Form MMS-4109 Form MMS-4109 Gas Processing Allowance Summary Report

30 CFR Parts 1202, 1206, and 1207, Indian Oil and Gas Valuation

4109_exp 8-31-2012

Indian Gas Processing Allowance

OMB: 1012-0002

Document [pdf]
Download: pdf | pdf
U.S. Department of the Interior
Office of Natural Resources Revenue

Gas Processing Allowance Summary Report
Form MMS-4109

FOR ONRR USE ONLY:

OMB Control Number 101 2-0002
OMB Approval Expires 08/31/2012

2 PAYOR CODE

1 PAYOR NAME
ADDRESS

6

4 AMENDED REPORT

ZIP

STATE

CITY
PLANT NAME

7

8
LEASE
NUMBER

5 REPORTING
PERIOD
(mm/dd/ccyy)
10

9
AGREEMENT
NUMBER

11
PRODUCT
CODE

NON-ARM’S LENGTH
INDICATOR

to

12
a

ROYALTY
QUANTITY

3

FOR PAYOR USE ONLY:

ACTUAL DATA
b
ALLOWANCE
RATE PER UNIT

c

ROYALTY
ALLOWANCE
AMOUNT

1
2
3
4
5
6
7
8
9
10
11
13 PAGE TOTAL
14 REPORT TOTAL (LAST PAGE ONLY)
IF MORE LINES ARE NEEDED, ATTACH ADDITIONAL PAGES OF FORM MMS-4109

xxxxxxxxxxxx
xxxxxxxxxxxx

I have read and examined the statements in this report and, to t he best of my knowledge, they are accurate and complete.
NAME (FIRST, MIDDLE INITIAL, LAST) (typed or printed)

DATE:

AUTHORIZED SIGNATURE:

DATE:

NAME OF PREPARER:
THIS INFORMATION SHOULD BE CONSIDERED (Please check one)

TELEPHONE NUMBER:
PROPRIETARY

NONPROPRIETARY

Paperwork Reduction Act of 1995 (PRA) Statement: The PRA (44 U.S.C. 3501 et seq.) requires us to inform you that we collect this information to determine product valuation and to ensure that royalties are paid properly. ONRR uses the information to evaluate the reasonableness of allowances claimed.
Responses are required to obtain a benefit. Proprietary informa tion is protected in accordance with standards established by th e Federal Oil and Gas Royalty Management Act of 1982 (30 U.S.C. 1733), the Freedom of Information Act [5 U.S.C. 552(b)(4)], and the Department regulations (43 CFR 2). An agency may not
conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB Control Number. Public reporting burden for this form is e stimated to average 20 hours per response, including the time for reviewing instructions, gathering and maintaining data, and
completing and reviewing the form. Direct comments regarding th e burden estimate or any other aspect of this form to the Office of Natural Resources Revenue, Attention: Rules & Regs Team, P.O. Box 25165, Denver, CO 80225-0165.

FORM MMS-4109 (revised 3/2012)

Page 1 of 3

Gas Processing Allowance Summary Report
Form MMS-4109
General Instructions
In accordance with 30 CFR 206.179, a payor may deduct from royalty payments the reasonable actual costs for processing
gas plant products (e.g., natural gas liquids (NGLs), sulfur, etc.) from a gas stream. All natural gas liquids are considered as
one product – NGLs, and the processing allowance rate for NGLs shall be based upon their aggregate processing cost. No
allowance will be given for non -royalty-bearing plant products unless the lessee has secured prior approval from ONRR.
Gas processing costs incurred under an arm's -length contract may be claimed as the gas processing allowance.
Processing costs incurred under other than an arm's -length contract consist of the following: plant operating costs plus
depreciation plus a return on undepreciated capital investment. A gas processing allowance rate is determined by dividing
the total processing costs by the quantity processed.
Payors are required to report to ONRR the actual processing costs deducted during the reporting period using
Form MMS-4109. For processing costs incurred under arm's -length conditions, payors are not required to submit Form
MMS–4109. Instead, payors are required to submit a copy of their arm’s -length processing contract to ONRR within 2
months of the date ONRR receives your first report that deducts the allowance on the Form MMS -2014. For processing costs
incurred under non-arm's-length or no contract situations, Page 1 of Form MMS -4109 and Schedules 1, 2, 2A and 2B must
be submitted within 3 months after the e nd of the 12-month period to which the allowance applies.
Form MMS-4109, Page 1, is used to report the non -arm’s-length processing allowance amount claimed for a plant product
during the reporting period.
Form MMS-4109, Schedule 1, is used to compute the non-arm’s-length processing allowance rate for a plant product. A
separate Schedule 1 must be completed for each plant product,
Form MMS-4109, Schedule 2, is used to summarize plant product costs based upon the lessee's portion of actual plant
operating, maintenance, and overhead costs for non -arm's-length or no contract situations.
Form MMS-4109, Schedule 2A, summarizes plant operating, maintenance, and overhead costs for a plant product for non arm’s-length or no contract situations.
Form MMS-4109, Supplemental Schedule 2A, is used to detail operating, maintenance, and overhead costs that could not
be shown on Schedule 2A because of limited space.
Form MMS-4109, Schedule 2B, summarizes plant depreciation and undepreciated capital investment for a pla nt product for
non-arm's-length or no contract situations.

