NSPS_CISWI_Tables_from ICRASfinal123010

NSPS_CISWI_Tables_from ICRASfinal123010.xls

NSPS for Commercial and Industrial Solid Waste Incineration (CISWI) units (40 CFR part 60, subpart CCCC) (Final Rule)

NSPS_CISWI_Tables_from ICRASfinal123010

OMB: 2060-0662

Document [xlsx]
Download: xlsx | pdf

Overview

COSTTAB_Small Remote Yr 1
COSTTAB_Small Remote Yr 2
COSTTAB_Small Remote Yr 3
COSTTAB_Small Remote Summary
RESPONDENTCOST Summary
EPACOST Year 1
EPACOST Year 2
EPACOST Year 3
EPACOST Summary


Sheet 1: COSTTAB_Small Remote Yr 1

Table 1.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Standards of Performance

for New Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart CCCC - Year 1, Small Remote Incinerators





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable


#VALUE!










2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $100 1 1 1 1 0 0 0 $41 $100 1 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $55,000 1 #VALUE! 1 #VALUE! #VALUE! #VALUE! 688 $0 $55,000 1 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 182 $14,533 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 $0 $0 0 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 1 64 3 6 0 $2,620 $0 1 c




b) Obtain operator qualification 72 0 $0 1 72 1 72 4 7 0 $2,948 $0 1 c




c) Annual refresher course 12
$0 1 12 0 0 0 0 0 $0 $0 0 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 0 0 0 0 0 $0 $0 0 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 1 40 2 4 #VALUE! $1,638 $0 1 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $16,100 1 17 1 17 1 2 0 $696 $16,100 1 c,f




b) Annual costs 17 0 $55,300 1 17 1 17 1 2 0 $696 $55,300 1 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 1 2 0 0 0 $82 $0 1





b) Fugitive Ash Emissions 1 0 $0 1 1 1 1 0 0 0 $41 $0 1




2) Notification of initial CMS Demonstration
2 0 $0 1 2 1 2 0 0 0 $82 $0 1




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 1 8 0 1 0 $328 $8 1





b) Fugitive Ash Emissions 2 0 $0 1 2 1 2 0 0 0 $82 $0 1




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 1 160 8 16 0 $6,550 $0 1 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 1 14 1 1 0 $573 $0 1 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 c



9) Waste management plan
160 0 $0 1 160 1 160 8 16 0 $6,550 $0 1 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 0 0 0 0 0 $0 $0 0



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 1 8 0 1 0 $328 $0 1 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 1 16 1 2 0 $655 $0 2 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 1 24 1 2 0 $983 $8 1 j

ReportingSubtotal








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
19


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 1 2 0 0 0 $61 $0 1 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




8) Records of persons who have completed operator training
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 0 0 0 0 0 $0 $0 0



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








#VALUE! #VALUE! #VALUE! 0 #VALUE! $0 1


TOTAL:








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $126,515 20













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

#VALUE! #VALUE! $126,515 #VALUE!












Annualized Capital and Startup

$71,200 $71,200












O & M Summary

$55,300 $55,300
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 2: COSTTAB_Small Remote Yr 2

Table 1.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Standards of Performance

for New Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart CCCC - Year 2, Small Remote Incinerators

























(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable


#VALUE!










2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 1 1 0 0 0 $41 $0 1 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $55,000 1 #VALUE! 1 #VALUE! #VALUE! #VALUE! 688 $0 $55,000 1 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 182 $14,533 1 #VALUE! 1 #VALUE! #VALUE! #VALUE! 182 $0 $14,533 1 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 1 64 3 6 0 $2,620 $0 1 c




b) Obtain operator qualification 72 0 $0 1 72 1 72 4 7 0 $2,948 $0 1 c




c) Annual refresher course 12
$0 1 12 1 12 1 1 0 $491 $0 1 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 1 8 0 1 0 $328 $0 1 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 1 40 2 4 #VALUE! #VALUE! $0 1 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $16,100 1 17 1 17 1 2 0 $696 $16,100 1 c,f




b) Annual costs 17 0 $55,300 1 17 1 17 1 2 0 $696 $55,300 1 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 1 2 0 0 0 $82 $0 1





b) Fugitive Ash Emissions 1 0 $0 1 1 1 1 0 0 0 $41 $0 1




2) Notification of initial CMS Demonstration
2 0 $0 1 2 1 2 0 0 0 $82 $0 1




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 1 8 0 1 0 $328 $8 1





b) Fugitive Ash Emissions 2 0 $0 1 2 1 2 0 0 0 $82 $0 1




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 1 160 8 16 0 $6,550 $0 1 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 1 14 1 1 0 $573 $0 1 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 c



9) Waste management plan
160 0 $0 1 160 1 160 8 16 0 $6,550 $0 1 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 1 40 2 4 0 $1,638 $8 1



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 2 16 1 2 0 $655 $0 2 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 2 32 2 3 0 $1,310 $0 4 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 2 48 2 5 0 $1,965 $15 2 j

ReportingSubtotal








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
27


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 2 3 0 0 0 $123 $0 2 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 2 2 0 0 0 $82 $0 2




8) Records of persons who have completed operator training
1 0 $0 1 1 2 2 0 0 0 $82 $0 2




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 2 2 0 0 0 $82 $0 2




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 1 24 1 2 0 $983 $0 1



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








#VALUE! #VALUE! #VALUE! 0 #VALUE! $0 9


TOTAL:








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $140,963 36













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

#VALUE! #VALUE! $140,963 #VALUE!












Annualized Capital and Startup

$71,100 $71,100












O & M Summary

$55,300 $55,300
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 3: COSTTAB_Small Remote Yr 3

Table 1.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Standards of Performance

for New Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart CCCC - Year 3, Small Remote Incinerators





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable


#VALUE!










2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 1 1 0 0 0 $41 $0 1 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $55,000 1 #VALUE! 1 #VALUE! #VALUE! #VALUE! 688 $0 $55,000 1 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 182 $14,533 1 #VALUE! 2 #VALUE! #VALUE! #VALUE! 363 $0 $29,067 2 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 1 64 3 6 0 $2,620 $0 1 c




b) Obtain operator qualification 72 0 $0 1 72 1 72 4 7 0 $2,948 $0 1 c




c) Annual refresher course 12
$0 1 12 2 24 1 2 0 $983 $0 2 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 2 16 1 2 0 $655 $0 2 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 1 40 2 4 #VALUE! #VALUE! $0 1 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $16,100 1 17 1 17 1 2 0 $696 $16,100 1 c,f




b) Annual costs 17 0 $55,300 1 17 2 34 2 3 0 $1,392 $55,300 2 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 1 2 0 0 0 $82 $0 1





b) Fugitive Ash Emissions 1 0 $0 1 1 1 1 0 0 0 $41 $0 1




2) Notification of initial CMS Demonstration
2 0 $0 1 2 1 2 0 0 0 $82 $0 1




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 1 8 0 1 0 $328 $8 1





b) Fugitive Ash Emissions 2 0 $0 1 2 1 2 0 0 0 $82 $0 1




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 1 160 8 16 0 $6,550 $0 1 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 1 14 1 1 0 $573 $0 1 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 c



9) Waste management plan
160 0 $0 1 160 1 160 8 16 0 $6,550 $0 1 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 2 80 4 8 0 $3,275 $15 2



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 2 16 1 2 0 $655 $0 2 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 2 32 2 3 0 $1,310 $0 4 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 3 72 4 7 0 $2,948 $23 3 j

ReportingSubtotal








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
33


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 3 5 0 0 0 $184 $0 3 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 3 3 0 0 0 $123 $0 3




8) Records of persons who have completed operator training
1 0 $0 1 1 3 3 0 0 0 $123 $0 3




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 3 3 0 0 0 $123 $0 3




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 2 48 2 5 0 $1,965 $0 2



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








#VALUE! #VALUE! #VALUE! 0 #VALUE! $0 14


TOTAL:








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $155,512 47













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

#VALUE! #VALUE! $155,512 #VALUE!












Annualized Capital and Startup

$71,100 $71,100












O & M Summary

$55,300 $55,300
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 4: COSTTAB_Small Remote Summary

Table 1.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Standards of Performance for New Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart CCCC, Small Remote Incinerators
Year Technical Hours Management Hours Clerical Hours Total Hours Testing Contractor Hoursa Labor Costs Non-Labor (O&M) Costs Total Costs
1 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $126,515 #VALUE!
2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $140,963 #VALUE!
3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $155,512 #VALUE!
Total #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $422,990 #VALUE!
Average #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $140,997 #VALUE!









a. Test contractor costs are accounted for in the non-labor category








Sheet 5: RESPONDENTCOST Summary

Table 2 - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for Standards of Performance for New Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart CCCC, All Subcategories
Year Technical Hours Management Hours Clerical Hours Total Labor Hours Testing Contractor Hoursa Labor Costs Non-Labor (O&M) Costs Total Costs
1 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $126,515 #VALUE!
2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $140,963 #VALUE!
3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $155,512 #VALUE!
Total #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $422,990 #VALUE!
Average #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $140,997 #VALUE!









a. Test contractor costs are accounted for in the non-labor category








Sheet 6: EPACOST Year 1

Table 3 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Standards of Performance for New Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart CCCC - Year 1





(A) (B) (C) (D) (E) (F)
Burden Item Number of Occurrences Per Year EPA Hours Per Occurrence Tech Hours Per Year (C=AxB) Management Hours Per Year (D=Cx0.05) Clerical Hours Per Year (E=Cx0.1) EPA Cost Per Year (a,b)
1. Applications


not applicable
2. Read and Understand Rule Requirements


1 c 16 16 1 2 $954
3. Required Activities










A. Observe initial stack tests










(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) 0 c,d 48 10 0 1 $573

B. Excess emissions -- Enforcement Activities

0 f 24 2 0 0 $143

C. Create Information

not applicable

D. Gather Information

not applicable

E. Report Reviews










1) Review waste managemant plan and siting analysis
1 c 8 8 0 1 $477


2) Review report submitted prior to initial startup
1 c 2 2 0 0 $119


3) Review initial stack test report
1 c 40 40 2 4 $2,386


4) Review annual compliance report
0 e 8 0 0 0 $0


5) Review semi-annual excess emission and parameter exceedance report 1 f 16 16 1 2 $954


6) Review status reports and corrective action summary for operators off-site 2 g 4 8 0 1 $477

F. Prepare annual summary report

1 200 200 10 20 $11,930
5. Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) =




$881 per trip

$176

TOTAL





302 15 30 $18,190












FOOTNOTES






















a Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52.












b Figures may not add exactly due to rounding.




















c One-time only costs.





















d Assumes EPA personnel attend 20 percent of the initial stack tests.





















e Burden not incurred until second year of operation onward.





















f Assume that 10 percent of the facilities have an exceedance during the year.





















g Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted.

Sheet 7: EPACOST Year 2

Table 4 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Standards of Performance for New Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart CCCC - Year 2





(A) (B) (C) (D) (E) (F)
Burden Item Number of Occurrences Per Year EPA Hours Per Occurrence Tech Hours Per Year (C=AxB) Management Hours Per Year (D=Cx0.05) Clerical Hours Per Year (E=Cx0.1) EPA Cost Per Year (a,b)
1. Applications


not applicable
2. Read and Understand Rule Requirements


0 c 16 0 0 0 $0
3. Required Activities










A.
Observe initial stack tests










(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) 0 c,d 48 10 0 1 $573

B.
Excess emissions -- Enforcement Activities
0 f 24 2 0 0 $143

C.
Create Information
not applicable

D.
Gather Information
not applicable

E.
Report Reviews









1) Review waste managemant plan and siting analysis
1 c 8 8 0 1 $477


2) Review report submitted prior to initial startup
1 c 2 2 0 0 $119


3) Review initial stack test report
1 c 40 40 2 4 $2,386


4) Review annual compliance report
1 e 8 8 0 1 $477


5) Review semi-annual excess emission and parameter exceedance report 2 f 16 32 2 3 $1,909


6) Review status reports and corrective action summary for operators off-site 4 g 4 16 1 2 $954

F.
Prepare annual summary report
1 200 200 10 20 $11,930
5. Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) =




$881 per trip

$176

TOTAL





318 16 32 $19,144












FOOTNOTES






















a Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52.












b Figures may not add exactly due to rounding.





















c One-time only costs.





















d Assumes EPA personnel attend 20 percent of the initial stack tests.





















e Burden not incurred until second year of operation onward.





















f Assume that 10 percent of the facilities have an exceedance during the year.





















g Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted.

Sheet 8: EPACOST Year 3

Table 5 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Standards of Performance for New Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart CCCC - Year 3





(A) (B) (C) (D) (E) (F)
Burden Item Number of Occurrences Per Year EPA Hours Per Occurrence Tech Hours Per Year (C=AxB) Management Hours Per Year (D=Cx0.05) Clerical Hours Per Year (E=Cx0.1) EPA Cost Per Year (a,b)
1. Applications


not applicable
2. Read and Understand Rule Requirements


0 c 16 0 0 0 $0
3. Required Activities










A.
Observe initial stack tests










(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) 0 c,d 48 10 0 1 $573

B.
Excess emissions -- Enforcement Activities
0 f 24 5 0 0 $286

C.
Create Information
not applicable

D.
Gather Information
not applicable

E.
Report Reviews









1) Review waste managemant plan and siting analysis 1 c 8 8 0 1 $477


2) Review report submitted prior to initial startup 1 c 2 2 0 0 $119


3) Review initial stack test report 1 c 40 40 2 4 $2,386


4) Review annual compliance report 2 e 8 16 1 2 $954


5) Review semi-annual excess emission and parameter exceedance report 3 f 16 48 2 5 $2,863


6) Review status reports and corrective action summary for operators off-site 4 g 4 16 1 2 $954

F.
Prepare annual summary report
1 200 200 10 20 $11,930
5. Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) =




$881 per trip

$176

TOTAL





344 17 34 $20,719












FOOTNOTES






















a Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52.












b Figures may not add exactly due to rounding.





















c One-time only costs.





















d Assumes EPA personnel attend 20 percent of the initial stack tests.





















e Burden not incurred until second year of operation onward.





















f Assume that 10 percent of the facilities have an exceedance during the year.












g Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted.

Sheet 9: EPACOST Summary

Table 6 - Summary of Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Standards of Performance for New Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart CCCC
Year Technical Hours Management Hours Clerical Hours Total Hours Labor Costs Non-Labor (O&M) Costs Total Costs
1 302 15 30 347 $18,014 $176 $18,190
2 318 16 32 366 $18,968 $176 $19,144
3 344 17 34 396 $20,543 $176 $20,719
Total 964 48 96 1,109 $57,525 $529 $58,053
Average 321 16 32 370 $19,175 $176 $19,351
File Typeapplication/vnd.ms-excel
AuthorEeastern Reseach Group, Inc.
Last Modified ByJHuckaby
File Modified2011-01-03
File Created1998-09-17

© 2024 OMB.report | Privacy Policy