Table 1.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Standards of Performance |
|
|
for New Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart CCCC - Year 1, Small Remote Incinerators |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
#VALUE! |
|
#VALUE! |
#VALUE! |
#VALUE! |
|
#VALUE! |
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$100 |
1 |
1 |
1 |
1 |
0 |
0 |
0 |
$41 |
$100 |
1 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$55,000 |
1 |
#VALUE! |
1 |
#VALUE! |
#VALUE! |
#VALUE! |
688 |
$0 |
$55,000 |
1 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
182 |
$14,533 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
1 |
64 |
3 |
6 |
0 |
$2,620 |
$0 |
1 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
1 |
72 |
4 |
7 |
0 |
$2,948 |
$0 |
1 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
1 |
40 |
2 |
4 |
#VALUE! |
$1,638 |
$0 |
1 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$16,100 |
1 |
17 |
1 |
17 |
1 |
2 |
0 |
$696 |
$16,100 |
1 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$55,300 |
1 |
17 |
1 |
17 |
1 |
2 |
0 |
$696 |
$55,300 |
1 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
1 |
2 |
0 |
0 |
0 |
$82 |
$0 |
1 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
1 |
1 |
0 |
0 |
0 |
$41 |
$0 |
1 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
1 |
2 |
0 |
0 |
0 |
$82 |
$0 |
1 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
1 |
8 |
0 |
1 |
0 |
$328 |
$8 |
1 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
1 |
2 |
0 |
0 |
0 |
$82 |
$0 |
1 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
1 |
160 |
8 |
16 |
0 |
$6,550 |
$0 |
1 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
1 |
14 |
1 |
1 |
0 |
$573 |
$0 |
1 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
1 |
160 |
8 |
16 |
0 |
$6,550 |
$0 |
1 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
1 |
8 |
0 |
1 |
0 |
$328 |
$0 |
1 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
1 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
1 |
24 |
1 |
2 |
0 |
$983 |
$8 |
1 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
|
19 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
1 |
2 |
0 |
0 |
0 |
$61 |
$0 |
1 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
1 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
$126,515 |
20 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
#VALUE! |
#VALUE! |
$126,515 |
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$71,200 |
$71,200 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$55,300 |
$55,300 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 1.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Standards of Performance |
|
|
for New Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart CCCC - Year 2, Small Remote Incinerators |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
#VALUE! |
|
#VALUE! |
#VALUE! |
#VALUE! |
|
#VALUE! |
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
1 |
1 |
0 |
0 |
0 |
$41 |
$0 |
1 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$55,000 |
1 |
#VALUE! |
1 |
#VALUE! |
#VALUE! |
#VALUE! |
688 |
$0 |
$55,000 |
1 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
182 |
$14,533 |
1 |
#VALUE! |
1 |
#VALUE! |
#VALUE! |
#VALUE! |
182 |
$0 |
$14,533 |
1 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
1 |
64 |
3 |
6 |
0 |
$2,620 |
$0 |
1 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
1 |
72 |
4 |
7 |
0 |
$2,948 |
$0 |
1 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
1 |
12 |
1 |
1 |
0 |
$491 |
$0 |
1 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
1 |
8 |
0 |
1 |
0 |
$328 |
$0 |
1 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
1 |
40 |
2 |
4 |
#VALUE! |
#VALUE! |
$0 |
1 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$16,100 |
1 |
17 |
1 |
17 |
1 |
2 |
0 |
$696 |
$16,100 |
1 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$55,300 |
1 |
17 |
1 |
17 |
1 |
2 |
0 |
$696 |
$55,300 |
1 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
1 |
2 |
0 |
0 |
0 |
$82 |
$0 |
