Table 1.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines | |||||||||||||||||||
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Incinerators | |||||||||||||||||||
(A) | Emission | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||||||
Respondent | Testing | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Emission | Total | Total | Total | Footnotes | ||||||
Hours per | Contractor | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Testing | Labor Costs | Non-Labor | Responses | |||||||
Occurrence | Hours | Per | Per | Respondent | Per Year (a) | Per Year | Per Year | Per Year | Contractor | Per Year | Costs | Per Year | |||||||
(Technical | Per | Occurrence | Respondent | Per Year | Hours Per | (b) | Per Year | ||||||||||||
Burden Item | hours) | Occurrence | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | Year | |||||||||||
1. | Applications | Not applicable | |||||||||||||||||
2. | Surveys and Studies | Not applicable | |||||||||||||||||
3. | Reporting Requirements | ||||||||||||||||||
A. | Read and Understand Rule Requirements | 1 | 0 | $100 | 1 | 1 | 3 | 3 | 0 | 0 | 0 | $123 | $300 | 3 | c,d,l | ||||
B. | Required Activities | ||||||||||||||||||
1) Initial stack test and report (PM, dioxins/furans, | Included in E. | varies | $14,333 | 1 | 0 | 3 | 0 | 0 | 0 | 179 | $0 | $42,999 | 3 | c | |||||
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) | |||||||||||||||||||
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) | Included in E. | 182 | $14,533 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e | |||||
3) | Operator training and qualification | ||||||||||||||||||
a) Establish and teach operator qualification course | 64 | 0 | $0 | 1 | 64 | 3 | 192 | 10 | 19 | 0 | $7,860 | $0 | 3 | c | |||||
b) Obtain operator qualification | 72 | 0 | $0 | 1 | 72 | 3 | 216 | 11 | 22 | 0 | $8,843 | $0 | 3 | c | |||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e | ||||||
d) Initial review of site-specific information | Included in a. | ||||||||||||||||||
e) Annual review of site-specific information | 8 | 0 | $0 | 1 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e | |||||
4) Establish operating parameters (maximum and minimum) | 40 | Included in B.1. | $0 | 1 | 40 | 3 | 120 | 6 | 12 | 0 | $4,913 | $0 | 3 | c | |||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||||
a) Initial costs | 17 | 0 | $8,000 | 1 | 17 | 3 | 51 | 3 | 5 | 0 | $2,088 | $8,000 | 3 | c,f | |||||
b) Annual costs | 17 | 0 | $39,500 | 1 | 17 | 3 | 51 | 3 | 5 | 0 | $2,088 | $39,500 | 3 | e,g | |||||
C. | Create Information | Included in 3.B | |||||||||||||||||
D. | Gather Information | Included in 3.E | |||||||||||||||||
E. | Report Preparation | ||||||||||||||||||
1) Notification of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 2 | 0 | $0 | 1 | 2 | 3 | 6 | 0 | 1 | 0 | $246 | $0 | 3 | ||||||
b) Fugitive Ash Emissions | 1 | 0 | $0 | 1 | 1 | 3 | 3 | 0 | 0 | 0 | $123 | $0 | 3 | ||||||
2) Notification of initial CMS Demonstration | 2 | 0 | $0 | 1 | 2 | 3 | 6 | 0 | 1 | 0 | $246 | $0 | 3 | ||||||
3) Report of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 8 | 0 | $7.50 | 1 | 8 | 3 | 24 | 1 | 2 | 0 | $983 | $23 | 3 | ||||||
b) Fugitive Ash Emissions | 2 | 0 | $0 | 1 | 2 | 3 | 6 | 0 | 1 | 0 | $246 | $0 | 3 | ||||||
4) Report of initial CMS demonstration | Included in 3.B.5 | ||||||||||||||||||
5) Report prior to construction (includes siting analysis) | 160 | 0 | $0 | 1 | 160 | 3 | 480 | 24 | 48 | 0 | $19,651 | $0 | 3 | c | |||||
6) Report prior to initial start-up | |||||||||||||||||||
a) Without site specific parameter petition | 6 | 0 | $0 | 1 | 6 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
b) With site specific parameter petition | 14 | 0 | $0 | 1 | 14 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
7) Report of initial stack test | Included in 3.B.1 | ||||||||||||||||||
8) Report established values for site-specific operating parameters | Included in 3.B | 0 | $0 | 1 | #VALUE! | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
9) Waste management plan | 160 | 0 | $0 | 1 | 160 | 3 | 480 | 24 | 48 | 0 | $19,651 | $0 | 3 | c | |||||
10) Annual Report: | |||||||||||||||||||
a) Results of performance tests conducted during the year | 40 | 0 | $7.50 | 1 | 40 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
11) Status report for operators that are off-site for more than 2 weeks | 8 | 0 | $0 | 1 | 8 | 0.3 | 2 | 0 | 0 | 0 | $98 | $0 | 0 | i | |||||
12) Corrective action summary for operators that are off-site for more | |||||||||||||||||||
than 2 weeks | 8 | 0 | $0 | 2 | 16 | 0.3 | 5 | 0 | 0 | 0 | $197 | $0 | 1 | i | |||||
13) Semiannual report of emissions/parameter exceedances | 24 | 0 | $7.50 | 1 | 24 | 0.3 | 7 | 0 | 1 | 0 | $295 | $2 | 0 | j | |||||
ReportingSubtotal | 1,652 | 83 | 165 | 179 | $67,648 | 43 | |||||||||||||
4. Recordkeeping Requirements | |||||||||||||||||||
A. Read Instructions | Inculded in 3.A | ||||||||||||||||||
B. Plan Activities | Not applicable | ||||||||||||||||||
C. Implement Activities | Not applicable | ||||||||||||||||||
D. Develop Record System | Not applicable | ||||||||||||||||||
E. Record Information | |||||||||||||||||||
1) Records of operating parameters | Included in 3.B.5.b | 0 | $0 | 52 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Records of periods for which minimum amount of data on operating | |||||||||||||||||||
parameters were not obtained | 0.5 | 0 | $0 | 52 | 26 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
3) Records of malfunction of the unit | 1.5 | 0 | $0 | 1 | 1.5 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
4) Records of exceedances of the operating parameters | 1.5 | 0 | $0 | 1 | 1.5 | 0.3 | 0 | 0 | 0 | 0 | $18 | $0 | 0 | j | |||||
5) Records of stack tests | Included in 3.E | ||||||||||||||||||
6) Records of siting analysis | Included in 3.E | ||||||||||||||||||
7) Records of persons who have reviewed operating procedures | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
8) Records of persons who have completed operator training | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
9) Records of persons whe meet operator qualification criteria | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
10) Records of monitoring device calibration | Included in 3.B | ||||||||||||||||||
11) Records of site-specific documentation | 24 | 0 | $0 | 1 | 24 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
F. Personnel Training | Included in 3.B | ||||||||||||||||||
G. Time for Audits | Not applicable | ||||||||||||||||||
Recordkeeping Subtotal | 0.45 | 0.0225 | 0.045 | 0 | $18 | $0 | 0.3 | ||||||||||||
TOTAL: | 1,653 | 83 | 165 | 179 | $67,666 | $90,824 | 44 | ||||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||||
Summary of Respondent Burden | 1,901 | $67,666 | $90,824 | $158,490 | |||||||||||||||
Annualized Capital and Startup | $51,299 | $51,299 | |||||||||||||||||
O & M Summary | $39,500 | $39,500 | |||||||||||||||||
FOOTNOTES | |||||||||||||||||||
a | Based on the total number of existing units expected to continue operating once the guidelines become effective. | ||||||||||||||||||
b | Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. | ||||||||||||||||||
c | One-time only costs. | ||||||||||||||||||
d | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||||
e | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||||
f | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
g | Based on the sum of the calculated annual cost for each monitoring system required for incinerators. | ||||||||||||||||||
h | Assumed that one-third of the facilities will petition for site-specific parameters. | ||||||||||||||||||
i | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||||
j | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||||
k | Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. | ||||||||||||||||||
l | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
Table 1.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines | |||||||||||||||||||
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Incinerators | |||||||||||||||||||
(A) | Emission | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||||||
Respondent | Testing | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Emission | Total | Total | Total | Footnotes | ||||||
Hours per | Contractor | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Testing | Labor Costs | Non-Labor | Responses | |||||||
Occurrence | Hours | Per | Per | Respondent | Per Year (a) | Per Year | Per Year | Per Year | Contractor | Per Year | Costs | Per Year | |||||||
(Technical | Per | Occurrence | Respondent | Per Year | Hours Per | (b) | Per Year | ||||||||||||
Burden Item | hours) | Occurrence | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | Year | |||||||||||
1. | Applications | Not applicable | |||||||||||||||||
2. | Surveys and Studies | Not applicable | |||||||||||||||||
3. | Reporting Requirements | ||||||||||||||||||
A. | Read and Understand Rule Requirements | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,d,l | ||||
B. | Required Activities | ||||||||||||||||||
1) Initial stack test and report (PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) | Included in E. | varies | $0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) | Included in E. | 182 | $14,533 | 1 | 0 | 3 | 0 | 0 | 0 | 545 | $0 | $43,600 | 3 | e | |||||
3) | Operator training and qualification | ||||||||||||||||||
a) Establish and teach operator qualification course | 64 | 0 | $0 | 1 | 64 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
b) Obtain operator qualification | 72 | 0 | $0 | 1 | 72 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 3 | 36 | 2 | 4 | 0 | $1,474 | $0 | 3 | e | ||||||
d) Initial review of site-specific information | Included in a. | ||||||||||||||||||
e) Annual review of site-specific information | 8 | 0 | $0 | 1 | 8 | 3 | 24 | 1 | 2 | 0 | $983 | $0 | 3 | e | |||||
4) Establish operating parameters (maximum and minimum) | 40 | Included in B.1. | $0 | 1 | 40 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||||
a) Initial costs | 17 | 0 | $8,000 | 1 | 17 | 0 | 0 | 0 | 0 | 0 | $0 | $8,000 | 0 | c,f | |||||
b) Annual costs | 17 | 0 | $47,500 | 1 | 17 | 3 | 51 | 3 | 5 | 0 | $2,088 | $47,500 | 3 | e,g | |||||
C. | Create Information | Included in 3.B | |||||||||||||||||
D. | Gather Information | Included in 3.E | |||||||||||||||||
E. | Report Preparation | ||||||||||||||||||
1) Notification of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Notification of initial CMS Demonstration | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
3) Report of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 8 | 0 | $7.50 | 1 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
4) Report of initial CMS demonstration | Included in 3.B.5 | ||||||||||||||||||
5) Report prior to construction (includes siting analysis) | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
6) Report prior to initial start-up | |||||||||||||||||||
a) Without site specific parameter petition | 6 | 0 | $0 | 1 | 6 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
b) With site specific parameter petition | 14 | 0 | $0 | 1 | 14 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
7) Report of initial stack test | Included in 3.B.1 | ||||||||||||||||||
8) Report established values for site-specific operating parameters | Included in 3.B | 0 | $0 | 1 | #VALUE! | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
9) Waste management plan | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
10) Annual Report: | |||||||||||||||||||
a) Results of performance tests conducted during the year | 40 | 0 | $7.50 | 1 | 40 | 3 | 120 | 6 | 12 | 0 | $4,913 | $23 | 3 | ||||||
11) Status report for operators that are off-site for more than 2 weeks | 8 | 0 | $0 | 1 | 8 | 0.3 | 2 | 0 | 0 | 0 | $98 | $0 | 0 | i | |||||
12) Corrective action summary for operators that are off-site for more | |||||||||||||||||||
than 2 weeks | 8 | 0 | $0 | 2 | 16 | 0.3 | 5 | 0 | 0 | 0 | $197 | $0 | 1 | i | |||||
13) Semiannual report of emissions/parameter exceedances | 24 | 0 | $7.50 | 1 | 24 | 0.3 | 7 | 0 | 1 | 0 | $295 | $2 | 0 | j | |||||
ReportingSubtotal | 245 | 12 | 25 | 545 | $10,046 | 16 | |||||||||||||
4. Recordkeeping Requirements | |||||||||||||||||||
A. Read Instructions | Inculded in 3.A | ||||||||||||||||||
B. Plan Activities | Not applicable | ||||||||||||||||||
C. Implement Activities | Not applicable | ||||||||||||||||||
D. Develop Record System | Not applicable | ||||||||||||||||||
E. Record Information | |||||||||||||||||||
1) Records of operating parameters | Included in 3.B.5.b | 0 | $0 | 52 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Records of periods for which minimum amount of data on operating | |||||||||||||||||||
parameters were not obtained | 0.5 | 0 | $0 | 52 | 26 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
3) Records of malfunction of the unit | 1.5 | 0 | $0 | 1 | 1.5 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
4) Records of exceedances of the operating parameters | 1.5 | 0 | $0 | 1 | 1.5 | 0.3 | 0 | 0 | 0 | 0 | $18 | $0 | 0 | j | |||||
5) Records of stack tests | Included in 3.E | ||||||||||||||||||
6) Records of siting analysis | Included in 3.E | ||||||||||||||||||
7) Records of persons who have reviewed operating procedures | 1 | 0 | $0 | 1 | 1 | 3 | 3 | 0 | 0 | 0 | $123 | $0 | 3 | ||||||
8) Records of persons who have completed operator training | 1 | 0 | $0 | 1 | 1 | 3 | 3 | 0 | 0 | 0 | $123 | $0 | 3 | ||||||
9) Records of persons whe meet operator qualification criteria | 1 | 0 | $0 | 1 | 1 | 3 | 3 | 0 | 0 | 0 | $123 | $0 | 3 | ||||||
10) Records of monitoring device calibration | Included in 3.B | ||||||||||||||||||
11) Records of site-specific documentation | 24 | 0 | $0 | 1 | 24 | 3 | 72 | 4 | 7 | 0 | $2,948 | $0 | 3 | ||||||
F. Personnel Training | Included in 3.B | ||||||||||||||||||
G. Time for Audits | Not applicable | ||||||||||||||||||
Recordkeeping Subtotal | 81.45 | 4.0725 | 8.145 | 0 | $3,334 | $0 | 12.3 | ||||||||||||
TOTAL: | 327 | 16 | 33 | 545 | $13,381 | $99,125 | 29 | ||||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||||
Summary of Respondent Burden | 376 | $13,381 | $99,125 | $112,506 | |||||||||||||||
Annualized Capital and Startup | $8,000 | $8,000 | |||||||||||||||||
O & M Summary | $47,500 | $47,500 | |||||||||||||||||
FOOTNOTES | |||||||||||||||||||
a | Based on the total number of existing units expected to continue operating once the guidelines become effective. | ||||||||||||||||||
b | Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. | ||||||||||||||||||
c | One-time only costs. | ||||||||||||||||||
d | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||||
e | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||||
f | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
g | Based on the sum of the calculated annual cost for each monitoring system required for incinerators. | ||||||||||||||||||
h | Assumed that one-third of the facilities will petition for site-specific parameters. | ||||||||||||||||||
i | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||||
j | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||||
k | Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. | ||||||||||||||||||
l | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
Table 1.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines | |||||||||||||||||||
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Incinerators | |||||||||||||||||||
(A) | Emission | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||||||
Respondent | Testing | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Emission | Total | Total | Total | Footnotes | ||||||
Hours per | Contractor | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Testing | Labor Costs | Non-Labor | Responses | |||||||
