2385t02

2385t02.xlsx

Emission Guidelines for Commercial and Industrial Solid Waste Incineration (CISWI) units (40 CFR part 60, subpart DDDD) (Final Rule)

2385t02

OMB: 2060-0664

Document [xlsx]
Download: xlsx | pdf

Overview

COSTTAB_Incinerators Yr 1
COSTTAB_Incinerators Yr 2
COSTTAB_Incinerators Yr 3
COSTTAB_Incinerators Summary
COSTTAB_ERU-Solid Yr 1
COSTTAB_ERU-Solid Yr 2
COSTTAB_ERU-Solid Yr 3
COSTTAB_ERU-Solid Summary
COSTTAB_Small Remote Yr 1
COSTTAB_Small Remote Yr 2
COSTTAB_Small Remote Yr 3
COSTTAB_Small Remote Summary
COSTTAB_ERU-Liq Yr 1
COSTTAB_ERU-Liq Yr 2
COSTTAB_ERU-Liq Yr 3
COSTTAB_ERU-Liq Summary
COSTTAB_Cement Kilns Yr 1
COSTTAB_Cement Kilns Yr 2
COSTTAB_Cement Kilns Yr 3
COSTTAB_Cement Kilns Summary
RESPONDENTCOST Summary
EPACOST Year 1
EPACOST Year 2
EPACOST Year 3
EPACOST Summary


Sheet 1: COSTTAB_Incinerators Yr 1

Table 1.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Incinerators





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable














2. Surveys and Studies

Not applicable














3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $100 1 1 3 3 0 0 0 $123 $300 3 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $14,333 1 0 3 0 0 0 179 $0 $42,999 3 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 182 $14,533 1 0 0 0 0 0 0 $0 $0 0 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 3 192 10 19 0 $7,860 $0 3 c




b) Obtain operator qualification 72 0 $0 1 72 3 216 11 22 0 $8,843 $0 3 c




c) Annual refresher course 12
$0 1 12 0 0 0 0 0 $0 $0 0 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 0 0 0 0 0 $0 $0 0 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 3 120 6 12 0 $4,913 $0 3 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $8,000 1 17 3 51 3 5 0 $2,088 $8,000 3 c,f




b) Annual costs 17 0 $39,500 1 17 3 51 3 5 0 $2,088 $39,500 3 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 3 6 0 1 0 $246 $0 3





b) Fugitive Ash Emissions 1 0 $0 1 1 3 3 0 0 0 $123 $0 3




2) Notification of initial CMS Demonstration
2 0 $0 1 2 3 6 0 1 0 $246 $0 3




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 3 24 1 2 0 $983 $23 3





b) Fugitive Ash Emissions 2 0 $0 1 2 3 6 0 1 0 $246 $0 3




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 3 480 24 48 0 $19,651 $0 3 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 0 0 0 0 $0 $0 0 c



9) Waste management plan
160 0 $0 1 160 3 480 24 48 0 $19,651 $0 3 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 0 0 0 0 0 $0 $0 0



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 0.3 2 0 0 0 $98 $0 0 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 0.3 5 0 0 0 $197 $0 1 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 0.3 7 0 1 0 $295 $2 0 j

ReportingSubtotal








1,652 83 165 179 $67,648
43


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 0 0 0 0 0 0 $0 $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 0.3 0 0 0 0 $18 $0 0 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




8) Records of persons who have completed operator training
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 0 0 0 0 0 $0 $0 0



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








0.45 0.0225 0.045 0 $18 $0 0.3


TOTAL:








1,653 83 165 179 $67,666 $90,824 44













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

1,901 $67,666 $90,824 $158,490












Annualized Capital and Startup

$51,299 $51,299












O & M Summary

$39,500 $39,500
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 2: COSTTAB_Incinerators Yr 2

Table 1.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Incinerators





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable














2. Surveys and Studies

Not applicable














3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) Included in E. varies $0 1 0 0 0 0 0 0 $0 $0 0 c






















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) Included in E. 182 $14,533 1 0 3 0 0 0 545 $0 $43,600 3 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 3 36 2 4 0 $1,474 $0 3 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 3 24 1 2 0 $983 $0 3 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 0 $0 $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $8,000 1 17 0 0 0 0 0 $0 $8,000 0 c,f




b) Annual costs 17 0 $47,500 1 17 3 51 3 5 0 $2,088 $47,500 3 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 0 0 0 0 $0 $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 3 120 6 12 0 $4,913 $23 3



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 0.3 2 0 0 0 $98 $0 0 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 0.3 5 0 0 0 $197 $0 1 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 0.3 7 0 1 0 $295 $2 0 j

ReportingSubtotal








245 12 25 545 $10,046
16


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 0 0 0 0 0 0 $0 $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 0.3 0 0 0 0 $18 $0 0 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 3 3 0 0 0 $123 $0 3




8) Records of persons who have completed operator training
1 0 $0 1 1 3 3 0 0 0 $123 $0 3




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 3 3 0 0 0 $123 $0 3




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 3 72 4 7 0 $2,948 $0 3



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








81.45 4.0725 8.145 0 $3,334 $0 12.3


TOTAL:








327 16 33 545 $13,381 $99,125 29













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

376 $13,381 $99,125 $112,506












Annualized Capital and Startup

$8,000 $8,000












O & M Summary

$47,500 $47,500
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 3: COSTTAB_Incinerators Yr 3

Table 1.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Incinerators

























(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year
Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year


@$22.32 Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable














2. Surveys and Studies

Not applicable














3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $0 1 0 0 0 0 0 0 $0 $0 0 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 182 $14,533 1 0 3 0 0 0 545 $0 $43,600 3 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 3 36 2 4 0 $1,474 $0 3 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 3 24 1 2 0 $983 $0 3 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 0 $0 $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $8,000 1 17 0 0 0 0 0 $0 $8,000 0 c,f




b) Annual costs 17 0 $47,500 1 17 3 51 3 5 0 $2,088 $47,500 3 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 0 0 0 0 0 0 $0 $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 3 120 6 12 0 $4,913 $23 3



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 0.3 2 0 0 0 $98 $0 0 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 0.3 5 0 0 0 $197 $0 1 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 0.3 7 0 1 0 $295 $2 0 j

ReportingSubtotal








245 12 25 545 $10,046
16


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 0 0 0 0 0 0 $0 $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 0.3 0 0 0 0 $18 $0 0 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 3 3 0 0 0 $123 $0 3




8) Records of persons who have completed operator training
1 0 $0 1 1 3 3 0 0 0 $123 $0 3




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 3 3 0 0 0 $123 $0 3




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 3 72 4 7 0 $2,948 $0 3



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








81.45 4.0725 8.145 0 $3,334 $0 12.3


TOTAL:








327 16 33 545 $13,381 $99,125 29













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

376 $13,381 $99,125 $112,506












Annualized Capital and Startup

$8,000 $8,000












O & M Summary

$47,500 $47,500
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 4: COSTTAB_Incinerators Summary

Table 1.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD, Incinerators
Year Technical Hours Management Hours Clerical Hours Total Hours Testing Contractor Hoursa Labor Costs Non-Labor (O&M) Costs Total Costs
1 1,653 83 165 1,901 179 $67,666 $90,824 $158,490
2 327 16 33 376 545 $13,381 $99,125 $112,506
3 327 16 33 376 545 $13,381 $99,125 $112,506
Total 2,307 115 231 2,653 1,269 $94,428 $289,073 $383,502
Average 769 38 77 884 423 $31,476 $96,358 $127,834









a. Test contractor costs are accounted for in the non-labor category








Sheet 5: COSTTAB_ERU-Solid Yr 1

Table 2.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Energy Recovery Units (Solids)





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable














2. Surveys and Studies

Not applicable














3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $100 1 1 20 20 1 2 0 $819 $2,000 20 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $23,280 1 0 31 0 0 0 291 $0 $721,667 31 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 182 $14,533 1 0 0 0 0 0 0 $0 $0 0 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 20 1,280 64 128 0 $52,402 $0 20 c




b) Obtain operator qualification 72 0 $0 1 72 20 1,440 72 144 0 $58,952 $0 20 c




c) Annual refresher course 12
$0 1 12 0 0 0 0 0 $0 $0 0 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 0 0 0 0 0 $0 $0 0 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 31 1,240 62 124 0 $50,765 $0 31 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $16,708 1 17 31 527 26 53 0 $21,575 $517,944 31 c,f




b) Annual costs 17 0 $31,778 1 17 31 527 26 53 0 $21,575 $985,108 31 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 31 62 3 6 0 $2,538 $0 31





b) Fugitive Ash Emissions 1 0 $0 1 1 31 31 2 3 0 $1,269 $0 31




2) Notification of initial CMS Demonstration
2 0 $0 1 2 20 40 2 4 0 $1,638 $0 20




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 31 248 12 25 0 $10,153 $233 31





b) Fugitive Ash Emissions 2 0 $0 1 2 31 62 3 6 0 $2,538 $0 31




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 20 3,200 160 320 0 $131,005 $0 20 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 13 78 4 8 0 $3,193 $0 13 c,h




b) With site specific parameter petition 14 0 $0 1 14 7 98 5 10 0 $4,012 $0 7 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 0 0 0 0 0 0 $0 $0 0 c



9) Waste management plan
160 0 $0 1 160 20 3,200 160 320 0 $131,005 $0 20 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 0 0 0 0 0 $0 $0 0



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 2 16 1 2 0 $655 $0 2 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 2 32 2 3 0 $1,310 $0 4 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 2 48 2 5 0 $1,965 $15 2 j

ReportingSubtotal








12,149 607 1,215 291 $497,370
396


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 0 0 0 0 0 0 $0 $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 2 3 0 0 0 $123 $0 2 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




8) Records of persons who have completed operator training
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 0 0 0 0 0 $0 $0 0



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








3 0.15 0.3 0 $123 $0 2


TOTAL:








