495 Construction Cost Estimates

Preloan Procedures and Requirements for Telecommunications Program

RUS495

Preloan Procedures and Requirements for Telecommunications Program

OMB: 0572-0079

Document [pdf]
Download: pdf | pdf
Form Approved
0572-0079
Expires 07/31/2013
According to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor, and a person Is not required to respond to a collection of information unless it displays a valid OMB
control number. The valid OMB control number for this information collection is 0572-0079. The time required to complete this information is estimated to average 14 hours per response, including
the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.

UNITED STATES DEPARTMENT OF
AGRICULTURE RURAL UTILITIES SERVICE

NAME OF BORROWER

CONSTRUCTION COST ESTIMATES

BORROWER and LOAN DESIGNATION

NAME OF EXCHANGE

STATE

INSTRUCTIONS - Prepare one copy of this form for each copy of the Loan Design.
PART A. PROPOSED CONSTRUCTION BUDGET (LOAN DESIGN)
CENTRAL OFFICE & ELECTRONIC EQUIPMENT

TOTAL
CONSTRUCTION ($)

Description

RUS FINANCING
REQUESTED ($)

(FOR RUS USE ONLY)
FINANCING APPROVED

1. NEW SWITCH
2. ADDITIONS
3. UPGRADE
4. OPERATOR SYSTEMS
5. RADIO SYSTEMS
6. TOLL ELECTRONICS
7. EAS ELECTRONICS
8. LOCAL SERVICE ELECTRONICS
9. OTHER
10. REMOVALS
11. SUBTOTAL COE & ELECTRONIC EQUIP. (1 thru 10)
OUTSIDE PLANT
ROUTE MILES
12. BURIED PLANT - METAL
13. BURIED PLANT - FIBER
14. AERIAL PLANT - METAL
15. AERIAL PLANT - FIBER
16. AERIAL PLANT - POLES
17. CONDUIT & MANHOLE SYSTEMS
18. UNDERGROUND CABLE - METAL
19. UNDERGROUND CABLE - FIBER
20. OTHER (Describe)
21. REMOVALS
22. ROW PROCUREMENT
23. SUBTOTAL OUTSIDE PLANT (12 thru 22)
LAND & BUILDINGS
Location

Size (sq. ft.)

24. CC BUILDING
25. HQ BUILDING
26. WAREHOUSE/GARAGE
27. LAND
28. OTHER (Describe)
29. REMOVALS
30. SUBTOTAL LAND& BUILDINGS (24 thru 29) 35. TOTAL EXCHANGE
CONSTRUCTION BUDGET (11-23+30)
PART B. ROUTE MILES OF PLANT (Including drops)

PART D. EAS

EXCHANGE

1. EXISTING SERVICE

1. EXISTING TO REMAIN AS IS:
2. EXISTING TO BE MODIFIED
3. NEW ROUTE
4. ROUTE RELINQUISHED

2. NEW SERVICE

PART C. TELECOMMUNICATIONS PLANT RETIRED
TYPE
1. COE & ELECTRONIC EQUIPMENT
2. OUTSIDE PLANT
3. LAND & BUILDINGS

ORIGINAL COST ($)

SALVAGE ($)

REMARKS:

RUS Form 495 (Rev. 09-2003)

11-2001, Excel V5.0


File Typeapplication/pdf
File Modified2013-06-19
File Created2013-06-11

© 2024 OMB.report | Privacy Policy