Burden Tables Private Industry

ICR 1773.10 Ex 1.xlsx

NESHAP for Hazardous Waste Combustors (Renewal)

Burden Tables Private Industry

OMB: 2050-0171

Document [xlsx]
Download: xlsx | pdf

Overview

exhibit 1
Summary
Misc


Sheet 1: exhibit 1













s/3 Sources 2012 DB s-Addl s-Est New s-total Fac f/3 Comm Units
OS units Sister Units








Respondents Legal Manager Technical Clerical Consultant



Incinerators 26.0 61 17 0 78 78 26.0 15
63 0








Base Hourly Wage 2005 ICR (burdened) 79.6 68.3 54.2 26.3




Cement Kilns 4.7 14

14 14 4.7


0








Inflation Factor 1.40 1.40 1.40 1.40




LWAKs 1.3 4

4 3 1.0


0








Inflation Adjusted Hourly Rate 111.37 95.59 75.81 36.85 95.59



LFB 25.0 75

75 53 17.7


0


















SFB 2.3 7

7 4 1.3


0








Agency Legal Manager Technical Clerical Consultant



HCl Prod Furn 4.7 14

14 8 2.7


0


















Phase I 32.0 79

96




0








Hourly Wage 55.7 47.7 34.3 19.0




Phase II 32.0 93

93




0








Overhead Multiplier 1.6 1.6 1.6 1.6




All 64.0 175

192 151 50


0








Total Hourly Rate 89.10 76.38 54.94 30.40 76.38







































721













Exhibit 1: Respondent Burden and Cost
































Hours and Costs Per Respondent or Activity
Total Hours and Costs



















Total Respondent Hours per Labor Category








Reporting (RP) vs. Recordkeeping (RK) Reporting vs. Recordkeeping









Legal Manager Technical Clerical Consultant Respon. Labor Capital/ O&M # of Total Capital/ O&M Total Reporting Recordkeeping









$111.37 $95.59 $75.81 $36.85 $95.59 Hours Cost Startup Costs Respondents Hours Startup Cost Cost













INFORMATION COLLECTION ACTIVITY
/hr /hr /hr /hr /hr hrs $ $ $ or Activities hr/yr $/yr $/yr $/yr No. Responses Total Hours Capital/O&M No. Responses Total Hours Capital/O&M
































Hour and Cost Burden- Private Sector




WHO IS SUBJECT TO THESE REGULATIONS





























Read 40 CFR Part 63, Subparts A and EEE
0.0 5.0 10.0 0.0 0.0 15.0 $1,236 $0 $0 50.3 755.0 $0 $0 $62,215 RK


50 755 $0


Hours per Response Total Annual Hour Burden Cost per Response (Capital/Startup and O&M Costs Only) Total Annual Cost Burden (Capital/Startup and O&M Costs Only)
Subtotal
0.0 5.0 10.0 0.0 0.0 15.0 $1,236 $0 $0
755.0 $0 $0 $62,215



50 755 $0

Reporting (1446 Responses) 66 95,723 $2,782 $4,023,981 1446

























Recordkeeping (1241 Responses) 34 42,711 $21 $25,771 1241
Total (Who is Subject to These Regulations)
0.0 5.0 10.0 0.0 0.0 15.0 $1,236 $0 $0
755.0 $0 $0 $62,215



50 755 $0

Third Party Disclosure





























Total (2687 Responses) 52 138,434 $1,507 $4,049,752 2687































MACT STANDARDS





























Cement kilns with in-line raw mills (63.1220(d))






























Conduct performance testing when the raw mills is on line and





























when the mill is off-line 0.00 3.00 30.00 10.00 40.00 83.00 $6,753 $0 $5,000 1.0 83.0 $0 $5,000 $11,753 RK


1 83 $5,000








Prepare and submit notification of compliance using the





























emission averaging requirements for cement kilns with in-line





























raw mills 0.00 1.00 3.00 1.00 0.00 5.00 $360 $0 $8 1.0 5.0 $0 $8 $368 RP 1 5 $8











Document in operating record compliance with the





























emission averaging requirements for cement kilns with in-line





























raw mills 0.00 0.00 0.50 0.50 0.00 1.00 $56 $0 $0 1.0 1.0 $0 $0 $56 RK


1 1 $0







Total (MACT Standards)
0.0 0.0 0.0 0.0 0.0 0.0 $0 $0 $0
89.0 0.0 5,008.0 12,177.4
1 5 8.0 2 84 5,000.0





































































COMPLIANCE WITH THE STANDARDS AND OPERATING REQUIREMENTS





























Compliance with alternative MACT standards when not burning Hazardous Waste(63.1206(b)(1)(ii))






























Document in the operating record compliance with





























applicable CAA requirements in lieu of the requirements





























of Subpart EEE 0.0 0.0 4.0 0.0 0.0 4.0 $303 $0 $0 3.2 12.8 $0 $0 $970 RK


3 13 0







Subtotal
0.0 0.0 4.0 0.0 0.0 4.0 $303 $0 $0
12.8 $0 $0 $970
0 0 $0 3 13 $0







Extension of compliance with emission standards (63.1206(b)(4), 63.6(i), 63.1213, and 63.9(c))






























Prepare and submit the request for an extension of compliance 0.0 2.0 10.0 4.0 0.0 30.0 $1,097 $0 $8 10.1 161.1 $0 $81 $11,120 RP 10 161 81











Prepare and submit a progress report, as applicable 0.0 1.0 5.0 2.0 0.0 15.0 $548 $0 $8 10.1 80.5 $0 $81 $5,600 RP 10 81 81










Subtotal
0.0 3.0 15.0 6.0 0.0 45.0 $1,645 $0 $16
242 $0 $161 $16,721
20 242 $161 0 0 $0







Changes in design, operation, or maintenance (63.1206(b)(5))






























Prepare and submit a notification of change in design,





























operation, or maintenance 0.0 2.0 32.0 8.0 20.0 62.0 $4,824 $0 $8 32.0 1,984.0 $0 $256 $154,615 RP 32 1984 256











Conduct a comprehensive performance test 0.0 20.0 80.0 28.0 500.0 628.0 $56,804 $5,000 $75,000 0.0 0.0 $0 $0 $0 RK


0 0 0








Document change in operating record if it is determined that





























the change will not adversely affect compliance with emission





























standards or operating requirements 0.0 0.0 1.0 0.0 0.0 1.0 $76 $0 $0 32.0 32.0 $0 $0 $2,426 RK


32 32 0








Revise, as necessary, the performance test plan,





























Documentation of Compliance, and start-up, shutdown, and





























malfunction plan to reflect changes that will not adversely





























affect compliance with emission standards or operating





























requirements. 0.0 1.0 6.0 4.0 0.0 11.0 $698 $0 $0 0.0 0.0 $0 $0 $0 RP 0 0 0










Subtotal
0.0 23.0 119.0 40.0 520.0 702.0 $62,402 $5,000 $75,008
2,016.0 $0 $256 $157,041
32 1984 $256 32 32 $0







Use of previous test results to document compliance with MACT DRE standard (63.1206(b)(7))






























Document quality of previous DRE test data 0.0 2.0 10.0 4.0 5.0 21.0 $1,575 $0 $8 48.0 1,008.0 $0 $384 $75,967 RP 48 1008 384










Subtotal
0.0 2.0 10.0 4.0 5.0 21.0 $1,575 $0 $8
1,008.0 $0 $384 $75,967
48 1008 $384 0 0 $0







Applicability of particulate matter and opacity standards during particulate matter CEMS correlation tests (63.1206(b)(8))






























Prepare and submit a particulate matter CEMS correlation





























test plan 0.0 2.0 16.0 2.0 0.0 20.0 $1,478 $0 $8 13.0 0.0 $0 $104 $19,316 RP 13 0 104











Request additional time extension for waiving PM and Opacity stnds 0.0 0.0 0.1 0.0 0.0 0.1 $8 $0 $0 0.0 0.0 $0 $0 $0 RP 0 0 0










Subtotal
0.0 2.0 16.0 2.0 0.0 20.0 $1,478 $0 $8
0.0 $0 $104 $19,316
13 0 $104 0 0 $0







Hazardous waste residence time






























Document hazardous waste residence time in operating record 0.0 0.0 2.0 0.5 2.0 4.5 $361 $0 $8 8.0 36.0 $0 $64 $2,954 RK


8 36 64







Subtotal
0.0 0.0 2.0 0.5 2.0 4.5 $361 $0 $8
36.0 $0 $64 $2,954 $0 0 0 $0 8 36 $64







Alternative hydrocarbon monitoring location for short cement kilns burning haz waste at location other than hot end of kiln






























Prepare and submit a petition for alternative monitoring





























location and emission standards 0.0 1.0 2.0 0.5 16.0 19.5 $1,795 $0 $8 0.0 0.0 $0 $0 $0 RP 0 0 0










Subtotal
0.0 1.0 2.0 0.5 16.0 19.5 $1,795 $0 $8
0.0 $0 $0 $0 $0 0 0 $0 0 0 $0







Startup, shutdown, and malfunction plan (63.1206(c)(2) and 63.6(e)(3))






























Develop a startup, shutdown, and malfunction plan 0.0 6.0 50.0 8.0 32.0 96.0 $7,718 $0 $0 64.0 6,144.0 $0 $0 $493,938 RK


64 6144 0








Have it reviewed and approved by EPA 0.0 1.0 5.0 2.0 5.0 13.0 $1,026 $0 $0 64.0 832.0 $0 $0 $65,683 RP 64 832 0











Make the plan available for inspection, if requested by the





























EPA 0.0 0.0 0.0 0.5 0.0 0.5 $18 $0 $0 64.0 32.0 $0 $0 $1,179 RP 64 32 0











Keep the plan on record for the life of the affected source or





























until the affected source is no longer subject to the provisions





























of 40 CFR Part 63 0.0 0.0 0.0 0.5 0.0 0.5 $18 $0 $0 64.0 32.0 $0 $0 $1,179 RK


64 32 0








Keep previous versions of the plan on record for a period of 5





























years after each revision, if the plan is revised 0.0 0.0 0.0 0.5 0.0 0.5 $18 $0 $0 64.0 32.0 $0 $0 $1,179 RK


64 32 0








Excessive emissions reporting 1.0 2.0 10.0 1.0 1.0 15.0 $1,193 $0 $1 6.4 96.0 $0 $6 $7,642 RP 6 96 6.4










Subtotal
0.0 7.0 55.0 11.5 37.0 110.5 $8,799 $0 $0
7,168.0 $0 $6 $570,801 $0 134 960 $6 192 6208 $0







Automatic waste feed cutoff (63.1206(c)(3))






























Investigate the cause of any AWFCO, take appropriate





























corrective measures to minimize future AWFCOs, and





























record the findings and corrective measures in the operating





























record 0.0 2.0 16.0 0.5 0.0 18.5 $1,423 $0 $0 128.0 2,368.0 $0 $0 $182,089 RK


128 2368 0








Develop and submit a written report documenting excessive





























exceedances and result of the investigation and corrective





























measures taken 0.0 2.0 16.0 0.5 0.0 18.5 $1,423 $0 $8 6.4 118.4 $0 $51 $9,156 RK


6 118 51.2








Test the AWFCO system and associated alarms weekely and





























document and record AWFCO operability test procedures and





























result in the operating record 0.0 0.0 1.5 0.0 0.0 1.5 $114 $0 $0 32.0 48.0 $0 $0 $3,639 RK


32 48 0








Document in the operating record that weekly inspections will





























unduly restrict or upset operations 0.0 0.0 0.5 0.0 0.0 0.5 $38 $0 $0 32.0 16.0 $0 $0 $1,213 RK


32 16 0








Test the AWFCO system monthly, and record results in





























operating record 0.0 0.0 1.5 0.0 0.0 1.5 $114 $0 $0 32.0 48.0 $0 $0 $3,639 RK


32 48 0








Document in the operating record the operating and maintenance





























plan ramp down procedures, as applicable 0.0 0.5 6.0 1.0 0.0 7.5 $540 $0 $0 128.0 960.0 $0 $0 $69,057 RK


128 960 0







Subtotal
0.0 4.5 41.5 2.0 0.0 48.0 $3,650 $0 $8
3,558.4 $0 $51 $268,792 $0 0 0 $0 358 3558 $51







ESV openings (63.1206(c)(4))






























Develop an ESV operating plan and keep it in the operating





























record 0.0 2.0 20.0 1.0 0.0 23.0 $1,744 $0 $0 13.0 299.0 $0 $0 $22,675 RK


13 299 0








Investigate the cause of the ESV opening, take appropriate





























corrective measures to minimize such future ESV openings,





























record the findings and corrective measures in the operating





























record, and determine if ESV caused non-compliance 0.0 2.0 16.0 0.5 0.0 18.5 $1,423 $0 $0 39.0 721.5 $0 $0 $55,480 RK


39 722 0








Develop and submit a written report documenting the ESV




























opening and result of the investigation and corrective





























measures taken, and whether ESV event caused non-compliance 0.0 2.0 16.0 0.5 0.0 18.5 $1,423 $0 $8 39.0 721.5 $0 $312 $55,792 RP 39 722 312










Subtotal
0.0 6.0 52.0 2.0 0.0 60.0 $4,589 $0 $8
1,742.0 $0 $312 $133,947
39 722 $312 52 1021 $0







Combustion system leaks (63.1206(c)(5))






























Prepare and submit a request to use an alternative means of





























control to provide control of combustion system leaks 0.0 0.5 10.0 0.5 0.0 11.0 $824 $0 $8 32.0 352.0 $0 $256 $26,634 RP 32 352 256











Specify in the comprehensive test workplan and the notification





























of compliance the methods used to control combustion system leaks 0.0 0.0 0.3 0.0 0.0 0.3 $19 $0 $0 32.0 8.0 $0 $0 $606 RK


32 8 0







Subtotal
0.0 0.5 10.3 0.5 0.0 11.3 $843 $0 $8
360.0 $0 $256 $27,241
32 352 $256 32 8 $0







Operator training and certification (63.1206(c)(6))






























Develop an operator training and certification program,





























implement the program, record the plan in the operating record,





























and keep records of the certification and training activities 0.0 8.0 200.0 5.0 10.0 223.0 $17,067 $0 $50 12.1 2,694.6 $0 $604 $206,829 RK


12 2695 604.166666666667







Subtotal
0.0 8.0 200.0 5.0 10.0 223.0 $17,067 $0 $50
2,694.6 $0 $604 $206,829 $0 0 0 $0 12 2695 $604







Operation and maintenance plan (63.1206 (c)(7))






























Prepare an operation and maintenance plan and





























put in the operating record 0.0 5.0 120.0 10.0 175.0 310.0 $26,672 $0 $0 64.0 19,840 $0 $0 $1,707,023 RK


64 19840 0








Install and operate bag leak detectors or PM Detectors. Document alarm limit exceedences and corrective action taken. Notify EPA if alarm limit is exceeded more than 5% of the time in a 6-month block period 0.0 10.0 60.0 0.0 20.0 90.0 $7,416 $6,000 $500 11.3 1,020.0 $68,000 $5,667 $157,719 RP 11 1020 73667











Recommend alternative OPLs for units with ESP or IWSs 0.0 0.0 10.0 1.0 0.0 11.0 $795 $0 $0 11.3 124.6 $0 $0 $9,005 RK


11 125 0








Conduct Correlation testing for PM Detectors 0.0 15.0 30.0 15.0 10.0 70.0 $5,217 $18,000 $2,000 1.0 70.0 $18,000 $2,000 $25,217 RK


1 70 20000







Subtotal
0.0 15.0 190.0 11.0 195.0 411.0 $34,884 $6,000 $500
21,054.6 86,000.0 7,666.7 1,898,964.1 0.0 11 1020 73,666.7 76 20035 20,000.0






































Total (Compliance and Standards)





1679.8 $139,391 $11,000 $75,630
39,892.0 $86,000 $9,866 $3,379,542 $0 330 6287 $75,146 766 33605 $20,719





































































PERFORMANCE TESTING REQUIREMENTS





























Comprehensive performance test requirements (63.1207(b)(1))






























Perform comprehensive performance test no later than 61





























months after the date of commencing the previous





























comprehensive performance test 5.0 20.0 140.0 50.0 500.0 715.0 $62,720 $0 $60,000 64.0 45,760.0 $0 $3,840,000 $7,854,111 RP 64 45760 3840000











One-time D/F testing for units w/out numerical D/F stnd 0.0 5.0 30.0 5.0 40.0 80.0 $6,760 $0 $5,000 14.7 1,173.3 $0 $73,333 $172,483 RP 15 1173 73333











Request 60 day extention to complete testing 0.0 1.0 1.0 1.0 0.0 3.0 $208 $0 $8 12.8 38.4 $0 $102 $2,768 RP 13 38 102











Request additional time for waiving OPLs for pretesting 0.0 1.0 1.0 1.0 0.0 3.0 $208 $0 $8 6.4 19.2 $0 $51 $1,384 RP 6 19 51










Subtotal
5.0 27.0 172.0 57.0 540.0 801.0 $69,897 $0 $65,016
46,990.9 $0 $3,913,487 $8,030,746
98 46991 $3,913,487 0 0 $0







Confirmatory performance test requirements (63.1207(b)(2))






























Perform the confirmatory performance test no later than 31





























months after the date of commencing the previous





























comprehensive performance test 0.0 5.0 20.0 8.0 50.0 83.0 $7,069 $0 $6,000 2.5 207.5 $0 $15,000 $32,671 RP 3 208 15000










Subtotal
0.0 5.0 20.0 8.0 50.0 83.0 $7,069 $0 $6,000
207.5 $0 $15,000 $32,671
3 208 $15,000










Data in lieu of the initial comprehensive performance test (63.1207(c)(2))






























Prepare and submit a request that previous emissions test





























data serve as documentation of conformance with emission





























standards 0.0 1.0 8.0 2.0 0.0 11.0 $776 $0 $8 6.4 70.4 $0 $51 $5,016 RP 6 70 51










Subtotal
0.0 1.0 8.0 2.0 0.0 11.0 $776 $0 $8
70.4 $0 $51 $5,016 RP 6 70 $51










Notification of performance test and CMS perfomance evaluation and approval of test plan CMS performance evaluation plan (63.1207(e))






























Prepare and submit a notification of intention to conduct





























a perfomance test 0.0 1.0 4.0 1.0 0.0 6.0 $436 $0 $1 6.4 38.4 $0 $6 $2,795 RP 6 38 6











Prepare and submit the rescheduled notification of intent to





























conduct a performance test, if test is postponed 0.0 1.0 4.0 1.0 0.0 6.0 $436 $0 $1 6.4 38.4 $0 $6 $2,795 RP 6 38 6











Prepare and submit a site-specific comprehensive





























performance test plan 2.0 5.0 30.0 12.0 80.0 129.0 $11,065 $0 $8 8.0 1,032.0 $0 $64 $88,580 RP 8 1032 64











Prepare and submit the site-specific confirmatory performance





























test plan 0.0 2.0 10.0 10.0 20.0 42.0 $3,230 $0 $8 16.0 672.0 $0 $128 $51,802 RP 16 672 128











Prepare and submit additional relevant information, if





























requested by the EPA 0.0 2.0 20.0 1.0 0.0 23.0 $1,744 $0 $8 1.6 36.8 $0 $13 $2,804 RP 2 37 13










Subtotal
2.0 11.0 68.0 25.0 100.0 206.0 $16,910 $0 $26
1,817.6 $0 $218 $148,775 $0 38 1818 $218 0 0 $0







Notification of compliance (63.1207(j), 63.9(h), 63.7(g), 63.10(d)(2) and 63.1210(d))






























Prepare and submit a notification of compliance 0.0 10.0 42.0 16.0 62.0 130.0 $10,656 $0 $8 64.0 8,320.0 $0 $512 $682,510 RP 64 8320 512











Prepare and submit a written request for a time extension, if





























necessary 0.0 0.5 0.0 1.0 0.0 1.5 $85 $0 $8 6.4 9.6 $0 $51 $593 RP 6 10 51










Subtotal
0.0 10.5 42.0 17.0 62.0 131.5 $10,741 $0 $16
8,329.6 $0 $563 $683,102 $0 70 8330 $563 0 0 $0







Waiver of performance tests and request for time extension (63.1207(h) and 63.1207(m))






























Prepare and submit a request for a 6 month time extension for





























conducting a performance test if test plan has not been approved 0.0 2.0 24.0 2.0 0.0 28.0 $2,084 $0 $8 6.4 179 $0 $51 $13,391 RP 6 179 51











Notify public of request for time extension 1.0 2.0 2.0 1.0 0.0 6.0 $491 $0 $0 6.4 38 $0 $0 $3,143 RP 6 38 0











Prepare and submit any supplementary information





























requested by the EPA 0.0 2.0 20.0 1.0 0.0 23.0 $1,744 $0 $8 6.4 147 $0 $51 $11,214 RP 6 147 51










Subtotal
1.0 6.0 46.0 4.0 0.0 57.0 $4,320 $0 $16
365 $0 $102 $27,748 RP 19 365 102









































Total (Performance Testing)





1289.5 $109,712 $0 $71,082
57,781 $0 $3,929,421 $8,928,059
235 57781 $3,929,421 0 0 $0




































































































MONITORING REQUIREMENTS





























Continuous emissions monitoring system (CEMS) and continuous opacity monitoring system (COMS) (63.1209(a))






























Install, calibrate, maintain, and continuously operate CEMS





























for carbon monoxide, hydrocarbons, and oxygen 0.0 0.0 0.0 0.0 0.0 0.0 $0 $0 $0 0.0 0.0 $0 $0 $0 RK


0 0 0








For existing and new cement kilns, install, calibrate, maintain,





























and continuously operate COMS for opacity 0.0 0.0 0.0 0.0 0.0 0.0 $0 $0 $0 0.0 0.0 $0 $0 $0 RK


0 0 0







Subtotal
0.0 0.0 0.0 0.0 0.0 0.0 $0 $0 $0
0.0 $0 $0 $0 $0 0 0 $0 0 0 $0







Continuous monitoring systems (CMS)






























Install and operate and maintain CMS 0.0 0.0 0.0 0.0 0.0 0.0 $0 $0 $0 0.0 0.0 $0 $0 $0 RK


0 0 0







Subtotal
0.0 0.0 0.0 0.0 0.0 0.0 $0 $0 $0
0.0 $0 $0 $0 $0 0 0 $0 0 0 $0







Feedstreams Analysis Plan (63.1209(c)(2))






























Develop and implement a feedstream analysis plan and





























put plan in the operating record 0.0 1.0 5.0 1.0 0.0 7.0 $511 $0 $0 0.0 0.0 $0 $0 $0 RK


0 0 0








Submit the plan for review and approval, if requested by the





























EPA 0.0 0.0 0.0 0.5 0.0 0.5 $18 $0 $0 0.0 0.0 $0 $0 $0 RP 0 0 0











Monitor and record feedrates 0.0 0.0 0.0 0.0 0.0 2.0 $0 $0 $0 0.0 0.0 $0 $0 $0 RK


0 0 0








Perform waste analysis four time annually (non-commercial





























facilities) 0.0 0.0 0.0 0.0 0.0 1.0 $0 $0 $0 0.0 0.0 $0 $0 $0 RK


0 0 0








Perform waste analysis 50 times annually (commercial





























facilities) 0.0 0.0 0.0 0.0 0.0 1.0 $0 $0 $2,000 0.0 0.0 $0 $0 $0 RK


0 0 0







Subtotal
0.0 1.0 5.0 1.5 0.0 11.5 $530 $0 $2,000
0.0 $0 $0 $0 $0 0 0 $0 0 0 $0







Alternative compliance monitoring requirements for standards other than those monitored with a CEMS (63.1209(g)(1))






























Prepare and submit an application for use of an alternative





























monitoring method 0.0 8.0 20.0 10.0 80.0 118.0 $10,297 $0 $8 6.4 755.2 $0 $51 $65,951 RP 6 755 51











Prepare and submit an application to waive an operating limit 0.0 4.0 24.0 2.0 0.0 30.0 $2,276 $0 $8 0.0 0.0 $0 $0 $0 RP 0 0 0










Subtotal
0.0 12.0 44.0 12.0 80.0 148.0 $12,572 $0 $16
755.2 $0 $51 $65,951
6 755 $51 0 0 $0







Use of CEMS in lieu of OPLs; or alternative methods in lieu of CEMS (63.1209(a)(5))






























Prepare and submit an application for use of an alternative





























monitoring method 0.0 8.0 20.0 10.0 80.0 118.0 $10,297 $0 $8 0.0 0.0 $0 $0 $0 RP 0 0 0











Prepare and submit an application to waive an operating limit 0.0 4.0 24.0 2.0 0.0 30.0 $2,276 $0 $8 0.0 0.0 $0 $0 $0 RP 0 0 0










Subtotal
0.0 12.0 44.0 12.0 80.0 148.0 $12,572 $0 $16
0.0 $0 $0 $0
0 0 $0 0 0 $0







DRE (63.1209(j))






























Comply with the operating limits applicable to DRE 0.0 0.0 0.0 0.0 0.0 0.0 $0 $0 $0 0.0 0.0 $0 $0 $0 RP 0 0 0










Subtotal
0.0 0.0 0.0 0.0 0.0 0.0 $0 $0 $0
0.0 $0 $0 $0
0 0 $0










Dioxins and furans (63.1209(k))






























Comply with the operating parameter limits applicable to





























dioxin and furans 0.0 0.0 0.0 0.0 0.0 0.0 $0 $0 $0 0.0 0.0 $0 $0 $0 RK


0 0 0








Document in the operating record procedures





























used to ensure carbon bed lifetime is being





























sufficiently monitored and controlled 0.0 0.0 0.3 0.0 0.0 0.3 $19 $0 $8 0.0 0.0 $0 $0 $0 RK


0 0 0








Document in the operating record that replacement carbon





























will provide the same level of control as original carbon





























used during the performance test 0.0 0.0 0.3 0.0 0.0 0.3 $19 $0 $8 0.0 0.0 $0 $0 $0 RK


0 0 0








Document in the operating record that replacement inhibitor





























will provide the same level of control as the original inhibitor





























used during the performance test 0.0 0.0 0.3 0.0 0.0 0.3 $19 $0 $8 0.0 0.0 $0 $0 $0 RK


0 0 0







Subtotal
0.0 0.0 0.8 0.0 0.0 0.8 $57 $0 $24
0.0 $0 $0 $0
0 0 $0 0 0 $0







Mercury (63.1209(l))






