12,152 608 1,215 291 $497,493 $2,226,966 398













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

13,975 $497,493 $2,226,966 $2,724,459












Annualized Capital and Startup

$1,241,611 $1,241,611












O & M Summary

$985,108 $985,108
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 6: COSTTAB_ERU-Solid Yr 2

Table 2.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Energy Recovery Units (Solids)





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable














2. Surveys and Studies

Not applicable














3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $23,280 1 0 0 0 0 0 291 $0 $0 0 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 182 $14,533 1 0 31 0 0 0 5,632 $0 $450,533 31 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 20 240 12 24 0 $9,825 $0 20 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 20 160 8 16 0 $6,550 $0 20 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 0 $0 $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $0 1 17 0 0 0 0 0 $0 $279,300 0 c,f




b) Annual costs 17 0 $31,778 1 17 0 0 0 0 0 $0 $985,108 0 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 0 0 0 0 0 0 $0 $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 31 1,240 62 124 0 $50,765 $233 31



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 2 16 1 2 0 $655 $0 2 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 2 32 2 3 0 $1,310 $0 4 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 2 48 2 5 0 $1,965 $15 2 j

ReportingSubtotal








1,736 87 174 5,923 $71,070
110


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 0 0 0 0 0 0 $0 $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 2 3 0 0 0 $123 $0 2 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 20 20 1 2 0 $819 $0 20




8) Records of persons who have completed operator training
1 0 $0 1 1 20 20 1 2 0 $819 $0 20




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 20 20 1 2 0 $819 $0 20




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 20 480 24 48 0 $19,651 $0 20



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








543 27.15 54.3 0 $22,230 $0 82


TOTAL:








2,279 114 228 5,923 $93,300 $1,715,189 192













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

2,621 $93,300 $1,715,189 $1,808,489












Annualized Capital and Startup

$279,300 $279,300












O & M Summary

$985,108 $985,108
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 7: COSTTAB_ERU-Solid Yr 3

Table 2.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Energy Recovery Units (Solids)





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable














2. Surveys and Studies

Not applicable














3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $23,280 1 0 0 0 0 0 291 $0 $0 0 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 182 $14,533 1 0 31 0 0 0 5,632 $0 $450,533 31 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 20 240 12 24 0 $9,825 $0 20 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 20 160 8 16 0 $6,550 $0 20 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 0 $0 $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $0 1 17 0 0 0 0 0 $0 $279,300 0 c,f




b) Annual costs 17 0 $31,778 1 17 0 0 0 0 0 $0 $985,108 0 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 0 0 0 0 0 0 $0 $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 31 1,240 62 124 0 $50,765 $233 31



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 2 16 1 2 0 $655 $0 2 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 2 32 2 3 0 $1,310 $0 4 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 2 48 2 5 0 $1,965 $15 2 j

ReportingSubtotal








1,736 87 174 5,923 $71,070
110


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 0 0 0 0 0 0 $0 $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 2 3 0 0 0 $123 $0 2 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 20 20 1 2 0 $819 $0 20




8) Records of persons who have completed operator training
1 0 $0 1 1 20 20 1 2 0 $819 $0 20




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 20 20 1 2 0 $819 $0 20




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 20 480 24 48 0 $19,651 $0 20



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








543 27.15 54.3 0 $22,230 $0 82


TOTAL:








2,279 114 228 5,923 $93,300 $1,715,189 192













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

2,621 $93,300 $1,715,189 $1,808,489












Annualized Capital and Startup

$279,300 $279,300












O & M Summary

$985,108 $985,108
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 8: COSTTAB_ERU-Solid Summary

Table 2.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD, Energy Recovery Units (Solids)
Year Technical Hours Management Hours Clerical Hours Total Hours Testing Contractor Hoursa Labor Costs Non-Labor (O&M) Costs Total Costs
1 12,152 608 1,215 13,975 291 $497,493 $2,226,966 $2,724,459
2 2,279 114 228 2,621 5,923 $93,300 $1,715,189 $1,808,489
3 2,279 114 228 2,621 5,923 $93,300 $1,715,189 $1,808,489
Total 16,710 836 1,671 19,217 12,136 $684,094 $5,657,344 $6,341,438
Average 5,570 279 557 6,406 4,045 $228,031 $1,885,781 $2,113,813









a. Test contractor costs are accounted for in the non-labor category








Sheet 9: COSTTAB_Small Remote Yr 1

Table 3.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Small Remote Incinerators





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable














2. Surveys and Studies

Not applicable














3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $100 1 1 16 16 1 2 0 $655 $1,600 16 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $21,377 1 0 19 0 0 0 267 $0 $406,167 19 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 182 $14,533 1 0 0 0 0 0 0 $0 $0 0 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 16 1,024 51 102 0 $41,922 $0 16 c




b) Obtain operator qualification 72 0 $0 1 72 16 1,152 58 115 0 $47,162 $0 16 c




c) Annual refresher course 12
$0 1 12 0 0 0 0 0 $0 $0 0 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 0 0 0 0 0 $0 $0 0 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 19 760 38 76 0 $31,114 $0 19 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $368 1 17 19 323 16 32 0 $13,223 $7,000 19 c,f