1 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
1 |
1 |
0 |
0 |
0 |
$41 |
$0 |
1 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
1 |
2 |
0 |
0 |
0 |
$82 |
$0 |
1 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
1 |
8 |
0 |
1 |
0 |
$328 |
$8 |
1 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
1 |
2 |
0 |
0 |
0 |
$82 |
$0 |
1 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
1 |
160 |
8 |
16 |
0 |
$6,550 |
$0 |
1 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
1 |
14 |
1 |
1 |
0 |
$573 |
$0 |
1 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
1 |
160 |
8 |
16 |
0 |
$6,550 |
$0 |
1 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
1 |
40 |
2 |
4 |
0 |
$1,638 |
$8 |
1 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
2 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
2 |
32 |
2 |
3 |
0 |
$1,310 |
$0 |
4 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
2 |
48 |
2 |
5 |
0 |
$1,965 |
$15 |
2 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
|
27 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
2 |
3 |
0 |
0 |
0 |
$123 |
$0 |
2 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
2 |
2 |
0 |
0 |
0 |
$82 |
$0 |
2 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
2 |
2 |
0 |
0 |
0 |
$82 |
$0 |
2 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
2 |
2 |
0 |
0 |
0 |
$82 |
$0 |
2 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
1 |
24 |
1 |
2 |
0 |
$983 |
$0 |
1 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
9 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
$140,963 |
36 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
#VALUE! |
#VALUE! |
$140,963 |
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$71,100 |
$71,100 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$55,300 |
$55,300 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 1.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Standards of Performance |
|
|
for New Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart CCCC - Year 3, Small Remote Incinerators |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
#VALUE! |
|
#VALUE! |
#VALUE! |
#VALUE! |
|
#VALUE! |
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
1 |
1 |
0 |
0 |
0 |
$41 |
$0 |
1 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$55,000 |
1 |
#VALUE! |
1 |
#VALUE! |
#VALUE! |
#VALUE! |
688 |
$0 |
$55,000 |
1 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
182 |
$14,533 |
1 |
#VALUE! |
2 |
#VALUE! |
#VALUE! |
#VALUE! |
363 |
$0 |
$29,067 |
2 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
1 |
64 |
3 |
6 |
0 |
$2,620 |
$0 |
1 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
1 |
72 |
4 |
7 |
0 |
$2,948 |
$0 |
1 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
2 |
24 |
1 |
2 |
0 |
$983 |
$0 |
2 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
2 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
1 |
40 |
2 |
4 |
#VALUE! |
#VALUE! |
$0 |
1 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$16,100 |
1 |
17 |
1 |
17 |
1 |
2 |
0 |
$696 |
$16,100 |
1 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$55,300 |
1 |
17 |
2 |
34 |
2 |
3 |
0 |
$1,392 |
$55,300 |
2 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
1 |
2 |
0 |
0 |
0 |
$82 |
$0 |
1 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
1 |
1 |
0 |
0 |
0 |
$41 |
$0 |
1 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
1 |
2 |
0 |
0 |
0 |
$82 |
$0 |
1 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
1 |
8 |
0 |
1 |
0 |
$328 |
$8 |
1 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
1 |
2 |
0 |
0 |
0 |
$82 |
$0 |
1 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
1 |
160 |
8 |
16 |
0 |
$6,550 |
$0 |
1 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
1 |
14 |
1 |
1 |
0 |
$573 |
$0 |
1 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
1 |
160 |
8 |
16 |
0 |
$6,550 |
$0 |
1 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
2 |
80 |
4 |
8 |
0 |
$3,275 |
$15 |
2 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
