Download:
pdf |
pdfAccording to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor, and a person is not required to respond to a collection of information
unless it displays a valid OMB control number. The valid OMB control number for this information collection is 0572-0059. The time required to complete this
information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information.
CERTIFICATE OF COMPLETION
SPECIAL EQUIPMENT CONTRACT
(Not Including Installation)
TO:
ADMINISTRATOR
RURAL UTILITIES SERVICE
U. S. DEPARTMENT OF AGRICULTURE
WASHINGTON, D. C. 20250
PROJECT DESIGNATION
I, the undersigned Engineer of the above-designated Rural Utilities Service
Project do hereby certify that:
1. The equipment and materials, provided for pursuant to Contract No.
dated
, including all approved amendments, (herein-
, 20
after called "Equipment") between
(Owner) and
(Contractor) have been delivered and are in all respects in strict compliance with the
provisions of the contract, including specifications, drawings and all modifications thereof.
2. The Equipment has been installed and all acceptance tests have been made on the Equipment and the results were satisfactory.
3. The total cost of the Equipment in accordance to the contract and approved amendments
thereto is
Dollars ($
).
A break down of the total cost by group or central office, as applicable, is shown on the
back of this certificate.
Dated this
day of
, 20
OWNER
By
NAME OF ENGINEER
By
APPROVED AS TO ITEMS 1 AND 2 ABOVE
TITLE
RUS FIELD ENGINEER
RUS FORM
396a
3-64
DATE
File Type | application/pdf |
File Title | RUS0396-000A-01.ofm |
Author | MBrooks |
File Modified | 2003-03-07 |
File Created | 2003-03-07 |