FORM MMS-4109 (revised 3/2012)

Page 2 of 3

Gas Processing Allowance Summary Report
Form MMS-4109
Line-by-Line Instructions
Page 1 of Form MMS -4109 is used to report the royalty processing allowance amount claimed for plant products during the
reporting period. In accordance with 30 CFR 1206.179, "the gas processing allowance shall not exceed 66 -2/3 percent of the
value of each gas plant product . . . less any applicable transportation allowances. . . ." The product processing allowance
rate, determined using Schedule 1, must be computed pr ior to completing Page 1 of Form MMS-4109.
1.

Enter the same payor name and address as used for reporting gas royalties and processing deductions on Form
MMS-2014.

2.

Enter the same payor code as reported on Form MMS-2014.

3.

Reserved for payor comment.

4.

Check the Amended Report box if this report is amending previously submitted data. A corrected report requires a
two-line entry. The first line reverses the original entry using a minus sign (-) in columns 12a, 12b, and 12c, as
applicable, and the second line shows the correct entry.

5.

Enter as the reporting period the period covered by the actual cost data for the processing allowance being reported
in column 12. The reporting period will begin the first day of the calendar year or when the processing contract
begins, is modified or amended rate and will end the last day of the calendar year or when the processing contract or
rate terminates, is modified or amended whichever is earlier.

6.

Enter the plant name. If extraction and fractionation takes place at separa te facilities, enter the plant name of each
facility.

7.

Line count; i.e., the number of allowances being reported.

8.

Enter the same Lease Number as reported on Form MMS-2014.

9.

Enter the same Agreement Number (if applicable), as reported on Form MMS-2014.

10.

Enter the same product code as reported on Form MMS-2014.

11.

Enter the non-arm's-length indicator as "NARM” for the portion of the processing costs incurred under non -arm'slength conditions.

12.

Column 12 is used for reporting the royalty allowance am ount deducted for the reporting period, the allowance rate,
and the royalty quantity processed during the reporting period.
Enter in column 12a the total royalty quantity processed during the reporting period. Total royalty quantity
is the sum of the mo nthly royalty quantities. Enter in column 12b the product processing allowance rate
from Schedule 1. In column 12c enter the royalty allowance amount determined by multiplying column 12a
by column 12b. Care should be taken to ensure that the allowance com ply with allowance limitations set
forth under 30 CFR 1206.179.

13.

Enter page totals on line 13.

14.

If the number of allowances being reported exceeds the number of lines on the Form MMS-4109, use additional
Page 1, Form MMS-4109s. If more than one Page 1, Form MMS-4109 is submitted, sum the amount on line 13 for
each page and enter the total only once, on line 14 of the last page of the Form MMS-4109 submittal.

Indicate by checking the appropriate box whether the information should be considered propri etary or nonproprietary.

