Burden(and(Cost(for(Petroleum(and((
Natural(Gas(Systems((Subpart(W)(
(
Appendix(I?1:(Detailed(Unit(Burden(and(Costs(
Appendix(I?2:(Summary(of(Burden(and(Cost(by(Activity(and(Year(
Appendix(I?3:(Change(in(Burden(and(Cost!
I1.$$Detailed$Unit$Burden$and$Costs$for$Petroleum$and$Natural$Gas$Systems$(Subpart$W)
I-1a. GAS PROCESSING
LABOR, AVERAGE PROCESSING FACILITY
(PROCESS EMISSIONS ONLY)
Labor Hours
Activity
Engineer
Technician
Senior
Manager
Middle
Manager
78.29
66.57
121.72
106.89
Labor Cost
per Year per
Reporting
Unit/Facility
(2011$)
Planning
QA/QC
Recordkeeping
Sampling and Analysis (Calculations)
Reporting
1.91
0.00
6.28
10.14
22.57
0.00
0.00
0.00
31.06
0.00
0.18
0.00
0.42
0.00
0.11
0.36
0.00
0.72
2.00
3.16
$210
$0
$620
$3,075
$2,117
Total
40.90
31.06
0.70
6.24
$6,022.21
NON-LABOR, AVERAGE PROCESSING FACILITY (PROCESS EMISSIONS ONLY)
Activity
Equipment (select, purchase, install)
Equipment (select, purchase, install)
Performance testing
Recordkeeping
Travel
Total
Capital Cost
$3,046
$0
Equipment
Lifetime
(years)
5
1
Discount Rate
(%)
7%
5
7%
$235
$427
$800
LABOR, AVERAGE GAS PROCESSING FACILITY (COMBUSTION)
Labor Hours
Technical(1) Management
72.43
114.31
Develop QA & Monitoring Plan
O&M Costs
$57
$3,281
Activity
Annualized
Capital Cost
$743
Labor Cost
per Year per
Reporting
Unit/Facility
(2011$)
0.00
0.00
$0
Travel
11.84
11.84
$2,211
Total
11.84
11.84
$2,211
$427
I1.$$Detailed$Unit$Burden$and$Costs$for$Petroleum$and$Natural$Gas$Systems$(Subpart$W)$(cont.)
I-1b. TRANSMISSION COMPRESSOR STATIONS
LABOR, AVERAGE COMPRESSOR STATION (PROCESS EMISSIONS ONLY)
Labor Hours
Activity
Engineer
Technician
Senior
Manager
Middle
Manager
78.29
66.57
121.72
106.89
Labor Cost
per Year per
Reporting
Unit/Facility
(2011$)
Planning
QA/QC
Recordkeeping
Sampling and Analysis (Calculations)
Reporting
0.07
0.00
2.49
7.67
17.83
0.00
0.00
0.00
27.71
0.00
0.00
0.00
0.08
0.00
0.00
0.01
0.00
0.09
2.00
0.42
$6
$0
$214
$2,659
$1,441
Total
28.06
27.71
0.08
2.52
$4,321
NON-LABOR, AVERAGE COMPRESSOR STATION (PROCESS EMISSIONS ONLY)
Activity
Equipment (select, purchase, install)
Equipment (select, purchase, install)
Performance testing
Recordkeeping
Capital Cost
$1,385
$0
Equipment
Lifetime
(years)
5
1
Discount Rate
(%)
7%
5
7%
$30
Annualized
Capital Cost
$338
$0
O&M Costs
$0
$0
$7
Travel
$1,008
Total
$1,415
$345
LABOR, AVERAGE GAS COMPRESSOR STATION (COMBUSTION)
Activity
Labor Hours
Technical(1) Management
72.43
114.31
Develop QA & Monitoring Plan
Labor Cost
per Year per
Reporting
Unit/Facility
(2011$)
0.00
0.00
$0
Travel
11.84
11.84
$2,211
Total
11.84
11.84
$2,211
$1,008
I1.$$Detailed$Unit$Burden$and$Costs$for$Petroleum$and$Natural$Gas$Systems$(Subpart$W)$(cont.)
I-1c STORAGE
LABOR, AVERAGE STORAGE FACILITY (PROCESS EMISSIONS ONLY)
Labor Hours
Activity
Engineer
Technician
Senior
Manager
Middle
Manager
78.29
66.57
121.72
106.89
Labor Cost
per Year per
Reporting
Unit/Facility
(2011$)
Planning
QA/QC
Recordkeeping
Sampling and Analysis (Calculations)
Reporting
2.44
0.00
5.44
6.96
18.98
0.00
0.00
0.00
33.34
0.00
0.08
0.00
0.43
0.00
0.11
0.49
0.00
0.65
3.00
3.17
$252
$0
$548
$3,085
$1,838
Total
33.83
33.34
0.62
7.30
$5,723
Annualized
Capital Cost
$164.37
$0
O&M Costs
$0
$0
NON-LABOR, AVERAGE STORAGE FACILITY (PROCESS EMISSIONS ONLY)
Activity
Equipment (select, purchase, install)
Equipment (select, purchase, install)
Performance testing
Recordkeeping
Capital Cost
$674
$0
Equipment
Lifetime
(years)
5
1
Discount Rate
(%)
7%
5
7%
$131
$31.95
Travel
$1,106
Total
$805
$0
$0
$196
$1,106
* Appendix A of the current ICR (OMB No. 2060-0651, ICR No. 2376.05) contained errors in the non-labor costs for storage
facilities. These errors did not significantly impact the costs reported in Appendix B and in Table 6-1.