Occurrence | Hours | Per | Per | Respondent | Per Year (a) | Per Year | Per Year | Contractor | Per Year | Costs | Per Year | ||||||||
(Technical | Per | Occurrence | Respondent | Per Year | @$22.32 | Hours Per | (b) | Per Year | |||||||||||
Burden Item | hours) | Occurrence | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | Year | |||||||||||
1. | Applications | Not applicable | |||||||||||||||||
2. | Surveys and Studies | Not applicable | |||||||||||||||||
3. | Reporting Requirements | ||||||||||||||||||
A. | Read and Understand Rule Requirements | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,d,l | ||||
B. | Required Activities | ||||||||||||||||||
1) Initial stack test and report (PM, dioxins/furans, | Included in E. | varies | $0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) | |||||||||||||||||||
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) | Included in E. | 182 | $14,533 | 1 | 0 | 3 | 0 | 0 | 0 | 545 | $0 | $43,600 | 3 | e | |||||
3) | Operator training and qualification | ||||||||||||||||||
a) Establish and teach operator qualification course | 64 | 0 | $0 | 1 | 64 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
b) Obtain operator qualification | 72 | 0 | $0 | 1 | 72 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 3 | 36 | 2 | 4 | 0 | $1,474 | $0 | 3 | e | ||||||
d) Initial review of site-specific information | Included in a. | ||||||||||||||||||
e) Annual review of site-specific information | 8 | 0 | $0 | 1 | 8 | 3 | 24 | 1 | 2 | 0 | $983 | $0 | 3 | e | |||||
4) Establish operating parameters (maximum and minimum) | 40 | Included in B.1. | $0 | 1 | 40 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||||
a) Initial costs | 17 | 0 | $8,000 | 1 | 17 | 0 | 0 | 0 | 0 | 0 | $0 | $8,000 | 0 | c,f | |||||
b) Annual costs | 17 | 0 | $47,500 | 1 | 17 | 3 | 51 | 3 | 5 | 0 | $2,088 | $47,500 | 3 | e,g | |||||
C. | Create Information | Included in 3.B | |||||||||||||||||
D. | Gather Information | Included in 3.E | |||||||||||||||||
E. | Report Preparation | ||||||||||||||||||
1) Notification of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Notification of initial CMS Demonstration | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
3) Report of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 8 | 0 | $7.50 | 1 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
4) Report of initial CMS demonstration | Included in 3.B.5 | ||||||||||||||||||
5) Report prior to construction (includes siting analysis) | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
6) Report prior to initial start-up | |||||||||||||||||||
a) Without site specific parameter petition | 6 | 0 | $0 | 1 | 6 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
b) With site specific parameter petition | 14 | 0 | $0 | 1 | 14 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
7) Report of initial stack test | Included in 3.B.1 | ||||||||||||||||||
8) Report established values for site-specific operating parameters | Included in 3.B | 0 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
9) Waste management plan | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
10) Annual Report: | |||||||||||||||||||
a) Results of performance tests conducted during the year | 40 | 0 | $7.50 | 1 | 40 | 3 | 120 | 6 | 12 | 0 | $4,913 | $23 | 3 | ||||||
11) Status report for operators that are off-site for more than 2 weeks | 8 | 0 | $0 | 1 | 8 | 0.3 | 2 | 0 | 0 | 0 | $98 | $0 | 0 | i | |||||
12) Corrective action summary for operators that are off-site for more | |||||||||||||||||||
than 2 weeks | 8 | 0 | $0 | 2 | 16 | 0.3 | 5 | 0 | 0 | 0 | $197 | $0 | 1 | i | |||||
13) Semiannual report of emissions/parameter exceedances | 24 | 0 | $7.50 | 1 | 24 | 0.3 | 7 | 0 | 1 | 0 | $295 | $2 | 0 | j | |||||
ReportingSubtotal | 245 | 12 | 25 | 545 | $10,046 | 16 | |||||||||||||
4. Recordkeeping Requirements | |||||||||||||||||||
A. Read Instructions | Inculded in 3.A | ||||||||||||||||||
B. Plan Activities | Not applicable | ||||||||||||||||||
C. Implement Activities | Not applicable | ||||||||||||||||||
D. Develop Record System | Not applicable | ||||||||||||||||||
E. Record Information | |||||||||||||||||||
1) Records of operating parameters | Included in 3.B.5.b | 0 | $0 | 52 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Records of periods for which minimum amount of data on operating | |||||||||||||||||||
parameters were not obtained | 0.5 | 0 | $0 | 52 | 26 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
3) Records of malfunction of the unit | 1.5 | 0 | $0 | 1 | 1.5 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
4) Records of exceedances of the operating parameters | 1.5 | 0 | $0 | 1 | 1.5 | 0.3 | 0 | 0 | 0 | 0 | $18 | $0 | 0 | j | |||||
5) Records of stack tests | Included in 3.E | ||||||||||||||||||
6) Records of siting analysis | Included in 3.E | ||||||||||||||||||
7) Records of persons who have reviewed operating procedures | 1 | 0 | $0 | 1 | 1 | 3 | 3 | 0 | 0 | 0 | $123 | $0 | 3 | ||||||
8) Records of persons who have completed operator training | 1 | 0 | $0 | 1 | 1 | 3 | 3 | 0 | 0 | 0 | $123 | $0 | 3 | ||||||
9) Records of persons whe meet operator qualification criteria | 1 | 0 | $0 | 1 | 1 | 3 | 3 | 0 | 0 | 0 | $123 | $0 | 3 | ||||||
10) Records of monitoring device calibration | Included in 3.B | ||||||||||||||||||
11) Records of site-specific documentation | 24 | 0 | $0 | 1 | 24 | 3 | 72 | 4 | 7 | 0 | $2,948 | $0 | 3 | ||||||
F. Personnel Training | Included in 3.B | ||||||||||||||||||
G. Time for Audits | Not applicable | ||||||||||||||||||
Recordkeeping Subtotal | 81.45 | 4.0725 | 8.145 | 0 | $3,334 | $0 | 12.3 | ||||||||||||
TOTAL: | 327 | 16 | 33 | 545 | $13,381 | $99,125 | 29 | ||||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||||
Summary of Respondent Burden | 376 | $13,381 | $99,125 | $112,506 | |||||||||||||||
Annualized Capital and Startup | $8,000 | $8,000 | |||||||||||||||||
O & M Summary | $47,500 | $47,500 | |||||||||||||||||
FOOTNOTES | |||||||||||||||||||
a | Based on the total number of existing units expected to continue operating once the guidelines become effective. | ||||||||||||||||||
b | Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. | ||||||||||||||||||
c | One-time only costs. | ||||||||||||||||||
d | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||||
e | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||||
f | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
g | Based on the sum of the calculated annual cost for each monitoring system required for incinerators. | ||||||||||||||||||
h | Assumed that one-third of the facilities will petition for site-specific parameters. | ||||||||||||||||||
i | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||||
j | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||||
k | Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. | ||||||||||||||||||
l | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
Table 1.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD, Incinerators | ||||||||
Year | Technical Hours | Management Hours | Clerical Hours | Total Hours | Testing Contractor Hoursa | Labor Costs | Non-Labor (O&M) Costs | Total Costs |
1 | 1,653 | 83 | 165 | 1,901 | 179 | $67,666 | $90,824 | $158,490 |
2 | 327 | 16 | 33 | 376 | 545 | $13,381 | $99,125 | $112,506 |
3 | 327 | 16 | 33 | 376 | 545 | $13,381 | $99,125 | $112,506 |
Total | 2,307 | 115 | 231 | 2,653 | 1,269 | $94,428 | $289,073 | $383,502 |
Average | 769 | 38 | 77 | 884 | 423 | $31,476 | $96,358 | $127,834 |
a. Test contractor costs are accounted for in the non-labor category |
Table 2.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines | |||||||||||||||||||
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Energy Recovery Units (Solids) | |||||||||||||||||||
(A) | Emission | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||||||
Respondent | Testing | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Emission | Total | Total | Total | Footnotes | ||||||
Hours per | Contractor | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Testing | Labor Costs | Non-Labor | Responses | |||||||
Occurrence | Hours | Per | Per | Respondent | Per Year (a) | Per Year | Per Year | Per Year | Contractor | Per Year | Costs | Per Year | |||||||
(Technical | Per | Occurrence | Respondent | Per Year | Hours Per | (b) | Per Year | ||||||||||||
Burden Item | hours) | Occurrence | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | Year | |||||||||||
1. | Applications | Not applicable | |||||||||||||||||
2. | Surveys and Studies | Not applicable | |||||||||||||||||
3. | Reporting Requirements | ||||||||||||||||||
A. | Read and Understand Rule Requirements | 1 | 0 | $100 | 1 | 1 | 20 | 20 | 1 | 2 | 0 | $819 | $2,000 | 20 | c,d,l | ||||
B. | Required Activities | ||||||||||||||||||
1) Initial stack test and report (PM, dioxins/furans, | Included in E. | varies | $23,280 | 1 | 0 | 31 | 0 | 0 | 0 | 291 | $0 | $721,667 | 31 | c | |||||
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) | |||||||||||||||||||
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) | Included in E. | 182 | $14,533 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e | |||||
3) | Operator training and qualification | ||||||||||||||||||
a) Establish and teach operator qualification course | 64 | 0 | $0 | 1 | 64 | 20 | 1,280 | 64 | 128 | 0 | $52,402 | $0 | 20 | c | |||||
b) Obtain operator qualification | 72 | 0 | $0 | 1 | 72 | 20 | 1,440 | 72 | 144 | 0 | $58,952 | $0 | 20 | c | |||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e | ||||||
d) Initial review of site-specific information | Included in a. | ||||||||||||||||||
e) Annual review of site-specific information | 8 | 0 | $0 | 1 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e | |||||
4) Establish operating parameters (maximum and minimum) | 40 | Included in B.1. | $0 | 1 | 40 | 31 | 1,240 | 62 | 124 | 0 | $50,765 | $0 | 31 | c | |||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||||
a) Initial costs | 17 | 0 | $16,708 | 1 | 17 | 31 | 527 | 26 | 53 | 0 | $21,575 | $517,944 | 31 | c,f | |||||
b) Annual costs | 17 | 0 | $31,778 | 1 | 17 | 31 | 527 | 26 | 53 | 0 | $21,575 | $985,108 | 31 | e,g | |||||
C. | Create Information | Included in 3.B | |||||||||||||||||
D. | Gather Information | Included in 3.E | |||||||||||||||||
E. | Report Preparation | ||||||||||||||||||
1) Notification of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 2 | 0 | $0 | 1 | 2 | 31 | 62 | 3 | 6 | 0 | $2,538 | $0 | 31 | ||||||
b) Fugitive Ash Emissions | 1 | 0 | $0 | 1 | 1 | 31 | 31 | 2 | 3 | 0 | $1,269 | $0 | 31 | ||||||
2) Notification of initial CMS Demonstration | 2 | 0 | $0 | 1 | 2 | 20 | 40 | 2 | 4 | 0 | $1,638 | $0 | 20 | ||||||
3) Report of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 8 | 0 | $7.50 | 1 | 8 | 31 | 248 | 12 | 25 | 0 | $10,153 | $233 | 31 | ||||||
b) Fugitive Ash Emissions | 2 | 0 | $0 | 1 | 2 | 31 | 62 | 3 | 6 | 0 | $2,538 | $0 | 31 | ||||||
4) Report of initial CMS demonstration | Included in 3.B.5 | ||||||||||||||||||
5) Report prior to construction (includes siting analysis) | 160 | 0 | $0 | 1 | 160 | 20 | 3,200 | 160 | 320 | 0 | $131,005 | $0 | 20 | c | |||||
6) Report prior to initial start-up | |||||||||||||||||||
a) Without site specific parameter petition | 6 | 0 | $0 | 1 | 6 | 13 | 78 | 4 | 8 | 0 | $3,193 | $0 | 13 | c,h | |||||
b) With site specific parameter petition | 14 | 0 | $0 | 1 | 14 | 7 | 98 | 5 | 10 | 0 | $4,012 | $0 | 7 | c,h | |||||
7) Report of initial stack test | Included in 3.B.1 | ||||||||||||||||||
8) Report established values for site-specific operating parameters | Included in 3.B | 0 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
9) Waste management plan | 160 | 0 | $0 | 1 | 160 | 20 | 3,200 | 160 | 320 | 0 | $131,005 | $0 | 20 | c | |||||
10) Annual Report: | |||||||||||||||||||
a) Results of performance tests conducted during the year | 40 | 0 | $7.50 | 1 | 40 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
11) Status report for operators that are off-site for more than 2 weeks | 8 | 0 | $0 | 1 | 8 | 2 | 16 | 1 | 2 | 0 | $655 | $0 | 2 | i | |||||
12) Corrective action summary for operators that are off-site for more | |||||||||||||||||||
than 2 weeks | 8 | 0 | $0 | 2 | 16 | 2 | 32 | 2 | 3 | 0 | $1,310 | $0 | 4 | i | |||||
13) Semiannual report of emissions/parameter exceedances | 24 | 0 | $7.50 | 1 | 24 | 2 | 48 | 2 | 5 | 0 | $1,965 | $15 | 2 | j | |||||
ReportingSubtotal | 12,149 | 607 | 1,215 | 291 | $497,370 | 396 | |||||||||||||
4. Recordkeeping Requirements | |||||||||||||||||||
A. Read Instructions | Inculded in 3.A | ||||||||||||||||||
B. Plan Activities | Not applicable | ||||||||||||||||||
C. Implement Activities | Not applicable | ||||||||||||||||||
D. Develop Record System | Not applicable | ||||||||||||||||||
E. Record Information | |||||||||||||||||||
1) Records of operating parameters | Included in 3.B.5.b | 0 | $0 | 52 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Records of periods for which minimum amount of data on operating | |||||||||||||||||||
parameters were not obtained | 0.5 | 0 | $0 | 52 | 26 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
3) Records of malfunction of the unit | 1.5 | 0 | $0 | 1 | 1.5 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
4) Records of exceedances of the operating parameters | 1.5 | 0 | $0 | 1 | 1.5 | 2 | 3 | 0 | 0 | 0 | $123 | $0 | 2 | j | |||||
5) Records of stack tests | Included in 3.E | ||||||||||||||||||
6) Records of siting analysis | Included in 3.E | ||||||||||||||||||
7) Records of persons who have reviewed operating procedures | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
8) Records of persons who have completed operator training | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
9) Records of persons whe meet operator qualification criteria | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
10) Records of monitoring device calibration | Included in 3.B | ||||||||||||||||||
11) Records of site-specific documentation | 24 | 0 | $0 | 1 | 24 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
F. Personnel Training | Included in 3.B | ||||||||||||||||||
G. Time for Audits | Not applicable | ||||||||||||||||||
Recordkeeping Subtotal | 3 | 0.15 | 0.3 | 0 | $123 | $0 | 2 | ||||||||||||
TOTAL: | 12,152 | 608 | 1,215 | 291 | $497,493 | $2,226,966 | 398 | ||||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||||
Summary of Respondent Burden | 13,975 | $497,493 | $2,226,966 | $2,724,459 | |||||||||||||||
Annualized Capital and Startup | $1,241,611 | $1,241,611 | |||||||||||||||||
O & M Summary | $985,108 | $985,108 | |||||||||||||||||
FOOTNOTES | |||||||||||||||||||
a | Based on the total number of existing units expected to continue operating once the guidelines become effective. | ||||||||||||||||||
b | Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. | ||||||||||||||||||
c | One-time only costs. | ||||||||||||||||||
d | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||||
e | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||||
f | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
g | Based on the sum of the calculated annual cost for each monitoring system required for incinerators. | ||||||||||||||||||
h | Assumed that one-third of the facilities will petition for site-specific parameters. | ||||||||||||||||||
i | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||||
j | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||||
k | Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. | ||||||||||||||||||
l | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
Table 2.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines | |||||||||||||||||||
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Energy Recovery Units (Solids) | |||||||||||||||||||
(A) | Emission | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||||||
