157 Construction Work Plan & Cost Distribution

Telecommunications System Construction Policies and Procedures

rus-0157

Telecommunications System Construction Policies and Procedures

OMB: 0572-0059

Document [pdf]
Download: pdf | pdf
"No further benefit may be paid out under this program unless this report is completed and filed as required (7 USC 901 et seq)
CENTRAL OFFICE AREA OR SYSTEM SUMMARY

NAME OF COMPANY

DATE PREPARED

USDA - RUS

CONSTRUCTION WORK PLAN AND
COST DISTRIBUTI0N - TELECOMMUNICATIONS
Instructions - Prepare 5 copies. The original and 2 copies should be submitted to the RUS Area Office. 5
One copy should be sent to the RUS Field Representative. For detailed instructions see RUS Bulletin 320-23.
CONSTRUCT ION BUDGET PURPOSE
1. CENTRAL OFC. EQUIP. Lines
a. ADDITIONS

Terminals

1ST QUARTER
(2)

2ND QUARTER
(3)

3RD QUARTER
(4)

Trunks

b. NEW OFFICE ....
c. ANI
d. OTHER (Specify)
2. ELECTRONIC EQUIPMENT
a. Toll carrier
b. EAS CARRIER
c. STATION CARRIER

-

d. TRUNK V. F. REPEATERS
e. OTHER (Specify)
3. OUTSIDE PLANT
a. AERIAL
b. BURIED
c. UNDERGROUND (include cable, conduit and man holes)
d. OTHER (Specify)
4. STATION EQUIPMENT
a. MAIN STATION INSTALLATION (exclude PABX, PBX,
and Key System)
b. EXTENSIONS TO MAIN STATIONS, PABX, AND PBX
c. PABX OR PBX (EXCLUDE EXTENSIONS)
d. KEY SYSTEMS (INCLUDE EXTENSIONS)
e. OTHER (Specify)
5. LAND AND BLDGS.
a. C.D.0. ADDITIONS .

Sq. Ft.

Cost Per Sq. Ft.
$

b. HEADQUARTERS
BLDG. ADDITIONS.
c. NEW HEADQUARTERS
BLDG.
d NEW UNATTENDED BLDG.
e. NEW LAND
f. OTHER (Specify)
6. MISCELLANEOUS
a.
b.
7. REMOVALS
8. ENGINEERING
9. TOTAL FUNDS REQUIRED
10. GENERAL FUNDS AVAILABLE (Cash forecast
line 3)
11. LOAN FUND REQUIREMENTS
REMARKS

RUS FORM 157

YEAR ENDING 20

YEAR ENDING 20
TOTAL
COST
(1)

10-77

According to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a valid OMB
control number. The valid OMB control number for this information collection is 0572-0059. The time required to complete this information collection is estimated to average 12 hours per
cresponse, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.

4TH QUARTER
(5)

1ST QUARTER
(6)

2ND QUARTER
(7)

3RD QUARTER

(8)

4TH QUARTER
(9)

SUBSEQUENT
YEARS
(10)

