Table 1.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Incinerators |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$100 |
1 |
1 |
3 |
3 |
0 |
0 |
0 |
$123 |
$300 |
3 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$14,333 |
1 |
0 |
3 |
0 |
0 |
0 |
179 |
$0 |
$42,999 |
3 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
182 |
$14,533 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
3 |
192 |
10 |
19 |
0 |
$7,860 |
$0 |
3 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
3 |
216 |
11 |
22 |
0 |
$8,843 |
$0 |
3 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
3 |
120 |
6 |
12 |
0 |
$4,913 |
$0 |
3 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$8,000 |
1 |
17 |
3 |
51 |
3 |
5 |
0 |
$2,088 |
$8,000 |
3 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$39,500 |
1 |
17 |
3 |
51 |
3 |
5 |
0 |
$2,088 |
$39,500 |
3 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
3 |
6 |
0 |
1 |
0 |
$246 |
$0 |
3 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
3 |
3 |
0 |
0 |
0 |
$123 |
$0 |
3 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
3 |
6 |
0 |
1 |
0 |
$246 |
$0 |
3 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
3 |
24 |
1 |
2 |
0 |
$983 |
$23 |
3 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
3 |
6 |
0 |
1 |
0 |
$246 |
$0 |
3 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
3 |
480 |
24 |
48 |
0 |
$19,651 |
$0 |
3 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
3 |
480 |
24 |
48 |
0 |
$19,651 |
$0 |
3 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
0.3 |
2 |
0 |
0 |
0 |
$98 |
$0 |
0 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
0.3 |
5 |
0 |
0 |
0 |
$197 |
$0 |
1 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
0.3 |
7 |
0 |
1 |
0 |
$295 |
$2 |
0 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
1,652 |
83 |
165 |
179 |
$67,648 |
|
43 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0.3 |
0 |
0 |
0 |
0 |
$18 |
$0 |
0 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
0.45 |
0.0225 |
0.045 |
0 |
$18 |
$0 |
0.3 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
1,653 |
83 |
165 |
179 |
$67,666 |
$90,824 |
44 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
1,901 |
$67,666 |
$90,824 |
$158,490 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$51,299 |
$51,299 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$39,500 |
$39,500 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 1.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Incinerators |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
Included in E. |
varies |
$0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
Included in E. |
182 |
$14,533 |
1 |
0 |
3 |
0 |
0 |
0 |
545 |
$0 |
$43,600 |
3 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
3 |
36 |
2 |
4 |
0 |
$1,474 |
$0 |
3 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
3 |
24 |
1 |
2 |
0 |
$983 |
$0 |
3 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$8,000 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$8,000 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$47,500 |
1 |
17 |
3 |
51 |
3 |
5 |
0 |
$2,088 |
$47,500 |
3 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
3 |
120 |
6 |
12 |
0 |
$4,913 |
$23 |
3 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
0.3 |
2 |
0 |
0 |
0 |
$98 |
$0 |
0 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
0.3 |
5 |
0 |
0 |
0 |
$197 |
$0 |
1 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
0.3 |
7 |
0 |
1 |
0 |
$295 |
$2 |
0 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
245 |
12 |
25 |
545 |
$10,046 |
|
16 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0.3 |
0 |
0 |
0 |
0 |
$18 |
$0 |
0 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
3 |
3 |
0 |
0 |
0 |
$123 |
$0 |
3 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
3 |
3 |
0 |
0 |
0 |
$123 |
$0 |
3 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
3 |
3 |
0 |
0 |
0 |
$123 |
$0 |
3 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
3 |
72 |
4 |
7 |
0 |
$2,948 |
$0 |
3 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
81.45 |
4.0725 |
8.145 |
0 |
$3,334 |
$0 |
12.3 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
327 |
16 |
33 |
545 |
$13,381 |
$99,125 |
29 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
376 |
$13,381 |
$99,125 |
$112,506 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$8,000 |
$8,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$47,500 |
$47,500 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 1.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Incinerators |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
|
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
@$22.32 |
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
182 |
$14,533 |
1 |
0 |
3 |
0 |
0 |
0 |
545 |
$0 |
$43,600 |
3 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
3 |
36 |
2 |
4 |
0 |
$1,474 |
$0 |
3 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
3 |
24 |
1 |
2 |
0 |
$983 |
$0 |
3 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$8,000 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$8,000 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$47,500 |
