INFORMATION COLLECTION
SUMMARY OF CHANGES
Locomotive Safety Standards
OMB No. 2130-0004
RIIN 2130-AC16
TABLE FOR PROGRAM CHANGES
Part 229 Sec. |
Responses |
Average Burden
|
Total Burden/ Change in Responses |
229.15a –Design and Operation - Tagging Each Remote Control Locomotive at Control Throttle (New Requirement) |
3,000 tags |
100 hours |
+ 100 hours + 3,000 resp. |
229.15b –Inspection Testing and Repair – Records of Defective Operational Control Units (New Requirement) |
200 records |
17 hours |
+ 17 hours + 200 resp. |
229.20a –Electronic Recordkeeping – Electronic Notification to RR Locomotive is Due for Inspection (New Requirement) |
21,000 notif |
6 hours |
+ 6 hours + 21,000 resp. |
229.23(f) –Periodic Inspection: General- RR Provision of List of Defects to Employees Performing Inspections (New Requirement) |
4,000 lists + 4,000 copies |
266 hours |
+ 266 hours + 8,000 resp.
|
229.23(g) –Periodic Inspection: General- RR Provision of List of All Tests Conducted Since Last Inspection and Procedures Needed to Perform Inspection (New Requirement) |
19,000 docs |
633 hours |
+ 633 hours + 19,000 resp. |
229.29 –Air Brake System Maintenance and Testing – RR Calibration Test of Air Flow Meter and Record (New Requirement) |
22,000 tests/ records |
367 hours |
+ 367 hours + 22,000 resp. |
229.46 –Brakes: General- Tagging of Isolation Switch of Locomotive by Employees (New Requirement) |
2,100 tags |
70 hours |
+ 70 hours + 2,100 resp. |
229.123(b) –Pilots, Snowplows, and Plates – Stenciling of Such Equipment Above Six Inches (New Requirement) |
20 loco. stencilings |
1 hour |
+ 1 hour + 20 resp. |
229.123(b)(4) –Pilots, Snowplows, and Plates –Equipment Above Six Inches - Notation on Form FRA F 6180.49A (New Requirement) |
20 notations |
1 hour |
+ 1 hour + 20 resp. |
SUBPART E – LOCOMOTIVE ELECTRONICS (NEW) |
|
|
|
229.303(a) –Requests to FRA for On-Track Testing Outside a Facility for Products (New Requirement) |
20 requests |
160 hours |
+ 160 hours + 20 resp. |
229.303(b) –Identification to FRA by Vendors of All Products Under Development (New Requirement) |
20 product ID docs. |
40 hours |
+ 40 hours + 20 resp. |
229.307 –Safety Analysis (SA) for Each Product Subject to This Subpart (New Requirement) |
300 SA documents |
72,000 hour |
+ 72,000 hours + 300 resp. |
229.309(a) –Notification to FRA of Safety-Critical Design Changes to Products (New Requirement) |
10 notific. |
160 hours |
+ 160 hours + 10 resp. |
229.309(b) –Report to Railroads of Previously Unidentified Product Hazards by Suppliers/Private Equipment Owners (New Requirement) |
10 reports |
80 hours |
+ 80 hours + 10 resp. |
229.311(a) –RR Notification to FRA of Intent to Place Product in Service Prior to Initial Planned Use (New Requirement) |
300 notific. |
600 hours |
+ 600 hours + 300 resp. |
229.311(c) –RR Maintenance of Documents Used to Demonstrate Product Meets SA Safety Requirements (New) |
300 docs. |
600 hours |
+ 600 hours + 300 resp. |
229.311(d) –RR Maintenance of Database of All Safety Relevant Hazards Encountered with Product (New) |
300 data bases |
1,200 hours |
+1,200 hours + 300 resp. |
229.311(d) –RR Report of Safety Relevant Hazards Exceeding SA Threshold (New Requirement) |
10 written reports |
20 hours |
+ 20 hours + 10 resp. |
229.311(d) –RR Final Report of Analysis/Countermeasures to Reduce Product Safety Relevant Hazards (New Requirement) |
10 written final reports |
40 hours |
+ 40 hours + 10 resp. |
229.313 – Product Testing Results and Records (New Requirement) |
120,000 tests/ records |
10,000 hour |
+ 10,000 hours + 120,000 resp. |