b) Annual costs 17 0 $1,242 1 17 19 323 16 32 0 $13,223 $23,600 19 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 19 38 2 4 0 $1,556 $0 19





b) Fugitive Ash Emissions 1 0 $0 1 1 19 19 1 2 0 $778 $0 19




2) Notification of initial CMS Demonstration
2 0 $0 1 2 16 32 2 3 0 $1,310 $0 16




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 19 152 8 15 0 $6,223 $143 19





b) Fugitive Ash Emissions 2 0 $0 1 2 19 38 2 4 0 $1,556 $0 19




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 16 2,560 128 256 0 $104,804 $0 16 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 10 60 3 6 0 $2,456 $0 10 c,h




b) With site specific parameter petition 14 0 $0 1 14 6 84 4 8 0 $3,439 $0 6 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 0 0 0 0 0 0 $0 $0 0 c



9) Waste management plan
160 0 $0 1 160 16 2,560 128 256 0 $104,804 $0 16 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 0 0 0 0 0 $0 $0 0



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 2 16 1 2 0 $655 $0 2 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 2 32 2 3 0 $1,310 $0 4 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 2 48 2 5 0 $1,965 $15 2 j

ReportingSubtotal








9,237 462 924 267 $378,155
272


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 0 0 0 0 0 0 $0 $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 2 3 0 0 0 $123 $0 2 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




8) Records of persons who have completed operator training
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 0 0 0 0 0 $0 $0 0



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








3 0.15 0.3 0 $123 $0 2


TOTAL:








9,240 462 924 267 $378,278 $438,524 274













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

10,626 $378,278 $438,524 $816,802












Annualized Capital and Startup

$414,767 $414,767












O & M Summary

$23,600 $23,600
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 10: COSTTAB_Small Remote Yr 2

Table 3.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Small Remote Incinerators

























(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable














2. Surveys and Studies

Not applicable














3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $21,377 1 0 0 0 0 0 267 $0 $0 0 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 182 $14,533 1 0 19 0 0 0 3,452 $0 $276,133 19 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 16 192 10 19 0 $7,860 $0 16 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 16 128 6 13 0 $5,240 $0 16 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 0 $0 $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $7,000 1 17 0 0 0 0 0 $0 $7,000 0 c,f




b) Annual costs 17 0 $23,600 1 17 0 0 0 0 0 $0 $23,600 0 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 0 0 0 0 0 0 $0 $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 19 760 38 76 0 $31,114 $143 19



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 2 16 1 2 0 $655 $0 2 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 2 32 2 3 0 $1,310 $0 4 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 2 48 2 5 0 $1,965 $15 2 j

ReportingSubtotal








1,176 59 118 3,719 $48,144
78


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 0 0 0 0 0 0 $0 $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 2 3 0 0 0 $123 $0 2 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 16 16 1 2 0 $655 $0 16




8) Records of persons who have completed operator training
1 0 $0 1 1 16 16 1 2 0 $655 $0 16




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 16 16 1 2 0 $655 $0 16




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 16 384 19 38 0 $15,721 $0 16



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








435 21.75 43.5 0 $17,809 $0 66


TOTAL:








1,611 81 161 3,719 $65,953 $306,891 144













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

1,853 $65,953 $306,891 $372,844












Annualized Capital and Startup

$7,000 $7,000












O & M Summary

$23,600 $23,600
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 11: COSTTAB_Small Remote Yr 3

Table 3.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Small Remote Incinerators





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable














2. Surveys and Studies

Not applicable














3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $21,377 1 0 0 0 0 0 267 $0 $0 0 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 182 $14,533 1 0 19 0 0 0 3,452 $0 $276,133 19 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 16 192 10 19 0 $7,860 $0 16 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 16 128 6 13 0 $5,240 $0 16 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 0 $0 $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $7,000 1 17 0 0 0 0 0 $0 $7,000 0 c,f




b) Annual costs 17 0 $23,600 1 17 0 0 0 0 0 $0 $23,600 0 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 0 0 0 0 0 0 $0 $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 19 760 38 76 0 $31,114 $143 19



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 2 16 1 2 0 $655 $0 2 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 2 32 2 3 0 $1,310 $0 4 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 2 48 2 5 0 $1,965 $15 2 j

ReportingSubtotal








1,176 59 118 3,719 $48,144
78


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 0 0 0 0 0 0 $0 $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 2 3 0 0 0 $123 $0 2 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 16 16 1 2 0 $655 $0 16




8) Records of persons who have completed operator training
1 0 $0 1 1 16 16 1 2 0 $655 $0 16




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 16 16 1 2 0 $655 $0 16




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 16 384 19 38 0 $15,721 $0 16



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








435 21.75 43.5 0 $17,809 $0 66


TOTAL:








1,611 81 161 3,719 $65,953 $306,891 144













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

1,853 $65,953 $306,891 $372,844












Annualized Capital and Startup

$7,000 $7,000












O & M Summary

$23,600 $23,600
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 12: COSTTAB_Small Remote Summary

