5900-222 Form C Part I - Request for BAMM Extension thru December

Regulation to Establish Mandatory Reporting of Greenhouse Gases (Change Worksheet for Petroleum and Natural Gas, Subpart W)

Form C 102810 BAMM # 5900-222-clean

Greenhouse Gas (GHG) Reporting Rule, Subpart W: Petroleum and Natural Gas Systems

OMB: 2060-0651

Document [docx]
Download: docx | pdf

Petroleum and Natural Gas Systems (Subpart W) of the Greenhouse Gas Reporting Rule

Optional Facility Form for Requesting Use of or Extension of Best Available Monitoring Methods (BAMM) for Leak Detection and Measurement


Form C Part I – Request for BAMM Extension thru December 31, 2011

For Sources Identified in 98.234(f)(4)




OMB Control No. 2060-0651

Approval expires 12/31/2013


The public reporting and recordkeeping burden for this collection of information is estimated to average 60 minutes per response (the burden was already included in ICR 2376.02). This is an optional application form. Send comments on the Agency's need for this information, the accuracy of the provided burden estimates, and any suggested methods for minimizing respondent burden, including through the use of automated collection techniques to the Director, Collection Strategies Division, U.S. Environmental Protection Agency (2822T), 1200 Pennsylvania Ave. NW, Washington, D.C. 20460. Include the OMB control number in any correspondence. Do NOT send the completed form to this address.



General Information: If you are an owner or operator subject to Subpart W of 40 CFR Part 98 and have sources eligible for BAMM under 98.234(f)(4), you may request to use best available monitoring methods for sources requiring leak detection and measurement. You may use this optional form to request to use BAMM to estimate emissions that occur between January 1, 2011 and December 31, 2011 for sources identified in 98.234(f)(4). You must submit your request by April 30, 2011.


To obtain approval, the request must demonstrate to the Administrator’s satisfaction that the owner or operator does not own the required monitoring equipment, and that it is not reasonably feasible to acquire, install, and operate the required piece of monitoring equipment or to obtain leak detection or measurement services in order to meet the requirements of subpart W.


For requests to use BAMM to estimate emissions that occur beyond December 31, 2011 for sources listed in 98.234(f)(8) due to unique and extreme circumstances which include safety, technical infeasibility, or inconsistency with local, State, or Federal regulations, you must submit your request by September 30, 2011. You may use Part II of this form if you find it necessary to submit a request for an extension of the use of BAMM past December 31, 2011, under subpart W of 40 CFR part 98 (40 CFR part 98.234(f)(8)).


The following table summarizes the important dates for subpart W BAMM requests for sources identified in 98.234(f)(4).


Important Dates for Subpart W BAMM Requests For Sources Identified in 98.234(f)(4)



To use BAMM to estimate emissions that occur between January 1, 2011 and December 31, 2011 for the following parameters:

Demonstrate that it is not reasonably feasible to comply with the monitoring requirements of subpart W:

Submit BAMM request no later than:

Reciprocating compressor rod packing venting in onshore natural gas processing, onshore natural gas transmission compression, underground natural gas storage, LNG storage, and LNG import and export equipment as specified in 98.232(d)(1), (e)(1), (f)(1), (g)(1), and (h)(1).


Centrifugal compressor wet seal oil degassing venting in onshore natural gas processing, onshore natural gas transmission compression, underground natural gas storage, LNG storage, and LNG import and export equipment as specified in 98.232(d)(2), (e)(2), (f)(2), (g)(2), and (h)(2).


Acid gas removal vent stacks in onshore petroleum and natural gas production and onshore natural gas processing as specified in 98.232(c)(17) and (d)(6)


Equipment leak emissions from valves, connectors, open ended lines, pressure relief valves, block valves, control valves, compressor blowdown valves, orifice meters, other meters, regulators, vapor recovery compressors, centrifugal compressor dry seals, and/or other equipment leaks in onshore natural gas processing, onshore natural gas transmission compression, underground natural gas storage, LNG storage, LNG import and export equipment, and natural gas distribution as specified in 98.232(d)(7), (e)(7), (f)(5), (g)(3), (h)(4), and (i)(1).


Condensate (oil and/or water) storage tanks in onshore natural gas transmissions compression as specified in 98.232(e)(3).


During the period between January 1, 2011 and December 31, 2011

April 30, 2011

To use BAMM to estimate emissions that occur beyond December 31, 2011 for the following parameters:

Demonstrate that, due to extreme and unique circumstances, it is not reasonably feasible to comply with the monitoring requirements of subpart W after:

Submit BAMM request no later than:

For sources listed in 98.234(f)(8).

December 31, 2011

September 30, 2011



This form can be submitted electronically (preferred) to [email protected]. Please include “Subpart W BAMM Request” in the subject line.