LABOR, AVERAGE STORAGE FACILITY (COMBUSTION)
Activity
Labor Hours
Technical(1) Management
72.43
114.31
Develop QA & Monitoring Plan
Labor Cost
per Year per
Reporting
Unit/Facility
(2011$)
0.00
0.00
$0
Travel
11.84
11.84
$2,211
Total
11.84
11.84
$2,211
I1.$$Detailed$Unit$Burden$and$Costs$for$Petroleum$and$Natural$Gas$Systems$(Subpart$W)$(cont.)
I-1d. LNG TERMINALS
LABOR, AVERAGE LNG TERMINAL (PROCESS EMISSIONS ONLY)
Labor Hours
Activity
Engineer
Technician
Senior
Manager
Middle
Manager
78.29
66.57
121.72
106.89
Labor Cost
per Year per
Reporting
Unit/Facility
(2011$)
Planning
QA/QC
Recordkeeping
Sampling and Analysis (Calculations)
Reporting
2.43
0.00
6.00
23.77
27.41
0.00
0.00
0.00
21.50
0.00
0.08
0.00
0.40
0.00
0.10
0.51
0.00
0.60
5.00
4.00
$254
$0
$583
$3,827
$2,585
Total
59.60
21.50
0.58
10.11
$7,248
NON-LABOR, AVERAGE LNG TERMINAL (PROCESS EMISSIONS ONLY)
Activity
Equipment (select, purchase, install)
Equipment (select, purchase, install)
Performance testing
Recordkeeping
Travel
Total
Capital Cost
$2,381
$7,000
Equipment
Lifetime
(years)
5
1
Discount Rate
(%)
7%
5
7%
$78
$1,956
$600
LABOR, AVERAGE GAS PROCESSING FACILITY (COMBUSTION)
Labor Hours
Technical(1) Management
72.43
114.31
Develop QA & Monitoring Plan
O&M Costs
$19
$9,460
Activity
Annualized
Capital Cost
$581
$0
Labor Cost
per Year per
Reporting
Unit/Facility
(2011$)
0.00
0.00
$0
Travel
11.84
11.84
$2,211
Total
11.84
11.84
$2,211
$1,956
I1.$$Detailed$Unit$Burden$and$Costs$for$Petroleum$and$Natural$Gas$Systems$(Subpart$W)$(cont.)
I-1e ONSHORE PRODUCTION
LABOR, AVERAGE ONSHORE PRODUCTION FACILITY (PROCESS EMISSIONS ONLY)
Labor Hours
Activity
Engineer
Technician
Senior
Manager
Middle
Manager
78.29
66.57
121.72
106.89
Labor Cost
per Year per
Reporting
Unit/Facility
(2011$)
Planning
QA/QC
Recordkeeping
Sampling and Analysis (Calculations)
Reporting
1.37
0.00
9.00
31.70
20.59
0.00
0.00
0.00
0.00
0.00
0.16
0.00
0.19
0.00
0.09
0.36
0.00
0.50
2.00
5.00
$165
$0
$781
$2,696
$2,158
Total
62.66
0.00
0.44
7.86
$5,800
NON-LABOR, AVERAGE ONSHORE PRODUCTION FACILITY (PROCESS EMISSIONS ONLY)
Activity
Equipment (select, purchase, install)
Equipment (select, purchase, install)
Performance testing
Recordkeeping
Travel
Total
Capital Cost
$0
$0
Equipment
Lifetime
(years)
5
1
Discount Rate
(%)
7%
5
7%
$235
$0
$57
LABOR, AVERAGE ONSHORE PRODUCTION FACILITY (COMBUSTION)
Labor Hours
Technical(1) Management
72.43
114.31
Develop QA & Monitoring Plan
O&M Costs
$57
$235
Activity
Annualized
Capital Cost
$0
$0
Labor Cost
per Year per
Reporting
Unit/Facility
(2011$)
0.00
0.00
$0
Annual Activities
11.84
11.84
$2,211
Total
11.84
11.84
$2,211
$0
I1.$$Detailed$Unit$Burden$and$Costs$for$Petroleum$and$Natural$Gas$Systems$(Subpart$W)$(cont.)
I-1f. LOCAL DISTRIBUTION COMPANIES
LABOR, AVERAGE LDC FACILITY (PROCESS EMISSIONS ONLY)
Labor Hours
Activity
Engineer
Technician
Senior
Manager
Middle
Manager
78.29
66.57
121.72
106.89
Labor Cost
per Year per
Reporting
Unit/Facility
(2011$)
Planning
QA/QC
Recordkeeping
Sampling and Analysis (Calculations)
Reporting
2.41
0.00
5.13
9.75
17.94
0.00
0.00
0.00
76.34
0.00
0.08
0.00
0.42
0.00
0.11
0.48
0.00
0.64
3.00
3.12
$250
$0
$521
$6,166
$1,751
Total
35.23
76.34
0.61
7.24
$8,687
NON-LABOR, AVERAGE LDC FACILITY (PROCESS EMISSIONS ONLY)
Activity
Equipment (select, purchase, install)
Equipment (select, purchase, install)
Performance testing
Recordkeeping
Travel
Total
Capital Cost
$365
Equipment
Lifetime
(years)
5
Discount Rate
(%)
7%
Annualized
Capital Cost
$89
O&M Costs
5
$235
7%
$57
$1,598
$600
** No combustion costs associated with LDC facilities ***
$146
$1,598
I1.$$Detailed$Unit$Burden$and$Costs$for$Petroleum$and$Natural$Gas$Systems$(Subpart$W)$(cont.)
I-1g LNG STORAGE
LABOR, AVERAGE LNG STORAGE FACILITY (PROCESS EMISSIONS ONLY)
Labor Hours
Activity
Engineer
Technician
Senior
Manager
Middle
Manager
78.29
66.57
121.72
106.89
Labor Cost
per Year per
Reporting
Unit/Facility
(2011$)
Planning
QA/QC
Recordkeeping
Sampling and Analysis (Calculations)
Reporting
2.42
0.00
4.49
14.35
18.09
0.00
0.00
0.00
16.00
0.00
0.08
0.00
0.42
0.00
0.11
0.47
0.00
0.64
1.88
3.12
$249
$0
$471
$2,389
$1,763
Total
39.35
16.00
0.61
6.11
$4,872
NON-LABOR, AVERAGE LNG STORAGE FACILITY (PROCESS EMISSIONS ONLY)
Activity
Equipment (select, purchase, install)
Equipment (select, purchase, install)
Performance testing
Recordkeeping
Travel
Total
Capital Cost
$1,509
$0
Equipment
Lifetime
(years)
5
1
Discount Rate
(%)
7%
7%
5
7%
$235
$784
$425
LABOR, AVERAGE GAS PROCESSING FACILITY (COMBUSTION)
Labor Hours
Technical(1) Management
72.43
114.31
Develop QA & Monitoring Plan
O&M Costs
$57
$1,744
Activity
Annualized
Capital Cost
$368
$0
Labor Cost
per Year per
Reporting
Unit/Facility
(2011$)
0.00
0.00
$0
Travel
11.84
11.84
$2,211
Total
11.84
11.84
$2,211
$784
I1.$$Detailed$Unit$Burden$and$Costs$for$Petroleum$and$Natural$Gas$Systems$(Subpart$W)$(cont.)
I-1h OFFSHORE PRODUCTION
LABOR, AVERAGE OFFSHORE FACILITY (PROCESS EMISSIONS ONLY)
Labor Hours
Activity
Engineer
Technician
Senior
Manager
Middle
Manager
78.29
66.57
121.72
106.89
Labor Cost
per Year per
Reporting
Unit/Facility
(2011$)
Planning
QA/QC
Recordkeeping
Sampling and Analysis (Calculations)
Reporting
10.26
0.00
0.42
0.15
9.44
0.00
0.00
0.00
0.00
0.00
1.03
0.00
0.03
0.00
0.17
2.07
0.00
0.06
0.00
2.02
$1,150
$0
$43
$12
$976
Total
20.27
0.00
1.23
4.15
$2,180
**No Capital or O&M Costs for Offshore Facilities
LABOR, AVERAGE GAS PROCESSING FACILITY (COMBUSTION)
Activity
Labor Hours
Technical(1) Management
72.43
114.31
Develop QA & Monitoring Plan
Labor Cost
per Year per
Reporting
Unit/Facility
(2011$)
0.00
0.00
$0
Travel
11.84
11.84
$2,211
Total
11.84
11.84
$2,211
1
1
1
1
1
1145
342
133
82
4
0
981
981
143
0
33
31
58
44
2786
Storage,$Processing
Storage,$Combustion
Lng$Terminals,$Processing
Lng$Terminals,$Combustion
Onshore$Production,$Processing
Onshore$Production,$Combustion
Local$Distribution$Companies,$
Processing
Local$Distribution$Companies,$
Combustion
Lng$Storage,$Processing$(3)
Lng$Storage,$Combustion
Offshore$Production,$Processing$(3)
Offshore$Production,$Combustion
TOTAL
4371
44
58
31
33
0
143
981
981
0
4
82
133
342
1145
105
289
Total$
Responses
$$$$$$$$$193,095
$$$$$$$$$$$$$$$$$521
$$$$$$$$$$$$$$1,176
$$$$$$$$$$$$$$$$$367
$$$$$$$$$$$$$$1,827
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$15,955
$$$$$$$$$$$$11,615
$$$$$$$$$$$$61,455
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$324
$$$$$$$$$$$$$$$$$971
$$$$$$$$$$$$$$8,933
$$$$$$$$$$$$$$4,049
$$$$$$$$$$$$63,861
$$$$$$$$$$$$$$1,243
$$$$$$$$$$$$20,797
Burden$F$
Technical
(hrs)
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
Burden$F$
Clerical
$(hrs)
$$$$$$$$$$$$$34,643
$$$$$$$$$$$$$$$$$$521
$$$$$$$$$$$$$$$$$$312
$$$$$$$$$$$$$$$$$$367
$$$$$$$$$$$$$$$$$$221
$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$1,121
$$$$$$$$$$$$$$$$$$F
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$11,615 $$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$8,147
$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$$$$43
$$$$$$$$$$$$$$$$$$971
$$$$$$$$$$$$$$$1,053
$$$$$$$$$$$$$$$4,049
$$$$$$$$$$$$$$$2,973
$$$$$$$$$$$$$$$1,243
$$$$$$$$$$$$$$$2,006
Burden$F$
Managerial
(hrs)
$$$$$$$$$$$$$$$F
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
Burden$F$
Legal
(hrs)
2013
$$$$$$$$$$227,738
$$$$$$$$$$$$$$$1,042
$$$$$$$$$$$$$$$1,488
$$$$$$$$$$$$$$$$$$734
$$$$$$$$$$$$$$$2,049
$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$17,076
$$$$$$$$$$$$$23,230
$$$$$$$$$$$$$69,602
$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$367
$$$$$$$$$$$$$$$1,942
$$$$$$$$$$$$$$$9,986
$$$$$$$$$$$$$$$8,099
$$$$$$$$$$$$$66,833
$$$$$$$$$$$$$$$2,486
$$$$$$$$$$$$$22,803
$18,201,063
$97,284
$126,454
$68,541
$160,775
$0
$1,242,278
$2,168,993
$5,689,456
$0
$28,994
$181,302
$761,188
$756,163
$4,947,061
$232,155
$1,740,419
Total$Burden$ Total$Labor$Cost
(hrs)
($)
$729,883
$0
$0
$0
$14,032
$0
$20,916
$0
$56,225
$0
$2,400
$0
$26,111
$0
$395,124
$0
$215,075
Capital$Cost
($)
$1,686,737
$0
$0
$0
$25,866
$0
$228,463
$0
$0
$0
$7,823
$0
$147,068
$0
$1,154,114
$0
$123,403
O&M$Cost
$($)
$20,617,684
$97,284
$126,454
$68,541
$200,674
$0
$1,491,657
$2,168,993
$5,745,682
$0
$39,217
$181,302
$934,367
$756,163
$6,496,299
$232,155
$2,078,897
Total$Cost
($)
(1)$Does$not$include$the$burden$or$cost$for$provision$of$information$on$parent$companies,$NAICS$codes,$and$whether$emissions$are$from$cogeneration.$$This$adds$another$0.68$hours$and$$44$per$
respondent$(see$Appendix$L).$$
(2)$The$number$of$respondents$is$not$additive.
(3)$Appendix$B$of$the$current$ICR$(OMB$No.$206050651,$ICR$No.$2376.05)$contained$addition$errors$in$the$Years$2$and$3$$burden$hours$calculations$for$Lng$Storage,$Processing$and$Offshore$
Production,$Processing.$These$errors$also$impacted$the$annual$average$burden$hours$reported$in$Appendix$B$and$in$Table$651.$$Reported$costs$were$unaffected.
1
1
1
1
1
1
1
1
1
1
1
105
Gas$Processing,$Combustion
Transmission$Compressor$Stations,$
Processing
Transmission$Compressor$Stations,$
Combustion
1
289
No.$Respondents$ Responses/
(1)
Respondent
Gas$Processing,$Processing
Source$Category
I2.$$Summary$of$Burden$and$Cost$for$Petroleum$and$Natural$Gas$Systems$(Subpart$W)$by$Activity$and$Year$(1)
1
1
1
1
1
1145
342
133
82
4
0
981
981
143
0
33
31
58
44
2786
Storage,$Processing
Storage,$Combustion
Lng$Terminals,$Processing
Lng$Terminals,$Combustion
Onshore$Production,$Processing
Onshore$Production,$Combustion
Local$Distribution$Companies,$
Processing
Local$Distribution$Companies,$
Combustion
Lng$Storage,$Processing$(3)
Lng$Storage,$Combustion
Offshore$Production,$Processing$(3)
Offshore$Production,$Combustion
TOTAL
4371
44
58
31
33
0
143
981
981
0
4
82
133
342
1145
105
289
Total$
Responses
$$$$$$$$$$193,095
$$$$$$$$$$$$$$$$$$521
$$$$$$$$$$$$$$$1,176
$$$$$$$$$$$$$$$$$$367
$$$$$$$$$$$$$$$1,827
$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$15,955
$$$$$$$$$$$$$11,615
$$$$$$$$$$$$$61,455
$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$324
$$$$$$$$$$$$$$$$$$971
$$$$$$$$$$$$$$$8,933
$$$$$$$$$$$$$$$4,049
$$$$$$$$$$$$$63,861
$$$$$$$$$$$$$$$1,243
$$$$$$$$$$$$$20,797
Burden$F$
Technical
(hrs)
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
Burden$F$
Clerical
$(hrs)
$$$$$$$$$$$$$$$$34,643 $$$$$$$$$$$$$$$$$$F
$$$$$$$$$$$$$$$$$$$$$$521
$$$$$$$$$$$$$$$$$$$$$$312
$$$$$$$$$$$$$$$$$$$$$$367
$$$$$$$$$$$$$$$$$$$$$$221
$$$$$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$1,121
$$$$$$$$$$$$$$$$11,615
$$$$$$$$$$$$$$$$$$8,147
$$$$$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$$$$$$$43
$$$$$$$$$$$$$$$$$$$$$$971
$$$$$$$$$$$$$$$$$$1,053
$$$$$$$$$$$$$$$$$$4,049
$$$$$$$$$$$$$$$$$$2,973
$$$$$$$$$$$$$$$$$$1,243
$$$$$$$$$$$$$$$$$$2,006
Burden$F$
Managerial
(hrs)
$$$$$$$$$$$$$$F
$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$5
Burden$F$
Legal
(hrs)
2014
$$$$$$$$$$227,738
$$$$$$$$$$$$$$$1,042
$$$$$$$$$$$$$$$1,488
$$$$$$$$$$$$$$$$$$734
$$$$$$$$$$$$$$$2,049
$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$17,076
$$$$$$$$$$$$$23,230
$$$$$$$$$$$$$69,602
$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$367
$$$$$$$$$$$$$$$1,942
$$$$$$$$$$$$$$$9,986
$$$$$$$$$$$$$$$8,099
$$$$$$$$$$$$$66,833
$$$$$$$$$$$$$$$2,486
$$$$$$$$$$$$$22,803
$18,201,063
$97,284
$126,454
$68,541
$160,775
$0
$1,242,278
$2,168,993
$5,689,456
$0
$28,994
$181,302
$761,188
$756,163
$4,947,061
$232,155
$1,740,419
Total$Burden$ Total$Labor$Cost
(hrs)
($)
$729,883
$0
$0
$0
$14,032
$0
$20,916
$0
$56,225
$0
$2,400
$0
$26,111
$0
$395,124
$0
$215,075
Capital$Cost
($)
$1,686,737
$0
$0
$0
$25,866
$0
$228,463
$0
$0
$0
$7,823
$0
$147,068
$0
$1,154,114
$0
$123,403
O&M$Cost
$($)
$20,617,684
$97,284
$126,454
$68,541
$200,674
$0
$1,491,657
$2,168,993
$5,745,682
$0
$39,217
$181,302
$934,367
$756,163
$6,496,299
$232,155
$2,078,897
Total$Cost
($)
(1)$Does$not$include$the$burden$or$cost$for$provision$of$information$on$parent$companies,$NAICS$codes,$and$whether$emissions$are$from$cogeneration.$$This$adds$another$0.68$hours$and$$44$per$
respondent$(see$Appendix$L).$$
(2)$The$number$of$respondents$is$not$additive.
(3)$Appendix$B$of$the$current$ICR$(OMB$No.$206050651,$ICR$No.$2376.05)$contained$addition$errors$in$the$Years$2$and$3$$burden$hours$calculations$for$Lng$Storage,$Processing$and$Offshore$Production,$
Processing.$These$errors$also$impacted$the$annual$average$burden$hours$reported$in$Appendix$B$and$in$Table$651.$$Reported$costs$were$unaffected.
Varies
1
1
1
1
1
1
1
1
1
1
105
Gas$Processing,$Combustion
Transmission$Compressor$Stations,$
Processing
Transmission$Compressor$Stations,$
Combustion
1
Responses/
Respondent
289
No.$
Respondents
Gas$Processing,$Processing
Source$Category
I2.$$Summary$of$Burden$and$Cost$for$Petroleum$and$Natural$Gas$Systems$(Subpart$W)$by$Activity$and$Year$(cont.)$(1)
1
1
1
1
1
1145
342
133
82
4
0
981
981
143
0
33
31
58
44
2786
Storage,$Processing
Storage,$Combustion
Lng$Terminals,$Processing
Lng$Terminals,$Combustion
Onshore$Production,$Processing
Onshore$Production,$Combustion
Local$Distribution$Companies,$
Processing
Local$Distribution$Companies,$
Combustion
Lng$Storage,$Processing$(3)
Lng$Storage,$Combustion
Offshore$Production,$Processing$(3)
Offshore$Production,$Combustion
TOTAL
4371
44
58
31
33
0
143
981
981
0
4
82
133
342
1145
105
289
Total$Responses
$$$$$$$$193,095
$$$$$$$$$$$$$$$$521
$$$$$$$$$$$$$1,176
$$$$$$$$$$$$$$$$367
$$$$$$$$$$$$$1,827
$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$15,955
$$$$$$$$$$$11,615
$$$$$$$$$$$61,455
$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$34,643
$$$$$$$$$$$$$$$$$$$$$$$F
$$$$$$$$$$$$$$$$$$521 $$$$$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$312 $$$$$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$367 $$$$$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$221 $$$$$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$1,121
$$$$$$$$$$$$$11,615 $$$$$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$8,147
$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$F
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
Burden$F$
Legal
(hrs)
2015
Burden$F$Clerical
$(hrs)
$$$$$$$$$$$$$$$$$$971 $$$$$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$1,053
$$$$$$$$$$$$$$$4,049
$$$$$$$$$$$$$$$2,973
$$$$$$$$$$$$$$$1,243
$$$$$$$$$$$$$$$2,006
Burden$F$
Managerial
(hrs)
$$$$$$$$$$$$$$$$324 $$$$$$$$$$$$$$$$$$$$$43
$$$$$$$$$$$$$$$$971
$$$$$$$$$$$$$8,933
$$$$$$$$$$$$$4,049
$$$$$$$$$$$63,861
$$$$$$$$$$$$$1,243
$$$$$$$$$$$20,797
Burden$F$
Technical
(hrs)
$$$$$$$$$227,738
$$$$$$$$$$$$$1,042
$$$$$$$$$$$$$1,488
$$$$$$$$$$$$$$$$$734
$$$$$$$$$$$$$2,049
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$17,076
$$$$$$$$$$$23,230
$$$$$$$$$$$69,602
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$367
$$$$$$$$$$$$$1,942
$$$$$$$$$$$$$9,986
$$$$$$$$$$$$$8,099
$$$$$$$$$$$66,833
$$$$$$$$$$$$$2,486
$$$$$$$$$$$22,803
$18,201,063
$97,284
$126,454
$68,541
$160,775
$0
$1,242,278
$2,168,993
$5,689,456
$0
$28,994
$181,302
$761,188
$756,163
$4,947,061
$232,155
$1,740,419
Total$Burden$ Total$Labor$Cost
(hrs)
($)
$729,883
$0
$0
$0
$14,032
$0
$20,916
$0
$56,225
$0
$2,400
$0
$26,111
$0
$395,124
$0
$215,075
Capital$Cost
($)
$1,686,737
$0
$0
$0
$25,866
$0
$228,463
$0
$0
$0
$7,823
$0
$147,068
$0
$1,154,114
$0
$123,403
O&M$Cost
$($)
$20,617,684
$97,284
$126,454
$68,541
$200,674
$0
$1,491,657
$2,168,993
$5,745,682
$0
$39,217
$181,302
$934,367
$756,163
$6,496,299
$232,155
$2,078,897
Total$Cost
($)
(1)$Does$not$include$the$burden$or$cost$for$provision$of$information$on$parent$companies,$NAICS$codes,$and$whether$emissions$are$from$cogeneration.$$This$adds$another$0.68$hours$and$$44$per$
respondent$(see$Appendix$L).$$
(2)$The$number$of$respondents$is$not$additive.