Table 3.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD, Small Remote Incinerators
Year Technical Hours Management Hours Clerical Hours Total Hours Testing Contractor Hoursa Labor Costs Non-Labor (O&M) Costs Total Costs
1 9,240 462 924 10,626 267 $378,278 $438,524 $816,802
2 1,611 81 161 1,853 3,719 $65,953 $306,891 $372,844
3 1,611 81 161 1,853 3,719 $65,953 $306,891 $372,844
Total 12,462 623 1,246 14,331 7,705 $510,184 $1,052,306 $1,562,490
Average 4,154 208 415 4,777 2,568 $170,061 $350,769 $520,830









a. Test contractor costs are accounted for in the non-labor category








Sheet 13: COSTTAB_ERU-Liq Yr 1

Table 4.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Energy Recovery Units (Liquid/Gas)





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable














2. Surveys and Studies

Not applicable














3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $100 1 1 4 4 0 0 0 $164 $400 4 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $40,111 1 0 6 0 0 0 501 $0 $240,667 6 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 632 $50,533 1 0 0 0 0 0 0 $0 $0 0 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 4 256 13 26 0 $10,480 $0 4 c




b) Obtain operator qualification 72 0 $0 1 72 4 288 14 29 0 $11,790 $0 4 c




c) Annual refresher course 12
$0 1 12 0 0 0 0 0 $0 $0 0 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 0 0 0 0 0 $0 $0 0 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 6 240 12 24 0 $9,825 $0 6 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $23,056 1 17 6 102 5 10 0 $4,176 $138,338 6 f




b) Annual costs 17 0 $20,632 1 17 6 102 5 10 0 $4,176 $123,792 6 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 6 12 1 1 0 $491 $0 6





b) Fugitive Ash Emissions 1 0 $0 1 1 6 6 0 1 0 $246 $0 6




2) Notification of initial CMS Demonstration
2 0 $0 1 2 4 8 0 1 0 $328 $0 4




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 6 48 2 5 0 $1,965 $45 6





b) Fugitive Ash Emissions 2 0 $0 1 2 6 12 1 1 0 $491 $0 6




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 4 640 32 64 0 $26,201 $0 4 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 2 12 1 1 0 $491 $0 2 c,h




b) With site specific parameter petition 14 0 $0 1 14 2 28 1 3 0 $1,146 $0 2 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 0 0 0 0 0 0 $0 $0 0 c



9) Waste management plan
160 0 $0 1 160 4 640 32 64 0 $26,201 $0 4 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 0 0 0 0 0 $0 $0 0



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 1 8 0 1 0 $328 $0 1 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 1 16 1 2 0 $655 $0 2 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 1 24 1 2 0 $983 $8 1 j

ReportingSubtotal








2,446 122 245 501 $100,137
80


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 0 0 0 0 0 0 $0 $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 1 2 0 0 0 $61 $0 1 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




8) Records of persons who have completed operator training
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 0 0 0 0 0 $0 $0 0



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








1.5 0.075 0.15 0 $61 $0 1


TOTAL:








2,448 122 245 501 $100,199 $503,249 81













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

2,815 $100,199 $503,249 $603,448












Annualized Capital and Startup

$379,405 $379,405












O & M Summary

$123,792 $123,792
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 14: COSTTAB_ERU-Liq Yr 2

Table 4.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Energy Recovery Units (Liquid/Gas)





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable














2. Surveys and Studies

Not applicable














3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $40,111 1 0 0 0 0 0 501 $0 $0 0 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 632 $50,533 1 0 6 0 0 0 3,790 $0 $303,200 6 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 4 48 2 5 0 $1,965 $0 4 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 4 32 2 3 0 $1,310 $0 4 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 0 $0 $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $0 1 17 0 0 0 0 0 $0 $121,292 0 c,f




b) Annual costs 17 0 $20,632 1 17 0 0 0 0 0 $0 $123,792 0 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 0 0 0 0 0 0 $0 $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 6 240 12 24 0 $9,825 $45 6



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 1 8 0 1 0 $328 $0 1 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 1 16 1 2 0 $655 $0 2 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 1 24 1 2 0 $983 $8 1 j

ReportingSubtotal








368 18 37 4,291 $15,066
24


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 0 0 0 0 0 0 $0 $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 1 2 0 0 0 $61 $0 1 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 4 4 0 0 0 $164 $0 4




8) Records of persons who have completed operator training
1 0 $0 1 1 4 4 0 0 0 $164 $0 4




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 4 4 0 0 0 $164 $0 4




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 4 96 5 10 0 $3,930 $0 4



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








109.5 5.475 10.95 0 $4,483 $0 17


TOTAL:








478 24 48 4,291 $19,548 $548,337 41













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

549 $19,548 $548,337 $567,885












Annualized Capital and Startup

$121,292 $121,292












O & M Summary

$123,792 $123,792
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 15: COSTTAB_ERU-Liq Yr 3

Table 4.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Energy Recovery Units (Liquid/Gas)

