FORM MMS-4109 (revised 3/2012)

Page 3 of 3

U.S. Department of the Interior
Office of Natural Resources Revenue

OMB Control Number 1012-0002
OMB Approval Expires 08/31/2012

Gas Product Allowance Computation Sheet
Form MMS-4109, Schedule 1
PLANT NAME & OPERATOR

PAYOR NAME AND CODE
ADDRESS
CITY

STATE

ZIP

PRODUCT CODE:
to

PERIOD: (mm/dd/ccyy)
(a)

Lease
Number

(b)

(c)

Agreement
Number

Sales
Quantity

TOTALS

(d)
Non-Arm's-Length
Processing
Costs ($)

TOTALS

Enter as the non-arm’s length Product Processing Allowance Rate the unit processi ng cost [total non-arm’s length processing costs (column d) divided by
total sales quantity (column c)] _________________. The allowanc e rate is to be carried to 6 decimal places; i.e., 0.574635.
THIS INFORMATION SHOULD BE CONSIDERED (Please check one)
FORM MMS-4109, SCHEDULE 1 (revised 3/2012)

PROPRIETARY

NONPROPRIETARY
Page 1 of 2

Gas Product Allowance Computation Sheet
Form MMS-4109, Schedule 1
Instructions
Schedule 1 is used to determine the processing allowance rate for a plant product based on actual cost.
Enter the same payor name, payor code, and payor address as used on Page 1 of Form MMS-4109.
Enter the plant name and operator. If extr action and fractionation takes place at separate facilities, enter
the plant name and operator of each facility. Enter the product code for which the allowance rate will apply.
Enter the reporting period. The reporting period must be the same period show n in item 5 on Page 1 of
Form MMS-4109.
Instructions for Computing the Processing Allowance Rate for a Plant Product
For each Lease Number and Agreement Number (if applicable), combination under which the plant product
is reported:
a.

Enter the same Lease Number as used on Form MMS -2014.

b.

Enter the same Agreement Number (if applicable) as used on Form MMS -2014.

c.

Enter the total sales quantity reported under this Lease Number/Agreement Number (if applicable)
during the reporting period. The total sales quantity is determined by summing the monthly sales
volumes reported on Form MMS -2014, column 15, during the reporting period.

d.

If the costs or a portion of the costs for processing the plant products were incurred under non -arm'slength or no contract conditions, enter the total non -arm's-length processing costs determined by
multiplying the sales quantity in column c by the processing allowance cost per unit from Schedule
2, line 5.

e.

Sum the sales quantity (column c) and processing costs (column d) and enter under columns c and
d on the total line of the last page of Schedule 1.

Compute the non-arm’s-length processing allowance rate for the product on the last page of Schedule 1.
The non-arm’s-length processing allowance rate is the unit processing cost. The non-arm’s-length unit
processing cost is determined by dividing the total non -arm’s-length processing costs (column d total) by
the total sales quantity (column c total). (Note: This allowance rate should be carried to 6 decimal places;
i.e., 0.574635.)
(Note: the total processing allowance deduction (arm’s -length and non-arm’s-length) claimed on the Form
MMS-2014 based on an individual product may not exceed 66 2/3 percent of the value of each gas plant
product determined under §1206.174. Before you calculate the 66 2/3 percent limit, you must first reduce
the value for any transportation allowances related to post -processing transportation authorized under
§1206.177.)
Indicate by checking the appropriate box whether the information should be considered proprietary or
nonproprietary.

FORM MMS-4109, SCHEDULE 1 (revised 3/2012)

Page 2 of 2

OMB Control Number 1012-0002
OMB Approval Expires 08/31/2012

U.S. Department of the Interior
Office of Natural Resources Revenue

Non-Arm‘s-Length Processing Facilities Operating Expenses,
Depreciation, and Return on Undepreciated Capital Investment
Form MMS-4109, Schedule 2
PAYOR NAME AND CODE

PLANT NAME & OPERATOR:

ADDRESS
CITY

STATE

ZIP
PRODUCT CODE:
PERIOD: (mm/dd/ccyy)

to

Lessee's Portion of Plant Expenses, Depreciation, and Return on Undepreciated Capital Investment
(a)

(b)
Undepreciated Capital
Investment at
Beginning-of-Year

Plant
Depreciation

(e)
Depreciation
Plus Return on
Capital Investment

(d)
Return on
Undepreciated
Capital Investment

(c)

Rate of Return

Extraction Facility

$

$

$

$

1a

Fractionation Facility

$

$

$

$

1b

Extraction Facility Operating, Maintenance, and Overhead Expenses (from Schedule 2A, Line 21)

