1010-0172 60-day Federal Register Notice

1010-0172 60-day FR.pdf

30 CFR Part 291, Open and Nondiscriminatory Access to Oil and Gas Pipelines under the OCS Lands Act

1010-0172 60-day Federal Register Notice

OMB: 1014-0012

Document [pdf]
Download: pdf | pdf
57285

Federal Register / Vol. 75, No. 181 / Monday, September 20, 2010 / Notices
Dated: September 14, 2010.
Tracey Denning,
Agency Clearance Officer, U.S. Customs and
Border Protection.
[FR Doc. 2010–23349 Filed 9–17–10; 8:45 am]
BILLING CODE 9111–14–P

DEPARTMENT OF THE INTERIOR
Bureau of Ocean Energy Management,
Regulation and Enforcement
[Docket No. BOEM–2010–0040]

BOEMRE Information Collection
Activity: 1010–0172, Open and
Nondiscriminatory Access to Oil and
Gas Pipelines, Extension of a
Collection; Comment Request
Bureau of Ocean Energy
Management, Regulation and
Enforcement (BOEMRE), Interior.
ACTION: Notice of an extension of an
information collection (1010–0172).
AGENCY:

To comply with the
Paperwork Reduction Act of 1995
(PRA), BOEMRE is inviting comments
on a collection of information that we
will submit to the Office of Management
and Budget (OMB) for review and
approval. The information collection
request (ICR) concerns the paperwork
requirements in 30 CFR Part 291, Open
and Nondiscriminatory Access to Oil
and Gas Pipelines under the OCS Lands
Act.
DATES: Submit written comments by
November 19, 2010.
FOR FURTHER INFORMATION CONTACT:
Arlene Bajusz, Policy and Management
Improvement at (703) 787–1025. You
may also contact Arlene Bajusz to obtain
a copy, at no cost, of the information
collection.

jdjones on DSK8KYBLC1PROD with NOTICES

SUMMARY:

You may submit comments
by either of the following methods listed
below.
• Electronically: go to http://
www.regulations.gov. In the entry titled
Enter Keyword or ID, enter docket ID
‘‘BOEM–2010–0040,’’ then click search.
Follow the instructions to submit public
comments and view supporting and
related materials available for this
collection. The BOEMRE will post all
comments.
• E-mail: [email protected].
Mail or hand-carry comments to the
Department of the Interior; Bureau of
Ocean Energy Management, Regulation
and Enforcement; Attention: Arlene
Bajusz; 381 Elden Street, MS–4020;
Herndon, Virginia 20170–4817. Please
reference ICR 1010–0172 in your
comment and include your name and
return address.
SUPPLEMENTARY INFORMATION:
Title: 30 CFR Part 291, Open and
Nondiscriminatory Access to Oil and
Gas Pipelines under the OCS Lands Act.
OMB Control Number: 1010–0172.
Abstract: The Outer Continental Shelf
(OCS) Lands Act (43 U.S.C. 1331 et
seq.), as amended, requires the Secretary
of the Interior to preserve, protect, and
develop OCS oil, gas, and sulphur
resources; make such resources
available to meet the Nation’s energy
needs; balance orderly energy resources
development with protection of the
human, marine, and coastal
environments; ensure the public a fair
and equitable return on the resources
offshore; and preserve and maintain free
enterprise competition.
Section 1334(f)(1) states ‘‘Except as
provided in paragraph (2), every permit,
license, easement, right-of-way, or other
grant of authority for the transportation
by pipeline on or across the Outer
Continental Shelf of oil or gas shall
require that the pipeline be operated in
accordance with the following
ADDRESSES:

competitive principles: (A) The pipeline
must provide open and
nondiscriminatory access to both owner
and non-owner shippers * * *.’’
These responsibilities are among
those delegated to the BOEMRE, which
replaced the Minerals Management
Service (MMS) on June 18, 2010. In
order to provide shippers with a
methodology to file complaints alleging
denial of access or that access is
discriminatory access, the MMS
promulgated regulations at 30 CFR Part
291. The BOEMRE will use the
information submitted during the
complaint process to determine whether
the shipper has been denied such access
or to initiate a more detailed
investigation into the specific
circumstances of the complainant’s
allegation. The complaint information
will be provided to the alleged
offending party. The BOEMRE may
request additional information upon
completion of the initial investigation.
We will protect information from
respondents considered proprietary
under the Freedom of Information Act
(5 U.S.C. 552) and its implementing
regulations (43 CFR Part 2). No items of
a sensitive nature are collected.
Responses are required to obtain a
benefit.
Frequency: The frequency is on
occasion.
Description of Respondents: Shippers
who do business on the OCS and
companies that pay royalties on the
OCS.
Estimated Annual Reporting and
Recordkeeping Hour Burden: The
currently approved hour burden for this
collection is 254 hours. Refer to the
table below for a break down of the
complete burden. This includes the time
for reviewing instructions, gathering
and maintaining data, and completing
and reviewing the information.