Respondent | Testing | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Emission | Total | Total | Total | Footnotes | ||||||
Hours per | Contractor | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Testing | Labor Costs | Non-Labor | Responses | |||||||
Occurrence | Hours | Per | Per | Respondent | Per Year (a) | Per Year | Per Year | Per Year | Contractor | Per Year | Costs | Per Year | |||||||
(Technical | Per | Occurrence | Respondent | Per Year | Hours Per | (b) | Per Year | ||||||||||||
Burden Item | hours) | Occurrence | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | Year | |||||||||||
1. | Applications | Not applicable | |||||||||||||||||
2. | Surveys and Studies | Not applicable | |||||||||||||||||
3. | Reporting Requirements | ||||||||||||||||||
A. | Read and Understand Rule Requirements | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,d,l | ||||
B. | Required Activities | ||||||||||||||||||
1) Initial stack test and report (PM, dioxins/furans, | Included in E. | varies | $23,280 | 1 | 0 | 0 | 0 | 0 | 0 | 291 | $0 | $0 | 0 | c | |||||
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) | |||||||||||||||||||
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) | Included in E. | 182 | $14,533 | 1 | 0 | 31 | 0 | 0 | 0 | 5,632 | $0 | $450,533 | 31 | e | |||||
3) | Operator training and qualification | ||||||||||||||||||
a) Establish and teach operator qualification course | 64 | 0 | $0 | 1 | 64 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
b) Obtain operator qualification | 72 | 0 | $0 | 1 | 72 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 20 | 240 | 12 | 24 | 0 | $9,825 | $0 | 20 | e | ||||||
d) Initial review of site-specific information | Included in a. | ||||||||||||||||||
e) Annual review of site-specific information | 8 | 0 | $0 | 1 | 8 | 20 | 160 | 8 | 16 | 0 | $6,550 | $0 | 20 | e | |||||
4) Establish operating parameters (maximum and minimum) | 40 | Included in B.1. | $0 | 1 | 40 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||||
a) Initial costs | 17 | 0 | $0 | 1 | 17 | 0 | 0 | 0 | 0 | 0 | $0 | $279,300 | 0 | c,f | |||||
b) Annual costs | 17 | 0 | $31,778 | 1 | 17 | 0 | 0 | 0 | 0 | 0 | $0 | $985,108 | 0 | e,g | |||||
C. | Create Information | Included in 3.B | |||||||||||||||||
D. | Gather Information | Included in 3.E | |||||||||||||||||
E. | Report Preparation | ||||||||||||||||||
1) Notification of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Notification of initial CMS Demonstration | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
3) Report of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 8 | 0 | $7.50 | 1 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
4) Report of initial CMS demonstration | Included in 3.B.5 | ||||||||||||||||||
5) Report prior to construction (includes siting analysis) | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
6) Report prior to initial start-up | |||||||||||||||||||
a) Without site specific parameter petition | 6 | 0 | $0 | 1 | 6 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
b) With site specific parameter petition | 14 | 0 | $0 | 1 | 14 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
7) Report of initial stack test | Included in 3.B.1 | ||||||||||||||||||
8) Report established values for site-specific operating parameters | Included in 3.B | 0 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
9) Waste management plan | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
10) Annual Report: | |||||||||||||||||||
a) Results of performance tests conducted during the year | 40 | 0 | $7.50 | 1 | 40 | 31 | 1,240 | 62 | 124 | 0 | $50,765 | $233 | 31 | ||||||
11) Status report for operators that are off-site for more than 2 weeks | 8 | 0 | $0 | 1 | 8 | 2 | 16 | 1 | 2 | 0 | $655 | $0 | 2 | i | |||||
12) Corrective action summary for operators that are off-site for more | |||||||||||||||||||
than 2 weeks | 8 | 0 | $0 | 2 | 16 | 2 | 32 | 2 | 3 | 0 | $1,310 | $0 | 4 | i | |||||
13) Semiannual report of emissions/parameter exceedances | 24 | 0 | $7.50 | 1 | 24 | 2 | 48 | 2 | 5 | 0 | $1,965 | $15 | 2 | j | |||||
ReportingSubtotal | 1,736 | 87 | 174 | 5,923 | $71,070 | 110 | |||||||||||||
4. Recordkeeping Requirements | |||||||||||||||||||
A. Read Instructions | Inculded in 3.A | ||||||||||||||||||
B. Plan Activities | Not applicable | ||||||||||||||||||
C. Implement Activities | Not applicable | ||||||||||||||||||
D. Develop Record System | Not applicable | ||||||||||||||||||
E. Record Information | |||||||||||||||||||
1) Records of operating parameters | Included in 3.B.5.b | 0 | $0 | 52 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Records of periods for which minimum amount of data on operating | |||||||||||||||||||
parameters were not obtained | 0.5 | 0 | $0 | 52 | 26 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
3) Records of malfunction of the unit | 1.5 | 0 | $0 | 1 | 1.5 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
4) Records of exceedances of the operating parameters | 1.5 | 0 | $0 | 1 | 1.5 | 2 | 3 | 0 | 0 | 0 | $123 | $0 | 2 | j | |||||
5) Records of stack tests | Included in 3.E | ||||||||||||||||||
6) Records of siting analysis | Included in 3.E | ||||||||||||||||||
7) Records of persons who have reviewed operating procedures | 1 | 0 | $0 | 1 | 1 | 20 | 20 | 1 | 2 | 0 | $819 | $0 | 20 | ||||||
8) Records of persons who have completed operator training | 1 | 0 | $0 | 1 | 1 | 20 | 20 | 1 | 2 | 0 | $819 | $0 | 20 | ||||||
9) Records of persons whe meet operator qualification criteria | 1 | 0 | $0 | 1 | 1 | 20 | 20 | 1 | 2 | 0 | $819 | $0 | 20 | ||||||
10) Records of monitoring device calibration | Included in 3.B | ||||||||||||||||||
11) Records of site-specific documentation | 24 | 0 | $0 | 1 | 24 | 20 | 480 | 24 | 48 | 0 | $19,651 | $0 | 20 | ||||||
F. Personnel Training | Included in 3.B | ||||||||||||||||||
G. Time for Audits | Not applicable | ||||||||||||||||||
Recordkeeping Subtotal | 543 | 27.15 | 54.3 | 0 | $22,230 | $0 | 82 | ||||||||||||
TOTAL: | 2,279 | 114 | 228 | 5,923 | $93,300 | $1,715,189 | 192 | ||||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||||
Summary of Respondent Burden | 2,621 | $93,300 | $1,715,189 | $1,808,489 | |||||||||||||||
Annualized Capital and Startup | $279,300 | $279,300 | |||||||||||||||||
O & M Summary | $985,108 | $985,108 | |||||||||||||||||
FOOTNOTES | |||||||||||||||||||
a | Based on the total number of existing units expected to continue operating once the guidelines become effective. | ||||||||||||||||||
b | Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. | ||||||||||||||||||
c | One-time only costs. | ||||||||||||||||||
d | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||||
e | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||||
f | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
g | Based on the sum of the calculated annual cost for each monitoring system required for incinerators. | ||||||||||||||||||
h | Assumed that one-third of the facilities will petition for site-specific parameters. | ||||||||||||||||||
i | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||||
j | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||||
k | Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. | ||||||||||||||||||
l | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
Table 2.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines | |||||||||||||||||||
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Energy Recovery Units (Solids) | |||||||||||||||||||
(A) | Emission | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||||||
Respondent | Testing | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Emission | Total | Total | Total | Footnotes | ||||||
Hours per | Contractor | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Testing | Labor Costs | Non-Labor | Responses | |||||||
Occurrence | Hours | Per | Per | Respondent | Per Year (a) | Per Year | Per Year | Per Year | Contractor | Per Year | Costs | Per Year | |||||||
(Technical | Per | Occurrence | Respondent | Per Year | Hours Per | (b) | Per Year | ||||||||||||
Burden Item | hours) | Occurrence | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | Year | |||||||||||
1. | Applications | Not applicable | |||||||||||||||||
2. | Surveys and Studies | Not applicable | |||||||||||||||||
3. | Reporting Requirements | ||||||||||||||||||
A. | Read and Understand Rule Requirements | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,d,l | ||||
B. | Required Activities | ||||||||||||||||||
1) Initial stack test and report (PM, dioxins/furans, | Included in E. | varies | $23,280 | 1 | 0 | 0 | 0 | 0 | 0 | 291 | $0 | $0 | 0 | c | |||||
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) | |||||||||||||||||||
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) | Included in E. | 182 | $14,533 | 1 | 0 | 31 | 0 | 0 | 0 | 5,632 | $0 | $450,533 | 31 | e | |||||
3) | Operator training and qualification | ||||||||||||||||||
a) Establish and teach operator qualification course | 64 | 0 | $0 | 1 | 64 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
b) Obtain operator qualification | 72 | 0 | $0 | 1 | 72 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 20 | 240 | 12 | 24 | 0 | $9,825 | $0 | 20 | e | ||||||
d) Initial review of site-specific information | Included in a. | ||||||||||||||||||
e) Annual review of site-specific information | 8 | 0 | $0 | 1 | 8 | 20 | 160 | 8 | 16 | 0 | $6,550 | $0 | 20 | e | |||||
4) Establish operating parameters (maximum and minimum) | 40 | Included in B.1. | $0 | 1 | 40 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||||
a) Initial costs | 17 | 0 | $0 | 1 | 17 | 0 | 0 | 0 | 0 | 0 | $0 | $279,300 | 0 | c,f | |||||
b) Annual costs | 17 | 0 | $31,778 | 1 | 17 | 0 | 0 | 0 | 0 | 0 | $0 | $985,108 | 0 | e,g | |||||
C. | Create Information | Included in 3.B | |||||||||||||||||
D. | Gather Information | Included in 3.E | |||||||||||||||||
E. | Report Preparation | ||||||||||||||||||
1) Notification of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Notification of initial CMS Demonstration | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
3) Report of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 8 | 0 | $7.50 | 1 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
4) Report of initial CMS demonstration | Included in 3.B.5 | ||||||||||||||||||
5) Report prior to construction (includes siting analysis) | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
6) Report prior to initial start-up | |||||||||||||||||||
a) Without site specific parameter petition | 6 | 0 | $0 | 1 | 6 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
b) With site specific parameter petition | 14 | 0 | $0 | 1 | 14 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
7) Report of initial stack test | Included in 3.B.1 | ||||||||||||||||||
8) Report established values for site-specific operating parameters | Included in 3.B | 0 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
9) Waste management plan | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
10) Annual Report: | |||||||||||||||||||
a) Results of performance tests conducted during the year | 40 | 0 | $7.50 | 1 | 40 | 31 | 1,240 | 62 | 124 | 0 | $50,765 | $233 | 31 | ||||||
11) Status report for operators that are off-site for more than 2 weeks | 8 | 0 | $0 | 1 | 8 | 2 | 16 | 1 | 2 | 0 | $655 | $0 | 2 | i | |||||
12) Corrective action summary for operators that are off-site for more | |||||||||||||||||||
than 2 weeks | 8 | 0 | $0 | 2 | 16 | 2 | 32 | 2 | 3 | 0 | $1,310 | $0 | 4 | i | |||||
13) Semiannual report of emissions/parameter exceedances | 24 | 0 | $7.50 | 1 | 24 | 2 | 48 | 2 | 5 | 0 | $1,965 | $15 | 2 | j | |||||
ReportingSubtotal | 1,736 | 87 | 174 | 5,923 | $71,070 | 110 | |||||||||||||
4. Recordkeeping Requirements | |||||||||||||||||||
A. Read Instructions | Inculded in 3.A | ||||||||||||||||||
B. Plan Activities | Not applicable | ||||||||||||||||||
C. Implement Activities | Not applicable | ||||||||||||||||||
D. Develop Record System | Not applicable | ||||||||||||||||||
E. Record Information | |||||||||||||||||||
1) Records of operating parameters | Included in 3.B.5.b | 0 | $0 | 52 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Records of periods for which minimum amount of data on operating | |||||||||||||||||||
parameters were not obtained | 0.5 | 0 | $0 | 52 | 26 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
3) Records of malfunction of the unit | 1.5 | 0 | $0 | 1 | 1.5 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
4) Records of exceedances of the operating parameters | 1.5 | 0 | $0 | 1 | 1.5 | 2 | 3 | 0 | 0 | 0 | $123 | $0 | 2 | j | |||||
5) Records of stack tests | Included in 3.E | ||||||||||||||||||
6) Records of siting analysis | Included in 3.E | ||||||||||||||||||
7) Records of persons who have reviewed operating procedures | 1 | 0 | $0 | 1 | 1 | 20 | 20 | 1 | 2 | 0 | $819 | $0 | 20 | ||||||
8) Records of persons who have completed operator training | 1 | 0 | $0 | 1 | 1 | 20 | 20 | 1 | 2 | 0 | $819 | $0 | 20 | ||||||
9) Records of persons whe meet operator qualification criteria | 1 | 0 | $0 | 1 | 1 | 20 | 20 | 1 | 2 | 0 | $819 | $0 | 20 | ||||||
10) Records of monitoring device calibration | Included in 3.B | ||||||||||||||||||
11) Records of site-specific documentation | 24 | 0 | $0 | 1 | 24 | 20 | 480 | 24 | 48 | 0 | $19,651 | $0 | 20 | ||||||
F. Personnel Training | Included in 3.B | ||||||||||||||||||
G. Time for Audits | Not applicable | ||||||||||||||||||
Recordkeeping Subtotal | 543 | 27.15 | 54.3 | 0 | $22,230 | $0 | 82 | ||||||||||||
TOTAL: | 2,279 | 114 | 228 | 5,923 | $93,300 | $1,715,189 | 192 | ||||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||||
Summary of Respondent Burden | 2,621 | $93,300 | $1,715,189 | $1,808,489 | |||||||||||||||
Annualized Capital and Startup | $279,300 | $279,300 | |||||||||||||||||
O & M Summary | $985,108 | $985,108 | |||||||||||||||||
FOOTNOTES | |||||||||||||||||||
a | Based on the total number of existing units expected to continue operating once the guidelines become effective. | ||||||||||||||||||
b | Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. | ||||||||||||||||||
c | One-time only costs. | ||||||||||||||||||
d | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||||
e | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||||
f | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
g | Based on the sum of the calculated annual cost for each monitoring system required for incinerators. | ||||||||||||||||||
h | Assumed that one-third of the facilities will petition for site-specific parameters. | ||||||||||||||||||
i | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||||
j | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||||
k | Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. | ||||||||||||||||||
l | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
Table 2.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD, Energy Recovery Units (Solids) | ||||||||
Year | Technical Hours | Management Hours | Clerical Hours | Total Hours | Testing Contractor Hoursa | Labor Costs | Non-Labor (O&M) Costs | Total Costs |
1 | 12,152 | 608 | 1,215 | 13,975 | 291 | $497,493 | $2,226,966 | $2,724,459 |
2 | 2,279 | 114 | 228 | 2,621 | 5,923 | $93,300 | $1,715,189 | $1,808,489 |
3 | 2,279 | 114 | 228 | 2,621 | 5,923 | $93,300 | $1,715,189 | $1,808,489 |
Total | 16,710 | 836 | 1,671 | 19,217 | 12,136 | $684,094 | $5,657,344 | $6,341,438 |
Average | 5,570 | 279 | 557 | 6,406 | 4,045 | $228,031 | $1,885,781 | $2,113,813 |
a. Test contractor costs are accounted for in the non-labor category |
Table 3.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines | |||||||||||||||||||
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Small Remote Incinerators | |||||||||||||||||||
(A) | Emission | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||||||