$

2a

Fractionation Facility Operating, Maintenance, and Overhead Expe nses (from Schedule 2A, Line 21)

$

2b

Total Lessee Operating and Maintenance Expenses (sum column e of line 1a, 1b, 2a, and 2b)

$

3
4

Total Product Quantity (including product quantities processed b y lessee for third parties under arm's -length contracts)

THIS INFORMATION SHOULD BE CONSIDERED (Please check one)

FORM MMS-4109, SCHEDULE 2 (revised 3/2012)

5

$

Product Processing Cost per unit carried to six decimal places ( Line 3 divided by line 4).

PROPRIETARY

NONPROPRIETARY

Page 1 of 4

Non-Arm‘s-Length Processing Facilities Operating Expenses,
Depreciation, and Return on Undepreciated Capital Investment
Form MMS-4109, Schedule 2
Instructions
Schedule 2 is used to determine a processing allowance rate for a plant product based upon the lessee's
portion of the actual plant operating, maintenance, and overhead expenditures incurred during the reporting
period.
Enter the same payor name, payor code, and address as used on Page 1 of Form MMS-4109.
Enter the plant name and operator. If extraction and fractionation takes place at separate facilities, enter
the plant name and operator of each facility.
Enter the reporting period. The period must be the same period shown in item 5 on Page 1 of Form MMS4109.
Instructions for Computing the Processinq Allowance Rate and Amount for a Plant Product Based upon
the Lessee’s Portion or Plant Operating Costs, Depreciation, and Return on Undep reciated Capital
Investment.
The processing allowance rate must be computed using the total lessee quantities and third -party
quantities of the product processed by the lessee during the reporting period.
(Note: Lines 1a and 2a are used for identifying t he lessee's portion of non -arm's-length or no contract costs
for extraction facilities owned by the lessee. Lines 1b and 2b are used for identifying the lessee's portion
of non-arm's-length or no contract costs for fractionation facilities owned by the lessee.)
1.

2.

Depreciation and return on undepreciated capital investment for the product are determined using
Schedule 2B. Schedule 2B must be completed prior to completing the following steps on Schedule
2.
a.

Enter on line 1a, column a (or line 1b, col umn a), the total depreciation costs for the reporting
period from Schedule 2B, line 8, column 6. A separate Schedule 2B must be completed when
the lessee is an interest owner in both the extraction facility and the fractionation facility.

b.

Enter on line 1a, column b (or line 1b, column b), the total undepreciated plant capital
investment at beginning-of-year from Schedule 2B, line 8, column 5.

c.

The rate of return shall be the industrial rate associated with Standard and Poor's BBB rating.
Enter the monthly average rate as published in Standard and Poor's Bond Guide for the first
month of reporting period.

d.

Compute the return on undepreciated capital investment by multiplying undepreciated plant
capital investment (column b, lines 1a and/or 1b) b y the rate of return (column c, lines 1a
and/or 1b). Enter under column d, lines 1a and/or 1b.

e.

Enter the sum of the plant depreciation (column a) and return on undepreciated
capital investment (column d) under column e, lines 1a and 1b.

Determine plant operations, maintenance, and overhead costs for the facility using Schedule 2A.
Enter the total plant operating, maintenance and overhead costs from Schedule 2A, line 21, on
Schedule 2, line 2a or line 2b. A separate Schedule 2A must be completed wh en the lessee is an
interest owner in both an extraction plant and a fractionation plant.

FORM MMS-4109, SCHEDULE 2 (revised 3/2012)

Page 2 of 4

Non-Arm‘s-Length Processing Facilities Operating Expenses,
Depreciation, and Return on Undepreciated Capital Investment
Form MMS-4109, Schedule 2
3.

Enter the total plant expenses (the sum of column e for lines 1a, 1b, 2a, and 2b) on line 3.

4.

Enter the total product quantity produced by the les see's portion of the plant (extraction plant in the
case of sulfur, CO 2, or raw make, fractionation plant in the case of NGL products) during the reporting
period, including the quantity of third -party products processed by the lessee, on line 4.

5.

Enter the product processing cost per unit determined by dividing the total lessee expenses (line 3)
by the total quantity of product produced (line 4) on line 5. The processing allowance rate should be
carried to 6 decimal places; i.e., 0.546576.

Instructions

Indicate by checking the appropriate box whether the information should be considered proprietary or
nonproprietary.
ALLOWABLE AND NONALLOWABLE OPERATING, MAINTENANCE, AND CAPITAL COSTS
Allowable Capital Costs
Allowable capital costs are generally those expenditures for fixed assets (including delivery and installation
costs) that are an integral part of the facility used in the processinq/extraction of gas products. most
capital items are generally located within the confines of the plant, beginning at the inlet of the plant and
ending at the tailgate of the plant. Transportation-facilities owned by the lessee and used to move raw
make from an extraction plant to a fractionation plant shall be considered as an allowable plant
expenditure.
Capital costs will vary considerably between plants, since no two systems are exactly alike even though
they possess superficial similarities. The items listed below are examples of investment items that will
normally be found in different types of plants and should generally be considered as allowable capital
costs:
Plant and office buildings, warehouses, shops, laboratory, sidewalks, fences, plant roads and
rights-of-way for plant roads, fresh water wells and supply systems, heat and steam, power, fuel
sewage and general plant facilities, all related controls, meters P (including plant inlet and residue
sales meters). Also, pipe valves and fittings, and equipment items whose primary function is the
recovery of plant products including natural gas liquids such as absorbers, hea t exchangers,
coolers, chillers, fractionating columns, liquid sweetening facilities, and compression facilities for
refrigeration or recompression of gas required during processing.
Nonallowable Capital Costs
Nondepreciable property, such as land and pi peline rights-of-way, or the facilities utilized in bringing the
raw gas from the field to the plant, and facilities utilized for delivering, storing, or otherwise disposing of the
residue gas and liquids after extraction, will generally not be considered plant investments. Capital costs
associated with placing lease production in marketable condition (e.g. compression, dehydration, and on lease gathering), schools, hospitals, roads, sewer plants and other capital improvements or equipment not
an integral part of the processing facilities are not considered as allowable capital costs. The cost
associated with the preparation of an environmental impact statement is not allowable. However, capital
costs for environmental equipment that are an integral part o f the gas processing facility are allowable.

FORM MMS-4109, SCHEDULE 2 (revised 3/2012)

Page 3 of 4

Non-Arm‘s-Length Processing Facilities Operating Expenses,
Depreciation, and Return on Undepreciated Capital Investment
Form MMS-4109, Schedule 2
Instructions
Allowable Operation and Maintenance Costs
Operation and maintenance costs are those nondepreciable expenditures which include the costs of
operating and maintaining the facilities and shall be l imited to costs directly related to processing gas
products or extracting natural gas liquid hydrocarbons.
Operation and maintenance expenditures may include the following items:
1.

Salaries and wages paid to employees and supervisors while engaged in op erating and maintaining
the plant. Such wages must be directly connected to the processing or extraction phase of the
plant.

2.

Electrical or other energy expenditures.

3.

Chemicals and lubricants used for the purpose of extraction, protection, or cleaning of plant
facilities.

4.

Repairs, contract labor, materials, and supplies directly connected to the processing or extraction
process of the plant.

5.

Insurance, ad valorem property taxes, and payroll taxes (Federal and State income taxes are not
allowable deductions).

6.

Rental or leasing expenditures of the plant site.

7,

General and administrative overhead costs (telephone service, office supplies, salary apportionment,
etc.), Overhead costs shall be limited to those costs which are directly allocable or attributable to
the operation and maintenance of the plant.

Operation and maintenance expenditures will be limited to those items that, in the judgment of MMS, are
an integral part of the extraction or fractionation process.
Nonallowable Operating Costs
1.

Federal and State income taxes, production taxes or fees such as State severance taxes, and
royalty payments.

2.

Any costs associated with nonallowable capital improvement or equipment.

3.

Any costs associated with placing the gas in marketable condi tion which the lessee is obligated to
perform at no cost to the lessor (e.g. gathering, dehydration, compression, or storage costs
incurred on the lease or a unit).

Capital costs and operations and maintenance expenditures may be verified by requesting c opies of
invoices.

FORM MMS-4109, SCHEDULE 2 (revised 3/2012)

Page 4 of 4

U.S. Department of the Interior
Office of Natural Resources Revenue

OMB Control Number 1012-0002
OMB Approval Expires 08/31/2012

Non-Arm‘s-Length Processing
Facilities Operations, Maintenance, and
Overhead Expenditures
Form MMS-4109, Schedule 2A

A.

PAYOR IDENTIFICATION BLOCK
Payor Name and Code:
Plant Name & Operator:

Product:
Period:
(mm/dd/ccyy)

Lessee's Operating Costs
Operations Supervision and Engineering

1

$

Operations Labor

2

Utilities

3

Materials

4

Ad Valorem Property Taxes

5

Rent

6

Supplies

7

Other (specify). Attach Supplemental Schedule 2A

8

as necessary
Total Operating Costs -- Subtotal
B.

9
$

10

$

11

Lessee's Maintenance Costs
Maintenance Supervision
Maintenance Labor

12

Materials

13

Other (specify). Attach Supplemental Schedule 2A

14
15

as necessary
Total Maintenance Costs -- Subtotal
C.

to

$

16

$

17

Lessee's Overhead Allocation (specify)
18
19

Other (specify) use Supplemental Schedule 2A

D.

Total Overhead Allocation

$

Total Operating and Maintenance Costs
(Line 10 + line 16 + line 20)

$

THIS INFORMATION SHOULD BE CONSIDERED (Please check one)

FORM MMS-4109, SCHEDULE 2A (revised 3/2012)

20
21

PROPRIETARY

NONPROPRIETARY

Page 1 of 2

Non-Arm‘s-Length Processing
Facilities Operations, Maintenance, and Overhead Expenditures
Form MMS-4109, Schedule 2A
Instructions
Schedule 2A is used to record the lessee's portion of the reasonable actual plant operating, maintenance,
and overhead costs for processing the product during the reporting period. A list of allowable and
nonallowable costs is provided herei n and should be used as a guide.
Complete the payor information block as follows .
Enter the same payor name and code as reported on Form MMS-4109, Page 1.
Enter the same plant name and operator.
Enter the product; e.g., NGLs, sulfur, CO 2, etc.
Enter the reporting period. The period must be the same period shown in item 5 on Page 1 of Form MMS4109.
Instructions for Computing Operating, Maintenance, and Overhead Costs .
Identify and list on Part A and Part B, the lessee's portion of all operating and ma intenance costs directly
attributable to the plant product during the reporting period. If additional space is needed to identify or
explain other cost items, complete and attach a Supplemental Schedule 2A noting the nature and amount
of the cost.
Line 10 - Enter total operating costs (the sum of lines 1 -9).
Line 16 - Enter total maintenance costs (the sum of lines 11 -15).
Part C - Identify and list the lessee's portion of all overhead costs directly allocable and attributable to the
processing of the plant product. If additional space is needed, complete and attach a Supplemental
Schedule 2A noting the nature and amount of the expenditure.
Line 20 - Sum lines 17 through 19 to obtain the total overhead expenditures directly allocable and
attributable to the plant.
Line 21 - Sum lines 10, 16, and 20 to obtain total plant operating costs. Enter on Schedule 2A line 21. If
the costs are associated with a fractionation facility owned by the lessee, enter the total operating costs
on Schedule 2, line 2b.
Indicate by checking the appropriate box whether the information should be considered proprietary or
nonproprietary.

FORM MMS-4109, SCHEDULE 2A (revised 3/2012)

Page 2 of 2

U.S. Department of the Interior
Office of Natural Resources Revenue

OMB Control Number 1012-0002
OMB Approval Expires 08/31/2012

Non-Arm’s-Length Processing
Facilities Operations, Maintenance, and
Overhead Expenditures
Form MMS-4109, Supplemental Schedule 2A

PAYOR IDENTIFICATION BLOCK
Payor Name and Code:
Plant Name & Operator:

Product:
Period:
(mm/dd/ccyy)

to

Type of Expenditure - Describe
$

Total

THIS INFORMATION SHOULD BE CONSIDERED (Please check one)
FORM MMS -4109, SUPPLEMENTAL SCHEDULE 2A (revised 3/2012)

