This collection of information is mandatory and will be used to identify critical inspection elements and specify an appropriate inspection frequency of US tunnels. Public reporting burden is estimated to average 1,400 hour per response, including the time for reviewing instructions searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Please note that an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The OMB control number for this collection is 2125-XXXX. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to: Information Collection Clearance Officer, Federal Highway Administration, 1200 New Jersey Avenue, SE, Washington, DC 20590. |
APPENDIX A PAGE 1 OF 2: PRELIMINARY INVENTORY TUNNEL DATA FORM |
|
|
|
|
|
|
|
DATE |
|
|
|
By: |
|
Item No. |
Item Name |
Item Value |
1 |
|
Tunnel Name |
|
|
|
|
|
2 |
|
Tunnel Owner |
|
|
|
|
|
3 |
|
Tunnel number |
|
|
|
|
|
4 |
|
Tunnel Operator |
|
|
|
|
|
5 |
|
Location |
|
|
|
|
|
6 |
|
Route Signing Prefix |
|
|
|
|
|
7 |
|
Route Number |
|
|
|
|
|
8 |
|
LRS Inventory Rt |
|
|
|
|
|
9 |
|
LRS Subroute |
|
|
|
|
|
10 |
|
Portals Latitude |
|
|
|
|
|
11 |
|
Portals Milepost |
|
|
|
|
|
12 |
|
Portals Longitude |
|
|
|
|
|
13 |
|
STRAHNET Designation |
|
|
|
|
|
14 |
|
Year Tunnel Construction Completed |
|
|
|
|
|
15 |
|
Posted Speed |
|
|
|
|
|
16 |
|
Design Speed |
|
|
|
|
|
17 |
|
Current ADT |
|
|
|
|
|
18 |
|
% of truck traffic |
|
|
|
|
|
19 |
|
Date of last Inspection |
|
|
|
|
|
20 |
|
No. of Bores |
|
|
|
|
|
21 |
|
No. of Lanes |
|
|
|
|
|
22 |
|
Direction of traffic |
|
|
|
|
|
|
|
|
|
FHWA FORM # NTI-001 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Item Name |
Item Value |
|
23 |
|
Tunnel Length |
|
|
|
|
|
24 |
|
Tunnel Height |
|
|
|
|
|
24 |
|
Lane Width |
|
|
|
|
|
25 |
|
Shoulder Width |
|
|
|
|
|
26 |
|
Pavement Type |
|
|
|
|
|
27 |
|
Tunnel Shape |
|
|
|
|
|
28 |
|
Ground Conditions |
|
|
|
|
|
29 |
|
Ceiling Type |
|
|
|
|
|
30 |
|
PortalType |
|
|
|
|
|
31 |
|
Portal Shape |
|
|
|
|
|
32 |
|
Finish Type |
|
|
|
|
|
33 |
|
Primary Tunnel Support Lining |
|
|
|
|
|
34 |
|
Vertical Clearance |
|
|
|
|
|
35 |
|
Tunnel Cross-sectional Width |
|
|
|
|
|
|
|
|
|
FHWA FORM # NTI-001 |
|
|
|
APPENDIX A PAGE 2 OF 2: NATIONAL TUNNEL APPRAISAL FORM |
|
|
DATE |
|
|
|
|
|
|
|
|
|
|
By: |
|
|
|
|
|
|
|
|
|
|
|
CONDITION CODE (SEE NOTES) |
ITEM NO. |
Item Name |
9 |
8 |
7 |
6 |
5 |
4 |
3 |
2 |
1 |
GOOD |
FAIR |
POOR |
1 |
Tunnel roof concrete |
|
|
|
|
|
|
|
|
|
2 |
Tunnel roof steel girders |
|
|
|
|
|
|
|
|
|
3 |
Tunnel roof girder connection |
|
|
|
|
|
|
|
|
|
4 |
Suspened ceiling hanger |
|
|
|
|
|
|
|
|
|
5 |
suspended ceiling panels |
|
|
|
|
|
|
|
|
|