Respondent | Testing | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Emission | Total | Total | Total | Footnotes | ||||||
Hours per | Contractor | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Testing | Labor Costs | Non-Labor | Responses | |||||||
Occurrence | Hours | Per | Per | Respondent | Per Year (a) | Per Year | Per Year | Per Year | Contractor | Per Year | Costs | Per Year | |||||||
(Technical | Per | Occurrence | Respondent | Per Year | Hours Per | (b) | Per Year | ||||||||||||
Burden Item | hours) | Occurrence | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | Year | |||||||||||
1. | Applications | Not applicable | |||||||||||||||||
2. | Surveys and Studies | Not applicable | |||||||||||||||||
3. | Reporting Requirements | ||||||||||||||||||
A. | Read and Understand Rule Requirements | 1 | 0 | $100 | 1 | 1 | 16 | 16 | 1 | 2 | 0 | $655 | $1,600 | 16 | c,d,l | ||||
B. | Required Activities | ||||||||||||||||||
1) Initial stack test and report (PM, dioxins/furans, | Included in E. | varies | $21,377 | 1 | 0 | 19 | 0 | 0 | 0 | 267 | $0 | $406,167 | 19 | c | |||||
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) | |||||||||||||||||||
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) | Included in E. | 182 | $14,533 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e | |||||
3) | Operator training and qualification | ||||||||||||||||||
a) Establish and teach operator qualification course | 64 | 0 | $0 | 1 | 64 | 16 | 1,024 | 51 | 102 | 0 | $41,922 | $0 | 16 | c | |||||
b) Obtain operator qualification | 72 | 0 | $0 | 1 | 72 | 16 | 1,152 | 58 | 115 | 0 | $47,162 | $0 | 16 | c | |||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e | ||||||
d) Initial review of site-specific information | Included in a. | ||||||||||||||||||
e) Annual review of site-specific information | 8 | 0 | $0 | 1 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e | |||||
4) Establish operating parameters (maximum and minimum) | 40 | Included in B.1. | $0 | 1 | 40 | 19 | 760 | 38 | 76 | 0 | $31,114 | $0 | 19 | c | |||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||||
a) Initial costs | 17 | 0 | $368 | 1 | 17 | 19 | 323 | 16 | 32 | 0 | $13,223 | $7,000 | 19 | c,f | |||||
b) Annual costs | 17 | 0 | $1,242 | 1 | 17 | 19 | 323 | 16 | 32 | 0 | $13,223 | $23,600 | 19 | e,g | |||||
C. | Create Information | Included in 3.B | |||||||||||||||||
D. | Gather Information | Included in 3.E | |||||||||||||||||
E. | Report Preparation | ||||||||||||||||||
1) Notification of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 2 | 0 | $0 | 1 | 2 | 19 | 38 | 2 | 4 | 0 | $1,556 | $0 | 19 | ||||||
b) Fugitive Ash Emissions | 1 | 0 | $0 | 1 | 1 | 19 | 19 | 1 | 2 | 0 | $778 | $0 | 19 | ||||||
2) Notification of initial CMS Demonstration | 2 | 0 | $0 | 1 | 2 | 16 | 32 | 2 | 3 | 0 | $1,310 | $0 | 16 | ||||||
3) Report of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 8 | 0 | $7.50 | 1 | 8 | 19 | 152 | 8 | 15 | 0 | $6,223 | $143 | 19 | ||||||
b) Fugitive Ash Emissions | 2 | 0 | $0 | 1 | 2 | 19 | 38 | 2 | 4 | 0 | $1,556 | $0 | 19 | ||||||
4) Report of initial CMS demonstration | Included in 3.B.5 | ||||||||||||||||||
5) Report prior to construction (includes siting analysis) | 160 | 0 | $0 | 1 | 160 | 16 | 2,560 | 128 | 256 | 0 | $104,804 | $0 | 16 | c | |||||
6) Report prior to initial start-up | |||||||||||||||||||
a) Without site specific parameter petition | 6 | 0 | $0 | 1 | 6 | 10 | 60 | 3 | 6 | 0 | $2,456 | $0 | 10 | c,h | |||||
b) With site specific parameter petition | 14 | 0 | $0 | 1 | 14 | 6 | 84 | 4 | 8 | 0 | $3,439 | $0 | 6 | c,h | |||||
7) Report of initial stack test | Included in 3.B.1 | ||||||||||||||||||
8) Report established values for site-specific operating parameters | Included in 3.B | 0 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
9) Waste management plan | 160 | 0 | $0 | 1 | 160 | 16 | 2,560 | 128 | 256 | 0 | $104,804 | $0 | 16 | c | |||||
10) Annual Report: | |||||||||||||||||||
a) Results of performance tests conducted during the year | 40 | 0 | $7.50 | 1 | 40 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
11) Status report for operators that are off-site for more than 2 weeks | 8 | 0 | $0 | 1 | 8 | 2 | 16 | 1 | 2 | 0 | $655 | $0 | 2 | i | |||||
12) Corrective action summary for operators that are off-site for more | |||||||||||||||||||
than 2 weeks | 8 | 0 | $0 | 2 | 16 | 2 | 32 | 2 | 3 | 0 | $1,310 | $0 | 4 | i | |||||
13) Semiannual report of emissions/parameter exceedances | 24 | 0 | $7.50 | 1 | 24 | 2 | 48 | 2 | 5 | 0 | $1,965 | $15 | 2 | j | |||||
ReportingSubtotal | 9,237 | 462 | 924 | 267 | $378,155 | 272 | |||||||||||||
4. Recordkeeping Requirements | |||||||||||||||||||
A. Read Instructions | Inculded in 3.A | ||||||||||||||||||
B. Plan Activities | Not applicable | ||||||||||||||||||
C. Implement Activities | Not applicable | ||||||||||||||||||
D. Develop Record System | Not applicable | ||||||||||||||||||
E. Record Information | |||||||||||||||||||
1) Records of operating parameters | Included in 3.B.5.b | 0 | $0 | 52 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Records of periods for which minimum amount of data on operating | |||||||||||||||||||
parameters were not obtained | 0.5 | 0 | $0 | 52 | 26 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
3) Records of malfunction of the unit | 1.5 | 0 | $0 | 1 | 1.5 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
4) Records of exceedances of the operating parameters | 1.5 | 0 | $0 | 1 | 1.5 | 2 | 3 | 0 | 0 | 0 | $123 | $0 | 2 | j | |||||
5) Records of stack tests | Included in 3.E | ||||||||||||||||||
6) Records of siting analysis | Included in 3.E | ||||||||||||||||||
7) Records of persons who have reviewed operating procedures | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
8) Records of persons who have completed operator training | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
9) Records of persons whe meet operator qualification criteria | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
10) Records of monitoring device calibration | Included in 3.B | ||||||||||||||||||
11) Records of site-specific documentation | 24 | 0 | $0 | 1 | 24 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
F. Personnel Training | Included in 3.B | ||||||||||||||||||
G. Time for Audits | Not applicable | ||||||||||||||||||
Recordkeeping Subtotal | 3 | 0.15 | 0.3 | 0 | $123 | $0 | 2 | ||||||||||||
TOTAL: | 9,240 | 462 | 924 | 267 | $378,278 | $438,524 | 274 | ||||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||||
Summary of Respondent Burden | 10,626 | $378,278 | $438,524 | $816,802 | |||||||||||||||
Annualized Capital and Startup | $414,767 | $414,767 | |||||||||||||||||
O & M Summary | $23,600 | $23,600 | |||||||||||||||||
FOOTNOTES | |||||||||||||||||||
a | Based on the total number of existing units expected to continue operating once the guidelines become effective. | ||||||||||||||||||
b | Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. | ||||||||||||||||||
c | One-time only costs. | ||||||||||||||||||
d | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||||
e | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||||
f | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
g | Based on the sum of the calculated annual cost for each monitoring system required for incinerators. | ||||||||||||||||||
h | Assumed that one-third of the facilities will petition for site-specific parameters. | ||||||||||||||||||
i | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||||
j | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||||
k | Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. | ||||||||||||||||||
l | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
Table 3.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines | |||||||||||||||||||
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Small Remote Incinerators | |||||||||||||||||||
(A) | Emission | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||||||
Respondent | Testing | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Emission | Total | Total | Total | Footnotes | ||||||
Hours per | Contractor | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Testing | Labor Costs | Non-Labor | Responses | |||||||
Occurrence | Hours | Per | Per | Respondent | Per Year (a) | Per Year | Per Year | Per Year | Contractor | Per Year | Costs | Per Year | |||||||
(Technical | Per | Occurrence | Respondent | Per Year | Hours Per | (b) | Per Year | ||||||||||||
Burden Item | hours) | Occurrence | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | Year | |||||||||||
1. | Applications | Not applicable | |||||||||||||||||
2. | Surveys and Studies | Not applicable | |||||||||||||||||
3. | Reporting Requirements | ||||||||||||||||||
A. | Read and Understand Rule Requirements | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,d,l | ||||
B. | Required Activities | ||||||||||||||||||
1) Initial stack test and report (PM, dioxins/furans, | Included in E. | varies | $21,377 | 1 | 0 | 0 | 0 | 0 | 0 | 267 | $0 | $0 | 0 | c | |||||
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) | |||||||||||||||||||
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) | Included in E. | 182 | $14,533 | 1 | 0 | 19 | 0 | 0 | 0 | 3,452 | $0 | $276,133 | 19 | e | |||||
3) | Operator training and qualification | ||||||||||||||||||
a) Establish and teach operator qualification course | 64 | 0 | $0 | 1 | 64 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
b) Obtain operator qualification | 72 | 0 | $0 | 1 | 72 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 16 | 192 | 10 | 19 | 0 | $7,860 | $0 | 16 | e | ||||||
d) Initial review of site-specific information | Included in a. | ||||||||||||||||||
e) Annual review of site-specific information | 8 | 0 | $0 | 1 | 8 | 16 | 128 | 6 | 13 | 0 | $5,240 | $0 | 16 | e | |||||
4) Establish operating parameters (maximum and minimum) | 40 | Included in B.1. | $0 | 1 | 40 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||||
a) Initial costs | 17 | 0 | $7,000 | 1 | 17 | 0 | 0 | 0 | 0 | 0 | $0 | $7,000 | 0 | c,f | |||||
b) Annual costs | 17 | 0 | $23,600 | 1 | 17 | 0 | 0 | 0 | 0 | 0 | $0 | $23,600 | 0 | e,g | |||||
C. | Create Information | Included in 3.B | |||||||||||||||||
D. | Gather Information | Included in 3.E | |||||||||||||||||
E. | Report Preparation | ||||||||||||||||||
1) Notification of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Notification of initial CMS Demonstration | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
3) Report of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 8 | 0 | $7.50 | 1 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
4) Report of initial CMS demonstration | Included in 3.B.5 | ||||||||||||||||||
5) Report prior to construction (includes siting analysis) | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
6) Report prior to initial start-up | |||||||||||||||||||
a) Without site specific parameter petition | 6 | 0 | $0 | 1 | 6 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
b) With site specific parameter petition | 14 | 0 | $0 | 1 | 14 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
7) Report of initial stack test | Included in 3.B.1 | ||||||||||||||||||
8) Report established values for site-specific operating parameters | Included in 3.B | 0 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
9) Waste management plan | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
10) Annual Report: | |||||||||||||||||||
a) Results of performance tests conducted during the year | 40 | 0 | $7.50 | 1 | 40 | 19 | 760 | 38 | 76 | 0 | $31,114 | $143 | 19 | ||||||
11) Status report for operators that are off-site for more than 2 weeks | 8 | 0 | $0 | 1 | 8 | 2 | 16 | 1 | 2 | 0 | $655 | $0 | 2 | i | |||||
12) Corrective action summary for operators that are off-site for more | |||||||||||||||||||
than 2 weeks | 8 | 0 | $0 | 2 | 16 | 2 | 32 | 2 | 3 | 0 | $1,310 | $0 | 4 | i | |||||
13) Semiannual report of emissions/parameter exceedances | 24 | 0 | $7.50 | 1 | 24 | 2 | 48 | 2 | 5 | 0 | $1,965 | $15 | 2 | j | |||||
ReportingSubtotal | 1,176 | 59 | 118 | 3,719 | $48,144 | 78 | |||||||||||||
4. Recordkeeping Requirements | |||||||||||||||||||
A. Read Instructions | Inculded in 3.A | ||||||||||||||||||
B. Plan Activities | Not applicable | ||||||||||||||||||
C. Implement Activities | Not applicable | ||||||||||||||||||
D. Develop Record System | Not applicable | ||||||||||||||||||
E. Record Information | |||||||||||||||||||
1) Records of operating parameters | Included in 3.B.5.b | 0 | $0 | 52 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Records of periods for which minimum amount of data on operating | |||||||||||||||||||
parameters were not obtained | 0.5 | 0 | $0 | 52 | 26 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
3) Records of malfunction of the unit | 1.5 | 0 | $0 | 1 | 1.5 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
4) Records of exceedances of the operating parameters | 1.5 | 0 | $0 | 1 | 1.5 | 2 | 3 | 0 | 0 | 0 | $123 | $0 | 2 | j | |||||
5) Records of stack tests | Included in 3.E | ||||||||||||||||||
6) Records of siting analysis | Included in 3.E | ||||||||||||||||||
7) Records of persons who have reviewed operating procedures | 1 | 0 | $0 | 1 | 1 | 16 | 16 | 1 | 2 | 0 | $655 | $0 | 16 | ||||||
8) Records of persons who have completed operator training | 1 | 0 | $0 | 1 | 1 | 16 | 16 | 1 | 2 | 0 | $655 | $0 | 16 | ||||||
9) Records of persons whe meet operator qualification criteria | 1 | 0 | $0 | 1 | 1 | 16 | 16 | 1 | 2 | 0 | $655 | $0 | 16 | ||||||
10) Records of monitoring device calibration | Included in 3.B | ||||||||||||||||||
11) Records of site-specific documentation | 24 | 0 | $0 | 1 | 24 | 16 | 384 | 19 | 38 | 0 | $15,721 | $0 | 16 | ||||||
F. Personnel Training | Included in 3.B | ||||||||||||||||||
G. Time for Audits | Not applicable | ||||||||||||||||||
Recordkeeping Subtotal | 435 | 21.75 | 43.5 | 0 | $17,809 | $0 | 66 | ||||||||||||
TOTAL: | 1,611 | 81 | 161 | 3,719 | $65,953 | $306,891 | 144 | ||||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||||
Summary of Respondent Burden | 1,853 | $65,953 | $306,891 | $372,844 | |||||||||||||||
Annualized Capital and Startup | $7,000 | $7,000 | |||||||||||||||||
O & M Summary | $23,600 | $23,600 | |||||||||||||||||
FOOTNOTES | |||||||||||||||||||
a | Based on the total number of existing units expected to continue operating once the guidelines become effective. | ||||||||||||||||||
b | Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. | ||||||||||||||||||
c | One-time only costs. | ||||||||||||||||||
d | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||||
e | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||||
f | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
g | Based on the sum of the calculated annual cost for each monitoring system required for incinerators. | ||||||||||||||||||
h | Assumed that one-third of the facilities will petition for site-specific parameters. | ||||||||||||||||||
i | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||||
j | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||||
k | Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. | ||||||||||||||||||
l | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
Table 3.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines | |||||||||||||||||||
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Small Remote Incinerators | |||||||||||||||||||
(A) | Emission | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||||||
Respondent | Testing | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Emission | Total | Total | Total | Footnotes | ||||||
Hours per | Contractor | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Testing | Labor Costs | Non-Labor | Responses | |||||||
Occurrence | Hours | Per | Per | Respondent | Per Year (a) | Per Year | Per Year | Per Year | Contractor | Per Year | Costs | Per Year | |||||||
