Sf-1406 Preaward Survey Of Prospective Contractor Quality Assura

Preaward Survey Forms (SFs 1403, 1404, 1405, 1406, 1407, and 1408) FAR Sections Affected 9.106-2 thru -4

SF_1406 12-2013 draft v2

Preaward Survey Forms (SFs 1403, 1404, 1405, 1406, 1407, and 1408) FAR Sections Affected 9.106-2 thru -4

OMB: 9000-0011

Document [pdf]
Download: pdf | pdf
SERIAL NO. (For surveying activity use)

PREAWARD SURVEY PROSPECTIVE CONTRACTOR
QUALITY ASSURANCE

OMB Control Number:
9000-0011
Expiration Date: 12/31/2013

PROSPECTIVE CONTRACTOR

Public reporting burden for this collection of information is estimated to average 24 hours per response, including the time for reviewing
instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of
information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for
reducing this burden, to the Regulatory Secretariat (MVCB), Office of Acquisition Policy, GSA, 1800 F Street, NW, Washington, DC 20405.
SECTION I - RECOMMENDATION
1. RECOMMEND:

AWARD

NO AWARD (Provide full substantiation for recommendation in 4. NARRATIVE)

2. IF PROSPECTIVE CONTRACTOR RECEIVES AWARD, A POST AWARD CONFERENCE IS RECOMMENDED.

YES

NO

3. AN ON-SITE SURVEY WAS PERFORMED.

YES

NO

4. NARRATIVE

IF CONTINUATION SHEETS
ATTACHED - MARK HERE

5. SURVEY MADE BY
A. SIGNATURE

6. SURVEY REVIEWING OFFICIAL
B. DATE SIGNED

A. SIGNATURE

C. NAME

C. NAME

D. OFFICE

D. OFFICE

E. AREA CODE

F. TELEPHONE NUMBER

AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is not usable.

G. EXT.

E. AREA CODE

B. DATE SIGNED

F. TELEPHONE NUMBER

G. EXT.

STANDARD FORM 1406 (REV. 12/2013)
Prescribed by GSA FAR (48 CFR) 53.209-1(d)

SECTION II - COMPANY AND SOLICITATION DATA
1. BRIEFLY DESCRIBE HOW QUALITY ASSURANCE RESPONSIBILITIES ARE ACCOMPLISHED.

2. QUALITY ASSURANCE OFFICIALS CONTACTED
A. NAME

C. YEARS OF QUALITY
ASSURANCE EXPERIENCE

B. TITLE

3. APPLICABLE CONTRACT QUALITY REQUIREMENTS
A. NUMBER

4.

IDENTICAL OR

B. TITLE

SIMILAR ITEMS HAVE BEEN

C. TAILORING (If any)

PRODUCED,

SUPPLIED, OR

SERVICED BY PROSPECTIVE CONTRACTOR

(If similar items, identify:

)

SECTION III - EVALUATION CHECKLIST
STATEMENTS
1. These items (where applicable to the
contract) are understood by the
prospective contractor.

A.
B.
C.

YES

NO

Exhibits, technical data, drawings, specifications, and approval requirements.
Preservation, packaging, packing, and marking requirements.
Other (Specify)

2. Records available indicate that the prospective contractor has a satisfactory quality performance record during the
past twelve (12) months for similar items.
3. Used, reconditioned, or remanufactured material and former Government surplus material will be furnished by the
prospective contractor. (If Yes, explain in Section I NARRATIVE)
4. Prospective contractor will require unusual assistance from the Government. (If Yes, explain in Section I NARRATIVE)
5. Did prospective contractor fulfill commitments to correct deficiencies, as proposed on previous surveys, when
awarded that contract? (If No, explain in Section I NARRATIVE)
6. Quality verification personnel
7. Quality verification to production personnel ratio.

NUMBER SKILLED

NUMBER SEMI-SKILLED
RATIO

:

THE FOLLOWING ARE AVAILABLE AND ADEQUATE. (If not applicable, show "N/A" in "Yes" column.)
8. Inspection and test equipment, gauges, and instruments for first article and production (including solicitation
specified equipment).
9. Calibration/metrology program.
10. Quality system procedures and controls.
11. Control of specifications, drawings, changes and modifications, work/process instructions.
12. System for determining inspection, test and measurement requirements.
13. Purchasing: Processes for selecting qualified suppliers and assuring the quality of purchased materials.
14. Product identification, segregation, traceability, and maintenance.
15. Government furnished property controls.
16. Process controls.
17. Nonconforming product: System for timely identification, disposition, correction of deficiencies, and corrective
and preventative action.
18. Preservation, storage, packaging, packing, marking, and delivery controls.
19. Records (such as: inspection, test, status, corrective actions, calibration, etc.)
20. Controls for investigation of customer complaints and correction of deficiencies.
21. Design controls system.
22. Computer software (deliverable and/or non-deliverable) quality assurance program.
23. Management review and internal quality audits.
24. Quality assurance training program.
25. Installation and servicing quality assurance program.
26. Statistical techniques.
STANDARD FORM 1406 (REV. 12/2013) BACK


File Typeapplication/pdf
File Modified2013-11-20
File Created2013-11-20

© 2024 OMB.report | Privacy Policy