PUBLISHED IC13-14-000 (FERC Form 80) 30dy

PUBLISHED IC13-14-000 (FERC Form 80) 30dy.pdf

FERC Form 80, Licensed Hydropower Development Recreation Report

PUBLISHED IC13-14-000 (FERC Form 80) 30dy

OMB: 1902-0106

Document [pdf]
Download: pdf | pdf
Federal Register / Vol. 78, No. 146 / Tuesday, July 30, 2013 / Notices
motion to intervene at the address
provided above in accordance with Rule
214 of FERC’s Rules of Practice and
Procedure (18 CFR 385.214). Fifteen
copies of each comment, protest, or
motion to intervene should be filed with
DOE on or before the date listed above.
Additional copies of such comment,
protest, or motion to intervene should
also be filed directly with: Mr. Robert S.
Grimm, CEO/President, Soule Hydro,
LLC, c/o Alaska Power & Telephone
Company, 193 Otto Street, P.O. Box
3222, Port Townsend, WA 98368.
Before a Presidential permit may be
issued or amended, DOE must
determine that the proposed action is in
the public interest. In making that
determination, DOE considers the
environmental impacts of the proposed
project pursuant to the National
Environmental Policy Act of 1969,
determines the project’s impact on
electric reliability by ascertaining
whether the proposed project would
adversely affect the operation of the U.S.
electric power supply system under
normal and contingency conditions, and
considers any other factors that may
also be relevant to the public interest.
DOE must obtain the concurrences of
the Secretary of State and the Secretary
of Defense before taking final action on
a Presidential permit application.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at http://
www.oe.energy.gov/permits_
pending.htm, or by emailing Angela
Troy at [email protected].
Issued in Washington, DC, on July 24,
2013.
Brian Mills,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. 2013–18241 Filed 7–29–13; 8:45 am]
BILLING CODE 6450–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC13–14–000]

pmangrum on DSK3VPTVN1PROD with NOTICES

Commission Information Collection
Activities (FERC Form 80); Comment
Request; Extension
Federal Energy Regulatory
Commission.
ACTION: Comment request.
AGENCY:

In compliance with the
requirements of the Paperwork
Reduction Act of 1995, 44 U.S.C.
3507(a)(1)(D), the Federal Energy

SUMMARY:

VerDate Mar<15>2010

14:32 Jul 29, 2013

Jkt 229001

Regulatory Commission (Commission or
FERC) is submitting the information
collection, FERC Form 80, Licensed
Hydropower Development Recreation
Report, to the Office of Management and
Budget (OMB) for review of the
information collection requirements.
Any interested person may file
comments directly with OMB and
should address a copy of those
comments to the Commission as
explained below. The Commission
issued a Notice in the Federal Register
(78 FR 28820, 5/16/2013) requesting
public comments. FERC received no
comments on the FERC Form 80 and is
making this notation in its submittal to
OMB.
DATES: Comments on the collection of
information are due August 29, 2013.
ADDRESSES: Comments filed with OMB,
identified by the OMB Control No.
1902–0106, should be sent via email to
the Office of Information and Regulatory
Affairs: [email protected].
Attention: Federal Energy Regulatory
Commission Desk Officer. The Desk
Officer may also be reached via
telephone at 202–395–4718.
A copy of the comments should also
be sent to the Federal Energy Regulatory
Commission, identified by the Docket
No. IC13–14–000, by either of the
following methods:
• eFiling at Commission’s Web site:
http://www.ferc.gov/docs-filing/
efiling.asp
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: http://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
[email protected], or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at http://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at [email protected], telephone
at (202) 502–8663, and fax at (202) 273–
0873.
SUPPLEMENTARY INFORMATION:
Title: FERC Form 80, Licensed
Hydropower Development Recreation
Report.
OMB Control No.: 1902–0106.
Type of Request: Minor revisions to
the FERC Form 80 information