(Technical | Per | Occurrence | Respondent | Per Year | Hours Per | (b) | Per Year | ||||||||||||
Burden Item | hours) | Occurrence | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | Year | |||||||||||
1. | Applications | Not applicable | |||||||||||||||||
2. | Surveys and Studies | Not applicable | |||||||||||||||||
3. | Reporting Requirements | ||||||||||||||||||
A. | Read and Understand Rule Requirements | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,d,l | ||||
B. | Required Activities | ||||||||||||||||||
1) Initial stack test and report (PM, dioxins/furans, | Included in E. | varies | $21,377 | 1 | 0 | 0 | 0 | 0 | 0 | 267 | $0 | $0 | 0 | c | |||||
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) | |||||||||||||||||||
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) | Included in E. | 182 | $14,533 | 1 | 0 | 19 | 0 | 0 | 0 | 3,452 | $0 | $276,133 | 19 | e | |||||
3) | Operator training and qualification | ||||||||||||||||||
a) Establish and teach operator qualification course | 64 | 0 | $0 | 1 | 64 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
b) Obtain operator qualification | 72 | 0 | $0 | 1 | 72 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 16 | 192 | 10 | 19 | 0 | $7,860 | $0 | 16 | e | ||||||
d) Initial review of site-specific information | Included in a. | ||||||||||||||||||
e) Annual review of site-specific information | 8 | 0 | $0 | 1 | 8 | 16 | 128 | 6 | 13 | 0 | $5,240 | $0 | 16 | e | |||||
4) Establish operating parameters (maximum and minimum) | 40 | Included in B.1. | $0 | 1 | 40 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||||
a) Initial costs | 17 | 0 | $7,000 | 1 | 17 | 0 | 0 | 0 | 0 | 0 | $0 | $7,000 | 0 | c,f | |||||
b) Annual costs | 17 | 0 | $23,600 | 1 | 17 | 0 | 0 | 0 | 0 | 0 | $0 | $23,600 | 0 | e,g | |||||
C. | Create Information | Included in 3.B | |||||||||||||||||
D. | Gather Information | Included in 3.E | |||||||||||||||||
E. | Report Preparation | ||||||||||||||||||
1) Notification of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Notification of initial CMS Demonstration | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
3) Report of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 8 | 0 | $7.50 | 1 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
4) Report of initial CMS demonstration | Included in 3.B.5 | ||||||||||||||||||
5) Report prior to construction (includes siting analysis) | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
6) Report prior to initial start-up | |||||||||||||||||||
a) Without site specific parameter petition | 6 | 0 | $0 | 1 | 6 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
b) With site specific parameter petition | 14 | 0 | $0 | 1 | 14 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
7) Report of initial stack test | Included in 3.B.1 | ||||||||||||||||||
8) Report established values for site-specific operating parameters | Included in 3.B | 0 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
9) Waste management plan | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
10) Annual Report: | |||||||||||||||||||
a) Results of performance tests conducted during the year | 40 | 0 | $7.50 | 1 | 40 | 19 | 760 | 38 | 76 | 0 | $31,114 | $143 | 19 | ||||||
11) Status report for operators that are off-site for more than 2 weeks | 8 | 0 | $0 | 1 | 8 | 2 | 16 | 1 | 2 | 0 | $655 | $0 | 2 | i | |||||
12) Corrective action summary for operators that are off-site for more | |||||||||||||||||||
than 2 weeks | 8 | 0 | $0 | 2 | 16 | 2 | 32 | 2 | 3 | 0 | $1,310 | $0 | 4 | i | |||||
13) Semiannual report of emissions/parameter exceedances | 24 | 0 | $7.50 | 1 | 24 | 2 | 48 | 2 | 5 | 0 | $1,965 | $15 | 2 | j | |||||
ReportingSubtotal | 1,176 | 59 | 118 | 3,719 | $48,144 | 78 | |||||||||||||
4. Recordkeeping Requirements | |||||||||||||||||||
A. Read Instructions | Inculded in 3.A | ||||||||||||||||||
B. Plan Activities | Not applicable | ||||||||||||||||||
C. Implement Activities | Not applicable | ||||||||||||||||||
D. Develop Record System | Not applicable | ||||||||||||||||||
E. Record Information | |||||||||||||||||||
1) Records of operating parameters | Included in 3.B.5.b | 0 | $0 | 52 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Records of periods for which minimum amount of data on operating | |||||||||||||||||||
parameters were not obtained | 0.5 | 0 | $0 | 52 | 26 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
3) Records of malfunction of the unit | 1.5 | 0 | $0 | 1 | 1.5 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
4) Records of exceedances of the operating parameters | 1.5 | 0 | $0 | 1 | 1.5 | 2 | 3 | 0 | 0 | 0 | $123 | $0 | 2 | j | |||||
5) Records of stack tests | Included in 3.E | ||||||||||||||||||
6) Records of siting analysis | Included in 3.E | ||||||||||||||||||
7) Records of persons who have reviewed operating procedures | 1 | 0 | $0 | 1 | 1 | 16 | 16 | 1 | 2 | 0 | $655 | $0 | 16 | ||||||
8) Records of persons who have completed operator training | 1 | 0 | $0 | 1 | 1 | 16 | 16 | 1 | 2 | 0 | $655 | $0 | 16 | ||||||
9) Records of persons whe meet operator qualification criteria | 1 | 0 | $0 | 1 | 1 | 16 | 16 | 1 | 2 | 0 | $655 | $0 | 16 | ||||||
10) Records of monitoring device calibration | Included in 3.B | ||||||||||||||||||
11) Records of site-specific documentation | 24 | 0 | $0 | 1 | 24 | 16 | 384 | 19 | 38 | 0 | $15,721 | $0 | 16 | ||||||
F. Personnel Training | Included in 3.B | ||||||||||||||||||
G. Time for Audits | Not applicable | ||||||||||||||||||
Recordkeeping Subtotal | 435 | 21.75 | 43.5 | 0 | $17,809 | $0 | 66 | ||||||||||||
TOTAL: | 1,611 | 81 | 161 | 3,719 | $65,953 | $306,891 | 144 | ||||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||||
Summary of Respondent Burden | 1,853 | $65,953 | $306,891 | $372,844 | |||||||||||||||
Annualized Capital and Startup | $7,000 | $7,000 | |||||||||||||||||
O & M Summary | $23,600 | $23,600 | |||||||||||||||||
FOOTNOTES | |||||||||||||||||||
a | Based on the total number of existing units expected to continue operating once the guidelines become effective. | ||||||||||||||||||
b | Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. | ||||||||||||||||||
c | One-time only costs. | ||||||||||||||||||
d | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||||
e | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||||
f | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
g | Based on the sum of the calculated annual cost for each monitoring system required for incinerators. | ||||||||||||||||||
h | Assumed that one-third of the facilities will petition for site-specific parameters. | ||||||||||||||||||
i | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||||
j | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||||
k | Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. | ||||||||||||||||||
l | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
Table 3.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD, Small Remote Incinerators | ||||||||
Year | Technical Hours | Management Hours | Clerical Hours | Total Hours | Testing Contractor Hoursa | Labor Costs | Non-Labor (O&M) Costs | Total Costs |
1 | 9,240 | 462 | 924 | 10,626 | 267 | $378,278 | $438,524 | $816,802 |
2 | 1,611 | 81 | 161 | 1,853 | 3,719 | $65,953 | $306,891 | $372,844 |
3 | 1,611 | 81 | 161 | 1,853 | 3,719 | $65,953 | $306,891 | $372,844 |
Total | 12,462 | 623 | 1,246 | 14,331 | 7,705 | $510,184 | $1,052,306 | $1,562,490 |
Average | 4,154 | 208 | 415 | 4,777 | 2,568 | $170,061 | $350,769 | $520,830 |
a. Test contractor costs are accounted for in the non-labor category |
Table 4.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines | |||||||||||||||||||
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Energy Recovery Units (Liquid/Gas) | |||||||||||||||||||
(A) | Emission | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||||||
Respondent | Testing | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Emission | Total | Total | Total | Footnotes | ||||||
Hours per | Contractor | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Testing | Labor Costs | Non-Labor | Responses | |||||||
Occurrence | Hours | Per | Per | Respondent | Per Year (a) | Per Year | Per Year | Per Year | Contractor | Per Year | Costs | Per Year | |||||||
(Technical | Per | Occurrence | Respondent | Per Year | Hours Per | (b) | Per Year | ||||||||||||
Burden Item | hours) | Occurrence | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | Year | |||||||||||
1. | Applications | Not applicable | |||||||||||||||||
2. | Surveys and Studies | Not applicable | |||||||||||||||||
3. | Reporting Requirements | ||||||||||||||||||
A. | Read and Understand Rule Requirements | 1 | 0 | $100 | 1 | 1 | 4 | 4 | 0 | 0 | 0 | $164 | $400 | 4 | c,d,l | ||||
B. | Required Activities | ||||||||||||||||||
1) Initial stack test and report (PM, dioxins/furans, | Included in E. | varies | $40,111 | 1 | 0 | 6 | 0 | 0 | 0 | 501 | $0 | $240,667 | 6 | c | |||||
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) | |||||||||||||||||||
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) | Included in E. | 632 | $50,533 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e | |||||
3) | Operator training and qualification | ||||||||||||||||||
a) Establish and teach operator qualification course | 64 | 0 | $0 | 1 | 64 | 4 | 256 | 13 | 26 | 0 | $10,480 | $0 | 4 | c | |||||
b) Obtain operator qualification | 72 | 0 | $0 | 1 | 72 | 4 | 288 | 14 | 29 | 0 | $11,790 | $0 | 4 | c | |||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e | ||||||
d) Initial review of site-specific information | Included in a. | ||||||||||||||||||
e) Annual review of site-specific information | 8 | 0 | $0 | 1 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e | |||||
4) Establish operating parameters (maximum and minimum) | 40 | Included in B.1. | $0 | 1 | 40 | 6 | 240 | 12 | 24 | 0 | $9,825 | $0 | 6 | c | |||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||||
a) Initial costs | 17 | 0 | $23,056 | 1 | 17 | 6 | 102 | 5 | 10 | 0 | $4,176 | $138,338 | 6 | f | |||||
b) Annual costs | 17 | 0 | $20,632 | 1 | 17 | 6 | 102 | 5 | 10 | 0 | $4,176 | $123,792 | 6 | e,g | |||||
C. | Create Information | Included in 3.B | |||||||||||||||||
D. | Gather Information | Included in 3.E | |||||||||||||||||
E. | Report Preparation | ||||||||||||||||||
1) Notification of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 2 | 0 | $0 | 1 | 2 | 6 | 12 | 1 | 1 | 0 | $491 | $0 | 6 | ||||||
b) Fugitive Ash Emissions | 1 | 0 | $0 | 1 | 1 | 6 | 6 | 0 | 1 | 0 | $246 | $0 | 6 | ||||||
2) Notification of initial CMS Demonstration | 2 | 0 | $0 | 1 | 2 | 4 | 8 | 0 | 1 | 0 | $328 | $0 | 4 | ||||||
3) Report of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 8 | 0 | $7.50 | 1 | 8 | 6 | 48 | 2 | 5 | 0 | $1,965 | $45 | 6 | ||||||
b) Fugitive Ash Emissions | 2 | 0 | $0 | 1 | 2 | 6 | 12 | 1 | 1 | 0 | $491 | $0 | 6 | ||||||
4) Report of initial CMS demonstration | Included in 3.B.5 | ||||||||||||||||||
5) Report prior to construction (includes siting analysis) | 160 | 0 | $0 | 1 | 160 | 4 | 640 | 32 | 64 | 0 | $26,201 | $0 | 4 | c | |||||
6) Report prior to initial start-up | |||||||||||||||||||
a) Without site specific parameter petition | 6 | 0 | $0 | 1 | 6 | 2 | 12 | 1 | 1 | 0 | $491 | $0 | 2 | c,h | |||||
b) With site specific parameter petition | 14 | 0 | $0 | 1 | 14 | 2 | 28 | 1 | 3 | 0 | $1,146 | $0 | 2 | c,h | |||||
7) Report of initial stack test | Included in 3.B.1 | ||||||||||||||||||
8) Report established values for site-specific operating parameters | Included in 3.B | 0 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
9) Waste management plan | 160 | 0 | $0 | 1 | 160 | 4 | 640 | 32 | 64 | 0 | $26,201 | $0 | 4 | c | |||||
10) Annual Report: | |||||||||||||||||||
a) Results of performance tests conducted during the year | 40 | 0 | $7.50 | 1 | 40 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
11) Status report for operators that are off-site for more than 2 weeks | 8 | 0 | $0 | 1 | 8 | 1 | 8 | 0 | 1 | 0 | $328 | $0 | 1 | i | |||||
12) Corrective action summary for operators that are off-site for more | |||||||||||||||||||
than 2 weeks | 8 | 0 | $0 | 2 | 16 | 1 | 16 | 1 | 2 | 0 | $655 | $0 | 2 | i | |||||
13) Semiannual report of emissions/parameter exceedances | 24 | 0 | $7.50 | 1 | 24 | 1 | 24 | 1 | 2 | 0 | $983 | $8 | 1 | j | |||||
ReportingSubtotal | 2,446 | 122 | 245 | 501 | $100,137 | 80 | |||||||||||||
4. Recordkeeping Requirements | |||||||||||||||||||
A. Read Instructions | Inculded in 3.A | ||||||||||||||||||
B. Plan Activities | Not applicable | ||||||||||||||||||
C. Implement Activities | Not applicable | ||||||||||||||||||
D. Develop Record System | Not applicable | ||||||||||||||||||
E. Record Information | |||||||||||||||||||
1) Records of operating parameters | Included in 3.B.5.b | 0 | $0 | 52 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Records of periods for which minimum amount of data on operating | |||||||||||||||||||
parameters were not obtained | 0.5 | 0 | $0 | 52 | 26 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
3) Records of malfunction of the unit | 1.5 | 0 | $0 | 1 | 1.5 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
4) Records of exceedances of the operating parameters | 1.5 | 0 | $0 | 1 | 1.5 | 1 | 2 | 0 | 0 | 0 | $61 | $0 | 1 | j | |||||
5) Records of stack tests | Included in 3.E | ||||||||||||||||||
6) Records of siting analysis | Included in 3.E | ||||||||||||||||||
7) Records of persons who have reviewed operating procedures | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
8) Records of persons who have completed operator training | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
9) Records of persons whe meet operator qualification criteria | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
10) Records of monitoring device calibration | Included in 3.B | ||||||||||||||||||
11) Records of site-specific documentation | 24 | 0 | $0 | 1 | 24 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
F. Personnel Training | Included in 3.B | ||||||||||||||||||
G. Time for Audits | Not applicable | ||||||||||||||||||
Recordkeeping Subtotal | 1.5 | 0.075 | 0.15 | 0 | $61 | $0 | 1 | ||||||||||||
TOTAL: | 2,448 | 122 | 245 | 501 | $100,199 | $503,249 | 81 | ||||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||||
Summary of Respondent Burden | 2,815 | $100,199 | $503,249 | $603,448 | |||||||||||||||
Annualized Capital and Startup | $379,405 | $379,405 | |||||||||||||||||
O & M Summary | $123,792 | $123,792 | |||||||||||||||||
FOOTNOTES | |||||||||||||||||||
a | Based on the total number of existing units expected to continue operating once the guidelines become effective. | ||||||||||||||||||
b | Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. | ||||||||||||||||||
c | One-time only costs. | ||||||||||||||||||
d | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||||
e | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||||
f | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
g | Based on the sum of the calculated annual cost for each monitoring system required for incinerators. | ||||||||||||||||||
h | Assumed that one-third of the facilities will petition for site-specific parameters. | ||||||||||||||||||
i | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||||
j | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||||
k | Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. | ||||||||||||||||||
l | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
Table 4.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines | |||||||||||||||||||
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Energy Recovery Units (Liquid/Gas) | |||||||||||||||||||
(A) | Emission | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||||||