1 |
17 |
3 |
51 |
3 |
5 |
0 |
$2,088 |
$47,500 |
3 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
3 |
120 |
6 |
12 |
0 |
$4,913 |
$23 |
3 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
0.3 |
2 |
0 |
0 |
0 |
$98 |
$0 |
0 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
0.3 |
5 |
0 |
0 |
0 |
$197 |
$0 |
1 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
0.3 |
7 |
0 |
1 |
0 |
$295 |
$2 |
0 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
245 |
12 |
25 |
545 |
$10,046 |
|
16 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0.3 |
0 |
0 |
0 |
0 |
$18 |
$0 |
0 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
3 |
3 |
0 |
0 |
0 |
$123 |
$0 |
3 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
3 |
3 |
0 |
0 |
0 |
$123 |
$0 |
3 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
3 |
3 |
0 |
0 |
0 |
$123 |
$0 |
3 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
3 |
72 |
4 |
7 |
0 |
$2,948 |
$0 |
3 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
81.45 |
4.0725 |
8.145 |
0 |
$3,334 |
$0 |
12.3 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
327 |
16 |
33 |
545 |
$13,381 |
$99,125 |
29 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
376 |
$13,381 |
$99,125 |
$112,506 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$8,000 |
$8,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$47,500 |
$47,500 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 2.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Energy Recovery Units (Solids) |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$100 |
1 |
1 |
20 |
20 |
1 |
2 |
0 |
$819 |
$2,000 |
20 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$23,280 |
1 |
0 |
31 |
0 |
0 |
0 |
291 |
$0 |
$721,667 |
31 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
182 |
$14,533 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
20 |
1,280 |
64 |
128 |
0 |
$52,402 |
$0 |
20 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
20 |
1,440 |
72 |
144 |
0 |
$58,952 |
$0 |
20 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
31 |
1,240 |
62 |
124 |
0 |
$50,765 |
$0 |
31 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$16,708 |
1 |
17 |
31 |
527 |
26 |
53 |
0 |
$21,575 |
$517,944 |
31 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$31,778 |
1 |
17 |
31 |
527 |
26 |
53 |
0 |
$21,575 |
$985,108 |
31 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
31 |
62 |
3 |
6 |
0 |
$2,538 |
$0 |
31 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
31 |
31 |
2 |
3 |
0 |
$1,269 |
$0 |
31 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
20 |
40 |
2 |
4 |
0 |
$1,638 |
$0 |
20 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
31 |
248 |
12 |
25 |
0 |
$10,153 |
$233 |
31 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
31 |
62 |
3 |
6 |
0 |
$2,538 |
$0 |
31 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
20 |
3,200 |
160 |
320 |
0 |
$131,005 |
$0 |
20 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
13 |
78 |
4 |
8 |
0 |
$3,193 |
$0 |
13 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
7 |
98 |
5 |
10 |
0 |
$4,012 |
$0 |
7 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
20 |
3,200 |
160 |
320 |
0 |
$131,005 |
$0 |
20 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
2 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
2 |
32 |
2 |
3 |
0 |
$1,310 |
$0 |
4 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
2 |
48 |
2 |
5 |
0 |
$1,965 |
$15 |
2 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
12,149 |
607 |
1,215 |
291 |
$497,370 |
|
396 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
2 |
3 |
0 |
0 |
0 |
$123 |
$0 |
2 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
3 |
0.15 |
0.3 |
0 |
$123 |
$0 |
2 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
12,152 |
608 |
1,215 |
291 |
$497,493 |
$2,226,966 |
398 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
13,975 |
$497,493 |
$2,226,966 |
$2,724,459 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$1,241,611 |
$1,241,611 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$985,108 |
$985,108 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 2.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Energy Recovery Units (Solids) |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$23,280 |
1 |
0 |
0 |
0 |
0 |
0 |
291 |
$0 |
$0 |
0 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
182 |
$14,533 |
1 |
0 |
31 |
0 |
0 |
0 |
5,632 |
$0 |
$450,533 |
31 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
20 |
240 |
12 |
24 |
0 |
$9,825 |
$0 |
20 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
20 |
160 |
8 |
16 |
0 |
$6,550 |
$0 |
20 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$279,300 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$31,778 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$985,108 |
0 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
31 |
1,240 |
62 |
124 |
0 |
$50,765 |
$233 |
31 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
2 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
2 |
32 |
2 |
3 |
0 |
