Download:
pdf |
pdf54880
Federal Register / Vol. 78, No. 173 / Friday, September 6, 2013 / Notices
In-Service Date: On or before June 1,
2015.
Issued in Washington, DC, on August 30,
2013.
Brian Mills,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. 2013–21779 Filed 9–5–13; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC13–17–000]
Commission Information Collection
Activities (FERC–551); Comment
Request
Federal Energy Regulatory
Commission, DOE.
ACTION: Comment request.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, 44 U.S.C.
3507(a)(1)(D), the Federal Energy
Regulatory Commission (Commission or
FERC) is submitting the information
collection FERC–551, Reporting of Flow
Volume and Capacity by Interstate
Natural Gas Pipelines, to the Office of
Management and Budget (OMB) for
review of the information collection
requirements. Any interested person
may file comments directly with OMB
and should address a copy of those
comments to the Commission as
explained below. The Commission
issued a Notice in the Federal Register
(78 FR 36176, 6/17/2013) requesting
public comments. FERC received no
comments on the FERC–551 and is
SUMMARY:
making this notation in its submittal to
OMB.
DATES: Comments on the collection of
information are due by October 7, 2013.
ADDRESSES: Comments filed with OMB,
identified by the OMB Control No.
1902–0243, should be sent via email to
the Office of Information and Regulatory
Affairs: [email protected].
Attention: Federal Energy Regulatory
Commission Desk Officer. The Desk
Officer may also be reached via
telephone at 202–395–4718.
A copy of the comments should also
be sent to the Federal Energy Regulatory
Commission, identified by the Docket
No. IC13–17–000, by either of the
following methods:
• eFiling at Commission’s Web site:
http://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: http://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
[email protected], or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at http://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at [email protected], by
telephone at (202) 502–8663, and by fax
at (202) 273–0873.
SUPPLEMENTARY INFORMATION:
Title: Reporting of Flow Volume and
Capacity by Interstate Natural Gas
Pipelines.
OMB Control No.: 1902–0243.
Type of Request: Three-year extension
of the FERC–551 information collection
requirements with no changes to the
reporting requirements.
Abstract: Interstate pipelines are
required to post on their Web sites the
volumes of no-notice service flows 1 at
each receipt and delivery point before
11:30 a.m. central clock time three days
after the day of gas flow.
FERC implemented Order Nos. 720
and 720–A to comply with the Energy
Policy Act of 2005 (‘‘EPAct 2005’’) and
specifically Section 23 of EPAct 2005,
which amended the NGA to direct FERC
to ‘‘facilitate price transparency in
markets for the sale or transportation of
physical natural gas in interstate
commerce.’’ On October 24, 2011, the
United States Court of Appeals for the
Fifth Circuit issued a decision granting
the Texas Pipeline Association and the
Railroad Commission’s petition for
review and vacating FERC’s Order Nos.
720 and 720–A. In its order, the 5th
Circuit held that Order Nos. 720 and
720–A exceeded the scope of FERC’
authority under the Natural Gas Act of
1938 and FERC could not require
intrastate natural gas pipelines to post
the information. However, the court’s
decision did not disrupt the reporting
and posting obligations of interstate
natural gas pipelines.2
Type of Respondents: Interstate
Natural Gas Pipelines.
Estimate of Annual Burden: 3 The
Commission estimates the total Public
Reporting Burden for this information
collection as:
FERC–551: REPORTING OF FLOW VOLUME AND CAPACITY BY INTERSTATE NATURAL GAS PIPELINES
Number of annual
responses per
respondent (B)
Number of respondents (A)
mstockstill on DSK4VPTVN1PROD with NOTICES
101 ...........................................................................................
Total number
responses
(A)×(B)=(C)
366
Estimated burden
hours per
response (D)
4 0.5
36,966
Estimated total
annual burden
(C)×(D)
18,483
The total estimated annual cost
burden to respondents is $1,040,038
[18,483 hours * $56.27/hour 5 =
$1,040,038]
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
1 See 18 CFR 284.7(a)(4) (requiring pipelines to
provide no-notice service).
2 Order Granting Motion to Clarify Opinion,
Texas Pipelines Ass’n v. FERC, 661 F.3d 258 (Dec.
20. 2011).
3 Burden is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a Federal agency. For further
explanation of what is included in the information
collection burden, reference 5 Code of Federal
Regulations 1320.3.
4 In the prior notice regarding this collection,
FERC used 183 burden hours per response, and the
assumption of one response per year. In this notice
we show the burden to a more detailed level,
indicating that there is one response per day per
respondent. We use 366 days as this keeps the total
burden hour figure consistent with the prior notice.
5 This figure includes wages plus benefits and
comes from the Bureau of Labor Statistics
Management Analyst category (13–1111) (http://
bls.gov/oes/current/naics2_22.htm and http://
www.bls.gov/news.release/ecec.nr0.htm).
VerDate Mar<15>2010
18:32 Sep 05, 2013
Jkt 229001
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
E:\FR\FM\06SEN1.SGM
06SEN1
Federal Register / Vol. 78, No. 173 / Friday, September 6, 2013 / Notices
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: August 29, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–21669 Filed 9–5–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
mstockstill on DSK4VPTVN1PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: RP13–1276–000.
Applicants: Texas Eastern
Transmission, LP.
Description: Statoil 8929736 9–1–
2013 Negotiated Rate to be effective 9/
1/2013.
Filed Date: 8/29/13.
Accession Number: 20130829–5047.
Comments Due: 5 p.m. ET 9/10/13.