PO 00000

Frm 00013

Fmt 4703

Sfmt 4703

45919

collection requirements with no change
to the current reporting burden.
Abstract: FERC uses the information
on the FERC Form 80 to implement the
statutory provisions of sections 4(a),
10(a), 301(a), 304 and 309 of the Federal
Power Act (FPA), 16 U.S.C. 797, 803,
825c & 8254. FERC’s authority to collect
this information comes from section
10(a) of the FPA which requires the
Commission to be responsible for
ensuring that hydro projects subject to
FERC jurisdiction are consistent with
the comprehensive development of the
nation’s waterway for recreation and
other beneficial public uses. In the
interest of fulfilling these objectives,
FERC expects licensees subject to its
jurisdiction to recognize the resources
that are affected by their activities and
to play a role in protecting such
resources.
FERC Form 80 is a report on the use
and development of recreational
facilities at hydropower projects
licensed by the Commission.
Applications for licenses, amendments
to licenses, and/or changes in land
rights frequently involve changes in
resources available for recreation. FERC
utilizes the FERC Form 80 data when
analyzing the adequacy of existing
public recreational facilities and when
processing and reviewing proposed
amendments to help determine the
impact of such changes. In addition, the
FERC regional office staff uses the FERC
Form 80 data when conducting
inspections of licensed projects. FERC
inspectors use the data in evaluating
compliance with various license
conditions and in identifying
recreational facilities at hydropower
projects.
The FERC Form 80 requires data
specified by Title 18 of the Code of
Federal Regulations (CFR) under Parts
8.11 and 141.14 (and discussed at
http://www.ferc.gov/docs-filing/
forms.asp#80).
FERC collects the FERC Form 80 once
every six years. The last collection was
due on April 1, 2009, for data compiled
during the 2008 calendar year. The next
collection of the FERC Form 80 is due
on April 1, 2015, with subsequent
collections due every sixth year, for data
compiled during the previous calendar
year.
The Commission made minor
revisions throughout the form.
Specifically, FERC clarified and
simplified instructions, removed
redundancy in certain questions,
clarified questions and terms, and
generally improved the readability of
the form.
FERC has attached the revised form to
this notice.

E:\FR\FM\30JYN1.SGM

30JYN1

45920

Federal Register / Vol. 78, No. 146 / Tuesday, July 30, 2013 / Notices

Type of Respondents: Hydropower
project licensees.
Estimate of Annual Burden:1 For each
reporting period, FERC estimates the
total Public Reporting Burden for this
information collection as: (a) 1,000
respondents, (b) 0.167 responses/

respondent, and (c) 3 hours per
response, giving a total of 501 burden
hours. The Commission has increased
its total number of respondents to reflect
the actual numbers we received during
the last two reporting periods. In
addition, FERC spreads the burden

hours and costs over the six-year
collection cycle in the table below to
reflect how the information is collected.
The average burden hours per response
remains unchanged. These are the
figures FERC will submit to OMB.

FERC–80—LICENSED HYDROPOWER DEVELOPMENT RECREATION REPORT
Number of
respondents

Number of
responses per
respondent 2

Total
number of
responses

Average
burden hours
per response

Estimated
total annual
burden

(A)

(B)

(A) × (B) = (C)

(D)

(C) × (D)

1,000

0.167

167

3

501

Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1483–001.
Applicants: Dominion Energy
Kewaunee, Inc.
Description: Supplement to June 29,
2012 Market Power Analyses Report of
Dominion Energy Kewaunee, Inc.
Filed Date: 6/17/13.
Accession Number: 20130617–5076.