229.315(a/b) – RR Product Operations and Maintenance Manuals (New Requirement) |
300 manuals |
12,000 hour |
+ 12,000 hours + 300 resp. |
229.315(c) – RR Configuration Management Control Plans That Document Product Hardware/Software/Firmware Revisions (New Requirement) |
300 plans |
2,400 hours |
+ 2,400 hours + 300 resp. |
229.315(d) – Identification of Safety-Critical Components (New Requirement) |
60,000 I.D. Components |
5,000 hours |
+ 5,000 hours + 60,000 resp. |
229.317(a) – RR Training and Qualification Program (New Requirement) |
300 programs |
12,000 hour |
+ 12,000 hours + 300 resp. |
229.317(b) – RR Training of Stipulated Employees (New Requirement) |
10,000 trained employees |
5,000 hours |
+ 5,000 hours + 10,000 resp. |
229.317(f) – RR Periodic Refresher Training of Stipulated Employees (New Requirement) |
1,000 trained employees |
333 hours |
+ 333 hours + 1,000 resp. |
229.317(g) – RR Regular and Periodic Evaluation of Training Program (New Requirement) |
300 evaluation |
1,200 hours |
+ 1,200 hours + 300 resp. |
229.317(h) – RR Records of Qualified Employees (New Requirement) |
10,000 record |
1,667 hours |
+ 1,667 hours + 10,000 resp. |
APPENDIX F – GUIDANCE FOR VERIFICATION AND VALIDATION OF PRODUCTS – Third Party Assessments (New Requirement) |
1 assessment |
4,000 hours |
+ 4,000 hours + 1 response |
Program Changes above increased the burden amount by 130,041 hours, and increased the number of responses by 278,821.
TABLE FOR PROGRAM ADJUSTMENTS
Part 229 Sec. |
Responses & Avg. Time (Previous Submission) |
Responses & Avg. Time (This Submission) |
Burden Hours (Previous Submission) |
Burden Hours (This Submission)
|
Difference (plus/minus) |
229.21 – Daily Inspections |
21,750 inspection/ Records 1-3 minutes |
26,500 inspection/ records 16-18 minutes |
155,350 hours |
1,911,780 hour |
+ 1,756,430 hrs. + 4,750 resp. |
229.21 – Daily Inspections for MUs and Written Reports |
0 reports 0 minutes |
250 reports 13 minutes |
0 hours |
54 hours |
+ 41 hrs. + 250 responses |
229.23(e) – Periodic Insp.—Secondary Record |
0 records 0 minutes |
19,000 records 2 minutes |
0 hours |
633 hours |
+ 633 hrs. + 19,000 resp. |
229.135 – Event Recorder – Reportable Events |
2,930 reports 15 minutes |
10,000 reports 15 minutes |
733 hours |
2,500 hours |
+ 1,767 hrs. + 7,070 resp. |
229.85 – Marked Doors, Cover Plates, or Barriers |
0 markings 0 minutes |
1,000 markings 1 minute |
0 hours |
17 hours |
+ 17 hrs. + 1,000 resp. |
210.31 – Main Reservoir Tests/ Insp. – Form FRA F 6180.49A |
87,000 tests/forms
|
19,000 tests/forms |
696,000 hours |
152,000 hours |
minus 544,000 hours minus 68,000 responses
|
229.135(b) – Event Recorders – Certified Memory Modules |
200 modules 3 hours |
0 modules 0 hours |
600 hours |
0 hours |
minus 600 hrs. minus 200 resp. |
229.135(b)(3) – Event Recorders – Certified Memory Modules |
600 modules 2 hours |
0 modules 0 hours |
1,200 hours |
0 hours |
Minus 1,200 hrs. minus 600 resp. |
210.31 – Noise Emission Tests – Locomotives – Remarks – Form FRA F 6180.49A |
100 tests/remarks 15 minutes |
0 tests/remarks 0 minutes |
25 hours |
0 hours |
minus 25 hrs. minus 100 resp. |
Adjustments increase above amount to 1,758,888 hours, while adjustment decreases amount to 545,825hours. Overall, adjustments above increased the burden by 1,213,063 hours and decreased responses by 36,830.
Program Changes and Adjustments combined increased the burden by 1,343,104 hours, and increased the number of responses by 241,991.
File Type | application/msword |
Author | USDOT User |
Last Modified By | USDOT User |
File Modified | 2011-01-12 |
File Created | 2011-01-12 |