Respondent | Testing | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Emission | Total | Total | Total | Footnotes | ||||||
Hours per | Contractor | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Testing | Labor Costs | Non-Labor | Responses | |||||||
Occurrence | Hours | Per | Per | Respondent | Per Year (a) | Per Year | Per Year | Per Year | Contractor | Per Year | Costs | Per Year | |||||||
(Technical | Per | Occurrence | Respondent | Per Year | Hours Per | (b) | Per Year | ||||||||||||
Burden Item | hours) | Occurrence | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | Year | |||||||||||
1. | Applications | Not applicable | |||||||||||||||||
2. | Surveys and Studies | Not applicable | |||||||||||||||||
3. | Reporting Requirements | ||||||||||||||||||
A. | Read and Understand Rule Requirements | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,d,l | ||||
B. | Required Activities | ||||||||||||||||||
1) Initial stack test and report (PM, dioxins/furans, | Included in E. | varies | $40,111 | 1 | 0 | 0 | 0 | 0 | 0 | 501 | $0 | $0 | 0 | c | |||||
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) | |||||||||||||||||||
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) | Included in E. | 632 | $50,533 | 1 | 0 | 6 | 0 | 0 | 0 | 3,790 | $0 | $303,200 | 6 | e | |||||
3) | Operator training and qualification | ||||||||||||||||||
a) Establish and teach operator qualification course | 64 | 0 | $0 | 1 | 64 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
b) Obtain operator qualification | 72 | 0 | $0 | 1 | 72 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 4 | 48 | 2 | 5 | 0 | $1,965 | $0 | 4 | e | ||||||
d) Initial review of site-specific information | Included in a. | ||||||||||||||||||
e) Annual review of site-specific information | 8 | 0 | $0 | 1 | 8 | 4 | 32 | 2 | 3 | 0 | $1,310 | $0 | 4 | e | |||||
4) Establish operating parameters (maximum and minimum) | 40 | Included in B.1. | $0 | 1 | 40 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||||
a) Initial costs | 17 | 0 | $0 | 1 | 17 | 0 | 0 | 0 | 0 | 0 | $0 | $121,292 | 0 | c,f | |||||
b) Annual costs | 17 | 0 | $20,632 | 1 | 17 | 0 | 0 | 0 | 0 | 0 | $0 | $123,792 | 0 | e,g | |||||
C. | Create Information | Included in 3.B | |||||||||||||||||
D. | Gather Information | Included in 3.E | |||||||||||||||||
E. | Report Preparation | ||||||||||||||||||
1) Notification of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Notification of initial CMS Demonstration | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
3) Report of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 8 | 0 | $7.50 | 1 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
4) Report of initial CMS demonstration | Included in 3.B.5 | ||||||||||||||||||
5) Report prior to construction (includes siting analysis) | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
6) Report prior to initial start-up | |||||||||||||||||||
a) Without site specific parameter petition | 6 | 0 | $0 | 1 | 6 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
b) With site specific parameter petition | 14 | 0 | $0 | 1 | 14 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
7) Report of initial stack test | Included in 3.B.1 | ||||||||||||||||||
8) Report established values for site-specific operating parameters | Included in 3.B | 0 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
9) Waste management plan | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
10) Annual Report: | |||||||||||||||||||
a) Results of performance tests conducted during the year | 40 | 0 | $7.50 | 1 | 40 | 6 | 240 | 12 | 24 | 0 | $9,825 | $45 | 6 | ||||||
11) Status report for operators that are off-site for more than 2 weeks | 8 | 0 | $0 | 1 | 8 | 1 | 8 | 0 | 1 | 0 | $328 | $0 | 1 | i | |||||
12) Corrective action summary for operators that are off-site for more | |||||||||||||||||||
than 2 weeks | 8 | 0 | $0 | 2 | 16 | 1 | 16 | 1 | 2 | 0 | $655 | $0 | 2 | i | |||||
13) Semiannual report of emissions/parameter exceedances | 24 | 0 | $7.50 | 1 | 24 | 1 | 24 | 1 | 2 | 0 | $983 | $8 | 1 | j | |||||
ReportingSubtotal | 368 | 18 | 37 | 4,291 | $15,066 | 24 | |||||||||||||
4. Recordkeeping Requirements | |||||||||||||||||||
A. Read Instructions | Inculded in 3.A | ||||||||||||||||||
B. Plan Activities | Not applicable | ||||||||||||||||||
C. Implement Activities | Not applicable | ||||||||||||||||||
D. Develop Record System | Not applicable | ||||||||||||||||||
E. Record Information | |||||||||||||||||||
1) Records of operating parameters | Included in 3.B.5.b | 0 | $0 | 52 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Records of periods for which minimum amount of data on operating | |||||||||||||||||||
parameters were not obtained | 0.5 | 0 | $0 | 52 | 26 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
3) Records of malfunction of the unit | 1.5 | 0 | $0 | 1 | 1.5 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
4) Records of exceedances of the operating parameters | 1.5 | 0 | $0 | 1 | 1.5 | 1 | 2 | 0 | 0 | 0 | $61 | $0 | 1 | j | |||||
5) Records of stack tests | Included in 3.E | ||||||||||||||||||
6) Records of siting analysis | Included in 3.E | ||||||||||||||||||
7) Records of persons who have reviewed operating procedures | 1 | 0 | $0 | 1 | 1 | 4 | 4 | 0 | 0 | 0 | $164 | $0 | 4 | ||||||
8) Records of persons who have completed operator training | 1 | 0 | $0 | 1 | 1 | 4 | 4 | 0 | 0 | 0 | $164 | $0 | 4 | ||||||
9) Records of persons whe meet operator qualification criteria | 1 | 0 | $0 | 1 | 1 | 4 | 4 | 0 | 0 | 0 | $164 | $0 | 4 | ||||||
10) Records of monitoring device calibration | Included in 3.B | ||||||||||||||||||
11) Records of site-specific documentation | 24 | 0 | $0 | 1 | 24 | 4 | 96 | 5 | 10 | 0 | $3,930 | $0 | 4 | ||||||
F. Personnel Training | Included in 3.B | ||||||||||||||||||
G. Time for Audits | Not applicable | ||||||||||||||||||
Recordkeeping Subtotal | 109.5 | 5.475 | 10.95 | 0 | $4,483 | $0 | 17 | ||||||||||||
TOTAL: | 478 | 24 | 48 | 4,291 | $19,548 | $548,337 | 41 | ||||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||||
Summary of Respondent Burden | 549 | $19,548 | $548,337 | $567,885 | |||||||||||||||
Annualized Capital and Startup | $121,292 | $121,292 | |||||||||||||||||
O & M Summary | $123,792 | $123,792 | |||||||||||||||||
FOOTNOTES | |||||||||||||||||||
a | Based on the total number of existing units expected to continue operating once the guidelines become effective. | ||||||||||||||||||
b | Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. | ||||||||||||||||||
c | One-time only costs. | ||||||||||||||||||
d | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||||
e | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||||
f | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
g | Based on the sum of the calculated annual cost for each monitoring system required for incinerators. | ||||||||||||||||||
h | Assumed that one-third of the facilities will petition for site-specific parameters. | ||||||||||||||||||
i | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||||
j | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||||
k | Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. | ||||||||||||||||||
l | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
Table 4.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines | |||||||||||||||||||
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Energy Recovery Units (Liquid/Gas) | |||||||||||||||||||
(A) | Emission | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||||||
Respondent | Testing | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Emission | Total | Total | Total | Footnotes | ||||||
Hours per | Contractor | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Testing | Labor Costs | Non-Labor | Responses | |||||||
Occurrence | Hours | Per | Per | Respondent | Per Year (a) | Per Year | Per Year | Per Year | Contractor | Per Year | Costs | Per Year | |||||||
(Technical | Per | Occurrence | Respondent | Per Year | Hours Per | (b) | Per Year | ||||||||||||
Burden Item | hours) | Occurrence | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | Year | |||||||||||
1. | Applications | Not applicable | |||||||||||||||||
2. | Surveys and Studies | Not applicable | |||||||||||||||||
3. | Reporting Requirements | ||||||||||||||||||
A. | Read and Understand Rule Requirements | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,d,l | ||||
B. | Required Activities | ||||||||||||||||||
1) Initial stack test and report (PM, dioxins/furans, | Included in E. | varies | $40,111 | 1 | 0 | 0 | 0 | 0 | 0 | 501 | $0 | $0 | 0 | c | |||||
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) | |||||||||||||||||||
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) | Included in E. | 632 | $50,533 | 1 | 0 | 6 | 0 | 0 | 0 | 3,790 | $0 | $303,200 | 6 | e | |||||
3) | Operator training and qualification | ||||||||||||||||||
a) Establish and teach operator qualification course | 64 | 0 | $0 | 1 | 64 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
b) Obtain operator qualification | 72 | 0 | $0 | 1 | 72 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 4 | 48 | 2 | 5 | 0 | $1,965 | $0 | 4 | e | ||||||
d) Initial review of site-specific information | Included in a. | ||||||||||||||||||
e) Annual review of site-specific information | 8 | 0 | $0 | 1 | 8 | 4 | 32 | 2 | 3 | 0 | $1,310 | $0 | 4 | e | |||||
4) Establish operating parameters (maximum and minimum) | 40 | Included in B.1. | $0 | 1 | 40 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||||
a) Initial costs | 17 | 0 | $0 | 1 | 17 | 0 | 0 | 0 | 0 | 0 | $0 | $121,292 | 0 | c,f | |||||
b) Annual costs | 17 | 0 | $20,632 | 1 | 17 | 0 | 0 | 0 | 0 | 0 | $0 | $123,792 | 0 | e,g | |||||
C. | Create Information | Included in 3.B | |||||||||||||||||
D. | Gather Information | Included in 3.E | |||||||||||||||||
E. | Report Preparation | ||||||||||||||||||
1) Notification of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Notification of initial CMS Demonstration | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
3) Report of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 8 | 0 | $7.50 | 1 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
4) Report of initial CMS demonstration | Included in 3.B.5 | ||||||||||||||||||
5) Report prior to construction (includes siting analysis) | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
6) Report prior to initial start-up | |||||||||||||||||||
a) Without site specific parameter petition | 6 | 0 | $0 | 1 | 6 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
b) With site specific parameter petition | 14 | 0 | $0 | 1 | 14 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
7) Report of initial stack test | Included in 3.B.1 | ||||||||||||||||||
8) Report established values for site-specific operating parameters | Included in 3.B | 0 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
9) Waste management plan | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
10) Annual Report: | |||||||||||||||||||
a) Results of performance tests conducted during the year | 40 | 0 | $7.50 | 1 | 40 | 6 | 240 | 12 | 24 | 0 | $9,825 | $45 | 6 | ||||||
11) Status report for operators that are off-site for more than 2 weeks | 8 | 0 | $0 | 1 | 8 | 1 | 8 | 0 | 1 | 0 | $328 | $0 | 1 | i | |||||
12) Corrective action summary for operators that are off-site for more | |||||||||||||||||||
than 2 weeks | 8 | 0 | $0 | 2 | 16 | 1 | 16 | 1 | 2 | 0 | $655 | $0 | 2 | i | |||||
13) Semiannual report of emissions/parameter exceedances | 24 | 0 | $7.50 | 1 | 24 | 1 | 24 | 1 | 2 | 0 | $983 | $8 | 1 | j | |||||
ReportingSubtotal | 368 | 18 | 37 | 4,291 | $15,066 | 24 | |||||||||||||
4. Recordkeeping Requirements | |||||||||||||||||||
A. Read Instructions | Inculded in 3.A | ||||||||||||||||||
B. Plan Activities | Not applicable | ||||||||||||||||||
C. Implement Activities | Not applicable | ||||||||||||||||||
D. Develop Record System | Not applicable | ||||||||||||||||||
E. Record Information | |||||||||||||||||||
1) Records of operating parameters | Included in 3.B.5.b | 0 | $0 | 52 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Records of periods for which minimum amount of data on operating | |||||||||||||||||||
parameters were not obtained | 0.5 | 0 | $0 | 52 | 26 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
3) Records of malfunction of the unit | 1.5 | 0 | $0 | 1 | 1.5 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
4) Records of exceedances of the operating parameters | 1.5 | 0 | $0 | 1 | 1.5 | 1 | 2 | 0 | 0 | 0 | $61 | $0 | 1 | j | |||||
5) Records of stack tests | Included in 3.E | ||||||||||||||||||
6) Records of siting analysis | Included in 3.E | ||||||||||||||||||
7) Records of persons who have reviewed operating procedures | 1 | 0 | $0 | 1 | 1 | 4 | 4 | 0 | 0 | 0 | $164 | $0 | 4 | ||||||
8) Records of persons who have completed operator training | 1 | 0 | $0 | 1 | 1 | 4 | 4 | 0 | 0 | 0 | $164 | $0 | 4 | ||||||
9) Records of persons whe meet operator qualification criteria | 1 | 0 | $0 | 1 | 1 | 4 | 4 | 0 | 0 | 0 | $164 | $0 | 4 | ||||||
10) Records of monitoring device calibration | Included in 3.B | ||||||||||||||||||
11) Records of site-specific documentation | 24 | 0 | $0 | 1 | 24 | 4 | 96 | 5 | 10 | 0 | $3,930 | $0 | 4 | ||||||
F. Personnel Training | Included in 3.B | ||||||||||||||||||
G. Time for Audits | Not applicable | ||||||||||||||||||
Recordkeeping Subtotal | 109.5 | 5.475 | 10.95 | 0 | $4,483 | $0 | 17 | ||||||||||||
TOTAL: | 478 | 24 | 48 | 4,291 | $19,548 | $548,337 | 41 | ||||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||||
Summary of Respondent Burden | 549 | $19,548 | $548,337 | $567,885 | |||||||||||||||
Annualized Capital and Startup | $121,292 | $121,292 | |||||||||||||||||
O & M Summary | $123,792 | $123,792 | |||||||||||||||||
FOOTNOTES | |||||||||||||||||||
a | Based on the total number of existing units expected to continue operating once the guidelines become effective. | ||||||||||||||||||
b | Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. | ||||||||||||||||||
c | One-time only costs. | ||||||||||||||||||
d | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||||
e | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||||
f | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
g | Based on the sum of the calculated annual cost for each monitoring system required for incinerators. | ||||||||||||||||||
h | Assumed that one-third of the facilities will petition for site-specific parameters. | ||||||||||||||||||
i | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||||
j | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||||
k | Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. | ||||||||||||||||||
l | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
Table 4.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD, Energy Recovery Units (Liquid/Gas) | ||||||||
Year | Technical Hours | Management Hours | Clerical Hours | Total Hours | Testing Contractor Hoursa | Labor Costs | Non-Labor (O&M) Costs | Total Costs |
1 | 2,448 | 122 | 245 | 2,815 | 501 | $100,199 | $503,249 | $603,448 |
2 | 478 | 24 | 48 | 549 | 4,291 | $19,548 | $548,337 | $567,885 |
3 | 478 | 24 | 48 | 549 | 4,291 | $19,548 | $548,337 | $567,885 |
Total | 3,403 | 170 | 340 | 3,913 | 9,084 | $139,296 | $1,599,922 | $1,739,218 |
Average | 1,134 | 57 | 113 | 1,304 | 3,028 | $46,432 | $533,307 | $579,739 |
a. Test contractor costs are accounted for in the non-labor category |
Table 5.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines | |||||||||||||||||||
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Waste-burning Kilns | |||||||||||||||||||
(A) | Emission | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||||||
Respondent | Testing | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Emission | Total | Total | Total | Footnotes | ||||||