Citation 30 CFR
291

Reporting amd recordkeeping requirement

Hour burden

105, 106, 108, 109,
111.

Submit complaint (with fee) to BOEMRE and affected parties. Request confidential treatment and respond to BOEMRE decision.

50 ..........................

5.

$7,500 processing
fee.
1 ............................

4.

106(b), 109 ...........

Request waiver or reduction of fee .....................................................................

104(b), 107, 111 ...

Submit response to a complaint. Request confidential treatment and respond
to BOEMRE decision.

110 ........................

Submit required information for BOEMRE to make a decision.

114, 115(a) ...........

Submit appeal on BOEMRE final decision.

Estimated Annual Reporting and
Recordkeeping Non-Hour Cost Burden:
We have identified a ‘‘non-hour’’ cost

VerDate Mar<15>2010

15:00 Sep 17, 2010

Jkt 220001

burden of $37,500. The BOEMRE
requires that shippers pay a
nonrefundable fee of $7,500 for each

PO 00000

Frm 00035

Fmt 4703

Sfmt 4703

Average number annual responses

Information required after an investigation
is opened against a specific entity is exempt under the PRA (5 CFR 1320.4).

complaint submitted to recover the
Federal Government’s processing costs.

E:\FR\FM\20SEN1.SGM

20SEN1

jdjones on DSK8KYBLC1PROD with NOTICES

57286

Federal Register / Vol. 75, No. 181 / Monday, September 20, 2010 / Notices

Public Disclosure Statement: The PRA
(44 U.S.C. 3501, et seq.) provides that an
agency may not conduct or sponsor a
collection of information unless it
displays a currently valid OMB control
number. Until OMB approves a
collection of information, you are not
obligated to respond.
Comments: Before submitting an ICR
to OMB, PRA section 3506(c)(2)(A)
requires each agency ‘‘* * * to provide
notice * * * and otherwise consult
with members of the public and affected
agencies concerning each proposed
collection of information * * *’’.
Agencies must specifically solicit
comments to: (a) Evaluate whether the
proposed collection of information is
necessary for the agency to perform its
duties, including whether the
information is useful; (b) evaluate the
accuracy of the agency’s estimate of the
burden of the proposed collection of
information; (c) enhance the quality,
usefulness, and clarity of the
information to be collected; and (d)
minimize the burden on the
respondents, including the use of
automated collection techniques or
other forms of information technology.
Agencies must also estimate the nonhour cost burdens to respondents or
recordkeepers resulting from the
collection of information. Therefore, if
you have costs to generate, maintain,
and disclose this information, you
should comment and provide your total
capital and startup cost components or
annual operation, maintenance, and
purchase of service components. You
should describe the methods you use to
estimate major cost factors, including
system and technology acquisition,
expected useful life of capital
equipment, discount rate(s), and the
period over which you incur costs.
Capital and startup costs include,
among other items, computers and
software you purchase to prepare for
collecting information, monitoring, and
record storage facilities. You should not
include estimates for equipment or
services purchased: (i) Before October 1,
1995; (ii) to comply with requirements
not associated with the information
collection; (iii) for reasons other than to
provide information or keep records for
the Government; or (iv) as part of
customary and usual business or private
practices.
We will summarize written responses
to this notice and address them in our
submission for OMB approval. As a
result of your comments, we will make
any necessary adjustments to the burden
in our submission to OMB.
Public Comment Procedures: Before
including your address, phone number,
e-mail address, or other personal

VerDate Mar<15>2010

15:00 Sep 17, 2010

Jkt 220001

identifying information in your
comment, you should be aware that
your entire comment—including your
personal identifying information—may
be made publicly available at any time.
While you can ask us in your comment
to withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
BOEMRE Information Collection
Clearance Office: Arlene Bajusz (703)
787–1025.
Dated: September 13, 2010.
George F. Triebsch,
Associate Director, Policy and Management
Improvement.
[FR Doc. 2010–23424 Filed 9–17–10; 8:45 am]
BILLING CODE 4310–MR–P

DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLNVS03000 L51010000.ER0000 LVRWF09
F8770 241A; 10–08807; MO# 4500014131;
TAS: 14X5017]

Notice of Availability of the Final
Environmental Impact Statement for
the NextLight Renewable Power, LLC,
Silver State Solar Project, Clark
County, NV
Bureau of Land Management,
Interior.
ACTION: Notice of Availability.
AGENCY:

In accordance with the
National Environmental Policy Act of
1969, as amended, and the Federal Land
Policy and Management Act of 1976, as
amended, the Bureau of Land
Management (BLM) has prepared a
Final Environmental Impact Statement
(EIS) for the Silver State Solar Project,
Clark County, Nevada, and by this
notice is announcing its availability.
DATES: The BLM will not issue a final
decision on the Silver State Solar
Project for a minimum of 30 days after
the date that the Environmental
Protection Agency publishes its notice
of availability in the Federal Register.
ADDRESSES: Copies of the Silver State
Solar Project Final EIS will be mailed to
individuals, agencies, organizations, or
companies who previously requested
copies or who responded to the BLM on
the Draft EIS. Printed copies or a
compact disc of the Final EIS are
available on request from the BLM
Southern Nevada District Office, 4701
N. Torrey Pines Drive, Las Vegas,
Nevada 89130, phone (702) 515–5000,
or e-mail:
[email protected].
Interested persons may also review the
SUMMARY:

PO 00000

Frm 00036

Fmt 4703

Sfmt 4703

Final EIS at the following Web site:
http://www.blm.gov/nv/st/en/fo/lvfo/
blm_programs/energy.html. Copies of
the Final EIS are available for public
inspection at the following locations:
• BLM Nevada State Office, 1340
Financial Blvd., Reno, Nevada.
• BLM Southern Nevada District
Office, 4701 N. Torrey Pines Drive, Las
Vegas, Nevada.
FOR FURTHER INFORMATION CONTACT:
Gregory Helseth, Renewable Energy
Project Manager, phone: (702) 515–
5173; address: BLM Southern Nevada
District Office, 4701 N. Torrey Pines
Drive, Las Vegas, Nevada 89130; e-mail:
[email protected].
SUPPLEMENTARY INFORMATION: NextLight
Renewable Power, LLC, applied to the
BLM for a right-of-way on public lands
to construct a solar photovoltaic (PV)
facility approximately 2 miles southeast
of Primm, Nevada, in Clark County. As
originally proposed, the project
included 6,320 acres of BLM managed
lands and was expected to operate for
approximately 50 years. The proposed
project would be capable of producing
400 megawatts of electricity.
The solar field and infrastructure
would consist of fixed panels, an
underground and overhead electrical
power collection system, two step-up
transformers, 230-kilovolt (kV) and 220kV transmission lines, an operation and
maintenance area, a switchyard, paved
access and maintenance roads, flood
and drainage controls, and a fire break.
The Final EIS describes and analyzes
site-specific impacts of the proposed
project on air quality; biological,
cultural, water, soil, visual,
paleontological, and geological
resources; recreation; land use; noise;
public health; socioeconomics; and
traffic and transportation.
The Final EIS analyzes three
alternatives, including the no action
alternative (Alternative 1) and 2 action
alternatives. Alternative 2, the proposed
action and the BLM’s preferred
alternative, would disturb up to 2,967
acres of BLM managed land and would
include the use of berms to reduce
erosion. Alternative 3 would disturb up
to 4,818 acres of BLM managed land and
would employ an alternate drainage and
flood control design to control erosion.
The Final EIS describes the different
types of solar arrays and trackers that
were considered and their respective
impacts.
On April 16, 2010, the BLM published
the Notice of Availability for the Draft
EIS for this project in the Federal
Register [75 FR19990]. The BLM held 3
public meetings and accepted written
comments during a 45-day comment

E:\FR\FM\20SEN1.SGM

20SEN1


File Typeapplication/pdf
File TitleDocument
SubjectExtracted Pages
AuthorU.S. Government Printing Office
File Modified2010-09-17
File Created2010-09-17

© 2024 OMB.report | Privacy Policy