$1,310 |
$0 |
4 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
2 |
48 |
2 |
5 |
0 |
$1,965 |
$15 |
2 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
1,736 |
87 |
174 |
5,923 |
$71,070 |
|
110 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
2 |
3 |
0 |
0 |
0 |
$123 |
$0 |
2 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
20 |
20 |
1 |
2 |
0 |
$819 |
$0 |
20 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
20 |
20 |
1 |
2 |
0 |
$819 |
$0 |
20 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
20 |
20 |
1 |
2 |
0 |
$819 |
$0 |
20 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
20 |
480 |
24 |
48 |
0 |
$19,651 |
$0 |
20 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
543 |
27.15 |
54.3 |
0 |
$22,230 |
$0 |
82 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
2,279 |
114 |
228 |
5,923 |
$93,300 |
$1,715,189 |
192 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
2,621 |
$93,300 |
$1,715,189 |
$1,808,489 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$279,300 |
$279,300 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$985,108 |
$985,108 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 2.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Energy Recovery Units (Solids) |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$23,280 |
1 |
0 |
0 |
0 |
0 |
0 |
291 |
$0 |
$0 |
0 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
182 |
$14,533 |
1 |
0 |
31 |
0 |
0 |
0 |
5,632 |
$0 |
$450,533 |
31 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
20 |
240 |
12 |
24 |
0 |
$9,825 |
$0 |
20 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
20 |
160 |
8 |
16 |
0 |
$6,550 |
$0 |
20 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$279,300 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$31,778 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$985,108 |
0 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
31 |
1,240 |
62 |
124 |
0 |
$50,765 |
$233 |
31 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
2 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
2 |
32 |
2 |
3 |
0 |
$1,310 |
$0 |
4 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
2 |
48 |
2 |
5 |
0 |
$1,965 |
$15 |
2 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
1,736 |
87 |
174 |
5,923 |
$71,070 |
|
110 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
2 |
3 |
0 |
0 |
0 |
$123 |
$0 |
2 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
20 |
20 |
1 |
2 |
0 |
$819 |
$0 |
20 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
20 |
20 |
1 |
2 |
0 |
$819 |
$0 |
20 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
20 |
20 |
1 |
2 |
0 |
$819 |
$0 |
20 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
20 |
480 |
24 |
48 |
0 |
$19,651 |
$0 |
20 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
543 |
27.15 |
54.3 |
0 |
$22,230 |
$0 |
82 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
2,279 |
114 |
228 |
5,923 |
$93,300 |
$1,715,189 |
192 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
2,621 |
$93,300 |
$1,715,189 |
$1,808,489 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$279,300 |
$279,300 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$985,108 |
$985,108 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 3.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Small Remote Incinerators |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$100 |
1 |
1 |
16 |
16 |
1 |
2 |
0 |
$655 |
$1,600 |
16 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$21,377 |
1 |
0 |
19 |
0 |
0 |
0 |
267 |
$0 |
$406,167 |
19 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
182 |
$14,533 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
16 |
1,024 |
51 |
102 |
0 |
$41,922 |
$0 |
16 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
16 |
1,152 |
58 |
115 |
0 |
$47,162 |
$0 |
16 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
19 |
760 |
38 |
76 |
0 |
$31,114 |
$0 |
19 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$368 |
1 |
17 |
19 |
323 |
16 |
32 |
0 |
$13,223 |
$7,000 |
19 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$1,242 |
1 |
17 |
19 |
323 |
16 |
32 |
0 |
$13,223 |
$23,600 |
19 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
19 |
38 |
2 |
4 |
0 |
$1,556 |
$0 |
19 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
19 |
19 |
1 |
2 |
0 |
$778 |
$0 |
19 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
16 |
32 |
2 |
3 |
0 |
$1,310 |
$0 |
16 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
19 |
152 |
8 |
15 |
0 |
$6,223 |
$143 |
19 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
19 |
38 |
2 |
4 |
0 |
$1,556 |
$0 |
19 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
16 |
2,560 |
128 |
256 |
0 |
$104,804 |
$0 |
16 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
10 |
60 |
3 |
6 |
0 |
$2,456 |
$0 |
10 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
6 |
84 |
4 |
8 |
0 |
$3,439 |
$0 |
6 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
16 |
2,560 |
128 |
256 |
0 |
$104,804 |
$0 |
16 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
2 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
2 |
32 |
2 |
3 |
0 |
$1,310 |
$0 |
4 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
2 |
48 |
2 |
5 |
0 |
$1,965 |
$15 |
2 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
9,237 |
462 |
924 |
267 |
$378,155 |
|
272 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
2 |
3 |
0 |
0 |
0 |
$123 |
$0 |
2 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
3 |
0.15 |
0.3 |
0 |
$123 |
$0 |
2 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
9,240 |
462 |
924 |
267 |
$378,278 |
$438,524 |
274 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
10,626 |
$378,278 |
$438,524 |
$816,802 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$414,767 |
$414,767 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$23,600 |
$23,600 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 3.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Small Remote Incinerators |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$21,377 |
1 |
0 |
0 |
0 |
0 |
0 |
267 |
$0 |
$0 |
0 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
182 |
$14,533 |
1 |
0 |
19 |
0 |
0 |
0 |
3,452 |
$0 |
$276,133 |
19 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
16 |
192 |
10 |
19 |
0 |
$7,860 |
$0 |
16 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
16 |
128 |
6 |
13 |
0 |
$5,240 |
$0 |
16 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$7,000 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$7,000 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$23,600 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$23,600 |
0 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
19 |
760 |
38 |
76 |
0 |
$31,114 |
$143 |
19 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
2 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
2 |
32 |
2 |
3 |
0 |
$1,310 |
$0 |
4 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
2 |
48 |
2 |
5 |
0 |
$1,965 |
$15 |
2 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
1,176 |
59 |
118 |
3,719 |
$48,144 |
|
78 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
2 |
3 |
0 |
0 |
0 |
$123 |
$0 |
2 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
16 |
16 |
1 |
2 |
0 |
$655 |
$0 |
16 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
16 |
16 |
1 |
2 |
0 |
$655 |
$0 |
16 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
16 |
16 |
1 |
2 |
0 |
$655 |
$0 |
16 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
16 |
384 |
19 |
38 |
0 |
$15,721 |
$0 |
16 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
435 |
21.75 |
43.5 |
0 |
$17,809 |
$0 |
66 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
1,611 |
81 |
161 |
3,719 |
$65,953 |
$306,891 |
144 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
1,853 |
$65,953 |
$306,891 |
$372,844 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$7,000 |
$7,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$23,600 |
$23,600 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 3.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Small Remote Incinerators |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$21,377 |
1 |
0 |
0 |
0 |
0 |
0 |
267 |
$0 |
$0 |
0 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
182 |
$14,533 |
1 |
0 |
19 |
0 |
0 |
0 |
3,452 |
$0 |
$276,133 |
19 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
16 |
192 |
10 |
19 |
0 |
$7,860 |
$0 |
16 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
16 |
128 |
6 |
13 |
0 |
$5,240 |
$0 |
16 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$7,000 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$7,000 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$23,600 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$23,600 |
0 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
19 |
760 |
38 |
76 |
0 |
$31,114 |
$143 |
19 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
2 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
2 |
32 |
2 |
3 |
0 |
$1,310 |
$0 |
4 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
2 |
48 |
2 |
5 |
0 |
$1,965 |
$15 |
2 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
1,176 |
59 |
118 |
3,719 |
$48,144 |
|
78 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
2 |
3 |
0 |
0 |
0 |
$123 |
$0 |
2 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
16 |
16 |
1 |
2 |
0 |
$655 |
$0 |
16 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
16 |
16 |
1 |
2 |
0 |
$655 |
$0 |
16 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
16 |
16 |
1 |
2 |
0 |
$655 |
$0 |
16 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
16 |
384 |
19 |
38 |
0 |
$15,721 |
$0 |
16 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
435 |
21.75 |
43.5 |
0 |
$17,809 |
$0 |
66 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
1,611 |
81 |
161 |
3,719 |
$65,953 |
$306,891 |
144 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
1,853 |
$65,953 |
$306,891 |
$372,844 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$7,000 |
$7,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$23,600 |
$23,600 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 4.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Energy Recovery Units (Liquid/Gas) |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$100 |
1 |
1 |
4 |
4 |
0 |
0 |
0 |
$164 |
$400 |
4 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$40,111 |
1 |
0 |
6 |
0 |
0 |
0 |
501 |
$0 |
$240,667 |
6 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
632 |
$50,533 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
4 |
256 |
13 |
26 |
0 |
$10,480 |
$0 |
4 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
4 |
288 |
14 |
29 |
0 |
$11,790 |
$0 |
4 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
6 |
240 |
12 |
24 |
0 |
$9,825 |
$0 |
6 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$23,056 |
1 |
17 |
6 |
102 |
5 |
10 |
0 |
$4,176 |
$138,338 |
6 |
f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$20,632 |
1 |
17 |
6 |
102 |
5 |
10 |
0 |
$4,176 |
$123,792 |
6 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
6 |
12 |
1 |
1 |
0 |
$491 |
$0 |
6 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
6 |
6 |
0 |
1 |
0 |
$246 |
$0 |
6 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
4 |
8 |
0 |
1 |
0 |
$328 |
$0 |
4 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
6 |
48 |
2 |
5 |
0 |
$1,965 |
$45 |
6 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
6 |
12 |
1 |
1 |
0 |
$491 |
$0 |
6 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
4 |
640 |
32 |
64 |
0 |
$26,201 |
$0 |
4 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
2 |
12 |
1 |
1 |
0 |
$491 |
$0 |
2 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
2 |
28 |
1 |
3 |
0 |
$1,146 |
$0 |
2 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
4 |
640 |
32 |
64 |
0 |
$26,201 |
$0 |
4 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
1 |
8 |
0 |
1 |
0 |
$328 |
$0 |
1 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
1 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
1 |
24 |
1 |
2 |
0 |
$983 |
$8 |
1 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
2,446 |
122 |
245 |
501 |
$100,137 |
|
80 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
1 |
2 |
0 |
0 |
0 |
$61 |
$0 |
1 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
1.5 |
0.075 |
0.15 |
0 |
$61 |
$0 |
1 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
2,448 |
122 |
245 |
501 |
$100,199 |
$503,249 |
81 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
2,815 |
$100,199 |
$503,249 |
$603,448 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$379,405 |
$379,405 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$123,792 |
$123,792 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 4.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Energy Recovery Units (Liquid/Gas) |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$40,111 |
1 |
0 |
0 |
0 |
0 |
0 |
501 |
$0 |
$0 |
0 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
632 |
$50,533 |
1 |
0 |
6 |
0 |
0 |
0 |
3,790 |
$0 |
$303,200 |
6 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
4 |
48 |
2 |
5 |
0 |
$1,965 |
$0 |
4 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
4 |
32 |
2 |
3 |
0 |
$1,310 |
$0 |
4 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$121,292 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$20,632 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$123,792 |
0 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
6 |
240 |
12 |
24 |
0 |
$9,825 |
$45 |
6 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
1 |
8 |
0 |
1 |
0 |
$328 |
$0 |
1 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
1 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
1 |
24 |
1 |
2 |
0 |
$983 |
$8 |
1 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
368 |
18 |
37 |
4,291 |
$15,066 |
|
24 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
1 |
2 |
0 |
0 |
0 |
$61 |
$0 |
1 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
4 |
4 |
0 |
0 |
0 |
$164 |
$0 |
4 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
4 |
4 |
0 |
0 |
0 |
$164 |
$0 |
4 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
4 |
4 |
0 |
0 |
0 |
$164 |
$0 |
4 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
4 |
96 |
5 |
10 |
0 |
$3,930 |
$0 |
4 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
109.5 |
5.475 |
10.95 |
0 |
$4,483 |
$0 |
17 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
478 |
24 |
48 |
4,291 |
$19,548 |
$548,337 |
41 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
549 |
$19,548 |
$548,337 |
$567,885 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$121,292 |
$121,292 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$123,792 |
$123,792 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 4.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Energy Recovery Units (Liquid/Gas) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$40,111 |
1 |
0 |
0 |
0 |
0 |
0 |
501 |
$0 |
$0 |
0 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
632 |
$50,533 |
1 |
0 |
6 |
0 |
0 |
0 |
3,790 |
$0 |
$303,200 |
6 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
4 |
48 |
2 |
5 |
0 |
$1,965 |
$0 |
4 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
4 |
32 |
2 |
3 |
0 |
$1,310 |
$0 |