As an alternative, the form can be printed and mailed. (Please do not send duplicative forms by multiple delivery modes, for example, by email, overnight mail, and fax.) For US mail use the following postal address:

Carole Cook,

Climate Change Division,

Office of Atmospheric Programs (MC– 6207J),

Environmental Protection Agency,

1200 Pennsylvania Ave., NW.,

Washington, DC 20460, USA



For submissions using a private mail carrier (e.g., DHL, FEDEX) use the following address:


Carole Cook

1310 L Street NW (802E)

Washington, DC 20005-4113

Phone: 202-343-9334

USA



Upon receipt, the request will be recorded in the EPA tracking system, and the requester will be notified that EPA has received and is evaluating the request. EPA will evaluate your request to confirm that it is consistent with §98.234(f). The agency will then notify you to confirm approval or denial of the application. As a general matter, EPA will base its decision on the information provided in the extension request and does not intend to negotiate on specific issues. As time allows, EPA may follow up on extension requests with additional questions. The requester must discontinue using best available monitoring methods and begin following all applicable monitoring and QA/QC requirements of subpart W and part 98 no later than July 1, 2011 unless EPA approves an extension request before that date.

General Information

1. Name of person to contact about the request


2. Contact person address (include street address, city, state and zip code)


3. Contact person phone number


4. Contact person e-mail address


5. Signature

I certify under penalty of law that I have personally examined, and am familiar with, the statements and information submitted in this document and all its attachments. Based on my inquiry of those individuals with primary responsibility for obtaining the information, I certify that the statements and information are to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false statements and information or omitting required statements and information, including the possibility of fine or imprisonment.”


6. Contact person date signed


7. Contact person date submitted


Facility and Segment Information 40 CFR §98.230(a)

8. Facility name


9. Industry segment:


Please enter appropriate rule segment, from §98.230 of 40 CFR part 98



10. Facility physical address (include street address, city, state and zip code) for where each emissions source is located.


For onshore production sources, please report the AAPG basin name.



Emission Source Type, Applicability, and Monitoring Equipment

40 CFR §98.234(f)(5)(iii)(B)(1)

11. Include a list of specific source types and specific equipment, monitoring instrumentation, and/or services for which the request is being made and the locations where each piece of monitoring instrumentation will be installed or monitoring service will be supplied. Please attach additional documentation as needed.


12. Indicate the BAMM chosen in place of the rule requirements such as company records, other engineering estimates, available data, etc. If the BAMM chosen differs by emission source category, please identify the BAMM chosen for each category choice. Please attach additional documentation as needed.


Identification of Specific Rule Requirements

40 CFR §98.234(f)(5)(iii)(B)(2)

13. Identify the specific rule requirements - by subpart, section, and paragraph number - for which the instrumentation or monitoring service is needed. Please attach additional documentation as needed.


Applicable Correspondence

40 CFR §98.234(f)(5)(iii)(B)(3)

14. Include appropriate documentation which demonstrates that the owner or operator made all reasonable efforts to obtain the information, services or equipment necessary to comply with subpart W reporting requirements, including evidence of specific service or equipment providers contacted and why services or information could not be obtained during 2011.


Specific Actions to Comply with Subpart W

40 CFR §98.234(f)(5)(iii)(B)(4)

15. Describe the specific actions the facility will take to obtain and/or install the equipment or obtain the monitoring service as soon as reasonably feasible and the expected date by which the equipment will be obtained and operating or service will be provided. Please attach additional documentation as needed.














If you are interested in submitting a request for an extension of the use of Best Available Monitoring Methods past December 31, 2011 for sources in 98.234 (f)(8), under Subpart W of 40 CFR Part 98 (40 CFR 98.234(f)) to the EPA Administrator, you have the option of using this form. You must submit your request by September 30, 2011. The EPA will only consider requests for BAMM extension beyond 2012 under extreme and unique circumstances for granting a further extension beyond 2012.




General Information

1. Name of person to contact about the request


2. Contact person address (include street address, city, state and zip code)


3. Contact person phone number


4. Contact person e-mail address


5. Signature

I certify under penalty of law that I have personally examined, and am familiar with, the statements and information submitted in this document and all its attachments. Based on my inquiry of those individuals with primary responsibility for obtaining the information, I certify that the statements and information are to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false statements and information or omitting required statements and information, including the possibility of fine or imprisonment.”


6. Contact person date signed


7. Contact person date submitted


Facility and Segment Information

8. Facility name


9. Industry segment:


Please enter appropriate rule segment, from §98.230 of 40 CFR part 98



10. Facility location (please enter location address of facility. For onshore petroleum and natural gas production facilities, please provide AAPG basin name as appropriate).



Listing of Specific Sources for BAMM

40 CFR §98.234(f)(8)(iii)

11. Please list the specific source categories and parameters for which BAMM is being requested. Please attach documentation as necessary.


Reason for BAMM Request

40 CFR §98.234(f)(8)(iv)

12. Include a description of the data collection methodologies that do not meet safety regulations, technical infeasibility, or specific laws or regulations that conflict with each specific source for which an owner or operator is requesting use of BAMM. Please attach additional documentation as necessary.


13. Please indicate the BAMM chosen in place of the rule requirements such as company records, other engineering estimates, available data, etc. If the BAMM chosen differs by emission source category, please identify the BAMM chosen for each category choice.


Specific Actions to Comply with Subpart W

§98.234(f)(8)(v)

14. Include a detailed explanation and supporting documentation of how and when the owner or operator will receive the services or equipment to comply with all of this subpart W reporting requirements. Indicate the time period for which BAMM is being requested. Please attach additional documentation as necessary.




EPA Form 5900-222 Page 5 of 7


File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
File TitleSample Draft Petition Form from Source
File Modified0000-00-00
File Created2021-02-01

© 2024 OMB.report | Privacy Policy