(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable














2. Surveys and Studies

Not applicable














3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $40,111 1 0 0 0 0 0 501 $0 $0 0 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 632 $50,533 1 0 6 0 0 0 3,790 $0 $303,200 6 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 4 48 2 5 0 $1,965 $0 4 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 4 32 2 3 0 $1,310 $0 4 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 0 $0 $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $0 1 17 0 0 0 0 0 $0 $121,292 0 c,f




b) Annual costs 17 0 $20,632 1 17 0 0 0 0 0 $0 $123,792 0 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 0 0 0 0 0 0 $0 $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 6 240 12 24 0 $9,825 $45 6



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 1 8 0 1 0 $328 $0 1 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 1 16 1 2 0 $655 $0 2 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 1 24 1 2 0 $983 $8 1 j

ReportingSubtotal








368 18 37 4,291 $15,066
24


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 0 0 0 0 0 0 $0 $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 1 2 0 0 0 $61 $0 1 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 4 4 0 0 0 $164 $0 4




8) Records of persons who have completed operator training
1 0 $0 1 1 4 4 0 0 0 $164 $0 4




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 4 4 0 0 0 $164 $0 4




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 4 96 5 10 0 $3,930 $0 4



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








109.5 5.475 10.95 0 $4,483 $0 17


TOTAL:








478 24 48 4,291 $19,548 $548,337 41













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

549 $19,548 $548,337 $567,885












Annualized Capital and Startup

$121,292 $121,292












O & M Summary

$123,792 $123,792
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 16: COSTTAB_ERU-Liq Summary

Table 4.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD, Energy Recovery Units (Liquid/Gas)
Year Technical Hours Management Hours Clerical Hours Total Hours Testing Contractor Hoursa Labor Costs Non-Labor (O&M) Costs Total Costs
1 2,448 122 245 2,815 501 $100,199 $503,249 $603,448
2 478 24 48 549 4,291 $19,548 $548,337 $567,885
3 478 24 48 549 4,291 $19,548 $548,337 $567,885
Total 3,403 170 340 3,913 9,084 $139,296 $1,599,922 $1,739,218
Average 1,134 57 113 1,304 3,028 $46,432 $533,307 $579,739









a. Test contractor costs are accounted for in the non-labor category








Sheet 17: COSTTAB_Cement Kilns Yr 1

Table 5.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Waste-burning Kilns





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable














2. Surveys and Studies

Not applicable














3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $100 1 1 12 12 1 1 0 $491 $1,200 12 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $15,417 1 0 16 0 0 0 193 $0 $246,667 16 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 357 $28,533 1 0 0 0 0 0 0 $0 $0 0 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 12 768 38 77 0 $31,441 $0 12 c




b) Obtain operator qualification 72 0 $0 1 72 12 864 43 86 0 $35,371 $0 12 c




c) Annual refresher course 12
$0 1 12 0 0 0 0 0 $0 $0 0 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 0 0 0 0 0 $0 $0 0 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 16 640 32 64 0 $26,201 $0 16 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $788 1 17 16 272 14 27 0 $11,135 $12,600 16 c,f




b) Annual costs 17 0 $9,781 1 17 16 272 14 27 0 $11,135 $156,500 16 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 16 32 2 3 0 $1,310 $0 16





b) Fugitive Ash Emissions 1 0 $0 1 1 16 16 1 2 0 $655 $0 16




2) Notification of initial CMS Demonstration
2 0 $0 1 2 12 24 1 2 0 $983 $0 12




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 16 128 6 13 0 $5,240 $120 16





b) Fugitive Ash Emissions 2 0 $0 1 2 16 32 2 3 0 $1,310 $0 16




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 12 1,920 96 192 0 $78,603 $0 12 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 8 48 2 5 0 $1,965 $0 8 c,h




b) With site specific parameter petition 14 0 $0 1 14 4 56 3 6 0 $2,293 $0 4 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 0 0 0 0 0 0 $0 $0 0 c



9) Waste management plan
160 0 $0 1 160 12 1,920 96 192 0 $78,603 $0 12 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 0 0 0 0 0 $0 $0 0



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 2 16 1 2 0 $655 $0 2 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 2 32 2 3 0 $1,310 $0 4 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 2 48 2 5 0 $1,965 $15 2 j

ReportingSubtotal








7,100 355 710 193 $290,668
220


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 0 0 0 0 0 0 $0 $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 2 3 0 0 0 $123 $0 2 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




8) Records of persons who have completed operator training
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 0 0 0 0 0 $0 $0 0



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








3 0.15 0.3 0 $123 $0 2


TOTAL:








7,103 355 710 193 $290,791 $417,102 222













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

8,168 $290,791 $417,102 $707,893












Annualized Capital and Startup

$260,467 $260,467












O & M Summary

$156,500 $156,500
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 18: COSTTAB_Cement Kilns Yr 2

Table 5.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Waste-burning Kilns





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year
@$34.60 @$82.23 @$22.32 Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year @$80





