U.S. Department of the Interior |
|
Submit original plus THREE copies,with ONE copy marked "Public Information." |
|
|
|
OMB Control No. 1010-0141 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Bureau of Ocean Energy Management, |
|
|
|
OMB Approval Expires 11/30/11 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Regulation and Enforcement (BOEMRE) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Application for Permit to Modify (APM) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. WELL NAME (CURRENT) |
2. SIDETRACK NO. (CURRENT) |
3. BYPASS NO. (CURRENT) |
4. OPERATOR NAME and ADDRESS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Submitting office) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5. API WELL NO. (12 digits) |
6. START DATE (Proposed) |
7. ESTIMATED DURATION (DAYS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8. |
9. |
If revision, please list changes: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Revision |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WELL AT TOTAL DEPTH |
WELL AT SURFACE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10. LEASE NO. |
13. LEASE NO. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11. AREA NAME |
14. AREA NAME |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12. BLOCK NO. |
15. BLOCK NO. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Proposed or Completed Work |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
16. PROPOSED OR COMPLETED WORK (Describe in Section 17) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PLEASE SELECT ONLY ONE PRIMARY TYPE IN BOLD AND AS MANY SECONDARY TYPES AS NECESSARY. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Enhance Production |
|
Workover: |
|
|
|
Completion:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Acidize |
|
|
|
Change Tubing |
|
|
|
Initial Completion |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Artifical Lift |
|
|
|
Casing Pressure Repair |
|
|
Reperforation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Wash/Desand Well |
|
|
|
|
|
|
|
|
Change Zone |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Jet Well |
|
|
Abandonment of Well Bore: |
|
|
Modify Perforations |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Utility |
|
|
|
Permanent Abandonment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Initial Injection Well |
|
|
Temporary Abandonment |
|
Information:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Additional Fluids for Injection |
|
|
Plugback to Sidetrack/Bypass |
|
|
Surface Location Plat |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other Operations |
|
|
Site Clearance |
|
|
|
Change Well Name |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Describe Operation(s) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
17. BRIEFLY DESCRIBE PROPOSED OPERATIONS (Attach prognosis): |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
18. LIST ALL ATTACHMENTS (Attach complete well prognosis and attachments required by 30 CFR 250.513(a) through (d); 250.613(a) through (d); 250.1712(a) through (g); 250.1721(a) through (h); 250.1722(a) through (d); or 250.1743(a). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
19. Rig Name or Primary Unit (e.g., Wireline Unit, Coil Tubing, Snubbing Unit, etc.) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
20. The greater of SITP or MASP (psi): |
|
|
|
21. Type of Safety Valve (SV): ___ SCSSV ___SSCSV ___ N/A |
|
|
|
|
|
|
|
|
22. SV Depth BML (ft): ______ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
23. |
Rig BOP (Rams) |
|
|
|
|
|
24. |
Rig BOP (Annular) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Size: |
|
Working Pressure |
|
Test Pressure |
|
Working Pressure |
Test Pressure |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(inches) |
(psi) |
|
(psi) |
|
|
(psi) |
|
(psi) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
________ |
___________ |
|
Low/High: ________ |
_________ |
|
Low/High: _________ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
25. Coiled Tubing BOP: |
|
|
26. |
Snubbing Unit BOP: |
|
|
27. |
Wireline Lubricator: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Working Pressure |
BOP Test Pressure |
|
|
Working Pressure |
|
|
|
Test Pressure |
|
Working Pressure |
Test Pressure |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(psi) |
(psi) |
|
|
(psi) |
|
|
|
(psi) |
|
(psi) |
(psi) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
____________ |
|
Low/High: __________ |
|
|
____________ |
|
Low/High: _________ |
|
Low/High: _________ |
________ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
28. CONTACT NAME: |
29. CONTACT TELEPHONE NO.: |
30. CONTACT E-MAIL ADDRESS: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
31. AUTHORIZING OFFICIAL (Type or print name) |
32. TITLE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
33. AUTHORIZING SIGNATURE |
34. DATE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
THIS SPACE FOR MMS USE ONLY |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
APPROVED BY: |
TITLE |
DATE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BOEMRE Form MMS-124 (November 2008 - Supersedes all previous versions of form MMS-124 which may not be used.) Page 1 of 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Application for Permit to Modify (APM) Information Sheet |
|
|
|
|
35) Question Information |
|
Questions |
|
|
Response |
|
Remarks |
|
|
a) Is H2S present in the well? If yes, then comment on the inclusion of a Contingency Plan for this operation. |
YES
|
|
|
|
|
NO
|
|
|
|
|
N/A
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b) Is this proposed operation the only lease holding activity for the subject lease? If yes, then comment. |
YES
|
|
|
|
|
NO
|
|
|
|
|
N/A
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c) Will all wells in the well bay and related production equipment be shut-in when moving on to or off of an offshore platform, or from well to well on the platform? If not, please explain. |
YES |
|
|
|
|
NO |
|
|
|
|
N/A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d) If sands are to be commingled for this completion, has aproval been obtained? |
YES
|
|
|
|
|
NO
|
|
|
|
|
N/A
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Will the completed interval be within 500 feet of a block line? If yes, then comment. |
YES
|
|
|
|
|
NO
|
|
|
|
|
N/A
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f) For permanent abandonment, will casings be cut 15 feet below the mudline? If no, then comment. |
YES
|
|
|
|
|
NO
|
|
|
|
|
N/A
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PAPERWORK REDUCTION ACT OF 1995 (PRA) STATEMENT: The PRA (44 U.S.C. 3501 et. seq.) requires us to inform you that we collect this information to obtain knowledge of equipment and procedures to be used in drilling operations. BOEMRE uses the information to evaluate and approve or disapprove the adequacy of the equipment and/or procedures to safely perform the proposed drilling operation. Responses are mandatory (43 U.S.C. 1334). Proprietary data are covered under 30 CFR 250.197. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB Control Number. Public reporting burden for this form, MMS-124, is estimated to average between 1-3 hours per response, depending on whether it is a paper submittal or electronic submittal. This includes the time for reviewing instructions, gathering and maintaining data, and completing and reviewing the form. Direct comments regarding the burden estimate or any other aspect of this form to the Information Collection Clearance Officer, Mail Stop 5438, BOEMRE, 1849 C Street, NW, Washington, DC 20240. |
BOEMRE Form MMS-124 (November 2008 - Supersedes all previous versions of form MMS-124 which may not be used.) Page 2 of 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|