The rules require that the technical parameters which govern the operation of WCS mobile and portable devices in the 2.3 GHz band, enhance performance requirements to ensure that mobile broadband is rapidly deployed and made available to the public, while limiting the potential for harmful interference to incumbent services operating in adjacent bands.
The Commission is now requesting OMB approval for a revision to this IC due to changes made in the Order on Reconsideration, FCC 12-130. Specifically, revising the technical rules to enhance the ability of WCS licensees to deploy mobile broadband networks while establishing safeguards to protect neighboring SDARS, AMT and DSN networks from interference; prohibited WCS mobile & portable devises' transmissions in WCS Blocks C and D to further protect SDARS operations; relaxed WCS licenseees notification requirements and clarified WCS notification and coordination procedures; and restarted and provided a limited extension of WCS performance periods to enable licensees to respond to revisions of technical rules.
The Commission is reporting a 1,065 total hour reduction and a $266,250 reduction in annual costs. This reduction adjustment is due to recalculations of the original estimates that was approved in 2011.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.