Comments Due: 5 p.m. ET 8/13/13.
Docket Numbers: ER10–1483–003,
ER10–2386–002; ER10–1823–002;
ER10–1462–002; ER10–1996–002;
ER10–1802–001; ER10–2413–002;
ER10–2309–002; ER10–1917–002;
ER13–1403–002; ER10–2458–002;
ER10–2468–003.
Applicants: Dominion Energy
Kewaunee, Inc., Fairless Energy, LLC,
Dominion Energy Marketing, Inc.,
Dominion Energy Brayton Point, LLC,
Dominion Energy Kewaunee, Inc.,
Dominion Retail, Inc., Dominion Energy
Manchester Street, Inc., Kincaid
Generation, L.L.C., Elwood Energy, LLC,
Dominion Nuclear Connecticut, Inc.,
Dominion Bridgeport Fuel Cell, LLC,
NedPower Mount Storm, LLC, Fowler
Ridge Wind Farm LLC.
Description: Second Supplement to
June 29, 2012 Market Power Analyses
Report of Dominion Energy Kewaunee,
Inc., et al.
Filed Date: 6/28/13.
Accession Number: 20130628–5319.
Comments Due: 5 p.m. ET 8/13/13.
Docket Numbers: ER13–101–003.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: 07–22–13 ATCLLC Order
1000 Compliance to be effective 12/31/
9998.
Filed Date: 7/22/13.
Accession Number: 20130722–5157.
Comments Due: 5 p.m. ET 8/21/13.
Docket Numbers: ER13–198–002.
Applicants: PJM Interconnection,
L.L.C.
Description: PJM Order 1000
Compliance filing per 3/22/2013 Order
in Docket No. ER13–198–000 to be
effective 1/1/2014.
Filed Date: 7/22/13.
Accession Number: 20130722–5164.

Comments Due: 5 p.m. ET 8/21/13.
Docket Numbers: ER13–690–003.
Applicants: Public Service Company
of New Mexico.
Description: Attachment H
Compliance Filing to be effective 8/2/
2011.
Filed Date: 7/22/13.
Accession Number: 20130722–5128.
Comments Due: 5 p.m. ET 8/12/13.
Docket Numbers: ER13–690–004.
Applicants: Public Service Company
of New Mexico.
Description: Public Service Company
of New Mexico submits Attachment H
Compliance to be effective 8/2/2013.
Filed Date: 7/23/13.
Accession Number: 20130723–5074.
Comments Due: 5 p.m. ET 8/13/13.
Docket Numbers: ER13–1366–000.
Applicants: Public Service Company
of New Mexico.
Description: Public Service Company
of New Mexico submits Gallup Refund
Report to be effective N/A.
Filed Date: 7/23/13.
Accession Number: 20130723–5065.
Comments Due: 5 p.m. ET 8/13/13.
Docket Numbers: ER13–1631–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Errata to June 4, 2013
Request for Waiver of certain tariff
provisions of Midcontinent Independent
System Operator, Inc.
Filed Date: 7/22/13.
Accession Number: 20130722–5191.
Comments Due: 5 p.m. ET 8/12/13.
Docket Numbers: ER13–1747–001.
Applicants: eBay Inc.
Description: eBay Inc. submits
Amendment to MBR Application to be
effective 8/26/2013.
Filed Date: 7/23/13.
Accession Number: 20130723–5096.

1 FERC defines burden as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a Federal agency. For further
explanation of what is included in the information

collection burden, reference 5 Code of Federal
Regulations 1320.3.
2 FERC divides the responses per respondent by
six because this collection occurs once every six
years.

3 FY 2013 Estimated Average Hourly Cost per
FTE, including salary + benefits.

The total estimated annual cost
burden to respondents is $35,070 [501
hours * $70/hour 3 = $35,070].
Comments: The Commission invites
comments on: (1) Whether the
collection of information is necessary
for the proper performance of the
functions of the Commission, including
whether the information will have
practical utility; (2) the accuracy of the
agency’s estimate of the burden and cost
of the collection of information,
including the validity of the
methodology and assumptions used; (3)
ways to enhance the quality, utility and
clarity of the information collection; and
(4) ways to minimize the burden of the
collection of information on those who
are to respond, including the use of
automated collection techniques or
other forms of information technology.
Dated: July 23, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–18208 Filed 7–29–13; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission

pmangrum on DSK3VPTVN1PROD with NOTICES

Combined Notice of Filings #1

VerDate Mar<15>2010

14:32 Jul 29, 2013

Jkt 229001

PO 00000

Frm 00014

Fmt 4703

Sfmt 4703

E:\FR\FM\30JYN1.SGM

30JYN1


File Typeapplication/pdf
File Modified2013-07-30
File Created2013-07-30

© 2024 OMB.report | Privacy Policy