K Reg
T Reg
Title
Assumptions
K, T
116.202
177.202 Plans and information required
Submitting all the necessary information takes 1 hour. All K & T vessels do this once. The
individual who does this is an O-1/2.
K, T
116.330
177.330 Sailing vessels
Submitting the required documents takes 20 minutes and is required of all new K & T that are
sailing vessels (1% =1.5). The submission occurs once and is performed by an O-1/2.
K, T
116.340
177.340 Alternate design considerations
Submission of the alternate design request takes 20 minutes, occurs once and 10% of all new K &
T vessels will submit requests. The submission is done by an O-1/2.
K, T
122.208
185.208 Accidents to machinery
The report takes 10 minutes to prepare and submit. All K& T vessels do this once every other year.
The submission is performed by an O-1/2.
K, T
122.230
Report of an accident to an aid to
185.230 navigation
Assumptions identical to those of 122.208 and 185.208.
Recordkeeping and Reporting
K, T
122.502
185.502 Crew and passenger list
Preparing and submitting the list takes 30 minutes. All K & T vessels do this prior to trips that meet
certain criteria. Assume 50% of all K & T vessels need to do this 50 times per year. Submission is
by an O-1/2.
K, T
122.503
185.503 Voyage plan
Preparing and submitting the list takes 40 minutes. All other assumptions are as for 122.502 and
185.502
epa gabove.
a d sub tt g t e st ta es 5
utes
&
esse s do t s p o to t ps t at eet
K, T
122.504
185.504 Passenger count
certain criteria. Assume 50% of all K & T vessels need to do this 274 times per year. Submission is
by an O-1/2.
* Based on Assumptions made in Appendix 3 there are Approximately 32,677 responses Reported Annually as a Result of this Regulation.
Reporting
K, T
K, T
K, T
K, T
K, T
K Reg
115.105 (a)
115.202
115.204
115.500 (a)
115.612
T Reg
176.105 (a)
176.202
176.204
176.500 (a)
176.612
K, T
K, T
K, T
K, T
K, T
K, T
K, T
K, T
115.700
115.704
115.920 ( c)
115.930
116.202
116.330
116.340
122.208
176.700
176.704
176.920( c)
176.930
177.202
177.330
177.340
185.208
K, T
122.230
Title
How to obtain or renew
Permit to proceed
Permit to carry Excursion Party
When required
Notice and plans required
Permission for repairs and alterations
Breaking of safety valve seals
Exemption
Equivalents
Plans and information required
Sailing vessels
Alternate design considerations
Accidents to machinery
Report of an accident to an aid to
185.230 navigation
Responses
1,968
2,952
2,952
1,968
984
2,952
590
590
5,903
5,903
1
13
2,952
2,952
32,677
all K vessel #
all T vessel #
Total
new K vessel #
new T vessel #
Total
383
5,520
5,903
8
120
128
Appendix 4. Database Page 8
Data used in calculations
Population
Total population of K vessels
Total population of T boats
Annual new entrants: K vessels
Annual new entrants: T boats
Number of T boats > 19.8 meters (65 ft.)
Number of K vessels > 19.8 meters (65 ft.)
Percentage of K vessels that regularly operate on foreign voyages
Number of K vessels that regularly operate on foreign voyages
Percentage of T boats that regularly operate on foreign voyages
Number of T boats that regularly operate on foreign voyages
Percentage of new K vessels that carry vehicles
Number of new K vessels that carry vehicles
Percentage of new T boats that carry vehicles
Number of new T boats that carry vehicles
Percentage of new K vessels that are sailing vessels
Number of new K vessels that are sailing vessels
Percentage of new T boats that are sailing vessels
Number of new T boats that are sailing vessels
Percentage of K vessels that do not regularly operate on foreign
voyages
Percentage of these that make at least 1 foreign voyage per year
Number of K vessels that make at least one foreign voyage per year
but do not regularly operate on foreign voyages
Percentage of T boats that do not regularly operate on foreign
voyages
Percentage of these that make at least 1 foreign voyage per year
Number of T boats that make at least one foreign voyage per year but
do not regularly operate on foreign voyages
Percentage of new K vessels that apply for alternate design
considerations
Number of new K vessels that apply for alternate design
Percentage of new T boats that apply for alternate design
Number of new T boats that apply for alternate design considerations
Percentage of K vessels that make trips as outlined in 122.502 and
185.502
Number of K vessels that make trips as outlined in 122.502 and
185.502
Percentage of T boats that make trips as outlined in 122.502 and
185.502
Number of T boats that make trips as outlined in 122.502 and
185.502
Percentage of K vessels that have falls
Number of K vessels that have falls
Percentage of T boats that have falls
Number of T boats that have falls
Number of existing K vessels that have primary lifesaving equipment
Percentage of new K vessels that have primary lifesaving equipment
Number of new K vessels that have primary lifesaving equipment
Number of existing T boats that have primary lifesaving equipment
Percentage of new T boats that have primary lifesaving equipment
Number of new T boats that have primary lifesaving equipment
383
5520
8
120
1167
352
0.05
19
0.05
276
0.05
0
0.05
6
0.01
0
0.01
1
0.95
0.5
182
0.95
0.5
2622
0.1
1
0.1
12
0.5
192
0.5
2760
0.35
134
0.01
55
268
0.70
6
1104
0.20
24
Appendix 4. Database Page 9
Frequency
Number of passenger safety orientation announcements per trip
Number of non foreign trips per day for K & T vessels
Percentage of year operated by K & T vessels
Number of non foreign trips per year for K & T vessels
Number of logbook entries per non foreign trip
Number of foreign trips per year for K & T vessels
Number of logbook entries per day per foreign trip
Number of days per foreign trip
Number of times hotwork performed annually
Number of annual requests per vessel for permit to proceed
Number of annual requests per vessel for Excursion permit
Annual number of applications for permission for repairs and alterations
Annual occurences of breaking of safety valve seals
Annual applications per vessel for equivalencies
Annual occurences of reportable accidents to machinery
Annual occurences of reportable accidents to aids to navigation
Number of annual trips taken per vessel that meet the criteria specified in 122.502 and 185.502
Number of falls per vessel
Annual number of foreign voyages undertaken by K & T vessels that ordinarily do not make
foreign voyages
Annual occurence of drydocking for safety related repairs or load line examinations
1
1
0.75
273.75
2
26
2
7
1
0.01
0.1
0.5
0.01
0.01
0.5
0.5
50
1
1
0.17
File Type | application/pdf |
File Title | 1625-0057_COI_Appendices_Sprdsht-2009.xls |
Author | DADuPont |
File Modified | 2011-01-06 |
File Created | 2009-05-15 |