Download:
pdf |
pdfCompliance Inspection Report
Note: Reports of Final and Repair Compliance Inspections
left at site always require reviewer's signature to be Official.
Consult mortgagee for official reports.
OMB No. 2502-0189
(exp. xx/xx/xxxx)
U.S. Department of Housing
and Urban Development
Office of Housing
Federal Housing Commissioner
Builder's Name and Address
FHA Case Number
a.
Report not left at site.
b.
Report not official without
reviewer's signature.
Date of Inspection (mm/dd/yyyy)
Property Address
Mortgagee's Name and Address
I. Inspection of On-Site Improvements Reveals
1. Construction
was,
was not begun prior to the date of mortgage
insurance approval shown on the commitment, statement of appraised
value or "Early Start" letter. (Applies to the initial report on new construction)
2.
Individual Sewage disposal system;
Individual Water supply system
No noncompliance.
Correction essential as explained below.
Submit Health Department letter
3.
4.
No noncompliance observed
On-site improvements acceptably completed subject to receipt of
certification that mortgagee's inspection reveals satisfactory completion of all items listed below.
II. Explanation of statements checked in Parts I and III
Initial Inspection
Framing Inspection
5.
6.
7.
On-site improvements acceptably completed except items listed below, completion of which is delayed by conditions beyond control of the
builder (see IV.A below).
On-site improvements acceptably completed
Off-site improvements
a. Correction/Completion essential as explained below
b. Completion assured by escrow agreement or governing authority
c. Acceptably completed
8.
Repairs required by form HUD92800.5b not acceptably completed.
Inspection Number
Final Inspection
No.
Other (explain)
Repair Inspection
No.
Certification: I certify that I have carefully inspected this property on this date. I have no personal interest, present or prospective, in the property, applicant,
or proceeds of the mortgage. To the best of my knowledge I have reported all noncompliance, work requiring correction, and unacceptable work.
Warning: HUD will prosecute false claims and statements. Conviction may result in criminal and/or civil penalties. (18 U.S.C. 1001, 1010, 1012; 31 U.S.C. 3729, 3802)
Signature
Date (mm/dd/yyyy)
ID Number
Fee Inspector
DE Staff Inspector
Appraiser
HUD Inspector
III. Specific Conditions Required by the HUD-92800.5B, Not Requiring Field Inspection
16.
Submit items or resubmit incomplete
17.
Acceptable Compliance with all specific
18.
Submit Termite Soil
None
items as noted above.
conditions not requiring field inspection.
Treatment Guarantee.
Approved
Signature
Date (mm/dd/yyyy)
ID Number
Direct Endorsement Underwriter
as modified
by me
IV. To Mortgagee: When signed below, refer to the statement on the back corresponding to the designation checked.
A. Compliance -- Incomplete Items. "Mortgagee's Assurance
B. Final Acceptance. Closing papers
of Completion", HUD-92300, may be submitted.
may be submitted provided
for completion
mortgage credit analysis is
$ __________________ not later than:(mm/dd/yyyy)
acceptable
___________________
Signature
Date (mm/dd/yyyy)
Direct Endorsement Underwriter
Director of Housing Development
ID Number
Deputy
Date (mm/dd/yyyy)
For HUD Use Only for concurrence of Direct Endorsement Processing of Signature of HUD Authorized Agent
this Compliance Inspection Report. If signed, this final report is considered
processed by HUD and, thereby, convertible to the Veterans Administration.
Previous editions are obsolete.
form HUD-92051 (03/11)
Retain this record for 30 years or the life of the file
Submit an Original and four copies
ref. Handbooks 4000, 4115.3, 4145, 4165, 4190, & 4240.4
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions,
searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. This agency
may not conduct or sponsor, and a person is not required to respond to, a collection information unless that collecton displays a valid OMB control number.
See the statement below that corresponds to the designation checked on the front of the form under section "IV. To Mortgagee".
A. Compliance. (with incomplete items)
Construction of on-site improvements has been acceptably completed except for any items listed on the front of this form. Completion
of those items is delayed by conditions beyond the parties' control. The property will considered acceptable for mortgage insurance and
closing papers may be submitted provided:
(a) All required off-site improvements have been acceptably completed and so reported, or their completion has been
assured by an acceptable "Mortgagee's Assurance of Completion" form, and;
(b) All specific conditions not requiring field inspection as indicated on the front of this form have been acceptably fulfilled
or evidence of compliance is submitted with the closing papers, and;
(c) The closing papers are accompanied by form HUD-92300, "Mortgagee's Assurance of Completion," properly executed
and providing for withholding the sum indicated, or by indicating the sum is available on a commercial letter of credit, and
for completion of construction not later than the date stated on the front of this form.
B. Final Acceptance
Construction has been completed and all specific conditions have been acceptably fulfilled. Closing papers may be submitted provided
the mortgagee's credit analysis of the borrower is acceptably completed. Evidence of compliance with specific conditions not requiring
field inspection as indicated on the front of this form may be submitted with the closing papers.
Previous editions are obsolete.
Retain this record for 30 years or the life of the file
Submit an Original and four copies
form HUD-92051 (03/11)
ref. Handbooks 4000, 4115.3, 4145, 4165, 4190, & 4240.4
File Type | application/pdf |
File Title | 92051 |
Subject | 92051 |
Author | ELK |
File Modified | 2011-04-04 |
File Created | 2001-11-26 |