$

PROPRIETARY

NONPROPRIETARY
Page 1 of 2

Non-Arm’s-Length Processing
Facilities Operations, Maintenance, and Overhead Expenditures
Form MMS-4109, Supplemental Schedule 2A
Instructions
Supplemental Schedule 2A is used to identify and document the lessee's portion of all operating,
maintenance, and overhead expenditures as listed under “Other” expenditure categories on Schedule 2A.
Complete the payor information block (see Schedule 2A instructions)
A separate Supplemental Schedule 2A must be prepared for other operations, costs, other maintenance
costs, and other overhead costs associated with the plant but not listed on Schedule 2A.
Describe and specify each expenditure item and amount. Receipts and invoices should be retained in the
office of the payor subject to audit.
Sum the amounts of each expenditure and list on the total line.
Enter the total amount of the operations, maintenance, or overhead expenditures on Sch edule 2A, lines 9, 15,
or 19 accordingly.
Indicate by checking the appropriate box whether the information should be considered proprietary or
nonproprietary.

FORM MMS-4109, SUPPLEMENTAL SCHEDULE 2A (revised 3/2012)

Page 2 of 2

OMB Control Number 1012-0002
OMB Approval Expires 08/31/2012

U.S. Department of the Interior
Office of Natural Resources Revenue

PAYOR IDENTIFICATION BLOCK
Payor Name and Code:
Plant Name & Operator:

Non-Arm’s-Length Processing
Facilities Depreciation and Capital Expenditure Summary
Form MMS-4109, Schedule 2B
1

2

Expenditure
Item

Initial Capital
Investment
and Date
Placed in Service
$

4

5

Salvage
Value

Depreciable
Life/Years
of Depreciation
Taken to Date

Undepreciated
Capital
Investment
at Beginning of Year

8
THIS INFORMATION SHOULD BE CONSIDERED (Please check one)

7
Undepreciated
Capital
Investment
at End of Year

Depreciation

$

$

$
Totals
Totals

$

PROPRIETARY

to

6

3

$

FORM MMS-4109, SCHEDULE 2B (revised 3/2012)

Product Code:
Period: (mm/dd/ccyy)

NONPROPRIETARY

$

Page 1 of 2

Non-Arm’s-Length Processing
Facilities Depreciation and Capital Expenditure Summary
Form MMS-4109, Schedule 2B
Instructions
Schedule 2B is used to summarize the lessee's portion of the actual plant depreciation and
undepreciated capital investment associated with the processing of the plant product for computing
return on investment.
Complete the payor information block (see Schedule 1 instructions).
For each capital expenditure item complete one line as follows:
I.

Identify the capital expenditure item.

2.

Enter the lessee's portion of the initial capital expenditure amount and the date the expenditure was
placed in service.

3.

Enter a reasonable salvage value.

4.

Enter the depreciable life of the expenditure item and the number of years of depreciation taken to date.

5.

Enter the lessee's portion of the beginning -of-year undepreciated capital investment. In computing
this amount, salvage must be deducted from the initial capital investment.

6.

Enter the amount of depreciation to be taken for the year. In computing depreciation, the payor may
elect to use either a straight -line depreciation method or a unit of production method based on the
life of equipment or the life of the reserves which the plant services. Once an election is made, the
payor may not alternate methods without MMS approval. Equipment shall not be depreciated below
a reasonable salvage va lue).

7.

Enter the end-of-year undepreciated capital investment. This is computed by subtracting
depreciation from the beginning-of-year undepreciated capital investment. This amount will be used
as the next year's beginning-of-year undepreciated capital investment.

8.

Total columns 5 and 6 and enter on Schedule 2, columns a and b, line 1a. If the costs are
associated with a fractionation facility owned by the lessee, enter the total costs on Schedule 2,
columns a and b, line 1b.

Indicate by checking the appropriate box whether the information should be considered proprietary or
nonproprietary.

FORM MMS-4109, SCHEDULE 2B (revised 3/2012)

Page 2 of 2


File Typeapplication/pdf
File TitleForm 4109
SubjectOMB 1010-0103, Gas Processing
AuthorMMS
File Modified2012-03-22
File Created2004-11-30

© 2024 OMB.report | Privacy Policy