4 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$121,292 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$20,632 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$123,792 |
0 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
6 |
240 |
12 |
24 |
0 |
$9,825 |
$45 |
6 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
1 |
8 |
0 |
1 |
0 |
$328 |
$0 |
1 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
1 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
1 |
24 |
1 |
2 |
0 |
$983 |
$8 |
1 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
368 |
18 |
37 |
4,291 |
$15,066 |
|
24 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
1 |
2 |
0 |
0 |
0 |
$61 |
$0 |
1 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
4 |
4 |
0 |
0 |
0 |
$164 |
$0 |
4 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
4 |
4 |
0 |
0 |
0 |
$164 |
$0 |
4 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
4 |
4 |
0 |
0 |
0 |
$164 |
$0 |
4 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
4 |
96 |
5 |
10 |
0 |
$3,930 |
$0 |
4 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
109.5 |
5.475 |
10.95 |
0 |
$4,483 |
$0 |
17 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
478 |
24 |
48 |
4,291 |
$19,548 |
$548,337 |
41 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
549 |
$19,548 |
$548,337 |
$567,885 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$121,292 |
$121,292 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$123,792 |
$123,792 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 5.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Waste-burning Kilns |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$100 |
1 |
1 |
12 |
12 |
1 |
1 |
0 |
$491 |
$1,200 |
12 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$15,417 |
1 |
0 |
16 |
0 |
0 |
0 |
193 |
$0 |
$246,667 |
16 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
357 |
$28,533 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
12 |
768 |
38 |
77 |
0 |
$31,441 |
$0 |
12 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
12 |
864 |
43 |
86 |
0 |
$35,371 |
$0 |
12 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
16 |
640 |
32 |
64 |
0 |
$26,201 |
$0 |
16 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$788 |
1 |
17 |
16 |
272 |
14 |
27 |
0 |
$11,135 |
$12,600 |
16 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$9,781 |
1 |
17 |
16 |
272 |
14 |
27 |
0 |
$11,135 |
$156,500 |
16 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
16 |
32 |
2 |
3 |
0 |
$1,310 |
$0 |
16 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
16 |
16 |
1 |
2 |
0 |
$655 |
$0 |
16 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
12 |
24 |
1 |
2 |
0 |
$983 |
$0 |
12 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
16 |
128 |
6 |
13 |
0 |
$5,240 |
$120 |
16 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
16 |
32 |
2 |
3 |
0 |
$1,310 |
$0 |
16 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
12 |
1,920 |
96 |
192 |
0 |
$78,603 |
$0 |
12 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
8 |
48 |
2 |
5 |
0 |
$1,965 |
$0 |
8 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
4 |
56 |
3 |
6 |
0 |
$2,293 |
$0 |
4 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
12 |
1,920 |
96 |
192 |
0 |
$78,603 |
$0 |
12 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
2 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
2 |
32 |
2 |
3 |
0 |
$1,310 |
$0 |
4 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
2 |
48 |
2 |
5 |
0 |
$1,965 |
$15 |
2 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
7,100 |
355 |
710 |
193 |
$290,668 |
|
220 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
2 |
3 |
0 |
0 |
0 |
$123 |
$0 |
2 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
3 |
0.15 |
0.3 |
0 |
$123 |
$0 |
2 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
7,103 |
355 |
710 |
193 |
$290,791 |
$417,102 |
222 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
8,168 |
$290,791 |
$417,102 |
$707,893 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$260,467 |
$260,467 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$156,500 |
$156,500 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 5.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Waste-burning Kilns |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
@$34.60 |
@$82.23 |
@$22.32 |
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year @$80 |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$15,417 |
1 |
0 |
0 |
0 |
0 |
0 |
193 |
$0 |
$0 |
0 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
357 |
$28,533 |
1 |
0 |
16 |
0 |
0 |
0 |
5,707 |
$0 |
$456,533 |
16 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
12 |
144 |
7 |
14 |
0 |
$5,895 |
$0 |
12 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
12 |
96 |
5 |
10 |
0 |
$3,930 |
$0 |
12 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$12,600 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$9,781 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$156,500 |
0 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
16 |
640 |
32 |
64 |
0 |
$26,201 |
$120 |
16 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
2 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
2 |
32 |
2 |
3 |
0 |
$1,310 |
$0 |
4 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
2 |
48 |
2 |
5 |
0 |
$1,965 |
$15 |
2 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
976 |
49 |
98 |
5,899 |
$39,957 |
|
64 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
2 |
3 |
0 |
0 |
0 |
$123 |
$0 |
2 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
12 |
12 |
1 |
1 |
0 |
$491 |
$0 |
12 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
12 |
12 |
1 |
1 |
0 |
$491 |
$0 |
12 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
12 |
12 |
1 |
1 |
0 |
$491 |
$0 |
12 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
12 |
288 |
14 |
29 |
0 |
$11,790 |
$0 |
12 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
327 |
16.35 |
32.7 |
0 |
$13,387 |
$0 |
50 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
1,303 |
65 |
130 |
5,899 |
$53,344 |
$625,768 |
114 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
1,498 |
$53,344 |
$625,768 |
$679,112 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$12,600 |
$12,600 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$156,500 |
$156,500 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 5.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Waste-burning Kilns |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$15,417 |
1 |
0 |
0 |
0 |
0 |
0 |
193 |
$0 |
$0 |
0 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
357 |
$28,533 |
1 |
0 |
16 |
0 |
0 |
0 |
5,707 |
$0 |
$456,533 |
16 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
12 |
144 |
7 |
14 |
0 |
$5,895 |
$0 |
12 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
12 |
96 |
5 |
10 |
0 |
$3,930 |
$0 |
12 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$12,600 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$9,781 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$156,500 |
0 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
16 |
640 |
32 |
64 |
0 |
$26,201 |
$120 |
16 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
2 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
2 |
32 |
2 |
3 |
0 |
$1,310 |
$0 |
4 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
2 |
48 |
2 |
5 |
0 |
$1,965 |
$15 |
2 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
976 |
49 |
98 |
5,899 |
$39,957 |
|
64 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
2 |
3 |
0 |
0 |
0 |
$123 |
$0 |
2 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
12 |
12 |
1 |
1 |
0 |
$491 |
$0 |
12 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
12 |
12 |
1 |
1 |
0 |
$491 |
$0 |
12 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
12 |
12 |
1 |
1 |
0 |
$491 |
$0 |
12 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
12 |
288 |
14 |
29 |
0 |
$11,790 |
$0 |
12 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
327 |
16.35 |
32.7 |
0 |
$13,387 |
$0 |
50 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
1,303 |
65 |
130 |
5,899 |
$53,344 |
$625,768 |
114 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
1,498 |
$53,344 |
$625,768 |
$679,112 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$12,600 |
$12,600 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$156,500 |
$156,500 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 7 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Emission Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1 |
|
|
|
|
|
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
Burden Item |
Number of Occurrences Per Year |
EPA Hours Per Occurrence |
Tech Hours Per Year (C=AxB) |
Management Hours Per Year (D=Cx0.05) |
Clerical Hours Per Year (E=Cx0.1) |
EPA Cost Per Year (a,b) |
1. |
Applications |
|
|
|
not applicable |
2. |
Read and Understand Rule Requirements |
|
|
|
1 |
c |
16 |
16 |
1 |
2 |
$954 |
3. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
A. |
Observe initial stack tests |
|
|
|
|
|
|
|
|
|
|
|
(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) |
15 |
c,d |
48 |
720 |
36 |
72 |
$42,947 |
|
B. |
Excess emissions -- Enforcement Activities |
|
|
8 |
f |
24 |
180 |
9 |
18 |
$10,737 |
|
C. |
Create Information |
|
|
not applicable |
|
D. |
Gather Information |
|
|
not applicable |
|
E. |
Report Reviews |
|
|
|
|
|
|
|
|
|
|
|
1) |
Review waste managemant plan and siting analysis |
|
55 |
c |
8 |
440 |
22 |
44 |
$26,245 |
|
|
2) |
Review report submitted prior to initial startup |
|
52 |
c |
2 |
104 |
5 |
10 |
$6,203 |
|
|
3) |
Review initial stack test report |
|
75 |
c |
40 |
3000 |
150 |
300 |
$178,944 |
|
|
4) |
Review annual compliance report |
|
0 |
e |
8 |
0 |
0 |
0 |
$0 |
|
|
5) |
Review semi-annual excess emission and parameter exceedance report |
7 |
f |
16 |
117 |
6 |
12 |
$6,967 |
|
|
6) |
Review status reports and corrective action summary for operators off-site |
15 |
g |
4 |
58 |
3 |
6 |
$3,483 |
|
F. |
Prepare annual summary report |
|
|
1 |
|
200 |
200 |
10 |
20 |
$11,930 |
5. |
Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = |
|
|
|
|
|
$881 |
per trip |
|
|
$13,219 |
|
TOTAL |
|
|
|
|
|
|
4835 |
242 |
484 |
$301,629 |
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52. |
|
|
|
|
|
|
|
|
|
|
|
|
b |
Figures may not add exactly due to rounding. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Assumes EPA personnel attend 20 percent of the initial stack tests. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Burden not incurred until second year of operation onward. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Assume that 10 percent of the facilities have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted. |
Table 8 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Emission Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2 |
|
|
|
|
|
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
Burden Item |
Number of Occurrences Per Year |
EPA Hours Per Occurrence |
Tech Hours Per Year (C=AxB) |
Management Hours Per Year (D=Cx0.05) |
Clerical Hours Per Year (E=Cx0.1) |
EPA Cost Per Year (a,b) |
1. |
Applications |
|
|
|
not applicable |
2. |
Read and Understand Rule Requirements |
|
|
|
0 |
c |
16 |
0 |
0 |
0 |
$0 |
3. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
A. |
|
Observe initial stack tests |
|
|
|
|
|
|
|
|
|
|
|
(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) |
0 |
c,d |
48 |
0 |
0 |
0 |
$0 |
|
B. |
|
Excess emissions -- Enforcement Activities |
|
8 |
f |
24 |
180 |
9 |
18 |
$10,737 |
|
C. |
|
Create Information |
|
not applicable |
|
D. |
|
Gather Information |
|
not applicable |
|
E. |
|
Report Reviews |
|
|
|
|
|
|
|
|
|
|
1) |
Review waste managemant plan and siting analysis |
|
0 |
c |
8 |
0 |
0 |
0 |
$0 |
|
|
2) |
Review report submitted prior to initial startup |
|
0 |
c |
2 |
0 |
0 |
0 |
$0 |
|
|
3) |
Review initial stack test report |
|
0 |
c |
40 |
0 |
0 |
0 |
$0 |
|
|
4) |
Review annual compliance report |
|
75 |
e |
8 |
600 |
30 |
60 |
$35,789 |
|
|
5) |
Review semi-annual excess emission and parameter exceedance report |
7 |
f |
16 |
117 |
6 |
12 |
$6,967 |
|
|
6) |
Review status reports and corrective action summary for operators off-site |
15 |
g |
4 |
58 |
3 |
6 |
$3,483 |
|
F. |
|
Prepare annual summary report |
|
1 |
|
200 |
200 |
10 |
20 |
$11,930 |
5. |
Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = |
|
|
|
|
|
|
per trip |
|
|
$0 |
|
TOTAL |
|
|
|
|
|
|
1155 |
58 |
116 |
$68,905 |
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52. |
|
|
|
|
|
|
|
|
|
|
|
|
b |
Figures may not add exactly due to rounding. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Assumes EPA personnel attend 20 percent of the initial stack tests. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Burden not incurred until second year of operation onward. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Assume that 10 percent of the facilities have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted. |
Table 9 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Emission Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3 |
|
|
|
|
|
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
Burden Item |
Number of Occurrences Per Year |
EPA Hours Per Occurrence |
Tech Hours Per Year (C=AxB) |
Management Hours Per Year (D=Cx0.05) |
Clerical Hours Per Year (E=Cx0.1) |
EPA Cost Per Year (a,b) |
1. |
Applications |
|
|
|
not applicable |
2. |
Read and Understand Rule Requirements |
|
|
|
0 |
c |
16 |
0 |
0 |
0 |
$0 |
3. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
A. |
|
Observe initial stack tests |
|
|
|
|
|
|
|
|
|
|
|
(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) |
0 |
c,d |
48 |
0 |
0 |
0 |
$0 |
|
B. |
|
Excess emissions -- Enforcement Activities |
|
8 |
f |
24 |
180 |
9 |
18 |
$10,737 |
|
C. |
|
Create Information |
|
not applicable |
|
D. |
|
Gather Information |
|
not applicable |
|
E. |
|
Report Reviews |
|
|
|
|
|
|
|
|
|
|
1) |
Review waste managemant plan and siting analysis |
0 |
c |
8 |
0 |
0 |
0 |
$0 |
|
|
2) |
Review report submitted prior to initial startup |
0 |
c |
2 |
0 |
0 |
0 |
$0 |
|
|
3) |
Review initial stack test report |
0 |
c |
40 |
0 |
0 |
0 |
$0 |
|
|
4) |
Review annual compliance report |
75 |
e |
8 |
600 |
30 |
60 |
$35,789 |
|
|
5) |
Review semi-annual excess emission and parameter exceedance report |
7 |
f |
16 |
117 |
6 |
12 |
$6,967 |
|
|
6) |
Review status reports and corrective action summary for operators off-site |
15 |
g |
4 |
58 |
3 |
6 |
$3,483 |
|
F. |
|
Prepare annual summary report |
|
1 |
|
200 |
200 |
10 |
20 |
$11,930 |
5. |
Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = |
|
|
|
|
|
|
per trip |
|
|
$0 |
|
TOTAL |
|
|
|
|
|
|
1155 |
58 |
116 |
$68,905 |
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52. |
|
|
|
|
|
|
|
|
|
|
|
|
b |
Figures may not add exactly due to rounding. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Assumes EPA personnel attend 20 percent of the initial stack tests. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Burden not incurred until second year of operation onward. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Assume that 10 percent of the facilities have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
g |
Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted. |