1. Applications

Not applicable














2. Surveys and Studies

Not applicable














3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $15,417 1 0 0 0 0 0 193 $0 $0 0 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 357 $28,533 1 0 16 0 0 0 5,707 $0 $456,533 16 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 12 144 7 14 0 $5,895 $0 12 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 12 96 5 10 0 $3,930 $0 12 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 0 $0 $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $0 1 17 0 0 0 0 0 $0 $12,600 0 c,f




b) Annual costs 17 0 $9,781 1 17 0 0 0 0 0 $0 $156,500 0 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 0 0 0 0 0 0 $0 $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 16 640 32 64 0 $26,201 $120 16



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 2 16 1 2 0 $655 $0 2 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 2 32 2 3 0 $1,310 $0 4 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 2 48 2 5 0 $1,965 $15 2 j

ReportingSubtotal








976 49 98 5,899 $39,957
64


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 0 0 0 0 0 0 $0 $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 2 3 0 0 0 $123 $0 2 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 12 12 1 1 0 $491 $0 12




8) Records of persons who have completed operator training
1 0 $0 1 1 12 12 1 1 0 $491 $0 12




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 12 12 1 1 0 $491 $0 12




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 12 288 14 29 0 $11,790 $0 12



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








327 16.35 32.7 0 $13,387 $0 50


TOTAL:








1,303 65 130 5,899 $53,344 $625,768 114













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

1,498 $53,344 $625,768 $679,112












Annualized Capital and Startup

$12,600 $12,600












O & M Summary

$156,500 $156,500
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 19: COSTTAB_Cement Kilns Yr 3

Table 5.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Waste-burning Kilns





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable














2. Surveys and Studies

Not applicable














3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $15,417 1 0 0 0 0 0 193 $0 $0 0 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 357 $28,533 1 0 16 0 0 0 5,707 $0 $456,533 16 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 12 144 7 14 0 $5,895 $0 12 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 12 96 5 10 0 $3,930 $0 12 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 0 $0 $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $0 1 17 0 0 0 0 0 $0 $12,600 0 c,f




b) Annual costs 17 0 $9,781 1 17 0 0 0 0 0 $0 $156,500 0 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 0 0 0 0 0 0 $0 $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 16 640 32 64 0 $26,201 $120 16



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 2 16 1 2 0 $655 $0 2 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 2 32 2 3 0 $1,310 $0 4 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 2 48 2 5 0 $1,965 $15 2 j

ReportingSubtotal








976 49 98 5,899 $39,957
64


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 0 0 0 0 0 0 $0 $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 2 3 0 0 0 $123 $0 2 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 12 12 1 1 0 $491 $0 12




8) Records of persons who have completed operator training
1 0 $0 1 1 12 12 1 1 0 $491 $0 12




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 12 12 1 1 0 $491 $0 12




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 12 288 14 29 0 $11,790 $0 12



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








327 16.35 32.7 0 $13,387 $0 50


TOTAL:








1,303 65 130 5,899 $53,344 $625,768 114













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

1,498 $53,344 $625,768 $679,112












Annualized Capital and Startup

$12,600 $12,600












O & M Summary

$156,500 $156,500
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 20: COSTTAB_Cement Kilns Summary

Table 5.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD, Waste-burning Kilns
Year Technical Hours Management Hours Clerical Hours Total Hours Testing Contractor Hoursa Labor Costs Non-Labor (O&M) Costs Total Costs
1 7,103 355 710 8,168 193 $290,791 $417,102 $707,893
2 1,303 65 130 1,498 5,899 $53,344 $625,768 $679,112
3 1,303 65 130 1,498 5,899 $53,344 $625,768 $679,112
Total 9,709 485 971 11,165 11,991 $397,479 $1,668,638 $2,066,117
Average 3,236 162 324 3,722 3,997 $132,493 $556,213 $688,706









a. Test contractor costs are accounted for in the non-labor category








Sheet 21: RESPONDENTCOST Summary

Table 6 - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD, All Subcategories
Year Technical Hours Management Hours Clerical Hours Total Labor Hours Testing Contractor Hoursa Labor Costs Non-Labor (O&M) Costs Total Costs
1 32,595 1,630 3,260 37,485 1,431 $1,334,428 $3,676,665 $5,011,092
2 5,997 300 600 6,897 20,377 $245,527 $3,295,309 $3,540,836
3 5,997 300 600 6,897 20,377 $245,527 $3,295,309 $3,540,836
Total 44,590 2,230 4,459 51,279 42,186 $1,825,481 $10,267,283 $12,092,764
Average 14,863 743 1,486 17,093 14,062 $608,494 $3,422,428 $4,030,921









a. Test contractor costs are accounted for in the non-labor category








Sheet 22: EPACOST Year 1

Table 7 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Emission Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1





(A) (B) (C) (D) (E) (F)
Burden Item Number of Occurrences Per Year EPA Hours Per Occurrence Tech Hours Per Year (C=AxB) Management Hours Per Year (D=Cx0.05) Clerical Hours Per Year (E=Cx0.1) EPA Cost Per Year (a,b)
1. Applications


not applicable
2. Read and Understand Rule Requirements


1 c 16 16 1 2 $954
3. Required Activities










A. Observe initial stack tests










(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) 15 c,d 48 720 36 72 $42,947

B. Excess emissions -- Enforcement Activities

8 f 24 180 9 18 $10,737

C. Create Information

not applicable

D. Gather Information

not applicable

E. Report Reviews










1) Review waste managemant plan and siting analysis
55 c 8 440 22 44 $26,245


2) Review report submitted prior to initial startup
52 c 2 104 5 10 $6,203


3) Review initial stack test report
75 c 40 3000 150 300 $178,944


4) Review annual compliance report
0 e 8 0 0 0 $0


5) Review semi-annual excess emission and parameter exceedance report 7 f 16 117 6 12 $6,967


6) Review status reports and corrective action summary for operators off-site 15 g 4 58 3 6 $3,483

F. Prepare annual summary report

1 200 200 10 20 $11,930
5. Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) =




$881 per trip

$13,219

TOTAL





4835 242 484 $301,629












FOOTNOTES






















a Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52.












b Figures may not add exactly due to rounding.




















c One-time only costs.





















d Assumes EPA personnel attend 20 percent of the initial stack tests.





















e Burden not incurred until second year of operation onward.





















f Assume that 10 percent of the facilities have an exceedance during the year.





















g Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted.

Sheet 23: EPACOST Year 2

Table 8 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Emission Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2





(A) (B) (C) (D) (E) (F)
Burden Item Number of Occurrences Per Year EPA Hours Per Occurrence Tech Hours Per Year (C=AxB) Management Hours Per Year (D=Cx0.05) Clerical Hours Per Year (E=Cx0.1) EPA Cost Per Year (a,b)
1. Applications


not applicable
2. Read and Understand Rule Requirements


0 c 16 0 0 0 $0
3. Required Activities










A.
Observe initial stack tests










(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) 0 c,d 48 0 0 0 $0

B.
Excess emissions -- Enforcement Activities
8 f 24 180 9 18 $10,737

C.
Create Information
not applicable

D.
Gather Information
not applicable

E.
Report Reviews









1) Review waste managemant plan and siting analysis
0 c 8 0 0 0 $0


2) Review report submitted prior to initial startup
0 c 2 0 0 0 $0


3) Review initial stack test report
0 c 40 0 0 0 $0


4) Review annual compliance report
75 e 8 600 30 60 $35,789


5) Review semi-annual excess emission and parameter exceedance report 7 f 16 117 6 12 $6,967


6) Review status reports and corrective action summary for operators off-site 15 g 4 58 3 6 $3,483

F.
Prepare annual summary report
1 200 200 10 20 $11,930
5. Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) =





per trip

$0

TOTAL





1155 58 116 $68,905












FOOTNOTES






















a Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52.












b Figures may not add exactly due to rounding.





















c One-time only costs.





















d Assumes EPA personnel attend 20 percent of the initial stack tests.





















e Burden not incurred until second year of operation onward.





















f Assume that 10 percent of the facilities have an exceedance during the year.





















g Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted.

Sheet 24: EPACOST Year 3

Table 9 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Emission Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3





(A) (B) (C) (D) (E) (F)
Burden Item Number of Occurrences Per Year EPA Hours Per Occurrence Tech Hours Per Year (C=AxB) Management Hours Per Year (D=Cx0.05) Clerical Hours Per Year (E=Cx0.1) EPA Cost Per Year (a,b)
1. Applications


not applicable
2. Read and Understand Rule Requirements


0 c 16 0 0 0 $0
3. Required Activities










A.
Observe initial stack tests










(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) 0 c,d 48 0 0 0 $0

B.
Excess emissions -- Enforcement Activities
8 f 24 180 9 18 $10,737

C.
Create Information
not applicable

D.
Gather Information
not applicable

E.
Report Reviews









1) Review waste managemant plan and siting analysis 0 c 8 0 0 0 $0


2) Review report submitted prior to initial startup 0 c 2 0 0 0 $0


3) Review initial stack test report 0 c 40 0 0 0 $0


4) Review annual compliance report 75 e 8 600 30 60 $35,789


5) Review semi-annual excess emission and parameter exceedance report 7 f 16 117 6 12 $6,967


6) Review status reports and corrective action summary for operators off-site 15 g 4 58 3 6 $3,483

F.
Prepare annual summary report
1 200 200 10 20 $11,930
5. Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) =





per trip

$0

TOTAL





1155 58 116 $68,905












FOOTNOTES






















a Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52.












b Figures may not add exactly due to rounding.





















c One-time only costs.





















d Assumes EPA personnel attend 20 percent of the initial stack tests.





















e Burden not incurred until second year of operation onward.





















f Assume that 10 percent of the facilities have an exceedance during the year.












g Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted.

Sheet 25: EPACOST Summary

Table 10 - Summary of Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Emission Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD
Year Technical Hours Management Hours Clerical Hours Total Hours Labor Costs Non-Labor (O&M) Costs Total Costs
1 4,835 242 484 5,560 $288,410 $13,219 $301,629
2 1,155 58 116 1,328 $68,905 $0 $68,905
3 1,155 58 116 1,328 $68,905 $0 $68,905
Total 7,146 357 715 8,217 $426,221 $13,219 $439,439
Average 2,382 119 238 2,739 $142,074 $4,406 $146,480
File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy