Annual Report for Infrastructure and Comprehensive Community Infrastructure

Broadband Technology Opportunities Program (BTOP) Quarterly and Annual Performance Progress Report

ProposedAddedum.Infrastructure.CCP.Annual.PPR.102811.xlsx

Annual Report for Infrastructure and Comprehensive Community Infrastructure

OMB: 0660-0037

Document [xlsx]
Download: xlsx | pdf
Proposed Addedum to the Annual Project Performance Report Responses
Please provide an updated list of Community Anchor Institutions (CAIs) that you have connected and plan to connect to your network. The list should include only those CAIs that you will connect as part of your BTOP grant project within your grant’s period of performance.  Include the following information:
a.      Name                                   
b.      Service Address               
c.      City                                       
d.      State                                    
e.      Zip Code (plus 4)                            
f.      Census Block           
g.      Latitude and Longitude Coordinates
h.      Connection Type             
i.    New
ii.    Improved
i.      Planned Speed Tier   [Select one]
i. < 10 Mb
ii. >10 Mb and < 50 Mb
iii.   > 50 Mb and < 100 Mb
iv.   > 100 Mb and < 1 Gb
v.    > 1 Gb
j.      Type of Anchor [Select one]
i.            Schools (K-12)
ii.           Libraries
iii.          Medical and Healthcare Providers
iv.          Public Safety Entities
    v.           Community Colleges
    vi.          Public Housing
    vii.         Other Institutions of Higher Education
    viii.        Other Community Support Organizations
    ix.         Other Government Facilities
k. Federal Identification Number (if applicable)
l.        Other Connection Status [Select one]
    i.            Currently Connected
    ii.           Planned but Not Yet Connected


Please provide a list of community pairs that are receiving new or improved broadband service as a result of BTOP grant funds.  Typically, these community pairs are defined by connections between Points of Presence (POPs) in two communities.   BTOP awardees are asked to identify all community pairs where BTOP funds were used for any of the following: 1) to construct a new POP, 2) to install or upgrade equipment in one of the two POPs constituting a community pair, or 3) to construct or improve the network that connects the POPs. When listing the community pairs associated with your project, please include all POPs that provide transport to an Internet gateway or carrier hotel. For example, if BTOP funds were used to deploy or upgrade a POP or segments that connects to an existing Internet gateway on your network, please specify as a community pair the improved POP and Internet Gateway pair. Similarly, if BTOP funds were used to acquire a connection to an Internet gateway or carrier hotel operated by another provider, please include this link in the list of community pairs you provide. 


a.      Community Pair Name 
b.      POP 1 Name                      
c.      POP 1 Service Address  
d.      POP 1 City                          
e.      POP 1 State                       
f.      POP 1 Zip Code                
g.      Is POP 1 An Internet Gateway [Select One]
        i.            Yes
        ii.            No
h.      POP 2 Name                      
i.       POP 2 Service Address  
j.       POP 2 City                          
k.      POP 2 State                       
l.       POP 2 Zip Code (plus 4)              
m.    Latitude/Longitude Coordinates
n. Census Block
m.    Is POP 2 An Internet Gateway  [Select one]
        i.            Yes
        ii.            No
n.      Connection Technology    [Select one]
        i.            Fiber
        ii.           Microwave
        iii.          Hybrid
o.      Transport Speed Tier [Select one]
        i.            < 100 Mb
        ii.            >100 Mb and < 1 Gb
        iii.            > 1 Gb
p.      Community Pair Status  [Select one]
        i.            Currently Connected
        ii.            Planned but Not Connected


Network Mapping- Please provide up-to-date network route maps in a single file, in a Google Earth compatible format (e.g., KMZ file). Maps may be reasonable approximations and do not have to be based on GPS or survey information at each point. These maps should have individual layers for each of the following:
a.      Proposed New Construction
b.      Proposed New Leases
c.      Existing Network (Owned or Leased)
d.      New Construction Completed
e.      New Leases Executed
File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy