1135ss11

1135ss11.docx

NSPS for Magnetic Tape Coating Facilities (40 CFR part 60, subpart SSS) (Renewal)

OMB: 2060-0171

Document [docx]
Download: docx | pdf

SUPPORTING STATEMENT

ENVIRONMENTAL PROTECTION AGENCY

NSPS for Magnetic Tape Coating Facilities (40 CFR Part 60, Subpart SSS) (Renewal)


1. Identification of the Information Collection


1(a) Title of the Information Collection


NSPS for Magnetic Tape Coating Facilities (40 CFR Part 60, Subpart SSS) (Renewal), EPA ICR Number 1135.11, OMB Control Number 2060-0171


1(b) Short Characterization/Abstract


The New Source Performance Standards (NSPS) for Magnetic Tape Coating Facilities were: proposed on January 22, 1986; promulgated on October 3, 1988; and last amended on February 12, 1999. These regulations apply to each coating operation and to each piece of coating mix preparation equipment for which construction, modification, or reconstruction began after January 22, 1986. This information is being collected to assure compliance with 40 CFR part 60, subpart SSS.


In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NSPS.


Any owner/operator subject to the provisions of this part shall maintain a file of these measurements, and retain the file for at least two years following the date of such measurements, the event that there is no such delegated authority, the reports are sent directly to the U. S. Environmental Protection Agency (EPA) regional office.


Over the next three years, an average of 6 respondents per year will be subject to these standards, and no additional respondents per year will become subject to the standards. However, we assume that two coating lines per year will be constructed at existing sources over the next three years.


The Office of Management and Budget (OMB) approved the currently active ICR without any “Terms of Clearance.”


The “Affected Public” are owners and operators of magnetic tape coating facilities. The burden to the “Affected Public” may be found below in Table 1: Annual Respondent Burden and Cost – NSPS for Magnetic Tape Coating Facilities (40 CFR Part 60, Subpart SSS) (Renewal). The “burden” to the Federal Government is attributed entirely to work performed by either Federal employees or government contractors and may be found below in Table 2: Average Annual EPA Burden and Cost – NSPS for Magnetic Tape Coating Facilities (40 CFR Part 60, Subpart SSS) (Renewal).


2. Need for and Use of the Collection


2(a) Need/Authority for the Collection


The EPA is charged under Section 111 of the Clean Air Act (CAA), as amended, to establish standards of performance for new stationary sources that reflect:


. . . application of the best technological system of continuous emissions reduction which (taking into consideration the cost of achieving such emissions reduction, or any non-air quality health and environmental impact and energy requirements) the Administrator determines has been adequately demonstrated. Section 111(a)(l).


The Agency refers to this charge as selecting the best demonstrated technology (BDT). Section 111 also requires that the Administrator review and, if appropriate, revise such standards every four years. In addition, section 114(a) states that the Administrator may require any owner/operator subject to any requirement of this Act to:


(A) Establish and maintain such records; (B) make such reports; (C) install, use, and maintain such monitoring equipment, and use such audit procedures, or methods; (D) sample such emissions (in accordance with such procedures or methods, at such locations, at such intervals, during such periods, and in such manner as the Administrator shall prescribe); (E) keep records on control equipment parameters, production variables or other indirect data when direct monitoring of emissions is impractical; (F) submit compliance certifications in accordance with Section 114(a)(3); and (G) provide such other information as the Administrator may reasonably require.


In the Administrator's judgment, volatile organic compound (VOC) emissions from magnetic tape coating operations either cause or contribute to air pollution that may reasonably be anticipated to endanger public health and/or welfare. Therefore, the NSPS were promulgated for this source category at 40 CFR part 60, subpart SSS.


2(b) Practical Utility/Users of the Data


The recordkeeping and reporting requirements in the standard ensure compliance with the applicable regulations which were promulgated in accordance with the Clean Air Act. The collected information is also used for targeting inspections and as evidence in legal proceedings.


Performance tests are required in order to determine an affected facility’s initial capability to comply with the emission standard. Continuous emission monitors are used to ensure compliance with the standard at all times. During the performance test a record of the operating parameters under which compliance was achieved may be recorded and used to determine compliance in place of a continuous emission monitor.


The notifications required in the standard are used to inform the Agency or delegated authority when a source becomes subject to the requirements of the regulations. The reviewing authority may then inspect the source to check if the pollution control devices are properly installed and operated, leaks are being detected and repaired, and the standard is being met. The performance test may also be observed.


The required semiannual reports are used to determine periods of excess emissions, identify problems at the facility, verify operation/maintenance procedures and for compliance determinations.


3. Non-duplication, Consultations, and Other Collection Criteria


The requested recordkeeping and reporting are required under 40 CFR part 60, subpart SSS.


3(a) Non-duplication


If the subject standards have not been delegated, the information is sent directly to the appropriate EPA regional office. Otherwise, the information is sent directly to the delegated state or local agency. If a state or local agency has adopted its own similar standards to implement the Federal standards, a copy of the report submitted to the state or local agency can be sent to the Administrator in lieu of the report required by the Federal standards. Therefore, duplication does not exist.


3(b) Public Notice Required Prior to ICR Submission to OMB


An announcement of a public comment period for the renewal of this ICR was published in the Federal Register (78 FR 33409) on June 4, 2013. No comments were received on the burden published in the Federal Register.


3(c) Consultations


The Agency’s industry experts have been consulted, and the Agency’s internal data sources and projections of industry growth over the next three years have been considered. The primary source of information as reported by industry, in compliance with the recordkeeping and reporting provisions in the standard, is the Online Tracking Information System (OTIS) which is operated and maintained by EPA's Office of Compliance. OTIS is EPA’s database for the collection, maintenance, and retrieval of all compliance data. The growth rate for the industry is based on our consultations with the Agency’s internal industry experts.

Industry trade associations and other interested parties were provided an opportunity to comment on the burden associated with the standards as they were being developed and the standards have been reviewed previously to determine the minimum information needed for compliance purposes. In developing this ICR, we contacted: 1) the National Electrical Manufacturers Association (NEMA), at 703-841-3245; and 2) the Imation Corporation, online at: http://www.imation.com/en-US/Contact-Imation/.


It is our policy to respond after a thorough review of comments received since the last ICR renewal as well as those submitted in response to the first Federal Register notice. In this case, no comments were received.


3(d) Effects of Less Frequent Collection


Less frequent information collection would decrease the margin of assurance that facilities are continuing to meet the standards. Requirements for information gathering and recordkeeping are useful techniques to ensure that good operation and maintenance practices are applied and emission limitations are met. If the information required by these standards was collected less frequently, the proper operation and maintenance of control equipment and the possibility of detecting violations would be less likely.


3(e) General Guidelines


These reporting or recordkeeping requirements do not violate any of the regulations promulgated by OMB under 5 CFR part 1320, section 1320.5.


3(f) Confidentiality


Any information submitted to the Agency for which a claim of confidentiality is made will be safeguarded according to the Agency policies set forth in Title 40, chapter 1, part 2, subpart B - Confidentiality of Business Information (CBI) (see 40 CFR 2; 41 FR 36902, September 1, 1976; amended by 43 FR 40000, September 8, 1978; 43 FR 42251, September 20, 1978; 44 FR 17674, March 23, 1979).


3(g) Sensitive Questions


The reporting or recordkeeping requirements in the standards do not include sensitive questions.


4. The Respondents and the Information Requested


4(a) Respondents/SIC Codes


The respondents to the recordkeeping and reporting requirements are magnetic tape manufacturers. The United States Standard Industrial Classification (SIC) code for the respondents affected by the standards is SIC 3695 which corresponds to the North American Industry Classification System (NAICS) 334613 for magnetic and optical recording media manufacturing.


4(b) Information Requested


(i) Data Items


In this ICR, all the data that is recorded or reported is required by the NSPS for Magnetic Tape Coating Facilities (40 CFR Part 60, Subpart SSS).


A source must make the following reports:



Notifications/Reports


Construction/reconstruction


60.7(a)(1)


Actual startup


60.7(a)(3)


Initial performance test results


60.8(a)


Initial performance test


60.8(d)


Demonstration of continuous monitoring system


60.7(a)(5)


Physical or operational change


60.7(a)(4)


A source must keep the following records:



Recordkeeping


Startups, shutdowns, malfunctions, periods where the continuous monitoring system is inoperative


60.7(b)


Records are required to be retained for two years. Records must be kept onsite.


60.717


Electronic Reporting


Some of the respondents are using monitoring equipment that automatically records parameter data. Although personnel at the affected facility must still evaluate the data, internal automation has significantly reduced the burden associated with monitoring and recordkeeping at a plant site.


Also, regulatory agencies in cooperation with the respondents continue to create reporting systems to transmit data electronically. However, electronic reporting systems are still not widely used. At this time, it is estimated that approximately 10 percent of the respondents use electronic reporting.


(ii) Respondent Activities



Respondent Activities


Read instructions.


Install, calibrate, maintain, and operate CMS for opacity, or for pressure drop and liquid supply pressure for control device.


Perform initial performance test, Reference Method 24 test, and repeat performance tests if necessary.


Write the notifications and reports listed above.


Enter information required to be recorded above.


Submit the required reports developing, acquiring, installing, and utilizing technology and systems for the purpose of collecting, validating, and verifying information.


Develop, acquire, install, and utilize technology and systems for the purpose of processing and maintaining information.


Develop, acquire, install, and utilize technology and systems for the purpose of disclosing and providing information.


Train personnel to be able to respond to a collection of information.


Transmit, or otherwise disclose the information.


Currently sources are using monitoring and reporting equipment that provide parameter data in an automated way (e.g., continuous parameter monitoring system). Although personnel at the source still need to evaluate the data, this type of monitoring equipment has significantly reduced the burden associated with monitoring and recordkeeping.


5. The Information Collected: Agency Activities, Collection Methodology, and Information Management


5(a) Agency Activities


EPA conducts the following activities in connection with the acquisition, analysis, storage, and distribution of the required information.



Agency Activities


Review notifications and reports, including performance test reports, and excess emissions reports, required to be submitted by industry.


Audit facility records.


Input, analyze, and maintain data in the Online Tracking Information System (OTIS).


5(b) Collection Methodology and Management


Following notification of startup, the reviewing authority could inspect the source to determine whether the pollution control devices are properly installed and operated. Performance test reports are used by the Agency to discern a source’s initial capability to comply with the emission standard, and note the operating conditions under which compliance was achieved. Data and records maintained by the respondents are tabulated and published for use in compliance and enforcement programs. The semiannual reports are used for problem identification, as a check on source operation and maintenance, and for compliance determinations.


Information contained in the reports is entered into OTIS which is operated and maintained by EPA's Office of Compliance. OTIS is EPA’s database for the collection, maintenance, and retrieval of compliance data for approximately 125,000 industrial and government-owned facilities. EPA uses the OTIS for tracking air pollution compliance and enforcement by local and state regulatory agencies, EPA regional offices and EPA headquarters. EPA and its delegated Authorities can edit, store, retrieve and analyze the data.


The records required by this regulation must be retained by the owner/operator for two years.


5(c) Small Entity Flexibility


There are no small entities (i.e. small businesses) affected by this regulation, and no small businesses are expected to become subject to the regulation in the next three years.


In addition, the impact on small entities was taken into consideration during the development of the regulation. Any new coating operation that utilizes less than 38 m3 of solvent or any modified or reconstructed coating operation that utilizes less than 370 m3 of solvent for the manufacture of magnetic tape per calendar year is subject only to the monitoring and reporting requirements of 60.714(a), 60.717(b), and 60.717(c).


5(d) Collection Schedule


The specific frequency for each information collection activity within this request is shown below in Table 1: Annual Respondent Burden and Cost – NSPS for Magnetic Tape Coating Facilities (40 CFR Part 60, Subpart SSS) (Renewal).


6. Estimating the Burden and Cost of the Collection


Table 1 documents the computation of individual burdens for the recordkeeping and reporting requirements applicable to the industry for the subpart included in this ICR. The individual burdens are expressed under standardized headings believed to be consistent with the concept of burden under the Paperwork Reduction Act. Wherever appropriate, specific tasks and major assumptions have been identified. Responses to this information collection are mandatory.


The Agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB Control Number.


6(a) Estimating Respondent Burden


The average annual burden to industry over the next three years from these record-keeping and reporting requirements is estimated to be 2,017 hours (Total Labor Hours from Table 1 below). These hours are based on Agency studies and background documents from the development of the regulation, Agency knowledge and experience with the NSPS program, the previously approved ICR, and any comments received.


6(b) Estimating Respondent Costs


(i) Estimating Labor Costs

This ICR uses the following labor rates:


Managerial $122.49 ($58.33+ 110%)

Technical $101.28 ($48.23 + 110%)

Clerical $50.80 ($24.19 + 110%)


These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2012, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.


(ii) Estimating Capital/Startup and Operation and Maintenance Costs


The type of industry costs associated with the information collection activities in the subject standard are both labor costs which are addressed elsewhere in this ICR and the costs associated with continuous monitoring. The capital/startup costs are one-time costs when a facility becomes subject to the regulation. The annual operation and maintenance costs are the ongoing costs to maintain the monitor(s) and other costs such as photocopying and postage.


(iii) Capital/Startup vs. Operation and Maintenance (O&M) Costs



Capital/Startup vs. Operation and Maintenance (O&M) Costs


(A)

Continuous Monitoring Device


(B)

Capital/Startup Cost for One Respondent


(C)

Number of New Respondents1


(D)

Total Capital/Startup Cost, (B X C)


(E)

Annual O&M Costs for One Respondent


(F)

Number of Respondents with O&M


(G)

Total O&M,

(E X F)


CEM 2


$29,000


1


$29,000


$1,200


4


$4,800


Thermocouple


$2,300


2


$4,600


$8,000


6


$48,000


Total






$33,600






$52,800

1 We assume there are 6 existing sources, and that two of the existing sources will construct a new coating line per year.

2 We assume that 60 percent of sources will install CEM.


The total capital/startup costs for this ICR are $33,600. This is the total of column D in the above table.


The total operation and maintenance (O&M) costs for this ICR are $52,800. This is the total of column G.


The average annual cost for capital/startup and operation and maintenance costs to industry over the next three years of the ICR is estimated to be $86,400. These are the costs of recordkeeping.


6(c) Estimating Agency Burden and Cost


The only costs to the Agency are those costs associated with analysis of the reported information. EPA's overall compliance and enforcement program includes activities such as the examination of records maintained by the respondents, periodic inspection of sources of emissions, and the publication and distribution of collected information.


The average annual Agency cost during the three years of the ICR is estimated to be $6,336.


This cost is based on the average hourly labor rate as follows:


Managerial $62.27 (GS-13, Step 5, $38.92 + 60%)

Technical $46.21 (GS-12, Step 1, $28.88 + 60%)

Clerical $25.01 (GS-6, Step 3, $15.63 + 60%)


These rates are from the Office of Personnel Management (OPM), 2012 General Schedule, which excludes locality, rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees. Details upon which this estimate is based appear below in Table 2: Average Annual EPA Burden and Cost – NSPS for Magnetic Tape Coating Facilities (40 CFR Part 60, Subpart SSS) (Renewal).


6(d) Estimating the Respondent Universe and Total Burden and Costs


Based on our research for this ICR, on average over the next three years, approximately 6 existing respondents will be subject to the standards. It is estimated that no additional respondents per year will become subject. However, we assume that two existing respondents will each construct a new coating line each year; however, the overall average number of respondents, as shown in the table below, is 6 per year.


The number of respondents is calculated using the following table that addresses the three years covered by this ICR.



Number of Respondents



Year


(A)

Number of New Respondents 1


(B)

Number of Existing Respondents


(C)

Number of Existing Respondents that keep records but do not submit reports


(D)

Number of Existing Respondents That Are Also New Respondents


(E)

Number of Respondents

(E=A+B+C-D)


1


2


6


0


2


6


2


2


6


0


2


6


3


2


6


0


2


6


Average


2


6


0


2


6

1 New respondent include sources with constructed, reconstructed and modified affected facilities.


Column D is subtracted to avoid double-counting respondents. As shown above, the average Number of Respondents over the three-year period of this ICR is 6.


The total number of annual responses per year is calculated using the following table:



Total Annual Responses


(A)


Information Collection Activity


(B)


Number of Respondents


(C)


Number of Responses


(D)

Number of Existing Respondents That Keep Records But Do Not Submit Reports


(E)

Total Annual Responses

E=(BxC)+D

Notification of construction/ reconstruction

1

1

0

1

Notification of physical /operational change

2

1

0

2

Notification of actual startup

2

1

0

2

Notification of initial performance test

2

1

0

2

Notification of CMS

2

1

0

2

Quarterly report of excess emission

1.2

4

0

4.8

Semiannual report of no excess emission

4.8

2

0

9.6




Total

23.4


The number of Total Annual Responses is 23 (rounded).


The total annual labor costs are $197,327. Details regarding these estimates may be found below in Table 1: Annual Respondent Burden and Cost – NSPS for Magnetic Tape Coating Facilities (40 CFR Part 60, Subpart SSS) (Renewal).


6(e) Bottom Line Burden Hours and Cost Tables


The detailed bottom line burden hours and cost calculations for the respondents and the Agency are shown in Tables 1 and 2, respectively, and summarized below.


(i) Respondent Tally


The total annual labor hours are 2,017 hours at a cost of $197,327. Details regarding these estimates may be found below in Table 1: Annual Respondent Burden and Cost – NSPS for Magnetic Tape Coating Facilities (40 CFR Part 60, Subpart SSS) (Renewal).


Furthermore, the annual public reporting and recordkeeping burden for this collection of information is estimated to average 88 hours per response.


The total annual capital/startup and O&M costs to the regulated entity are $86,400. The cost calculations are detailed in Section 6(b)(iii), Capital/Startup vs. Operation and Maintenance (O&M) Costs.


(ii) The Agency Tally


The average annual Agency burden and cost over next three years is estimated to be 141 labor hours at a cost of $6,336. See below Table 2: Average Annual EPA Burden and Cost – NSPS for Magnetic Tape Coating Facilities (40 CFR Part 60, Subpart SSS) (Renewal).


6(f) Reasons for Change in Burden


There is no change in labor hours in this ICR compared to the previous ICR. This is due to two considerations: 1) the regulations have not changed over the past three years and are not anticipated to change over the next three years; and 2) the growth rate for the industry is either very low, or negative or non-existent, so there is no significant change in the overall burden. However, there is an adjustment increase in both the respondent and Agency burden costs due to an increase in labor rates.


6(g) Burden Statement


The annual public reporting and recordkeeping burden for this collection of information is estimated to average 88 hours per response. Burden means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements; train personnel to be able to respond to a collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information.


An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a valid OMB Control Number. The OMB Control Numbers for EPA regulations are listed at 40 CFR part 9 and 48 CFR chapter 15.


To comment on the Agency's need for this information, the accuracy of the provided burden estimates, and any suggested methods for minimizing respondent burden, including the use of automated collection techniques, EPA has established a public docket for this ICR under Docket ID Number EPA-HQ-OECA-2013-0318. An electronic version of the public docket is available at http://www.regulations.gov/, which may be used to obtain a copy of the draft collection of information, submit or view public comments, access the index listing of the contents of the docket, and to access those documents in the public docket that are available electronically. When in the system, select “search,” then key in the docket ID number identified in this document. The documents are also available for public viewing at the Enforcement and Compliance Docket and Information Center in the EPA Docket Center (EPA/DC), WJC West, Room 3334, 1301 Constitution Ave., NW, Washington, DC. The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Reading Room is (202) 566-1744, and the telephone number for the docket center is (202) 566-1752. Also, you can send comments to the Office of Information and Regulatory Affairs, Office of Management and Budget, 725 17th Street, NW, Washington, DC 20503, Attention: Desk Officer for EPA. Please include the EPA Docket ID Number EPA-HQ-OECA-2013-0318 and OMB Control Number 2060-0171 in any correspondence.


Part B of the Supporting Statement


This part is not applicable because no statistical methods were used in collecting this information.

Table 1: Annual Respondent Burden and Cost – NSPS for Magnetic Tape Coating Facilities (40 CFR Part 60, Subpart SSS)

(Renewal)


Burden Items

(A)
Person

hours per occurrence




(B)
Number of occurrences per respondent per year



(C)
Person hours per respondent per year
(C=A x B)



(D)
Number of Respondents per year
b





(E)
Technical person

hours
per

year
(E=C x D)


(F)
Management person hours
per
year

(Ex0.05)


(G)
Clerical person

hours

per
year
(E x 0.1)


(H) Total Labor Costs per Year a





1. Applications

N/A








2. Surveys and Studies

N/A








3. Reporting Requirements









A. Read Instructions

0.87

1

0.87

2

1.74

0.09

0.17

$195.63

B. Required Activities









New Sources









Initial performance test c

243.48

1

243.48

2

486.96

24.35

48.70

$54,775.05

Repeat of performance test

243.48

0.2

48.70

2

97.39

4.87

9.74

$10,955.01

Method 24 Testing

78.26

12

939.13

0.1

93.91

4.70

9.39

$10,563.76

C. Create Information

See 3B








D. Gather Existing Information

See 3E








E. Write Report









New Sources









Notification of construction/reconstruction/modification d

1.74

1

1.74

1

1.74

0.09

0.17

$195.63

Notification of phys/operational change

6.96

1

6.96

2

13.91

0.70

1.39

$1,565.00

Notification of actual startup

1.74

1

1.74

2

3.48

0.17

0.35

$391.25

Notification of initial performance test

1.74

1

1.74

2

3.48

0.17

0.35

$391.25

Notification of CMS

1.74

1

1.74

2

3.48

0.17

0.35

$391.25

Report of performance test

See 3B








Excess Emission Report e

13.91

4

55.65

1.2

66.78

3.34

6.68

$7,512.01

Report of No Excess Emissions f

6.96

2

13.91

4.8

66.78

3.34

6.68

$7,512.01

Report when Exceed Size Cutoff

1.74

1

1.74

0

0

0

0

$0

Subtotal for Reporting Requirements





965.6

$94,447.85

4. Recordkeeping Requirements









A. Read Instructions

See 3A








B.  Plan Activities

See 4C








C. Implement Activities

See 3B








D.  Develop Record System

N/A








E.  Time to Enter Information









Records of startups, shutdowns, malfunctions, etc. g

1.30

50

65.22

6

391.30

19.57

39.13

$44,015.66

Records of control device operating parameters h

0.22

350

76.09

6

456.52

22.83

45.65

$51,351.61

Records of Projected/Actual Solvent Use i

6.96

2

13.91

1.2

16.70

0.83

1.67

$1,878.00

Records for Monthly Liquid Material Balance j

1.74

12

20.87

1.2

25.04

1.25

2.50

$2,817.00

Monthly Determination of Avg VOC Content k

1.74

12

20.87

1.2

25.04

1.25

2.50

$2,817.00

F.   Train Personnel

N/A








G.  Audits

N/A








Subtotal for Recordkeeping Requirements





1,051.8

$102,879.27

TOTAL LOBOR BURDEN AND COST (rounded)





2,017

$197,327


Assumptions:


a This ICR uses the following labor rates: $122.49 per hour for Executive, Administrative, and Managerial labor; $101.28 per hour for Technical labor, and $50.80 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2012, “Table 2. Civilian Workers, by Occupational and Industry group”. The rates are from column 1, “Total Compensation”. The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.

b We have assumed that the average number of respondents that will be subject to the rule will be 6 existing sources, and no additional sources will become subject to the standard. However, we assume that two coating lines per year will be constructed at existing sources over the three-year period of this ICR.

c We have assumed that it will take each respondent 243.48 hours to perform initial performance test.

d We have assumed that there will be one modification/reconstruction line over 5 years.

e We have assumed that 20 percent of sources will report excess emissions.

f We have assumed that 80 percent of sources will report no excess emissions.

g We have assumed that each respondent will take 1.3 hours 50 times per year to record SSM reports.

h We have assumed that each respondent will take 0.22 hours 350 time per year to record the control device operating parameters information.

i We have assumed that 20 percent of respondents will enter information on records of projected/actual solvent use two times per year.

j We have assumed that 20 percent of respondents will record liquid material balance 12 times per year.

k We have assumed that 20 percent of respondents will perform monthly VOC determination.
















Table 2: Average Annual EPA Burden and Cost – NSPS for Magnetic Tape Coating Facilities (40 CFR Part 60, Subpart SSS)

(Renewal)


Activity

(A)
EPA Hours per Occurrence

(B)
Number of Occurrences per Plant per Year

(C)
EPA Hours per Year
(C=A x B)


(D)
Plants per Year
b



(E) Technical Hours

per Year (E=C x D)

(F)
Management Hours per Year
(E x 0.05)

(G)
Clerical Hours per Year
(E x 0.1)

(H)

Total
Costs per Year
a


Initial Performance Tests c

 

 

 

 

 

 

 

 

New Plant

20.87

1

20.87

2

41.74

2.09

4.17

$2,163.11

Repeat Performance Test








 

New Plant

20.87

0.2

4.17

2

8.35

0.42

0.83

$432.62

Report Review








 

New Plant








 

Notification of construction

1.74

1

1.74

2

3.48

0.17

0.35

$180.26

Notification of actual startup

0.43

1

0.43

2

0.87

0.04

0.09

$45.06

Notification of initial test d

0.43

1.2

0.52

2

1.04

0.05

0.10

$54.08

Review test results e

6.96

1.2

8.35

2

16.70

0.83

1.67

$865.24

Excess emission report f

6.96

4

27.83

1.2

33.39

1.67

3.34

$1,730.49

Report of no excess emissions g

1.74

2

3.48

4.8

16.70

0.83

1.67

$865.24

TOTAL LABOR BURDEN AND COST (rounded)

 

 

 

 

141

$6,336


Assumptions:

a This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: $62.27 Managerial rate (GS-13, Step 5, $38.92 x 1.6), $46.21 Technical rate (GS-12, Step 1, $28.88 x 1.6), and $25.01 Clerical rate (GS-6, Step 3, $15.63 x 1.6). These rates are from the Office of Personnel Management (OPM) “2012 General Schedule”, which excludes locality rates of pay.

b We have assumed that the average number of respondents that will be subject to the rule will be 6 existing sources, and no additional sources will become subject to the standard. However, we assume that two coating lines per year will be constructed at existing sources over the three-year period of this ICR.

c We have assumed that it will take each respondent 20.87 hours to perform initial performance test.

d We have assumed that it will take each respondent 0.43 hours 1.2 time per year to perform initial test notification.

e We have assumed that it will take 6.96 hours 1.2 times per year to review test results.

f We have assumed that 20 percent of sources will report excess emissions.

g We have assumed that 80 percent of sources will report no excess emissions


File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document