Comply with the operating parameter limits applicable to





























mercury 0.0 0.0 0.0 0.0 0.0 0.0 $0 $0 $0 0.0 0.0 $0 $0 $0 RK


0 0 0








Prepare and submit request to extrapolate mercury feedrate





























limits 0.0 0.5 4.0 1.0 0.0 5.5 $388 $0 $8 6.4 35.2 $0 $51 $2,534 RK


6 35 51.2








Install, calibrate, maintain, and continuously operate CEMS





























for compliance monitoring for mercury 0.0 0.0 12.0 0.0 0.0 12.0 $910 $0 $0 0.0 0.0 $0 $0 $0 RK


0 0 0







Subtotal
0.0 0.5 16.0 1.0 0.0 17.5 $1,298 $0 $8
35.2 $0 $51 $2,534 $0 0 0 $0 6 35 $51







Particulate matter (63.1209(m))






























Comply with the operating parameter limits applicable to





























particulate matter 0.0 0.0 0.0 0.0 0.0 0.0 $0 $0 $0 0.0 0.0 $0 $0 $0














Subtotal
0.0 0.0 0.0 0.0 0.0 0.0 $0 $0 $0
0.0 $0 $0 $0 $0 0 0 $0 0 0 $0







Semivolatile and low volatile metals (63.1209(n))






























Comply with the operating parameter limits applicable to





























semivolatile metals and low volatile metals 0.0 0.0 0.0 0.0 0.0 0.0 $0 $0 $0 0.0 0.0 $0 $0 $0 RK


0 0 0








Prepare and submit request to extrapolate semivolatile metal





























and low volatile metal feedrate limits 0.0 0.5 4.0 1.0 0.0 5.5 $388 $0 $8 6.4 35.2 $0 $51 $2,534 RP 6 35 51











Install, calibrate, maintain, and continuously operate CEMS





























for compliance monitoring for semivolatile metals and low





























volatile metals 0.0 0.0 12.0 0.0 0.0 12.0 $910 $0 $0 0.0 0.0 $0 $0 $0 RK


0 0 0







Subtotal
0.0 0.5 16.0 1.0 0.0 17.5 $1,298 $0 $8
35.2 $0 $51 $2,534 $0 6 35 $51 0 0 $0







Total chlorine (hydrochloride and chlorine gas) (63.1209(o))






























Comply with the operating parameter limits applicable to total





























chlorine 0.0 0.0 0.0 0.0 0.0 0.0 $0 $0 $0 0.0 0.0 $0 $0 $0 RK


0 0 0








Document in the operating record that replacement sorbent





























will provide the same level of control as the original sorbent





























used during the performance test 0.0 0.0 0.3 0.0 0.0 0.3 $19 $0 $0 0.0 0.0 $0 $0 $0 RK


0 0 0








Install, calibrate, maintain, and continuously operate CEMS





























for compliance monitoring total chlorine 0.0 0.0 12.0 0.0 0.0 12.0 $910 $0 $0 0.0 0.0 $0 $0 $0 RK


0 0 0







Subtotal
0.0 0.0 12.3 0.0 0.0 12.3 $929 $0 $0
0.0 $0 $0 $0
0 0 $0 0 0 $0







Operating under different modes of operation (63.1207(g) and 63.1209(r))






























Document the mode of operation in the operating record, if a





























source has tested under two or more operating modes 0.0 0.0 0.3 0.0 0.0 0.3 $19 $0 $0 32.0 8.0 $0 $0 $606 RK


32 8 0







Subtotal
0.0 0.0 0.3 0.0 0.0 0.3 $19 $0 $0
8.0 $0 $0 $606
0 0 $0 32 8 $0






































Total (Monitoring)





355.8 $29,274 $0 $2,072
834 $0 $154 $71,624
13 790 $102 38 43 $51




































































































CMS PERFORMANCE EVALUATIONS





























Quality control program (63.1209(d) and 63.8(d)






























Develop and implement a CMS QC program 0.0 5.0 24.0 10.0 40.0 79.0 $6,490 $0 $0 64.0 5,056.0 $0 $0 $415,332 RK


64 5056 0








Keep the CMS quality control program on record for the life





























of the affected source or until the affected source is no





























longer subject to the provisions of 40 CFR Part 63 0.0 0.0 0.0 0.5 0.0 0.5 $18 $0 $0 64.0 32.0 $0 $0 $1,179 RK


64 32 0








Submit the CMS quality control program for inspection, if





























requested by the EPA 0.0 0.0 0.0 0.5 0.0 0.5 $18 $0 $8 6.4 3.2 $0 $51 $169 RP 6 3 51










Subtotal
0.0 5.0 24.0 11.0 40.0 80.0 $6,526 $0 $8
5,091 $0 $51 $416,680
6 3 $51 128 5088 $0







Notification of performance evaluation (63.1209(d) and 63.8(e)(2))






























Prepare and submit a notification of CMS performance





























evaluation 0.0 1.0 4.0 1.0 0.0 6.0 $436 $0 $1 64.0 384.0 $0 $64 $27,948 RP 64 384 64










Subtotal
0.0 1.0 4.0 1.0 0.0 6.0 $436 $0 $1
384.0 $0 $64 $27,948
64 384 $64










Additional notification requirements for CMS (63.9(g)(2) and (3))






























Prepare and submit additional notification requirements for





























source with CMS 0.0 1.0 4.0 1.0 0.0 6.0 $436 $0 $1 64.0 384.0 $0 $64 $27,948 RP 64 384 64










Subtotal
0.0 1.0 4.0 1.0 0.0 6.0 $436 $0 $1
384.0 $0 $64 $27,948
64 384 $64










Submission of site-specific peformance evaluation test plan (63.1209(d) and 63.8(e)(3))






























Develop and submit a CMS site-specific performance





























evaluation test plan 0.0 10.0 24.0 8.0 20.0 62.0 $4,982 $0 $8 64.0 3,968.0 $0 $512 $319,359 RP 64 3968 512











Submit additional relevant information, if requested by the





























EPA 0.0 2.0 12.0 1.0 0.0 15.0 $1,138 $0 $8 6.4 96.0 $0 $51 $7,333 RP 6 96 51










Subtotal
0.0 12.0 36.0 9.0 20.0 77.0 $6,120 $0 $16
4,064.0 $0 $563 $326,692
70 4064 $563 0 0 $0







Conduct of performance evaluation and performance evaluation dates (63.1209(d) and 63.8(e)(4))






























Conduct a CMS performance evalutaion 0.0 4.0 20.0 4.0 20.0 48.0 $3,958 $0 $0 64.0 3,072.0 $0 $0 $253,299 RK


64 3072 0







Subtotal
0.0 4.0 20.0 4.0 20.0 48.0 $3,958 $0 $0
3,072.0 $0 $0 $253,299



64 3072 $0







Reporting results of CMS performance evaluations (63.10(e)(2))






