2 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
2 |
32 |
2 |
3 |
0 |
$1,310 |
$0 |
4 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
3 |
72 |
4 |
7 |
0 |
$2,948 |
$23 |
3 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
|
33 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
3 |
5 |
0 |
0 |
0 |
$184 |
$0 |
3 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
3 |
3 |
0 |
0 |
0 |
$123 |
$0 |
3 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
3 |
3 |
0 |
0 |
0 |
$123 |
$0 |
3 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
3 |
3 |
0 |
0 |
0 |
$123 |
$0 |
3 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
2 |
48 |
2 |
5 |
0 |
$1,965 |
$0 |
2 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
14 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
$155,512 |
47 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
#VALUE! |
#VALUE! |
$155,512 |
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$71,100 |
$71,100 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$55,300 |
$55,300 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 3 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Standards of Performance for New Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart CCCC - Year 1 |
|
|
|
|
|
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
Burden Item |
Number of Occurrences Per Year |
EPA Hours Per Occurrence |
Tech Hours Per Year (C=AxB) |
Management Hours Per Year (D=Cx0.05) |
Clerical Hours Per Year (E=Cx0.1) |
EPA Cost Per Year (a,b) |
1. |
Applications |
|
|
|
not applicable |
2. |
Read and Understand Rule Requirements |
|
|
|
1 |
c |
16 |
16 |
1 |
2 |
$954 |
3. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
A. |
Observe initial stack tests |
|
|
|
|
|
|
|
|
|
|
|
(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) |
0 |
c,d |
48 |
10 |
0 |
1 |
$573 |
|
B. |
Excess emissions -- Enforcement Activities |
|
|
0 |
f |
24 |
2 |
0 |
0 |
$143 |
|
C. |
Create Information |
|
|
not applicable |
|
D. |
Gather Information |
|
|
not applicable |
|
E. |
Report Reviews |
|
|
|
|
|
|
|
|
|
|
|
1) |
Review waste managemant plan and siting analysis |
|
1 |
c |
8 |
8 |
0 |
1 |
$477 |
|
|
2) |
Review report submitted prior to initial startup |
|
1 |
c |
2 |
2 |
0 |
0 |
$119 |
|
|
3) |
Review initial stack test report |
|
1 |
c |
40 |
40 |
2 |
4 |
$2,386 |
|
|
4) |
Review annual compliance report |
|
0 |
e |
8 |
0 |
0 |
0 |
$0 |
|
|
5) |
Review semi-annual excess emission and parameter exceedance report |
1 |
f |
16 |
16 |
1 |
2 |
$954 |
|
|
6) |
Review status reports and corrective action summary for operators off-site |
2 |
g |
4 |
8 |
0 |
1 |
$477 |
|
F. |
Prepare annual summary report |
|
|
1 |
|
200 |
200 |
10 |
20 |
$11,930 |
5. |
Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = |
|
|
|
|
|
$881 |
per trip |
|
|
$176 |
|
TOTAL |
|
|
|
|
|
|
302 |
15 |
30 |
$18,190 |
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52. |
|
|
|
|
|
|
|
|
|
|
|
|
b |
Figures may not add exactly due to rounding. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Assumes EPA personnel attend 20 percent of the initial stack tests. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Burden not incurred until second year of operation onward. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Assume that 10 percent of the facilities have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted. |
Table 4 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Standards of Performance for New Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart CCCC - Year 2 |
|
|
|
|
|
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
Burden Item |
Number of Occurrences Per Year |
EPA Hours Per Occurrence |
Tech Hours Per Year (C=AxB) |
Management Hours Per Year (D=Cx0.05) |
Clerical Hours Per Year (E=Cx0.1) |
EPA Cost Per Year (a,b) |
1. |
Applications |
|
|
|
not applicable |
2. |
Read and Understand Rule Requirements |
|
|
|
0 |
c |
16 |
0 |
0 |
0 |
$0 |
3. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
A. |
|
Observe initial stack tests |
|
|
|
|
|
|
|
|
|
|
|
(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) |
0 |
c,d |
48 |
10 |
0 |
1 |
$573 |
|
B. |
|
Excess emissions -- Enforcement Activities |
|
0 |
f |
24 |
2 |
0 |
0 |
$143 |
|
C. |
|
Create Information |
|
not applicable |
|
D. |
|
Gather Information |
|
not applicable |
|
E. |
|
Report Reviews |
|
|
|
|
|
|
|
|
|
|
1) |
Review waste managemant plan and siting analysis |
|
1 |
c |
8 |
8 |
0 |
1 |
$477 |
|
|
2) |
Review report submitted prior to initial startup |
|
1 |
c |
2 |
2 |
0 |
0 |
$119 |
|
|
3) |
Review initial stack test report |
|
1 |
c |
40 |
40 |
2 |
4 |
$2,386 |
|
|
4) |
Review annual compliance report |
|
1 |
e |
8 |
8 |
0 |
1 |
$477 |
|
|
5) |
Review semi-annual excess emission and parameter exceedance report |
2 |
f |
16 |
32 |
2 |
3 |
$1,909 |
|
|
6) |
Review status reports and corrective action summary for operators off-site |
4 |
g |
4 |
16 |
1 |
2 |
$954 |
|
F. |
|
Prepare annual summary report |
|
1 |
|
200 |
200 |
10 |
20 |
$11,930 |
5. |
Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = |
|
|
|
|
|
$881 |
per trip |
|
|
$176 |
|
TOTAL |
|
|
|
|
|
|
318 |
16 |
32 |
$19,144 |
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52. |
|
|
|
|
|
|
|
|
|
|
|
|
b |
Figures may not add exactly due to rounding. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Assumes EPA personnel attend 20 percent of the initial stack tests. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Burden not incurred until second year of operation onward. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Assume that 10 percent of the facilities have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted. |
Table 5 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Standards of Performance for New Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart CCCC - Year 3 |
|
|
|
|
|
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
Burden Item |
Number of Occurrences Per Year |
EPA Hours Per Occurrence |
Tech Hours Per Year (C=AxB) |
Management Hours Per Year (D=Cx0.05) |
Clerical Hours Per Year (E=Cx0.1) |
EPA Cost Per Year (a,b) |
1. |
Applications |
|
|
|
not applicable |
2. |
Read and Understand Rule Requirements |
|
|
|
0 |
c |
16 |
0 |
0 |
0 |
$0 |
3. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
A. |
|
Observe initial stack tests |
|
|
|
|
|
|
|
|
|
|
|
(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) |
0 |
c,d |
48 |
10 |
0 |
1 |
$573 |
|
B. |
|
Excess emissions -- Enforcement Activities |
|
0 |
f |
24 |
5 |
0 |
0 |
$286 |
|
C. |
|
Create Information |
|
not applicable |
|
D. |
|
Gather Information |
|
not applicable |
|
E. |
|
Report Reviews |
|
|
|
|
|
|
|
|
|
|
1) |
Review waste managemant plan and siting analysis |
1 |
c |
8 |
8 |
0 |
1 |
$477 |
|
|
2) |
Review report submitted prior to initial startup |
1 |
c |
2 |
2 |
0 |
0 |
$119 |
|
|
3) |
Review initial stack test report |
1 |
c |
40 |
40 |
2 |
4 |
$2,386 |
|
|
4) |
Review annual compliance report |
2 |
e |
8 |
16 |
1 |
2 |
$954 |
|
|
5) |
Review semi-annual excess emission and parameter exceedance report |
3 |
f |
16 |
48 |
2 |
5 |
$2,863 |
|
|
6) |
Review status reports and corrective action summary for operators off-site |
4 |
g |
4 |
16 |
1 |
2 |
$954 |
|
F. |
|
Prepare annual summary report |
|
1 |
|
200 |
200 |
10 |
20 |
$11,930 |
5. |
Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = |
|
|
|
|
|
$881 |
per trip |
|
|
$176 |
|
TOTAL |
|
|
|
|
|
|
344 |
17 |
34 |
$20,719 |
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52. |
|
|
|
|
|
|
|
|
|
|
|
|
b |
Figures may not add exactly due to rounding. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Assumes EPA personnel attend 20 percent of the initial stack tests. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Burden not incurred until second year of operation onward. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Assume that 10 percent of the facilities have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
g |
Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted. |