Docket Numbers: RP13–1277–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: FPLE Forney Negotiated
Rate to be effective 9/1/2013.
Filed Date: 8/29/13.
Accession Number: 20130829–5061.
Comments Due: 5 p.m. ET 9/10/13.
Docket Numbers: RP13–1278–000.
Applicants: Southeast Supply Header,
LLC.
Description: Negotiated Rate Clean Up
Filing to be effective 9/30/2013.
Filed Date: 8/29/13.
Accession Number: 20130829–5063.
Comments Due: 5 p.m. ET 9/10/13.
Docket Numbers: RP13–1279–000.
Applicants: Gulfstream Natural Gas
System, L.L.C.
Description: August 29, 2013 Cleanup Filing to be effective 9/30/2013.
Filed Date: 8/29/13.
Accession Number: 20130829–5065.
Comments Due: 5 p.m. ET 9/10/13.
Docket Numbers: RP13–1280–000.
Applicants: Texas Eastern
Transmission, LP.
Description: 2013 Operational
Entitlements Filing.
Filed Date: 8/29/13.
Accession Number: 20130829–5074.
Comments Due: 5 p.m. ET 9/10/13.
Docket Numbers: RP13–1281–000.
VerDate Mar<15>2010
18:05 Sep 05, 2013
Jkt 229001
Applicants: Natural Gas Pipeline
Company of America.
Description: EDF Negotiated Rate FTS
to be effective 9/1/2013.
Filed Date: 8/29/13.
Accession Number: 20130829–5086.
Comments Due: 5 p.m. ET 9/10/13.
Docket Numbers: RP13–1282–000.
Applicants: Southeast Supply Header,
LLC.
Description: SESH Pass Through of
Negotiated Usage and Fuel Rates to be
effective 10/1/2013.
Filed Date: 8/29/13.
Accession Number: 20130829–5105.
Comments Due: 5 p.m. ET 9/10/13.
Docket Numbers: RP13–1283–000.
Applicants: Dominion Transmission,
Inc.
Description: DTI—Volume No. 2 Rate
Schedule Cancellations and Related
Changes to be effective 9/30/2013.
Filed Date: 8/29/13.
Accession Number: 20130829–5151.
Comments Due: 5 p.m. ET 9/10/13.
Docket Numbers: RP13–1284–000.
Applicants: Equitrans, L.P.
Description: 115SS and 60SS Variable
Storage Contract Demand Filing to be
effective 9/30/2013.
Filed Date: 8/30/13.
Accession Number: 20130830–5001.
Comments Due: 5 p.m. ET 9/11/13.
Docket Numbers: RP13–1285–000.
Applicants: Stingray Pipeline
Company, L.L.C.
Description: Stingray Pipeline
Company, L.L.C. submits Events
Surcharge tracker.
Filed Date: 8/29/13.
Accession Number: 20130829–5194.
Comments Due: 5 p.m. ET 9/10/13.
Docket Numbers: RP13–1286–000.
Applicants: Petrohawk Energy
Corporation, HK Energy Marketing, LLC.
Description: Joint Petition of
Petrohawk Energy Corporation and HK
Marketing, LLC for Temporary Waivers
of Capacity Release Regulations and
Policies, and Request for Shortened
Comment Period and Expedited
Treatment.
Filed Date: 8/29/13.
Accession Number: 20130829–5195.
Comments Due: 5 p.m. ET 9/6/13.
Docket Numbers: RP13–1287–000.
Applicants: Sea Robin Pipeline
Company, LLC.
Description: Hurricane Surcharge
Filing on 8–30–13 to be effective 10/1/
2013.
Filed Date: 8/30/13.
Accession Number: 20130830–5014.
Comments Due: 5 p.m. ET 9/11/13.
Docket Numbers: RP13–1288–000.
Applicants: Texas Gas Transmission,
LLC.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
54881
Description: Neg Rate Agmts related
to permanent and temporary capacity
releases to be effective 9/1/2013.
Filed Date: 8/30/13.
Accession Number: 20130830–5015.
Comments Due: 5 p.m. ET 9/11/13.
Docket Numbers: RP13–1289–000.
Applicants: Florida Gas Transmission
Company, LLC.
Description: Fuel Filing on 8–30–13 to
be effective 10/1/2013.
Filed Date: 8/30/13.
Accession Number: 20130830–5018.
Comments Due: 5 p.m. ET 9/11/13.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP08–257–000.
Applicants: Saltville Gas Storage
Company L.L.C.
Description: Petition to Amend
Stipulation and Agreement and Motion
for Shortened Answer Period and
Request for Expedited Action of
Saltville Gas Storage Company L.L.C.
Filed Date: 8/28/13.
Accession Number: 20130828–5195.
Comments Due: 5 p.m. ET 9/4/13.
Docket Numbers: RP13–545–001.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
Description: EP2DART Conversion to
be effective 10/1/2013.
Filed Date: 8/29/13.
Accession Number: 20130829–5118.
Comments Due: 5 p.m. ET 9/10/13.
Docket Numbers: RP13–556–004.
Applicants: Gulf Shore Energy
Partners, LP.
Description: Gulf Shore Energy
Partners, LP GAS TARIFF ORIGINAL
VOLUME NO. 1—Compliance to be
effective 8/28/2013.
Filed Date: 8/29/13.
Accession Number: 20130829–5062.
Comments Due: 5 p.m. ET 9/10/13.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
E:\FR\FM\06SEN1.SGM
06SEN1
File Type | application/pdf |
File Modified | 2013-09-06 |
File Created | 2013-09-06 |