(3)$Appendix$B$of$the$current$ICR$(OMB$No.$206050651,$ICR$No.$2376.05)$contained$addition$errors$in$the$Years$2$and$3$$burden$hours$calculations$for$Lng$Storage,$Processing$and$Offshore$Production,$
Processing.$These$errors$also$impacted$the$annual$average$burden$hours$reported$in$Appendix$B$and$in$Table$651.$$Reported$costs$were$unaffected.
Varies
1
1
1
1
1
1
1
1
1
1
105
Gas$Processing,$Combustion
Transmission$Compressor$Stations,$
Processing
Transmission$Compressor$Stations,$
Combustion
1
Responses/
Respondent
289
No.$
Respondents
Gas$Processing,$Processing
Source$Category
I2.$$Summary$of$Burden$and$Cost$for$Petroleum$and$Natural$Gas$Systems$(Subpart$W)$by$Activity$and$Year$(cont.)$(1)
1
1
1
1
1
1145
342
133
82
4
0
981
981
143
0
33
31
58
44
2786
Storage,$Processing
Storage,$Combustion
Lng$Terminals,$Processing
Lng$Terminals,$Combustion
Onshore$Production,$Processing
Onshore$Production,$Combustion
Local$Distribution$Companies,$
Processing
Local$Distribution$Companies,$
Combustion
Lng$Storage,$Processing$(3)
Lng$Storage,$Combustion
Offshore$Production,$Processing$(3)
Offshore$Production,$Combustion
TOTAL
4371
44
58
31
33
0
143
981
981
0
4
82
133
342
1145
105
289
Total$
Responses
$$$$$$$$$$193,095
$$$$$$$$$$$$$$$$$$521
$$$$$$$$$$$$$$1,176
$$$$$$$$$$$$$$$$$$367
$$$$$$$$$$$$$$1,827
$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$15,955
$$$$$$$$$$$$11,615
$$$$$$$$$$$$61,455
$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$324
$$$$$$$$$$$$$$$$$$971
$$$$$$$$$$$$$$8,933
$$$$$$$$$$$$$$4,049
$$$$$$$$$$$$63,861
$$$$$$$$$$$$$$1,243
$$$$$$$$$$$$20,797
Burden$F$
Technical
(hrs)
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$F
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$5
Burden$F$
Legal
(hrs)
$$$$$$$$$$227,738
$$$$$$$$$$$$$$$1,042
$$$$$$$$$$$$$$$1,488
$$$$$$$$$$$$$$$$$$734
$$$$$$$$$$$$$$$2,049
$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$17,076
$$$$$$$$$$$$$23,230
$$$$$$$$$$$$$69,602
$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$367
$$$$$$$$$$$$$$$1,942
$$$$$$$$$$$$$$$9,986
$$$$$$$$$$$$$$$8,099
$$$$$$$$$$$$$66,833
$$$$$$$$$$$$$$$2,486
$$$$$$$$$$$$$22,803
Total$Burden$
(hrs)
Annual$Average$F$3$year$ICR$Period
Burden$F$
Clerical
$(hrs)
$$$$$$$$$$$$34,643 $$$$$$$$$$$$$$$$$$F
$$$$$$$$$$$$$$$$$$521
$$$$$$$$$$$$$$$$$$312
$$$$$$$$$$$$$$$$$$367
$$$$$$$$$$$$$$$$$$221
$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$1,121
$$$$$$$$$$$$11,615
$$$$$$$$$$$$$$8,147
$$$$$$$$$$$$$$$$$$$5
$$$$$$$$$$$$$$$$$$$$43
$$$$$$$$$$$$$$$$$$971
$$$$$$$$$$$$$$1,053
$$$$$$$$$$$$$$4,049
$$$$$$$$$$$$$$2,973
$$$$$$$$$$$$$$1,243
$$$$$$$$$$$$$$2,006
Burden$F$
Managerial
(hrs)
$18,201,063
$97,284
$126,454
$68,541
$160,775
$0
$1,242,278
$2,168,993
$5,689,456
$0
$28,994
$181,302
$761,188
$756,163
$4,947,061
$232,155
$1,740,419
Total$Labor$Cost
($)
$729,883
$0
$0
$0
$14,032
$0
$20,916
$0
$56,225
$0
$2,400
$0
$26,111
$0
$395,124
$0
$215,075
Capital$Cost
($)
$1,686,737
$0
$0
$0
$25,866
$0
$228,463
$0
$0
$0
$7,823
$0
$147,068
$0
$1,154,114
$0
$123,403
O&M$Cost
$($)
$20,617,684
$97,284
$126,454
$68,541
$200,674
$0
$1,491,657
$2,168,993
$5,745,682
$0
$39,217
$181,302
$934,367
$756,163
$6,496,299
$232,155
$2,078,897
Total$Cost
($)
(1)$Does$not$include$the$burden$or$cost$for$provision$of$information$on$parent$companies,$NAICS$codes,$and$whether$emissions$are$from$cogeneration.$$This$adds$another$0.68$hours$and$$44$per$
respondent$(see$Appendix$L).$$
(2)$The$number$of$respondents$is$not$additive.
(3)$Appendix$B$of$the$current$ICR$(OMB$No.$206050651,$ICR$No.$2376.05)$contained$addition$errors$in$the$Years$2$and$3$$burden$hours$calculations$for$Lng$Storage,$Processing$and$Offshore$Production,$
Processing.$These$errors$also$impacted$the$annual$average$burden$hours$reported$in$Appendix$B$and$in$Table$651.$$Reported$costs$were$unaffected.
Varies
1
1
1
1
1
1
1
1
1
1
105
Gas$Processing,$Combustion
Transmission$Compressor$Stations,$
Processing
Transmission$Compressor$Stations,$
Combustion
1
Responses/
Respondent
289
No.$
Respondents
Gas$Processing,$Processing
Source$Category
I2.$$Summary$of$Burden$and$Cost$for$Petroleum$and$Natural$Gas$Systems$(Subpart$W)$by$Activity$and$Year$(cont.)$(1)
I3.'Change'in'Burden'and'Cost'for'Petroleum'and'Natural'Gas'Systems'(Subpart'W)'(1)
Current Cost & Burden (OMB No. 2060-0651, ICR No. 2376.05)
First-Year Burden & Cost (1)
Source'Category
Gas$Processing
Trans.$Compression$Stations
Storage
No.'
Respond4
ents
Responses/
Respondent
Total'
Responses
Total'Burden'
(hrs)
Total'Labor'
Cost
Capital'Cost'
($K)
($K)
O&M'Cost
'($K)
Total'Cost
($K)
289
2
394
115,744
$8,084
$231
$123
$8,439
1,145
2
1,487
214,373
$14,660
$395
$1,154
$16,209
133
2
215
33,791
$2,362
$26
$147
$2,536
Lng$Terminals
4
2
4
655
$47
$30
$8
$85
Onshore$Production
981
2
1,962
237,222
$16,798
$56
$0
$16,854
Local$Distribution$Companies
143
2
143
26,059
$1,712
$21
$229
$1,961
Lng$Storage
33
2
64
9,939
$706
$14
$26
$746
Offshore$Production
58
2
102
6,821
$491
$0
$0
$491
2,786
Varies
4,371
644,604
$44,860
$774
$1,687
$47,320
No.'
Respond4
ents
Responses/
Respondent
Total'
Responses
Total'Burden'
(hrs)
TOTAL
Subsequent-Year Burden & Cost (1)
Source'Category
Gas$Processing
Total'Labor'
Cost
Capital'Cost'
($K)
($K)
O&M'Cost
'($K)
Total'Cost
($K)
289
2
394
25,289
$1,655
$215
$123
$1,994
1,145
2
1,487
74,934
$4,752
$395
$1,154
$6,301
133
2
215
11,928
$782
$26
$147
$955
4
2
4
367
$25
$2
$8
$36
Onshore$Production
981
2
1,962
92,832
$6,645
$56
$0
$6,701
Local$Distribution$Companies
143
2
143
17,077
$1,056
$21
$228
$1,306
Lng$Storage
33
2
64
23,537
$191
$14
$26
$231
Offshore$Production
58
2
102
23,845
$183
$0
$0
$183
2,786
Varies
4,371
269,810
$15,289
$730
$1,687
$17,706
No.'
Respond4
ents
Responses/
Respondent
Total'
Responses
Total'Burden'
(hrs)
Trans.$Compression$Stations
Storage
Lng$Terminals
TOTAL
Annual Average Burden & Cost (1)
Source'Category
Gas$Processing
Trans.$Compression$Stations
Storage
Lng$Terminals
Total'Labor'
Cost
Capital'Cost'
($K)
($K)
O&M'Cost
'($K)
Total'Cost
($K)
289
2
394
55,441
$3,798
$220
$124
$4,142
1,145
2
1,487
121,405
$8,054
$395
$1,154
$9,603
133
2
215
19,218
$1,310
$26
$147
$1,482
4
2
4
463
$33
$12
$8
$52
Onshore$Production
981
2
1,962
140,980
$10,031
$56
$0
$10,087
Local$Distribution$Companies
143
2
143
20,075
$1,269
$21
$228
$1,517
Lng$Storage
33
2
64
19,004
$362
$14
$26
$402
Offshore$Production
58
2
102
18,170
$285
$0
$0
$286
2,786
Varies
4,371
394,757
$25,142
$745
$1,687
$27,572
TOTAL
(1)$Does$not$include$the$burden$or$cost$for$provision$of$information$on$parent$companies,$NAICS$codes,$and$whether$emissions$are$from$cogeneration.$$This$
adds$another$0.68$hours$and$$44$per$respondent$(see$Appendix$L).$$
I3.'Change'in'Burden'and'Cost'for'Petroleum'and'Natural'Gas'Systems'(Subpart'W)'(cont.)
Revised Burden & Cost
First-Year Burden & Cost (1)
Source'Category
Gas$Processing
Trans.$Compression$Stations
Storage
No.'
Respond4
ents
Responses/
Respondent
Total'
Responses
Total'Burden'
(hrs)
Total'Labor'
Cost
Capital'Cost'
($K)
($K)
O&M'Cost
'($K)
Total'Cost
($K)
289
2
394
25,289
$1,973
$215
$123
$2,311
1,145
2
1,487
74,932
$5,703
$395
$1,154
$7,252
133
2
215
11,928
$942
$26
$147
$1,116
Lng$Terminals
4
2
4
367
$29
$2
$8
$39
Onshore$Production
981
2
1,962
92,832
$7,858
$56
$0
$7,915
Local$Distribution$Companies
143
2
143
17,076
$1,242
$21
$228
$1,492
Lng$Storage
33
2
64
2,783
$229
$14
$26
$269
Offshore$Production
58
2
102
2,530
$224
$0
$0
$224
2,786
Varies
4,371
227,738
$18,201
$730
$1,687
$20,618
No.'
Respond4
ents
Responses/
Respondent
Total'
Responses
Total'Burden'
(hrs)
TOTAL
Subsequent-Year Burden & Cost (1)
Source'Category
Gas$Processing
Total'Labor'
Cost
Capital'Cost'
($K)
($K)
O&M'Cost
'($K)
Total'Cost
($K)
289
2
394
25,289
$1,973
$215
$123
$2,311
1,145
2
1,487
74,932
$5,703
$395
$1,154
$7,252
133
2
215
11,928
$942
$26
$147
$1,116
4
2
4
367
$29
$2
$8
$39
Onshore$Production
981
2
1,962
92,832
$7,858
$56
$0
$7,915
Local$Distribution$Companies
143
2
143
17,076
$1,242
$21
$228
$1,492
Lng$Storage
33
2
64
2,783
$229
$14
$26
$269
Offshore$Production
58
2
102
2,530
$224
$0
$0
$224
2,786
Varies
4,371
227,738
$18,201
$730
$1,687
$20,618
No.'
Respond4
ents
Responses/
Respondent
Total'
Responses
Total'Burden'
(hrs)
Trans.$Compression$Stations
Storage
Lng$Terminals
TOTAL
Annual Average Burden & Cost (1)
Source'Category
Gas$Processing
Trans.$Compression$Stations
Storage
Lng$Terminals
Total'Labor'
Cost
Capital'Cost'
($K)
($K)
O&M'Cost
'($K)
Total'Cost
($K)
289
2
394
25,289
$1,972
$215
$124
$2,311
1,145
2
1,487
74,932
$5,703
$395
$1,154
$7,252
133
2
215
11,928
$943
$26
$147
$1,116
4
2
4
367
$29
$2
$8
$39
Onshore$Production
981
2
1,962
92,832
$7,860
$56
$0
$7,915
Local$Distribution$Companies
143
2
143
17,076
$1,236
$21
$228
$1,492
Lng$Storage
33
2
64
2,783
$229
$14
$26
$269
Offshore$Production
58
2
102
2,530
$223
$0
$0
$224
2,786
Varies
4,371
227,738
$18,196
$730
$1,687
$20,618
TOTAL
(1)$Does$not$include$the$burden$or$cost$for$provision$of$information$on$parent$companies,$NAICS$codes,$and$whether$emissions$are$from$cogeneration.$$This$
adds$another$0.68$hours$and$$44$per$respondent$(see$Appendix$L).$$
I3.'Change'in'Burden'and'Cost'for'Petroleum'and'Natural'Gas'Systems'(Subpart'W)'(cont.)'
Change in Burden and Cost
No.'
Respond4
ents
Responses/
Respondent
Total'
Responses
Total'Burden'
(hrs)
Gas$Processing
0
0
0
.30,152
.$1,826
.$5
$0
.$1,831
Trans.$Compression$Stations
0
0
0
.46,473
.$2,351
$0
$0
.$2,351
Storage
0
0
0
.7,290
.$366
$0
$0
.$366
Lng$Terminals
0
0
0
.96
.$4
.$9
$0
.$13
Onshore$Production
0
0
0
.48,148
.$2,171
$0
$0
.$2,173
Local$Distribution$Companies
0
0
0
.2,999
.$33
$0
$0
.$26
Lng$Storage
0
0
0
.16,221
.$133
$0
$0
.$133
Offshore$Production
0
0
0
.15,641
.$62
$0
$0
.$62
TOTAL
0
0
4167,018
4$6,945
4$15
$0
4$6,955
Source'Category
Total'Labor'
Cost
Capital'Cost'
($K)
($K)
O&M'Cost
'($K)
Total'Cost
($K)
Reason for Changes in Burden and Cost
•$Adjusted$the$labor$hours$and$labor$cost$per$facility$to$recognize$the$completion$of$the$one.time$activities$that$occurred$
in$the$first$year$of$data$collection.
•$Corrected$an$error$in$the$previous$ICR,$in$which$the$burden$associated$with$processing$at$LNG$Storage$Facilities$and$Off.
•$Updated$the$labor$rates$used$to$calculate$labor$costs$to$use$sector.specific$rates$(see$Appendix$F).