6 |
suspended ceiling beams |
|
|
|
|
|
|
|
|
|
7 |
Suspened ceiling concrete anchors |
|
|
|
|
|
|
|
|
|
8 |
Jet fans concrete anchors |
|
|
|
|
|
|
|
|
|
9 |
Steel Pile in tunnel wall |
|
|
|
|
|
|
|
|
|
10 |
Ceramic tile |
|
|
|
|
|
|
|
|
|
11 |
Prefabricated wall panels |
|
|
|
|
|
|
|
|
|
12 |
Prefabricated wall panel attachment to wall |
|
|
|
|
|
|
|
|
|
13 |
Prefabricated linning elements |
|
|
|
|
|
|
|
|
|
14 |
Prefabricated lining element joints |
|
|
|
|
|
|
|
|
|
15 |
Prefabricated lining element bolts |
|
|
|
|
|
|
|
|
|
16 |
Expansion joints |
|
|
|
|
|
|
|
|
|
17 |
Compression joints |
|
|
|
|
|
|
|
|
|
18 |
Portals Cross drain |
|
|
|
|
|
|
|
|
|
19 |
Overhead sign support |
|
|
|
|
|
|
|
|
|
20 |
Overhead sign attachment anchors |
|
|
|
|
|
|
|
|
|
21 |
roadway slab beams |
|
|
|
|
|
|
|
|
|
22 |
Hand rails on sidewalk |
|
|
|
|
|
|
|
|
|
NATIONAL TUNNEL APPRAISAL FORM |
|
|
DATE |
CONDITION CODES (SEE NOTES) |
|
By: |
ITEM NO. |
Item Name |
9 |
8 |
7 |
6 |
5 |
4 |
3 |
2 |
1 |
GOOD |
FAIR |
POOR |
23 |
Exit doors |
|
|
|
|
|
|
|
|
|
24 |
Overhead Tunnel lighting support |
|
|
|
|
|
|
|
|
|
25 |
Flood Gate Gasket |
|
|
|
|
|
|
|
|
|
26 |
Rock bolt |
|
|
|
|
|
|
|
|
|
27 |
Rock tunnel lining |
|
|
|
|
|
|
|
|
|
28 |
Timber Posts in Tunnel Walls |
|
|
|
|
|
|
|
|
|
29 |
Tunnel wearing surface |
|
|
|
|
|
|
|
|
|
30 |
Tunnel safety walk |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NOTES: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CODE |
DESCRIPTION |
|
|
|
|
|
|
|
|
|
9 |
Newly completed construction |
|
|
|
|
|
|
|
|
|
8 |
Excellent condition - No defects found. |
|
|
|
|
|
|
|
|
|
7 |
Good condition - No repairs necessary. Isolated defects found. |
|
|
|
|
|
|
|
|
|
6 |
Shading between "5" and "7" |
|
|
|
|
|
|
|
|
|
5 |
Fair condition - Minor repairs required but element is functioning as originally |
|
|
|
|
|
|
|
|
|
|
designed. Minor, moderate, and isolated severe defects are present but with |
|
|
|
|
|
|
|
|
|
|
no significant section loss. |
|
|
|
|
|
|
|
|
|
4 |
Shading between '3' and "5" |
|
|
|
|
|
|
|
|
|
3 |
Poor Condition - Major repairs are required and element is not functioning as |
|
|
|
|
|
|
|
|
|
|
originally designed. Severe defects are present. |
|
|
|
|
|
|
|
|
|
2 |
Serious condition - Major repairs required immediately to keep structure open |
|
|
|
|
|
|
|
|
|
|
to highway or rail transit traffic. |
|
|
|
|
|
|
|
|
|
1 |
Critical condition - Immediate closure required. Study should be performed to |
|
|
|
|
|
|
|
|
|
|
determine the feasibility of repairing the structure. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FHWA FORM # NTI-001 |
|
|
|
|
|
|
|
|
|
|