Prepare and submit a written report of the results of the





























CMS performance evaluation 0.0 1.0 12.0 6.0 24.0 43.0 $3,521 $0 $8 64.0 2,752.0 $0 $512 $225,831 RP 64 2752 512











Prepare and submit written reports of the results of the





























COMS performance evaluation, as applicable 0.0 1.0 10.0 4.0 8.0 23.0 $1,766 $0 $8 0.0 0.0 $0 $0 $0 RP 0 0 0










Subtotal
0.0 2.0 22.0 10.0 32.0 66.0 $5,286 $0 $16
2,752.0 $0 $512 $225,831
64 2752 $512 0 0 $0






































Total (CMS Performance Evaluations)





283.0 $22,762 $0 $42
15,747.2 $0 $1,254 $1,278,397
269 7587 $1,254 192 8160 $0



































































































































MISCELLANEOUS NOTIFICATION REQUIREMENTS





























Notice of intent to comply 63.1206(b)-(d)






























Prepare draft NIC 4.0 5.0 40.0 3.0 5.0 57.0 $4,544 $0 $20 5.0 286.9 $0 $101 $22,974 RP 5 287 101











Notify public about meeting and draft NIC 0.0 1.0 3.0 2.0 0.0 6.0 $397 $0 $150 5.0 30.2 $0 $755 $2,752 RP 5 30 755











Conduct public meeting 2.0 2.0 15.0 3.0 5.0 27.0 $2,140 $250 $200 5.0 135.9 $1,258 $1,007 $13,034 RP 5 136 2265











Prepare and submit final NIC 1.0 1.0 30.0 3.0 5.0 40.0 $3,070 $0 $100 5.0 201.3 $0 $503 $15,954 RP 5 201 503











Prepare progress report 0.0 3.0 25.0 3.0 5.0 36.0 $2,771 $0 $50 5.0 181.2 $0 $252 $14,197 RP 5 181 252










Subtotal
7.0 12.0 113.0 14.0 20.0 166.0 $12,921 $250 $520
835.5 $1,258 $2,617 $68,911
25 836 $3,876 0 0 $0







Initial notification 63.9(b) and 63.5(d)






























Prepare and submit and initial notification 0.0 2.0 8.0 1.0 0.0 11.0 $835 $0 $0 5.0 55.4 $0 $0 $4,200 RP 5 55 0











Prepare and submit an application of approval of construction





























as applicable 1.0 6.0 32.0 0.5 0.0 39.5 $3,129 $0 $0 0.0 0.0 $0 $0 $0 RP 0 0 0











Prepare and submit an application of approval of reconstruction





























as applicable 1.0 6.0 32.0 0.5 0.0 39.5 $3,129 $0 $0 0.0 0.0 $0 $0 $0 RP 0 0 0











Submit additional relevant information as requested by the





























EPA 0.0 0.5 4.0 1.0 0.0 5.5 $388 $0 $0 0.0 0.0 $0 $0 $0 RP 0 0 0










Subtotal
0.0 14.5 76.0 3.0 0.0 95.5 $7,481 $0 $0
55.4 $0 $0 $4,200 $0 5 55 $0 0 0 $0







Adjustment to time periods or postmark deadlines for submittal and review of required communications 63.9(i)






























Prepare and submit a request for an adjustment to a time





























period or postmark deadline 0.0 0.3 2.0 0.5 0.0 2.8 $194 $0 $8 16.0 44.0 $0 $128 $3,231 RP 16 44 128










Subtotal
0.0 0.3 2.0 0.5 0.0 2.8 $194 $0 $8
44.0 $0 $128 $3,231
16 44 $128 0 0 $0







Change in information already provided 63.9(i)






























Submit change(s) in the information already provided, as





























necessary 0.0 0.3 2.0 0.5 0.0 2.8 $194 $0 $8 16.0 44.0 $0 $128 $3,231 RP 16 44 128










Subtotal
0.0 0.3 2.0 0.5 0.0 2.8 $194 $0 $8
44.0 $0 $128 $3,231
16 44 $128 0 0 $0







Request to reduce frequency of excess emissions and continuous monitoring system performance results 63.10(e)(3)(ii)






























Prepare and submit a request to reduce the frequency of





























excess emissions and CMS performance reports 0.0 0.3 2.0 0.5 0.0 2.8 $194 $0 $8 3.2 8.8 $0 $26 $646 RP 3 9 26










Subtotal
0.0 0.3 2.0 0.5 0.0 2.8 $194 $0 $8
8.8 $0 $26 $646
3 9 $26 0 0 $0







Waiver of recordkeeping and reporting requirements






























Prepare and submit a waiver of recordkeeping and reporting 0.0 0.3 2.0 0.5 0.0 2.8 $194 $0 $8 0.6 1.8 $0 $5 $129 RP 1 2 5










Subtotal
0.0 0.3 2.0 0.5 0.0 2.8 $194 $0 $8
1.8 $0 $5 $129
1 2 $5 0 0 $0






































Total (Miscellaneous Notification)










989 $1,258 $2,904 $80,349
66 989 $4,162 0 0 $0




































































































MISCELLANEOUS RECORDKEEPING & REPORTING REQUIREMENTS





























RECORDKEEPING





























Startup, shutdown, and malfunction reports 63.10(d)(5)(i) and (ii)






























Prepare and submit a periodic startup, shutdown, and





























malfunction report, as applicable 0.0 0.3 5.0 1.0 0.0 6.3 $440 $0 $8 8.0 50.0 $0 $64 $3,582 RP 8 50 64











Prepare and submit an immediate startup, shutdown, and




























malfunction report, as applicable 0.0 0.3 5.0 1.0 0.0 6.3 $440 $0 $8 3.2 20.0 $0 $26 $1,433 RP 3 20 26










Subtotal
0.0 0.5 10.0 2.0 0.0 12.5 $880 $0 $16
70.0 $0 $90 $5,015
11 70 $90 0 0 $0







Excess emissions and continuous monitoring system performance report and summary report 63.10(e)(3)






























Prepare and submit an excess emissions and monitoring




























system performance report and summary report 0.0 0.3 4.0 2.0 0.0 6.3 $401 $0 $8 32.0 200.0 $0 $256 $13,083 RP . 200 256










Subtotal
0.0 0.3 4.0 2.0 0.0 6.3 $401 $0 $8
200.0 $0 $256 $13,083
0.0 200.0 256.0 0.0 0.0 0.0







REPORTING





























General recordkeeping requirements 63.10(b)






























Retain files of all information (including all reports and)





























notifications) for atleast 5 years 0.0 0.0 0.0 40.0 0.0 40.0 $1,474 $67 $0 64.0 2,560.0 $4,267 $0 $98,598 RP 64 2560 4267










Subtotal
0.0 0.0 0.0 40.0 0.0 40.0 $1,474 $67 $0
2,560.0 $4,267 $0 $98,598
64 2560 $4,267 0 0 $0







Additional recordkeeping requirements for source with CMS (63.10(c))






























Maintain additional records for continuous monitoring





























systems 0.0 0.0 0.0 20.0 0.0 20.0 $737 $67 $0 64.0 1,280.0 $4,267 $0 $51,432 RP 64 1280 4267










Subtotal
0.0 0.0 0.0 20.0 0.0 20.0 $737 $67 $0
1,280.0 $4,267 $0 $51,432
64 1280 $4,267










Documentation of Compliance 63.1211(d)






























Develop a Documentation of Compliance and include it in the





























operating record 0.0 1.0 10.0 2.0 0.0 13.0 $927 $67 $0 64.0 832.0 $4,267 $0 $63,620 RP 64 832 4267










Subtotal
0.0 1.0 10.0 2.0 0.0 13.0 $927 $67 $0
832.0 $4,267 $0 $63,620
64 832 $4,267










Data compression






























Prepare and submit request for approval to use data





























compression techniques to record data on a less frequent





























basis than required by Section 63.1209 0.0 0.3 2.0 0.5 0.0 2.8 $194 $0 $8 3.2 8.8 $0 $26 $646 RP 3 9 26










Subtotal
0.0 0.3 2.0 0.5 0.0 2.8 $194 $0 $8
8.8 $0 $26 $646
3 9 $26 0 0 $0






































Total (Miscellaneous Recordkeeping and Reporting)





94.5 $4,613 $200 $32
4,942.0 $12,801 $346 $231,748
203 4942 $13,146 0 0 $0





































































POLLUTION PREVENTION OR WASTE MINIMIZATION





























Extension of the compliance date to install pollution prevention or waste minimization controls (63.1213)






























Prepare and submit the request for an extrension of compliance





























date due to installation of pollution prevention controls 0.0 4.0 24.0 2.0 0.0 30.0 $2,276 $0 $8 6.4 192.0 $0 $51 $14,614 RP 6 192 51











Prepare and submit the request for an extrension of compliance





























date due to waste minimization controls 0.0 4.0 24.0 2.0 0.0 30.0 $2,276 $0 $8 6.4 192.0 $0 $51 $14,614 RP 6 192 51










Subtotal
0.0 8.0 48.0 4.0 0.0 60.0 $4,551 $0 $16
384.0 $0 $102 $29,229 $0 13 384 $102 0 0 $0






































Total (Pollution Prevention)
0.0 8.0 48.0 4.0 0.0 60.0 $4,551 $0 $16
384.0 $0 $102 $29,229 $0 13 384 $102 0 0 $0




































































































QUALITY ASSURANCE PROCEDURES FOR CEMS





























Quality control (QC) requirements (63, Subpart EEE Appendix, Section 1.1)






























Develop and implement a QC program 0.0 8.0 100.0 12.0 40.0 160.0 $12,612 $0 $0 32 5,120 $0 $0 $403,571 RP 32 5120 0











Revise program, if necessary 0.0 1.0 8.0 1.0 0.0 10.0 $739 $0 $0 6 64 $0 $0 $4,729 RP 6 64 0











Record program in operating record 0.0 0.0 20.0 0.0 0.0 20.0 $1,516 $0 $0 64 1,280 $0 $0 $97,037 RP 64 1280 0










Subtotal
0.0 9.0 128.0 13.0 40.0 190.0 $14,867 $0 $0
6,464 $0 $0 $505,337
102 6464 $0 0 0 $0







Quality assurance (QA) requirements (63, Subpart EEE Appendix, Section 1.1)






























Develop and implement a QA program 0.0 8.0 100.0 12.0 20.0 140.0 $10,700 $0 $0 64.0 8,960.0 $0 $0 $684,784 RP 64 8960 0











Revise or update plan, if necessary 0.0 1.0 8.0 1.0 0.0 10.0 $739 $0 $0 7.0 70.4 $0 $0 $5,202 RP 7 70 0











Record plan in the operating record 0.0 0.0 10.0 0.0 0.0 10.0 $758 $0 $0 64.0 640.0 $0 $0 $48,518 RP 64 640 0










Subtotal
0.0 9.0 118.0 13.0 20.0 160.0 $12,197 $0 $0
9,670.4 $0 $0 $738,505
135 9670 $0 0 0 $0







Calibration drift (CD) and zero drift (ZD) assessment and daily system audit (63, Subpart EEE Appendix, Section 4)






























Check, record, and quantify the ZD and the CD





























at least once daily (330 times per year) 0.0 0.0 0.0 0.0 0.0 0.0 $0 $0 $0 64.0 0.0 $0 $0 $0 RK


64 0 0








Retain all CEMS measurements in the





























operating record for at least 5 years 0.0 0.0 1.0 0.0 0.0 1.0 $76 $0 $0 64.0 64.0 $0 $0 $4,852 RK


64 64 0







Subtotal
0.0 0.0 1.0 0.0 0.0 1.0 $76 $0 $0
64.0 $0 $0 $4,852
0 0 $0 128 64 $0







Performance Evaluation (Appendix EEE, Section 5)






























Conduct ACA, RATA, or interference reponse test as





























applicable 0.0 0.0 0.0 0.0 0.0 0.0 $0 $0 $0 64.0 0.0 $0 $0 $0 RK


64 0 0








Prepare and submit a written report of the results of the




























performance evaluation 0.0 0.3 1.0 0.0 0.0 1.3 $100 $0 $8 64.0 80.0 $0 $512 $6,893 RP 64 80 512










Subtotal
0.0 0.3 1.0 0.0 0.0 1.3 $100 $0 $8
80.0 $0 $512 $6,893
64 80 $512 64 0 $0







Use of alternative CEMS spans (63, Subpart EEE Appendix, Section 6.3.5)





























Prepare and submit a request to use an





























alternative CEMS span
0.0 0.5 15.0 1.0 10.0 26.5 $2,178 $0 $8 0.0 0.0 $0 $0 $0 RP 0 0 0










Subtotal
0.0 0.5 15.0 1.0 10.0 26.5 $2,178 $0 $8 0.0 0.0 $0 $0 $0
0 0 $0









































Total (QA for CEMS)





378.8 $29,417 $0 $16
16,278.4 $0 $512 $1,255,587
301 16214 $512 192 64 $0




































































































MISCELLANEOUS REQUIREMENTS





























Alternative risk based chlorine standards






























Make request to use risk based chlorine stnds 1.0 1.0 20.0 5.0 20.0 47.0 $3,819 $0 $8 14.8 697.2 $0 $119 $56,771 RP 15 697 119










Subtotal
1.0 1.0 20.0 5.0 20.0 47.0 $3,819 $0 $8
697.2 $0 $119 $56,771
15 697 $119










HCl Production Furnace storage and transfer requirements






























Develop, implement Leak Detection and Repair Plan 1.0 3.0 40.0 5.0 20.0 69.0 $5,527 $0 $8 0.5 32.2 $0 $4 $2,583 RP 0 32 4











Demonstrate compliance with storage and transfer control reqs 1.0 2.0 15.0 5.0 5.0 69.0 $5,527 $0 $8 0.5 13.1 $0 $4 $2,583 RP 0 13 4










Subtotal
2.0 5.0 55.0 10.0 25.0 138.0 $11,053 $0 $16
45.3 $0 $7 $5,166
1 45 $7 0 0 $0






































Total (Miscellaneous Requirements)





185.0

$24
742 $0 $126 $61,936
16 742 $126 0 0 $0




































































































GRAND TOTAL





4,341 $340,955 $11,200 $148,914
138,434 $100,059 $3,949,693 $15,390,863
1446 95723 $4,023,981 1241 42711 $25,771



















































O&M + Labor
$19,440,615















Sheet 2: Summary

SUMMARY LABOR HOURS/ CAPITAL O&M Costs -2008 ICR








Labor Capital O&M





Hours Costs Costs




Who is Subject to Regs 755 $0 $0




MACT Standards 89 $0 $5,008




How/When to Comply 39,892 $86,000 $9,866




Performance Testing Requirements 57,781 $0 $3,929,421




Monitoring Requirements 834 $0 $154




CMS Performance Eval 15,747 $0 $1,254




Misc Notification 989 $1,258 $2,904




Misc Recordkeeping/Reporting 4,942 $12,801 $346




Waste Min 384 $0 $102




QA for CEMS 16,278 $0 $512




Misc 742 $0 $126





138,434 $100,059 $3,949,693

-63,093.18 -$7,683 -$1,209,436.1

721.009989583333















SUMMARY LABOR HOURS/ CAPITAL O&M Costs - 2005 ICR for reference








Labor Capital O&M





Hours Costs Costs




Who is Subject to Regs 1,190 $0 $0




MACT Standards 89 $0 $5,008




How/When to Comply 51,221 $78,000 $12,171




Performance Testing Requirements 83,894 $0 $5,109,576




Monitoring Requirements 1,033 $0 $190




CMS Performance Eval 19,520 $0 $1,555




Misc Notification 10,595 $13,875 $29,368




Misc Recordkeeping/Reporting 6,059 $15,867 $342




Waste Min 476 $0 $127




QA for CEMS 26,525 $0 $635




Misc 925 $0 $157





201,527 $107,742 $5,159,129





Sheet 3: Misc






CPI















http://www.bls.gov/news.release/archives/cpi_06132008.pdf




















J A S O N D





June to Dec 2005

1.70%
0.50% 0.50% 1.20% 0.20% -0.60% -0.10% 1.70264086033431





2006

2.50%












2007

4.10%

















J F M A M J (EST)





Jan to June 2008

2.50%
0.40% 0.00% 0.30% 0.20% 0.60% 1.00% 2.523098194544








11.23%














































ECI- Private Ind Comp Costs















http://www.bls.gov/news.release/pdf/eci.pdf




















Sept Dec









June to Dec 2005

1.61%
0.80% 0.80%



1.60639999999999





2006

3.20%












2007

3.30%

















Mar Jun(EST)









Jan to June 2008

2.31%
0.80% 1.50%



2.31199999999998








10.82%













































































































http://www.opm.gov/oca/08tables/pdf/gs_h.pdf
































Grade B/0 Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10















1 B $ 8.17 $ 8.44 $ 8.71 $ 8.98 $ 9.25 $ 9.41 $ 9.68 $ 9.95 $ 9.96 $ 10.22















O 12.26 12.66 13.07 13.47 13.88 14.12 14.52 14.93 14.94 15.33















2 B 9.18 9.40 9.71 9.96 10.07 10.37 10.67 10.96 11.26 11.55















O 13.77 14.10 14.57 14.94 15.11 15.56 16.01 16.44 16.89 17.33















3 B 10.02 10.35 10.69 11.02 11.36 11.69 12.02 12.36 12.69 13.03















O 15.03 15.53 16.04 16.53 17.04 17.54 18.03 18.54 19.04 19.55















4 B 11.25 11.62 12.00 12.37 12.75 13.12 13.50 13.87 14.25 14.62















O 16.88 17.43 18.00 18.56 19.13 19.68 20.25 20.81 21.38 21.93















5 B 12.58 13.00 13.42 13.84 14.26 14.68 15.10 15.52 15.94 16.36















O 18.87 19.50 20.13 20.76 21.39 22.02 22.65 23.28 23.91 24.54















6 B 14.03 14.50 14.96 15.43 15.90 16.37 16.83 17.30 17.77 18.24















O 21.05 21.75 22.44 23.15 23.85 24.56 25.25 25.95 26.66 27.36















7 B 15.59 16.11 16.63 17.15 17.67 18.19 18.71 19.22 19.74 20.26















O 23.39 24.17 24.95 25.73 26.51 27.29 28.07 28.83 29.61 30.39















8 B 17.26 17.84 18.41 18.99 19.57 20.14 20.72 21.29 21.87 22.44















O 25.89 26.76 27.62 28.49 29.36 30.21 31.08 31.50 31.50 31.50















9 B 19.07 19.70 20.34 20.98 21.61 22.25 22.88 23.52 24.15 24.79















O 28.61 29.55 30.51 31.47 31.50 31.50 31.50 31.50 31.50 31.50















10 B 21.00 21.70 22.40 23.10 23.80 24.50 25.20 25.90 26.60 27.30















O 31.50 31.50 31.50 31.50 31.50 31.50 31.50 31.50 31.50 31.50















11 B 23.07 23.84 24.61 25.38 26.15 26.92 27.68 28.45 29.22 29.99















O 31.50 31.50 31.50 31.50 31.50 31.50 31.50 31.50 31.50 31.50















12 B 27.65 28.57 29.50 30.42 31.34 32.26 33.18 34.10 35.03 35.95















O 31.50 31.50 31.50 31.50 31.50 32.26 33.18 34.10 35.03 35.95















13 B 32.88 33.98 35.07 36.17 37.27 38.36 39.46 40.56 41.65 42.75















O 32.88 33.98 35.07 36.17 37.27 38.36 39.46 40.56 41.65 42.75















14 B 38.86 40.15 41.45 42.74 44.04 45.33 46.63 47.92 49.22 50.51















O 38.86 40.15 41.45 42.74 44.04 45.33 46.63 47.92 49.22 50.51















15 B 45.71 47.23 48.75 50.28 51.80 53.33 54.85 56.37 57.90 59.42















O 45.71 47.23 48.75 50.28 51.80 53.33 54.85 56.37















File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy