0137 OCS Plan Information Form

30 CFR 550, Subpart B, Plans and Information

Form_0137_exp_2014[1]9-14-11

509-585 - Contents of Exploration Plans (EP)

OMB: 1010-0151

Document [doc]
Download: doc | pdf

U.S. Department of the Interior OMB Control Number: 1010-0151

Bureau of Ocean Energy Management, OMB Approval Expires: mo/dy/yr

Regulation and Enforcement

OCS PLAN INFORMATION FORM

General Information

Type of OCS Plan:


Exploration Plan (EP)

Development Operations Coordination Document (DOCD)


Company Name:

BOEMRE Operator Number:

Address:

Contact Person:


Phone Number:


E-Mail Address:

If a service fee is required under 30 CFR 250.125(a), provide the

Amount paid


Receipt No.


Project and Worst Case Discharge (WCD) Information

Lease(s):

Area:

Block(s):

Project Name (If Applicable):

Objective(s):


Oil


Gas


Sulphur


Salt

Onshore Support Base(s):

Platform/Well Name:

Total Volume of WCD:

API Gravity:

Distance to Closest Land (Miles):

Volume from uncontrolled blowout:

Have you previously provided information to verify the calculations and assumptions for your WCD?


Yes


No

If so, provide the Control Number of the EP or DOCD with which this information was provided


Do you propose to use new or unusual technology to conduct your activities?


Yes


No

Do you propose to use a vessel with anchors to install or modify a structure?


Yes


No

Do you propose any facility that will serve as a host facility for deepwater subsea development?


Yes


No

Description of Proposed Activities and Tentative Schedule (Mark all that apply)

Proposed Activity

Start Date

End Date

No. of Days

Exploration drilling




Development drilling




Well completion




Well test flaring (for more than 48 hours)




Installation or modification of structure




Installation of production facilities




Installation of subsea wellheads and/or manifolds




Installation of lease term pipelines




Commence production




Other (Specify and attach description)




Description of Drilling Rig

Description of Structure


Jackup


Drillship


Caisson


Tension leg platform


Gorilla Jackup


Platform rig


Fixed platform


Compliant tower


Semisubmersible


Submersible


Spar


Guyed tower


DP Semisubmersible


Other (Attach Description)


Floating production system


Other (Attach Description)

Drilling Rig Name (If Known):

Description of Lease Term Pipelines

From (Facility/Area/Block)

To (Facility/Area/Block)

Diameter (Inches)

Length (Feet)














BOEMRE FORM 0137 (Mo/Year - Supersedes all previous editions of this form which may not be used.) Page 1 of 4

OCS PLAN INFORMATION FORM (CONTINUED)

Include one copy of this page for each proposed well/structure

Proposed Well/Structure Location

Well or Structure Name/Number (If renaming well or structure, reference previous name):

Previously reviewed under an approved EP or DOCD?


Yes


No

Is this an existing well or structure?


Yes


No

If this is an existing well or structure, list the Complex ID or API No.


Do you plan to use a subsea BOP or a surface BOP on a floating facility to conduct your proposed activities?


Yes


No

WCD info

For wells, volume of uncontrolled blowout (Bbls/day):

For structures, volume of all storage and pipelines (Bbls):

API Gravity of fluid



Surface Location

Bottom-Hole Location (For Wells)

Completion (For multiple completions, enter separate lines)

Lease No.

OCS


OCS

OCS

OCS

Area Name




Block No.




Blockline

Departures

(in feet)

N/S Departure: F____ L

N/S Departure: F____ L

N/S Departure: F____ L

N/S Departure: F____ L

N/S Departure: F____ L


E/W Departure: F____ L




E/W Departure: F____ L

E/W Departure: F____ L

E/W Departure: F____ L

E/W Departure: F____ L

Lambert X-Y coordinates

X:

X:

X:

X:

X:


Y:

Y:

Y:

Y:

Y:

Latitude/

Longitude

Latitude

Latitude

Latitude

Latitude

Latitude


Longitude

Longitude

Longitude

Longitude

Longitude

Water Depth (Feet):

MD (Feet):

TVD (Feet):

MD (Feet):

MD (Feet):

MD (Feet):

TVD (Feet):

TVD (Feet):

TVD (Feet):

Anchor Radius (if applicable) in feet:


Anchor Locations for Drilling Rig or Construction Barge (If anchor radius supplied above, not necessary)

Anchor Name

or No.

Area

Block

X Coordinate

Y Coordinate

Length of Anchor Chain on Seafloor




X =

Y =





X =

Y =





X =

Y =





X =

Y =





X =

Y =





X =

Y =





X =

Y =





X =

Y =



BOEMRE FORM 0137 (Mo/Year - Supersedes all previous editions of this form which may not be used.) Page 2 of 4




OCS PLAN INFORMATION FORM (CONTINUED)

Provide the following information for the well with the highest Worst Case Discharge volume:


Worst Case Discharge (WCD) Well Information

WCD Well Name

Surface Lease

Surface Area/Block

Bottom Lease

Bottom Area/Block

Product Type

MD

TVD









Analog Well(s)

Area/Block

OCS Lease

Well No.

API No.























Geologic Data for WCD


Open Hole Interval for WCD

Top (TVD in feet)

Base (TVD in feet)







Sand 1

Sand 2

Sand 3

Sand 4

Sand 5

Formation Data






Sand Name






Estimated Top TVD






Estimated Base TVD






Estimated Net Sand Height MD (Net Pay if hydrocarbon)






Estimated Net Sand Height TVT (Net Pay if hydrocarbon)






Fluid Type






Used in WCD? (Yes/No)







Seismic Survey Used








Engineering Data for WCD


WCD Engineering Items

WCD (STB/Day)


WCD Calculated at

Mudline


Yes

No


Atmosphere


Yes


No


Flow Correlation


Outlet Pressure (Psia)


Gas Turbulence Factor


Software Model Used




Sand 1

Sand 2

Sand 3

Sand 4

Sand 5

Formation Data






Sand Name






Permeability (mD)






Initial Pressure (PSIA)







BOEMRE FORM 0137 (Mo/Year - Supersedes all previous editions of this form which may not be used.) Page 3 of 4



OCS PLAN INFORMATION FORM (CONTINUED)


Sand 1

Sand 2

Sand 3

Sand 4

Sand 5

Formation Data






Reservoir Temperature (F)






Porosity (0.00)






Water Saturation (0.00)






Rock Compressibility (microsips)






Water Salinity (ppm)






Drive Mechanism






Drainage Area (acres)






Oil Reservoir Data






Bubble Point Pressure (PSIA)






Initial Bo (RB/STB)






Bo (RB/STB) @ Bubble Point






Rsi (SCF/STB)






Initial Oil Viscosity (Cp)






Oil Viscosity (CP) @ Bubble Point






Oil Compressibility (1/PSIA)






Oil API Gravity (API)






Specific Gas Gravity (0.00)






Gas Reservoir Data






Condensate API Gravity (API)






Specific Gas Gravity (0.00)






Yield (STB/MMCF)







Source of Permeability Used

Permeability from MDT


Permeability from Core Analysis

Percussion core

Rotary sidewall core

Conventional core

Pressure Transient Analysis


Permeability from CMR or NMR log analysis


Permeability from other source



Provide Model Input Values for Relative Permeability:

Residual Oil to Gas fraction (=1-Slc-Swc)


Residual Oil to Water fraction (=Soc)


Critical Gas fraction (Sgc, Gas/Oil-Water Systems)


Residual Gas to Water fraction (Sgc, Gas/Gas-Water Systems)


Kro Oil Curve Endpoint (fraction of absolute permeability)


Krg Gas Curve Endpoint (fraction of absolute permeability)


Krw Water Curve Endpoint (fraction of absolute permeability)



Paperwork Reduction Act of 1995 Statement: The Paperwork Reduction Act of 1995 (44 U.S.C. 2501 et seq.) requires us to inform you that BOEMRE collects this information as part of an applicant’s Exploration Plan or Development Operations Coordination Document submitted for BOEMRE approval. We use the information to facilitate our review and data entry for OCS plans. We will protect proprietary data according to the Freedom of Information Act and 30 CFR 250.197. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid Office of Management and Budget Control Number. Responses are mandatory (43 U.S.C. 1334). The public reporting burden for this form is included in the burden for preparing Exploration Plans and Development Operations Coordination Documents. We estimate that burden to average 600 hours with an accompanying EP, or 700 hours with an accompanying DPP or DOCD, including the time for reviewing instructions, gathering and maintaining data, and completing and reviewing the forms associated with subpart B. Direct comments regarding the burden estimate or any other aspect of this form to the Information Collection Clearance Officer, Bureau of Ocean Energy Management, Regulation and Enforcement, 381 Elden Street, Herndon, VA 20170.



BOEMRE FORM 0137 (Mo/Year - Supersedes all previous editions of this form which may not be used.) Page 4 of 4

File Typeapplication/msword
File TitleAPPENDIX J
AuthorMichael Joseph Tolbert
Last Modified ByMinerals Management Service
File Modified2011-09-15
File Created2011-09-15

© 2024 OMB.report | Privacy Policy