Hours per | Contractor | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Testing | Labor Costs | Non-Labor | Responses | |||||||
Occurrence | Hours | Per | Per | Respondent | Per Year (a) | Per Year | Per Year | Per Year | Contractor | Per Year | Costs | Per Year | |||||||
(Technical | Per | Occurrence | Respondent | Per Year | Hours Per | (b) | Per Year | ||||||||||||
Burden Item | hours) | Occurrence | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | Year | |||||||||||
1. | Applications | Not applicable | |||||||||||||||||
2. | Surveys and Studies | Not applicable | |||||||||||||||||
3. | Reporting Requirements | ||||||||||||||||||
A. | Read and Understand Rule Requirements | 1 | 0 | $100 | 1 | 1 | 12 | 12 | 1 | 1 | 0 | $491 | $1,200 | 12 | c,d,l | ||||
B. | Required Activities | ||||||||||||||||||
1) Initial stack test and report (PM, dioxins/furans, | Included in E. | varies | $15,417 | 1 | 0 | 16 | 0 | 0 | 0 | 193 | $0 | $246,667 | 16 | c | |||||
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) | |||||||||||||||||||
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) | Included in E. | 357 | $28,533 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e | |||||
3) | Operator training and qualification | ||||||||||||||||||
a) Establish and teach operator qualification course | 64 | 0 | $0 | 1 | 64 | 12 | 768 | 38 | 77 | 0 | $31,441 | $0 | 12 | c | |||||
b) Obtain operator qualification | 72 | 0 | $0 | 1 | 72 | 12 | 864 | 43 | 86 | 0 | $35,371 | $0 | 12 | c | |||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e | ||||||
d) Initial review of site-specific information | Included in a. | ||||||||||||||||||
e) Annual review of site-specific information | 8 | 0 | $0 | 1 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e | |||||
4) Establish operating parameters (maximum and minimum) | 40 | Included in B.1. | $0 | 1 | 40 | 16 | 640 | 32 | 64 | 0 | $26,201 | $0 | 16 | c | |||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||||
a) Initial costs | 17 | 0 | $788 | 1 | 17 | 16 | 272 | 14 | 27 | 0 | $11,135 | $12,600 | 16 | c,f | |||||
b) Annual costs | 17 | 0 | $9,781 | 1 | 17 | 16 | 272 | 14 | 27 | 0 | $11,135 | $156,500 | 16 | e,g | |||||
C. | Create Information | Included in 3.B | |||||||||||||||||
D. | Gather Information | Included in 3.E | |||||||||||||||||
E. | Report Preparation | ||||||||||||||||||
1) Notification of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 2 | 0 | $0 | 1 | 2 | 16 | 32 | 2 | 3 | 0 | $1,310 | $0 | 16 | ||||||
b) Fugitive Ash Emissions | 1 | 0 | $0 | 1 | 1 | 16 | 16 | 1 | 2 | 0 | $655 | $0 | 16 | ||||||
2) Notification of initial CMS Demonstration | 2 | 0 | $0 | 1 | 2 | 12 | 24 | 1 | 2 | 0 | $983 | $0 | 12 | ||||||
3) Report of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 8 | 0 | $7.50 | 1 | 8 | 16 | 128 | 6 | 13 | 0 | $5,240 | $120 | 16 | ||||||
b) Fugitive Ash Emissions | 2 | 0 | $0 | 1 | 2 | 16 | 32 | 2 | 3 | 0 | $1,310 | $0 | 16 | ||||||
4) Report of initial CMS demonstration | Included in 3.B.5 | ||||||||||||||||||
5) Report prior to construction (includes siting analysis) | 160 | 0 | $0 | 1 | 160 | 12 | 1,920 | 96 | 192 | 0 | $78,603 | $0 | 12 | c | |||||
6) Report prior to initial start-up | |||||||||||||||||||
a) Without site specific parameter petition | 6 | 0 | $0 | 1 | 6 | 8 | 48 | 2 | 5 | 0 | $1,965 | $0 | 8 | c,h | |||||
b) With site specific parameter petition | 14 | 0 | $0 | 1 | 14 | 4 | 56 | 3 | 6 | 0 | $2,293 | $0 | 4 | c,h | |||||
7) Report of initial stack test | Included in 3.B.1 | ||||||||||||||||||
8) Report established values for site-specific operating parameters | Included in 3.B | 0 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
9) Waste management plan | 160 | 0 | $0 | 1 | 160 | 12 | 1,920 | 96 | 192 | 0 | $78,603 | $0 | 12 | c | |||||
10) Annual Report: | |||||||||||||||||||
a) Results of performance tests conducted during the year | 40 | 0 | $7.50 | 1 | 40 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
11) Status report for operators that are off-site for more than 2 weeks | 8 | 0 | $0 | 1 | 8 | 2 | 16 | 1 | 2 | 0 | $655 | $0 | 2 | i | |||||
12) Corrective action summary for operators that are off-site for more | |||||||||||||||||||
than 2 weeks | 8 | 0 | $0 | 2 | 16 | 2 | 32 | 2 | 3 | 0 | $1,310 | $0 | 4 | i | |||||
13) Semiannual report of emissions/parameter exceedances | 24 | 0 | $7.50 | 1 | 24 | 2 | 48 | 2 | 5 | 0 | $1,965 | $15 | 2 | j | |||||
ReportingSubtotal | 7,100 | 355 | 710 | 193 | $290,668 | 220 | |||||||||||||
4. Recordkeeping Requirements | |||||||||||||||||||
A. Read Instructions | Inculded in 3.A | ||||||||||||||||||
B. Plan Activities | Not applicable | ||||||||||||||||||
C. Implement Activities | Not applicable | ||||||||||||||||||
D. Develop Record System | Not applicable | ||||||||||||||||||
E. Record Information | |||||||||||||||||||
1) Records of operating parameters | Included in 3.B.5.b | 0 | $0 | 52 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Records of periods for which minimum amount of data on operating | |||||||||||||||||||
parameters were not obtained | 0.5 | 0 | $0 | 52 | 26 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
3) Records of malfunction of the unit | 1.5 | 0 | $0 | 1 | 1.5 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
4) Records of exceedances of the operating parameters | 1.5 | 0 | $0 | 1 | 1.5 | 2 | 3 | 0 | 0 | 0 | $123 | $0 | 2 | j | |||||
5) Records of stack tests | Included in 3.E | ||||||||||||||||||
6) Records of siting analysis | Included in 3.E | ||||||||||||||||||
7) Records of persons who have reviewed operating procedures | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
8) Records of persons who have completed operator training | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
9) Records of persons whe meet operator qualification criteria | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
10) Records of monitoring device calibration | Included in 3.B | ||||||||||||||||||
11) Records of site-specific documentation | 24 | 0 | $0 | 1 | 24 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
F. Personnel Training | Included in 3.B | ||||||||||||||||||
G. Time for Audits | Not applicable | ||||||||||||||||||
Recordkeeping Subtotal | 3 | 0.15 | 0.3 | 0 | $123 | $0 | 2 | ||||||||||||
TOTAL: | 7,103 | 355 | 710 | 193 | $290,791 | $417,102 | 222 | ||||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||||
Summary of Respondent Burden | 8,168 | $290,791 | $417,102 | $707,893 | |||||||||||||||
Annualized Capital and Startup | $260,467 | $260,467 | |||||||||||||||||
O & M Summary | $156,500 | $156,500 | |||||||||||||||||
FOOTNOTES | |||||||||||||||||||
a | Based on the total number of existing units expected to continue operating once the guidelines become effective. | ||||||||||||||||||
b | Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. | ||||||||||||||||||
c | One-time only costs. | ||||||||||||||||||
d | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||||
e | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||||
f | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
g | Based on the sum of the calculated annual cost for each monitoring system required for incinerators. | ||||||||||||||||||
h | Assumed that one-third of the facilities will petition for site-specific parameters. | ||||||||||||||||||
i | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||||
j | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||||
k | Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. | ||||||||||||||||||
l | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
Table 5.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines | |||||||||||||||||||
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Waste-burning Kilns | |||||||||||||||||||
(A) | Emission | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||||||
Respondent | Testing | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Emission | Total | Total | Total | Footnotes | ||||||
Hours per | Contractor | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Testing | Labor Costs | Non-Labor | Responses | |||||||
Occurrence | Hours | Per | Per | Respondent | Per Year (a) | Per Year | Per Year | Per Year | Contractor | Per Year | Costs | Per Year | |||||||
(Technical | Per | Occurrence | Respondent | Per Year | @$34.60 | @$82.23 | @$22.32 | Hours Per | (b) | Per Year | |||||||||
Burden Item | hours) | Occurrence | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | Year @$80 | |||||||||||
1. | Applications | Not applicable | |||||||||||||||||
2. | Surveys and Studies | Not applicable | |||||||||||||||||
3. | Reporting Requirements | ||||||||||||||||||
A. | Read and Understand Rule Requirements | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,d,l | ||||
B. | Required Activities | ||||||||||||||||||
1) Initial stack test and report (PM, dioxins/furans, | Included in E. | varies | $15,417 | 1 | 0 | 0 | 0 | 0 | 0 | 193 | $0 | $0 | 0 | c | |||||
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) | |||||||||||||||||||
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) | Included in E. | 357 | $28,533 | 1 | 0 | 16 | 0 | 0 | 0 | 5,707 | $0 | $456,533 | 16 | e | |||||
3) | Operator training and qualification | ||||||||||||||||||
a) Establish and teach operator qualification course | 64 | 0 | $0 | 1 | 64 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
b) Obtain operator qualification | 72 | 0 | $0 | 1 | 72 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 12 | 144 | 7 | 14 | 0 | $5,895 | $0 | 12 | e | ||||||
d) Initial review of site-specific information | Included in a. | ||||||||||||||||||
e) Annual review of site-specific information | 8 | 0 | $0 | 1 | 8 | 12 | 96 | 5 | 10 | 0 | $3,930 | $0 | 12 | e | |||||
4) Establish operating parameters (maximum and minimum) | 40 | Included in B.1. | $0 | 1 | 40 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||||
a) Initial costs | 17 | 0 | $0 | 1 | 17 | 0 | 0 | 0 | 0 | 0 | $0 | $12,600 | 0 | c,f | |||||
b) Annual costs | 17 | 0 | $9,781 | 1 | 17 | 0 | 0 | 0 | 0 | 0 | $0 | $156,500 | 0 | e,g | |||||
C. | Create Information | Included in 3.B | |||||||||||||||||
D. | Gather Information | Included in 3.E | |||||||||||||||||
E. | Report Preparation | ||||||||||||||||||
1) Notification of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Notification of initial CMS Demonstration | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
3) Report of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 8 | 0 | $7.50 | 1 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
4) Report of initial CMS demonstration | Included in 3.B.5 | ||||||||||||||||||
5) Report prior to construction (includes siting analysis) | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
6) Report prior to initial start-up | |||||||||||||||||||
a) Without site specific parameter petition | 6 | 0 | $0 | 1 | 6 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
b) With site specific parameter petition | 14 | 0 | $0 | 1 | 14 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
7) Report of initial stack test | Included in 3.B.1 | ||||||||||||||||||
8) Report established values for site-specific operating parameters | Included in 3.B | 0 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
9) Waste management plan | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
10) Annual Report: | |||||||||||||||||||
a) Results of performance tests conducted during the year | 40 | 0 | $7.50 | 1 | 40 | 16 | 640 | 32 | 64 | 0 | $26,201 | $120 | 16 | ||||||
11) Status report for operators that are off-site for more than 2 weeks | 8 | 0 | $0 | 1 | 8 | 2 | 16 | 1 | 2 | 0 | $655 | $0 | 2 | i | |||||
12) Corrective action summary for operators that are off-site for more | |||||||||||||||||||
than 2 weeks | 8 | 0 | $0 | 2 | 16 | 2 | 32 | 2 | 3 | 0 | $1,310 | $0 | 4 | i | |||||
13) Semiannual report of emissions/parameter exceedances | 24 | 0 | $7.50 | 1 | 24 | 2 | 48 | 2 | 5 | 0 | $1,965 | $15 | 2 | j | |||||
ReportingSubtotal | 976 | 49 | 98 | 5,899 | $39,957 | 64 | |||||||||||||
4. Recordkeeping Requirements | |||||||||||||||||||
A. Read Instructions | Inculded in 3.A | ||||||||||||||||||
B. Plan Activities | Not applicable | ||||||||||||||||||
C. Implement Activities | Not applicable | ||||||||||||||||||
D. Develop Record System | Not applicable | ||||||||||||||||||
E. Record Information | |||||||||||||||||||
1) Records of operating parameters | Included in 3.B.5.b | 0 | $0 | 52 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Records of periods for which minimum amount of data on operating | |||||||||||||||||||
parameters were not obtained | 0.5 | 0 | $0 | 52 | 26 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
3) Records of malfunction of the unit | 1.5 | 0 | $0 | 1 | 1.5 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
4) Records of exceedances of the operating parameters | 1.5 | 0 | $0 | 1 | 1.5 | 2 | 3 | 0 | 0 | 0 | $123 | $0 | 2 | j | |||||
5) Records of stack tests | Included in 3.E | ||||||||||||||||||
6) Records of siting analysis | Included in 3.E | ||||||||||||||||||
7) Records of persons who have reviewed operating procedures | 1 | 0 | $0 | 1 | 1 | 12 | 12 | 1 | 1 | 0 | $491 | $0 | 12 | ||||||
8) Records of persons who have completed operator training | 1 | 0 | $0 | 1 | 1 | 12 | 12 | 1 | 1 | 0 | $491 | $0 | 12 | ||||||
9) Records of persons whe meet operator qualification criteria | 1 | 0 | $0 | 1 | 1 | 12 | 12 | 1 | 1 | 0 | $491 | $0 | 12 | ||||||
10) Records of monitoring device calibration | Included in 3.B | ||||||||||||||||||
11) Records of site-specific documentation | 24 | 0 | $0 | 1 | 24 | 12 | 288 | 14 | 29 | 0 | $11,790 | $0 | 12 | ||||||
F. Personnel Training | Included in 3.B | ||||||||||||||||||
G. Time for Audits | Not applicable | ||||||||||||||||||
Recordkeeping Subtotal | 327 | 16.35 | 32.7 | 0 | $13,387 | $0 | 50 | ||||||||||||
TOTAL: | 1,303 | 65 | 130 | 5,899 | $53,344 | $625,768 | 114 | ||||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||||
Summary of Respondent Burden | 1,498 | $53,344 | $625,768 | $679,112 | |||||||||||||||
Annualized Capital and Startup | $12,600 | $12,600 | |||||||||||||||||
O & M Summary | $156,500 | $156,500 | |||||||||||||||||
FOOTNOTES | |||||||||||||||||||
a | Based on the total number of existing units expected to continue operating once the guidelines become effective. | ||||||||||||||||||
b | Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. | ||||||||||||||||||
c | One-time only costs. | ||||||||||||||||||
d | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||||
e | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||||
f | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
g | Based on the sum of the calculated annual cost for each monitoring system required for incinerators. | ||||||||||||||||||
h | Assumed that one-third of the facilities will petition for site-specific parameters. | ||||||||||||||||||
i | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||||
j | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||||
k | Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. | ||||||||||||||||||
l | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
Table 5.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines | |||||||||||||||||||
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Waste-burning Kilns | |||||||||||||||||||
(A) | Emission | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||||||||||
Respondent | Testing | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Emission | Total | Total | Total | Footnotes | ||||||
Hours per | Contractor | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Testing | Labor Costs | Non-Labor | Responses | |||||||
Occurrence | Hours | Per | Per | Respondent | Per Year (a) | Per Year | Per Year | Per Year | Contractor | Per Year | Costs | Per Year | |||||||
(Technical | Per | Occurrence | Respondent | Per Year | Hours Per | (b) | Per Year | ||||||||||||
Burden Item | hours) | Occurrence | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | Year | |||||||||||
1. | Applications | Not applicable | |||||||||||||||||
2. | Surveys and Studies | Not applicable | |||||||||||||||||
3. | Reporting Requirements | ||||||||||||||||||
A. | Read and Understand Rule Requirements | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,d,l | ||||
B. | Required Activities | ||||||||||||||||||
1) Initial stack test and report (PM, dioxins/furans, | Included in E. | varies | $15,417 | 1 | 0 | 0 | 0 | 0 | 0 | 193 | $0 | $0 | 0 | c | |||||
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) | |||||||||||||||||||
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) | Included in E. | 357 | $28,533 | 1 | 0 | 16 | 0 | 0 | 0 | 5,707 | $0 | $456,533 | 16 | e | |||||
3) | Operator training and qualification | ||||||||||||||||||
a) Establish and teach operator qualification course | 64 | 0 | $0 | 1 | 64 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
b) Obtain operator qualification | 72 | 0 | $0 | 1 | 72 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 12 | 144 | 7 | 14 | 0 | $5,895 | $0 | 12 | e | ||||||
d) Initial review of site-specific information | Included in a. | ||||||||||||||||||
e) Annual review of site-specific information | 8 | 0 | $0 | 1 | 8 | 12 | 96 | 5 | 10 | 0 | $3,930 | $0 | 12 | e | |||||
4) Establish operating parameters (maximum and minimum) | 40 | Included in B.1. | $0 | 1 | 40 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||||
a) Initial costs | 17 | 0 | $0 | 1 | 17 | 0 | 0 | 0 | 0 | 0 | $0 | $12,600 | 0 | c,f | |||||
b) Annual costs | 17 | 0 | $9,781 | 1 | 17 | 0 | 0 | 0 | 0 | 0 | $0 | $156,500 | 0 | e,g | |||||
C. | Create Information | Included in 3.B | |||||||||||||||||
D. | Gather Information | Included in 3.E | |||||||||||||||||
E. | Report Preparation | ||||||||||||||||||
1) Notification of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 1 | 0 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Notification of initial CMS Demonstration | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
3) Report of initial performance test | |||||||||||||||||||
a) Pollutants, fugitive ash emissions | 8 | 0 | $7.50 | 1 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
b) Fugitive Ash Emissions | 2 | 0 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
4) Report of initial CMS demonstration | Included in 3.B.5 | ||||||||||||||||||
5) Report prior to construction (includes siting analysis) | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
6) Report prior to initial start-up | |||||||||||||||||||
a) Without site specific parameter petition | 6 | 0 | $0 | 1 | 6 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
b) With site specific parameter petition | 14 | 0 | $0 | 1 | 14 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,h | |||||
7) Report of initial stack test | Included in 3.B.1 | ||||||||||||||||||
8) Report established values for site-specific operating parameters | Included in 3.B | 0 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
9) Waste management plan | 160 | 0 | $0 | 1 | 160 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
10) Annual Report: | |||||||||||||||||||
a) Results of performance tests conducted during the year | 40 | 0 | $7.50 | 1 | 40 | 16 | 640 | 32 | 64 | 0 | $26,201 | $120 | 16 | ||||||
11) Status report for operators that are off-site for more than 2 weeks | 8 | 0 | $0 | 1 | 8 | 2 | 16 | 1 | 2 | 0 | $655 | $0 | 2 | i | |||||
12) Corrective action summary for operators that are off-site for more | |||||||||||||||||||
than 2 weeks | 8 | 0 | $0 | 2 | 16 | 2 | 32 | 2 | 3 | 0 | $1,310 | $0 | 4 | i | |||||
13) Semiannual report of emissions/parameter exceedances | 24 | 0 | $7.50 | 1 | 24 | 2 | 48 | 2 | 5 | 0 | $1,965 | $15 | 2 | j | |||||
ReportingSubtotal | 976 | 49 | 98 | 5,899 | $39,957 | 64 | |||||||||||||
4. Recordkeeping Requirements | |||||||||||||||||||
A. Read Instructions | Inculded in 3.A | ||||||||||||||||||
B. Plan Activities | Not applicable | ||||||||||||||||||
C. Implement Activities | Not applicable | ||||||||||||||||||
D. Develop Record System | Not applicable | ||||||||||||||||||
E. Record Information | |||||||||||||||||||
1) Records of operating parameters | Included in 3.B.5.b | 0 | $0 | 52 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Records of periods for which minimum amount of data on operating | |||||||||||||||||||
parameters were not obtained | 0.5 | 0 | $0 | 52 | 26 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
3) Records of malfunction of the unit | 1.5 | 0 | $0 | 1 | 1.5 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | k | |||||
4) Records of exceedances of the operating parameters | 1.5 | 0 | $0 | 1 | 1.5 | 2 | 3 | 0 | 0 | 0 | $123 | $0 | 2 | j | |||||
5) Records of stack tests | Included in 3.E | ||||||||||||||||||
6) Records of siting analysis | Included in 3.E | ||||||||||||||||||
7) Records of persons who have reviewed operating procedures | 1 | 0 | $0 | 1 | 1 | 12 | 12 | 1 | 1 | 0 | $491 | $0 | 12 | ||||||
8) Records of persons who have completed operator training | 1 | 0 | $0 | 1 | 1 | 12 | 12 | 1 | 1 | 0 | $491 | $0 | 12 | ||||||
9) Records of persons whe meet operator qualification criteria | 1 | 0 | $0 | 1 | 1 | 12 | 12 | 1 | 1 | 0 | $491 | $0 | 12 | ||||||
10) Records of monitoring device calibration | Included in 3.B | ||||||||||||||||||
11) Records of site-specific documentation | 24 | 0 | $0 | 1 | 24 | 12 | 288 | 14 | 29 | 0 | $11,790 | $0 | 12 | ||||||
F. Personnel Training | Included in 3.B | ||||||||||||||||||
G. Time for Audits | Not applicable | ||||||||||||||||||
Recordkeeping Subtotal | 327 | 16.35 | 32.7 | 0 | $13,387 | $0 | 50 | ||||||||||||
TOTAL: | 1,303 | 65 | 130 | 5,899 | $53,344 | $625,768 | 114 | ||||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||||
Summary of Respondent Burden | 1,498 | $53,344 | $625,768 | $679,112 | |||||||||||||||
Annualized Capital and Startup | $12,600 | $12,600 | |||||||||||||||||
O & M Summary | $156,500 | $156,500 | |||||||||||||||||
FOOTNOTES | |||||||||||||||||||
a | Based on the total number of existing units expected to continue operating once the guidelines become effective. | ||||||||||||||||||
b | Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. | ||||||||||||||||||
c | One-time only costs. | ||||||||||||||||||
d | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||||
e | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||||
f | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
g | Based on the sum of the calculated annual cost for each monitoring system required for incinerators. | ||||||||||||||||||
h | Assumed that one-third of the facilities will petition for site-specific parameters. | ||||||||||||||||||
i | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||||
j | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||||
k | Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. | ||||||||||||||||||
l | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
Table 5.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD, Waste-burning Kilns | ||||||||
Year | Technical Hours | Management Hours | Clerical Hours | Total Hours | Testing Contractor Hoursa | Labor Costs | Non-Labor (O&M) Costs | Total Costs |
1 | 7,103 | 355 | 710 | 8,168 | 193 | $290,791 | $417,102 | $707,893 |
2 | 1,303 | 65 | 130 | 1,498 | 5,899 | $53,344 | $625,768 | $679,112 |
3 | 1,303 | 65 | 130 | 1,498 | 5,899 | $53,344 | $625,768 | $679,112 |
Total | 9,709 | 485 | 971 | 11,165 | 11,991 | $397,479 | $1,668,638 | $2,066,117 |
Average | 3,236 | 162 | 324 | 3,722 | 3,997 | $132,493 | $556,213 | $688,706 |
a. Test contractor costs are accounted for in the non-labor category |
Table 6 - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD, All Subcategories | ||||||||
Year | Technical Hours | Management Hours | Clerical Hours | Total Labor Hours | Testing Contractor Hoursa | Labor Costs | Non-Labor (O&M) Costs | Total Costs |
1 | 32,595 | 1,630 | 3,260 | 37,485 | 1,431 | $1,334,428 | $3,676,665 | $5,011,092 |
2 | 5,997 | 300 | 600 | 6,897 | 20,377 | $245,527 | $3,295,309 | $3,540,836 |
3 | 5,997 | 300 | 600 | 6,897 | 20,377 | $245,527 | $3,295,309 | $3,540,836 |
Total | 44,590 | 2,230 | 4,459 | 51,279 | 42,186 | $1,825,481 | $10,267,283 | $12,092,764 |
Average | 14,863 | 743 | 1,486 | 17,093 | 14,062 | $608,494 | $3,422,428 | $4,030,921 |
a. Test contractor costs are accounted for in the non-labor category |
Table 7 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Emission Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1 | |||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | ||||||
Burden Item | Number of Occurrences Per Year | EPA Hours Per Occurrence | Tech Hours Per Year (C=AxB) | Management Hours Per Year (D=Cx0.05) | Clerical Hours Per Year (E=Cx0.1) | EPA Cost Per Year (a,b) | |||||
1. | Applications | not applicable | |||||||||
2. | Read and Understand Rule Requirements | 1 | c | 16 | 16 | 1 | 2 | $954 | |||
3. | Required Activities | ||||||||||
A. | Observe initial stack tests | ||||||||||
(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) | 15 | c,d | 48 | 720 | 36 | 72 | $42,947 | ||||
B. | Excess emissions -- Enforcement Activities | 8 | f | 24 | 180 | 9 | 18 | $10,737 | |||
C. | Create Information | not applicable | |||||||||
D. | Gather Information | not applicable | |||||||||
E. | Report Reviews | ||||||||||
1) | Review waste managemant plan and siting analysis | 55 | c | 8 | 440 | 22 | 44 | $26,245 | |||
2) | Review report submitted prior to initial startup | 52 | c | 2 | 104 | 5 | 10 | $6,203 | |||
3) | Review initial stack test report | 75 | c | 40 | 3000 | 150 | 300 | $178,944 | |||
4) | Review annual compliance report | 0 | e | 8 | 0 | 0 | 0 | $0 | |||
5) | Review semi-annual excess emission and parameter exceedance report | 7 | f | 16 | 117 | 6 | 12 | $6,967 | |||
6) | Review status reports and corrective action summary for operators off-site | 15 | g | 4 | 58 | 3 | 6 | $3,483 | |||
F. | Prepare annual summary report | 1 | 200 | 200 | 10 | 20 | $11,930 | ||||
5. | Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = | $881 | per trip | $13,219 | |||||||
TOTAL | 4835 | 242 | 484 | $301,629 | |||||||
FOOTNOTES | |||||||||||
a | Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52. | ||||||||||
b | Figures may not add exactly due to rounding. | ||||||||||
c | One-time only costs. | ||||||||||
d | Assumes EPA personnel attend 20 percent of the initial stack tests. | ||||||||||
e | Burden not incurred until second year of operation onward. | ||||||||||
f | Assume that 10 percent of the facilities have an exceedance during the year. | ||||||||||
g | Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted. |
Table 8 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Emission Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2 | |||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | ||||||
Burden Item | Number of Occurrences Per Year | EPA Hours Per Occurrence | Tech Hours Per Year (C=AxB) | Management Hours Per Year (D=Cx0.05) | Clerical Hours Per Year (E=Cx0.1) | EPA Cost Per Year (a,b) | |||||
1. | Applications | not applicable | |||||||||
2. | Read and Understand Rule Requirements | 0 | c | 16 | 0 | 0 | 0 | $0 | |||
3. | Required Activities | ||||||||||
A. | Observe initial stack tests | ||||||||||
(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) | 0 | c,d | 48 | 0 | 0 | 0 | $0 | ||||
B. | Excess emissions -- Enforcement Activities | 8 | f | 24 | 180 | 9 | 18 | $10,737 | |||
C. | Create Information | not applicable | |||||||||
D. | Gather Information | not applicable | |||||||||
E. | Report Reviews | ||||||||||
1) | Review waste managemant plan and siting analysis | 0 | c | 8 | 0 | 0 | 0 | $0 | |||
2) | Review report submitted prior to initial startup | 0 | c | 2 | 0 | 0 | 0 | $0 | |||
3) | Review initial stack test report | 0 | c | 40 | 0 | 0 | 0 | $0 | |||
4) | Review annual compliance report | 75 | e | 8 | 600 | 30 | 60 | $35,789 | |||
5) | Review semi-annual excess emission and parameter exceedance report | 7 | f | 16 | 117 | 6 | 12 | $6,967 | |||
6) | Review status reports and corrective action summary for operators off-site | 15 | g | 4 | 58 | 3 | 6 | $3,483 | |||
F. | Prepare annual summary report | 1 | 200 | 200 | 10 | 20 | $11,930 | ||||
5. | Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = | per trip | $0 | ||||||||
TOTAL | 1155 | 58 | 116 | $68,905 | |||||||
FOOTNOTES | |||||||||||
a | Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52. | ||||||||||
b | Figures may not add exactly due to rounding. | ||||||||||
c | One-time only costs. | ||||||||||
d | Assumes EPA personnel attend 20 percent of the initial stack tests. | ||||||||||
e | Burden not incurred until second year of operation onward. | ||||||||||
f | Assume that 10 percent of the facilities have an exceedance during the year. | ||||||||||
g | Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted. |
Table 9 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Emission Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3 | |||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | ||||||
Burden Item | Number of Occurrences Per Year | EPA Hours Per Occurrence | Tech Hours Per Year (C=AxB) | Management Hours Per Year (D=Cx0.05) | Clerical Hours Per Year (E=Cx0.1) | EPA Cost Per Year (a,b) | |||||
1. | Applications | not applicable | |||||||||
2. | Read and Understand Rule Requirements | 0 | c | 16 | 0 | 0 | 0 | $0 | |||
3. | Required Activities | ||||||||||
A. | Observe initial stack tests | ||||||||||
(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) | 0 | c,d | 48 | 0 | 0 | 0 | $0 | ||||
B. | Excess emissions -- Enforcement Activities | 8 | f | 24 | 180 | 9 | 18 | $10,737 | |||
C. | Create Information | not applicable | |||||||||
D. | Gather Information | not applicable | |||||||||
E. | Report Reviews | ||||||||||
1) | Review waste managemant plan and siting analysis | 0 | c | 8 | 0 | 0 | 0 | $0 | |||
2) | Review report submitted prior to initial startup | 0 | c | 2 | 0 | 0 | 0 | $0 | |||
3) | Review initial stack test report | 0 | c | 40 | 0 | 0 | 0 | $0 | |||
4) | Review annual compliance report | 75 | e | 8 | 600 | 30 | 60 | $35,789 | |||
5) | Review semi-annual excess emission and parameter exceedance report | 7 | f | 16 | 117 | 6 | 12 | $6,967 | |||
6) | Review status reports and corrective action summary for operators off-site | 15 | g | 4 | 58 | 3 | 6 | $3,483 | |||
F. | Prepare annual summary report | 1 | 200 | 200 | 10 | 20 | $11,930 | ||||
5. | Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = | per trip | $0 | ||||||||
TOTAL | 1155 | 58 | 116 | $68,905 | |||||||
FOOTNOTES | |||||||||||
a | Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52. | ||||||||||
b | Figures may not add exactly due to rounding. | ||||||||||
c | One-time only costs. | ||||||||||
d | Assumes EPA personnel attend 20 percent of the initial stack tests. | ||||||||||
e | Burden not incurred until second year of operation onward. | ||||||||||
f | Assume that 10 percent of the facilities have an exceedance during the year. | ||||||||||
g | Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted. |
Table 10 - Summary of Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Emission Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD | |||||||
Year | Technical Hours | Management Hours | Clerical Hours | Total Hours | Labor Costs | Non-Labor (O&M) Costs | Total Costs |
1 | 4,835 | 242 | 484 | 5,560 | $288,410 | $13,219 | $301,629 |
2 | 1,155 | 58 | 116 | 1,328 | $68,905 | $0 | $68,905 |
3 | 1,155 | 58 | 116 | 1,328 | $68,905 | $0 | $68,905 |
Total | 7,146 | 357 | 715 | 8,217 | $426,221 | $13,219 | $439,439 |
Average | 2,382 | 119 | 238 | 2,739 | $142,074 | $4,406 | $146,480 |
File Type | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
File Modified | 0000-00-00 |
File Created | 0000-00-00 |